| Project/Opp Number | Account | Account Number (Account) | Project Name | Contact | Priority | Source Campaign | Project Success | Currency Name (Currency) | Info from | Decision date | Sales area | Responsible | application technology | Back office | Presales | halfenspecified | Project hierarchy | Potential Customer | Country | Postcode | Town | Types of Project | Street | Project phase | Created On | Import Number | Date of Submission | BIM designed | International Project | HALFEN Specified | competitor | User Provided | System Calculated | Estimation (Base) | Currency |
| 403562-001 | | | ALBA COSTRUZIONI / REALIZZAZIONE NUOVA CABINA PRIMARIA ENEL / LOIRI "PORTO SAN PAOLO" / DETAN | | Default Value | | Running | euro | 21.12.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 07020 | Loiri Porto San Paolo | | PORTO SAN PAOLO | 30 - Tender & Submission Phase | 21.12.2021 16:22 | | | | No | No | | | | 32.000,00 € | euro |
| 403562 | | | ALBA COSTRUZIONI / REALIZZAZIONE NUOVA CABINA PRIMARIA ENEL / LOIRI "PORTO SAN PAOLO" | | Default Value | | Running | euro | 21.12.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | Loiri Porto San Paolo | | PORTO SAN PAOLO | 10 - Information Phase | 21.12.2021 16:22 | | | | No | No | | | | 32.000,00 € | euro |
| 403534-001 | | | HDB PIANI / PALAZZINA VA10 / MILANO / SMV | | Default Value | | Running | euro | 21.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20121 | Milano | Residential houses | Via Varese 10 | 40 - Realisation Phase | 21.12.2021 13:37 | | | | No | No | | | | | euro |
| 403534 | | | PALAZZINA VA10 / MILANO / SMV | | Default Value | | Running | euro | 21.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | Milano | Residential houses | Via Varese 10 | 40 - Realisation Phase | 21.12.2021 13:35 | | | | No | No | | | | | euro |
| 403453-001 | | | DETAN S / NUOVO PLESSO SCOLASTICO / VILLA SANTINA | | Default Value | | Running | euro | 20.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 33029 | Villa Santina | Educational facility | Via Renier | 30 - Tender & Submission Phase | 20.12.2021 12:17 | | | | No | No | | | | | euro |
| 403453 | | | NUOVO PLESSO SCOLASTICO / VILLA SANTINA | | Default Value | | Running | euro | 20.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 33029 | Villa Santina | Educational facility | Via Renier | 10 - Information Phase | 20.12.2021 12:12 | | | | No | No | | | | | euro |
| 403264-001 | | | GARA / ADEGUAMENTO SISMICO PER LEONARDO / BENEVENTO / DETAN | | Default Value | | Running | euro | 15.12.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 82100 | Benevento | | * | 30 - Tender & Submission Phase | 15.12.2021 09:35 | | | | No | No | | | | 36.000,00 € | euro |
| 403264 | | | GARA / ADEGUAMENTO SISMICO PER LEONARDO / BENEVENTO | | Default Value | | Running | euro | 15.12.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 82100 | Benevento | | * | 10 - Information Phase | 15.12.2021 09:35 | | | | No | No | | | | 36.000,00 € | euro |
| 403260-001 | | | DRUFA / PERCHEGGIO / LOCATE DISTRICT SPA / | | Default Value | | Running | euro | 15.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20085 | Locate di Triulzi | Infrastructural facility | Via Milano 5 | 40 - Realisation Phase | 15.12.2021 09:13 | | | | No | No | | | | | euro |
| 403260 | | | PERCHEGGIO / LOCATE DISTRICT SPA / | | Default Value | | Running | euro | 15.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20085 | Locate di Triulzi | Infrastructural facility | Via Milano 5 | 40 - Realisation Phase | 15.12.2021 09:11 | | | | No | No | | | | | euro |
| 402870-001 | | | HDB / 514 MIVAR / VIA VARESINA MILANO | | Default Value | | Running | euro | 07.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20156 | Milano | Office building | via Varesina 204 | 40 - Realisation Phase | 07.12.2021 17:25 | | | | No | No | | | | | euro |
| 402870 | | | 514 MIVAR / VIA VARESINA MILANO | | Default Value | | Running | euro | 07.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | Milano | Office building | via Varesina 204 | 40 - Realisation Phase | 07.12.2021 17:24 | | | | No | No | | | | | euro |
| 402787-001 | | | HDB / AZ.AGRICOLA / LA CASCINAZZA / BUCCINASCO | | Default Value | | Running | euro | 06.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Buccinasco | Residential houses | loc. Cascinazza | 40 - Realisation Phase | 06.12.2021 18:11 | | | | No | No | | | | | euro |
| 402787 | | | AZ.AGRICOLA / LA CASCINAZZA / BUCCINASCO | | Default Value | | Running | euro | 06.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | Buccinasco | | loc. Cascinazza | 40 - Realisation Phase | 06.12.2021 18:10 | | | | No | No | | | | | euro |
| 402691-001 | | | HIT / EDIFICIO ELISA / MONTAGNA IN VALTELLINA | | Default Value | | Running | euro | 03.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23020 | Montagna in Valtellina | | Via Caparoni | 30 - Tender & Submission Phase | 03.12.2021 10:41 | | | | No | No | | | | | euro |
| 402691 | | | EDIFICIO ELISA / MONTAGNA IN VALTELLINA | | Default Value | | Running | euro | 03.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23020 | Montagna in Valtellina | | Via Caparoni | 30 - Tender & Submission Phase | 03.12.2021 10:38 | | | | No | No | | | | | euro |
| 402639-001 | | | HDB / V10 / RESIDENZIALE VIA VARESE 10 MILANO / SMV | | Default Value | | Running | euro | 02.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20121 | Milano | | Via Varese 10 | 40 - Realisation Phase | 02.12.2021 12:52 | | | | No | No | | | | | euro |
| 402639 | | | V10 / RESIDENZIALE VIA VARESE 10 MILANO / SMV | | Default Value | | Running | euro | 02.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | Milano | | Via Varese 10 | 40 - Realisation Phase | 02.12.2021 12:51 | | | | No | No | | | | | euro |
| 402591 | | | DESPE / INTERVENTI DI COMPLETAMENTO DELLO S.A.U. DEL PROMONTORIODI SAN BENIGNO / GENOVA | | Default Value | | Running | euro | 01.12.2021 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | * | 10 - Information Phase | 01.12.2021 17:18 | | | | No | No | | | | | euro |
| 402582-001 | | | GARA / CONDOMINIO GUTLEBEN / LAIVES / HDB | | Default Value | | Running | euro | 01.12.2021 | | ITRE-TRENTINO ALTO ADIGE | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 39055 | Laives | | --- | 30 - Tender & Submission Phase | 01.12.2021 15:49 | | | | No | No | | | | | euro |
| 402582 | | | GARA / CONDOMINIO GUTLEBEN / LAIVES | | Default Value | | Running | euro | 01.12.2021 | | ITRE-TRENTINO ALTO ADIGE | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 39055 | Laives | | --- | 10 - Information Phase | 01.12.2021 15:48 | | | | No | No | | | | | euro |
| 402490-001 | | | Progetto esecutivo del Potenziamento in sede del sistema autostradale e tangenziale di Bologna “Passante di Bologna”/COPRIGIUNTI | | Default Value | | Running | euro | 30.11.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | Infrastructural facilities (Railway) | BOLOGNA | 30 - Tender & Submission Phase | 30.11.2021 14:55 | | | | No | No | | | | | euro |
| 402490 | | | Progetto esecutivo del Potenziamento in sede del sistema autostradale e tangenziale di Bologna “Passante di Bologna” | | Default Value | | Running | euro | 30.11.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Parent Project | Halfen System Account | Italy | 40100 | BOLOGNA | Infrastructural facilities (Railway) | BOLOGNA | 10 - Information Phase | 30.11.2021 14:54 | | | | No | No | | | | | euro |
| 402337-002 | | | SILICON CARDIBE / ST MICROELECTRONICS / DETAN | | Default Value | | Running | euro | 09.12.2021 | | ILOM-LOMBARDIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 95121 | Catania | | Strada Primosole | 30 - Tender & Submission Phase | 09.12.2021 10:56 | | | | No | No | | | | | euro |
| 402337-001 | | | HTA / SILICON CARDIBE / ST MICROELECTRONICS / | | Default Value | | Running | euro | 26.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 95121 | Catania | | Strada Primosole | 40 - Realisation Phase | 26.11.2021 16:00 | | | | No | No | | | | | euro |
| 402337 | | | SILICON CARDIBE / ST MICROELECTRONICS / | | Default Value | | Running | euro | 26.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 95121 | Catania | | Strada Primosole | 40 - Realisation Phase | 26.11.2021 15:57 | | | | No | No | | | | | euro |
| 402008-001 | | | TERREAL / RISTRUTTURAZIONE PER DEMOLIZIONE RICOSTRUZIONE / TREVISO / FK5 | | Default Value | | Running | euro | 23.11.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 31100 | TREVISO (TV) | | VIA CIRENAICA 1 | 10 - Information Phase | 23.11.2021 11:10 | | | | No | No | | | | | euro |
| 402008 | | | TERREAL / RISTRUTTURAZIONE PER DEMOLIZIONE RICOSTRUZIONE / TREVISO | | Default Value | | Running | euro | 23.11.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO (TV) | | VIA CIRENAICA 1 | 10 - Information Phase | 23.11.2021 11:07 | | | | No | No | | | | | euro |
| 402004-001 | | | TERREAL / COSTRUZIONE DI EDIFICIO RESIDENZIALE UNIFAMILIARE SU LOTTO 2 / CASSOLA (VI) / FK5 | | Default Value | | Running | euro | 23.11.2021 | | IVEN-VENETO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 36022 | Cassola | | VIA MARINI | 30 - Tender & Submission Phase | 23.11.2021 11:03 | | | | No | No | | | | | euro |
| 402004 | | | TERREAL / COSTRUZIONE DI EDIFICIO RESIDENZIALE UNIFAMILIARE SU LOTTO 2 / CASSOLA (VI) | | Default Value | | Running | euro | 23.11.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 36022 | Cassola | | VIA MARINI | 10 - Information Phase | 23.11.2021 11:03 | | | | No | No | | | | | euro |
| 401981-001 | | | HDB / SOCIOSANITARIA TOC / FONDAZIONE TOGETHER ONLUS / MILANO | | Default Value | | Running | euro | 23.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20158 | Milano | Medical facility | Via Livigno / l.le Jenner | 30 - Tender & Submission Phase | 23.11.2021 07:01 | | | | No | Yes | | | | | euro |
| 401981 | | | SOCIOSANITARIA TOC / FONDAZIONE TOGETHER ONLUS / MILANO | | Default Value | | Running | euro | 23.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | Milano | Medical facility | Via Livigno / l.le Jenner | 30 - Tender & Submission Phase | 23.11.2021 06:57 | | | | No | No | | | | | euro |
| 401976 | | | SKYDROP / MILANO / EDILTECNO RESTAURI | | Default Value | | Running | euro | 22.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20142 | Milano | Office building | Via-G.Palatucci-snc | 10 - Information Phase | 22.11.2021 14:56 | | | | No | No | | | | | euro |
| 401911 | | | Costr edificio ad uso abitaz 32 app e scuola materna 1 fase OOUU primaria | | Default Value | | Running | euro | 14.10.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | Residential houses | Via G. Valentini 63 | 10 - Information Phase | 19.11.2021 13:47 | 4809 | | | No | No | | | | | euro |
| 401910 | | | Costruz residenza sanitaria assistenziale 80 posti non autosufficienti | | Default Value | | Running | euro | 01.10.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58100 | GROSSETO | | Via Lago di Mezzano | 10 - Information Phase | 19.11.2021 13:47 | 4808 | | | No | No | | | | | euro |
| 401909 | | | Costruzione edificio per complessivi 12 alloggi e ludoteca | | Default Value | | Running | euro | 13.10.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Pietrasantina Lottizz Campaldo | 10 - Information Phase | 19.11.2021 13:47 | 4807 | | | No | No | | | | | euro |
| 401908 | | | Costruzione edificio multip ad uso abitazione 23 unita' abitative | | Default Value | | Running | euro | 10.09.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via F. Turati 27 | 10 - Information Phase | 19.11.2021 13:47 | 4806 | | | No | No | | | | | euro |
| 401907 | | | Lavori di costruzione di 24 alloggi | | Default Value | | Running | euro | 10.09.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via A. da Morrona | 10 - Information Phase | 19.11.2021 13:47 | 4805 | | | No | No | | | | | euro |
| 401906 | | | Costr struttura comunitaria a prevalente accoglienza abitative x over 65 | | Default Value | | Running | euro | 16.09.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55049 | VIAREGGIO | | Via Comparini | 10 - Information Phase | 19.11.2021 13:47 | 4804 | | | No | No | | | | | euro |
| 401905 | | | Costruzione e manut pluriennale nuova sede Comando Polizia Municipale | | Default Value | | Running | euro | 08.10.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52100 | AREZZO | | Via Filzi 27 | 10 - Information Phase | 19.11.2021 13:47 | 4803 | | | No | No | | | | | euro |
| 401904 | | | Costr edif x 21 all ERP servizi ed attrezzature alla persona (5� stralcio) | | Default Value | | Running | euro | 14.09.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Via Schiff snc Ex Pegna Benelli | 10 - Information Phase | 19.11.2021 13:47 | 4802 | | | No | No | | | | | euro |
| 401903 | | | Costruzione 2 edifici commerciali 1� lotto urbanizz e opere idrauliche | | Default Value | | Running | euro | 17.09.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50013 | CAMPI BISENZIO | Technical facilities | Via Palagetta | 10 - Information Phase | 19.11.2021 13:47 | 4801 | | | No | No | | | | | euro |
| 401764 | | | Lavori di recupero parco e Villa Eleonora per centro culturale ristorante | | Default Value | | Running | euro | 24.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | | Via A. Volta (Vico 2�) | 10 - Information Phase | 17.11.2021 09:36 | 4800 | | | No | No | | | | | euro |
| 401763 | | | Lavori di ristrutturazione centro sociale Giovanni Paolo II | | Default Value | | Running | euro | 10.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | | Loc Torangius | 10 - Information Phase | 17.11.2021 09:36 | 4799 | | | No | No | | | | | euro |
| 401762 | | | Lavori di ristrutturazione istituto scolastico Frassinetti | | Default Value | | Running | euro | 10.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | | Quartiere Sacro Cuore | 10 - Information Phase | 17.11.2021 09:36 | 4798 | | | No | No | | | | | euro |
| 401761 | | | Recupero e riqualificazione alloggi comunali Intervento Bottom Up | | Default Value | | Running | euro | 02.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Vie Verdi / Tiziano / Piave | 10 - Information Phase | 17.11.2021 09:36 | 4797 | | | No | No | | | | | euro |
| 401760 | | | Opere di edilizia residenz pubblica x realizz 44 alloggi ERP stralcio funz | | Default Value | | Running | euro | 08.10.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | Residential houses | Localita' Su Pinu | 10 - Information Phase | 17.11.2021 09:36 | 4796 | | | No | No | | | | | euro |
| 401759 | | | Ristrutturazione messa sicurezza razionalizz energetica palazzo comunale | | Default Value | | Running | euro | 10.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | | Via Dante 44 | 10 - Information Phase | 17.11.2021 09:36 | 4795 | | | No | No | | | | | euro |
| 401758 | | | Lavori di realizzazione tribuna coperta stadio comunale | | Default Value | | Running | euro | 30.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | POSADA | | Via Gramsci | 10 - Information Phase | 17.11.2021 09:36 | 4794 | | | No | No | | | | | euro |
| 401757 | | | Interventi di messa a norma sicurezza e completamento piscina comunale | | Default Value | | Running | euro | 16.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | IRGOLI | | Localita' Arjolas | 10 - Information Phase | 17.11.2021 09:36 | 4793 | | | No | No | | | | | euro |
| 401756 | | | Lavori di rifacimento della copertura e manutenzione I.P.S.A.R. | | Default Value | | Running | euro | 21.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Cedrino | 10 - Information Phase | 17.11.2021 09:36 | 4792 | | | No | No | | | | | euro |
| 401755 | | | Interv urgenti consolid strutturale ist Magistrale di Castelvi' (ala A B) | | Default Value | | Running | euro | 21.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Vie Manno / Berlinguer | 10 - Information Phase | 17.11.2021 09:36 | 4791 | | | No | No | | | | | euro |
| 401754 | | | Lavori di consolidamento strutturale istituto E. Fermi | | Default Value | | Running | euro | 21.09.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07014 | OZIERI | | Piazza Medaglie d'Oro | 10 - Information Phase | 17.11.2021 09:36 | 4790 | | | No | No | | | | | euro |
| 401497-001 | | | REPIN / COSTRUZIONE DI UN COMPLESSO SCOLASTICO SCUOLA INFANZIA E PRIMARIA CON PALESTRA / ITALA (ME) / GIUNTI | | Default Value | | Running | euro | 11.11.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 98025 | Itala | | LOC. CASALELLO - ACQUA PESATA | 30 - Tender & Submission Phase | 11.11.2021 16:29 | | | | No | No | | | | 18.000,00 € | euro |
| 401497 | | | REPIN / COSTRUZIONE DI UN COMPLESSO SCOLASTICO SCUOLA INFANZIA E PRIMARIA CON PALESTRA / ITALA (ME) | | Default Value | | Running | euro | 11.11.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 98025 | Itala | | LOC. CASALELLO - ACQUA PESATA | 10 - Information Phase | 11.11.2021 16:29 | | | | No | No | | | | 18.000,00 € | euro |
| 401281 | | | Costruzione villette e opere urbanizzazione a scomputo | | Default Value | | Running | euro | 14.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46100 | MANTOVA | Residential houses | Via A. Possevino | 10 - Information Phase | 09.11.2021 09:05 | 4789 | | | No | No | | | | | euro |
| 401280 | | | Ampliamento e ristrutturaz Centro Nazionale Adroterapia Oncologica CNAO | | Default Value | | Running | euro | 29.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | PAVIA | | Strada Campeggi 53 | 10 - Information Phase | 09.11.2021 09:05 | 4788 | | | No | No | | | | | euro |
| 401279 | | | Costruzione chiesa ortodossa | | Default Value | | Running | euro | 04.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27058 | VOGHERA | Technical facilities | Strada Oropa | 10 - Information Phase | 09.11.2021 09:05 | 4787 | | | No | No | | | | | euro |
| 401278 | | | Costruzione edificio 3 piani f.t. ad uso abitaz 7 unita' abitative e boxes | | Default Value | | Running | euro | 04.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27058 | VOGHERA | Residential houses | Via Sanzio | 10 - Information Phase | 09.11.2021 09:05 | 4786 | | | No | No | | | | | euro |
| 401277 | | | Costruzione villa bifamiliare | | Default Value | | Running | euro | 04.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27058 | VOGHERA | Residential houses | Via Baratta | 10 - Information Phase | 09.11.2021 09:05 | 4785 | | | No | No | | | | | euro |
| 401276 | | | Ampliamento stabilimento industriale produzione uffici 8500 mq | | Default Value | | Running | euro | 14.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27049 | BOSNASCO | Industry building | Via Cavallante 13 | 10 - Information Phase | 09.11.2021 09:04 | 4784 | | | No | No | | | | | euro |
| 401275 | | | Realizzazione nuova centrale accumulo trattamento rilancio | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26812 | BORGHETTO LODIGIANO | Technical facilities | Localita' Casoni | 10 - Information Phase | 09.11.2021 09:04 | 4783 | | | No | No | | | | | euro |
| 401274 | | | Costruzione supermercato | | Default Value | | Running | euro | 29.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Via Castelleone | 10 - Information Phase | 09.11.2021 09:04 | 4782 | | | No | No | | | | | euro |
| 401273 | | | Costruzione edificio ad uso abitaz e boxes 6 unita' abitative | | Default Value | | Running | euro | 29.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Residential houses | Via F. Genala 85 | 10 - Information Phase | 09.11.2021 09:04 | 4781 | | | No | No | | | | | euro |
| 401272 | | | Riqualificazione recupero e risanamento Velodromo Baffi | | Default Value | | Running | euro | 22.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | | Via IV Novembre 115 | 10 - Information Phase | 09.11.2021 09:04 | 4780 | | | No | No | | | | | euro |
| 401271 | | | Demoricostruzione edificio 4 piani f.t. 10 unita' abitative e boxes | | Default Value | | Running | euro | 12.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via degli Incisori 7 | 10 - Information Phase | 09.11.2021 09:04 | 4779 | | | No | No | | | | | euro |
| 401270 | | | Costruzione edificio multip ad uso abitaz e boxes 9 appartam e negozio | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Monte Ortigara 72 | 10 - Information Phase | 09.11.2021 09:04 | 4778 | | | No | No | | | | | euro |
| 401269 | | | Costruzione concessionaria autoveicoli | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Via Valcamonica 19 | 10 - Information Phase | 09.11.2021 09:04 | 4777 | | | No | No | | | | | euro |
| 401268 | | | Costruzione 3 ville unifamiliari | | Default Value | | Running | euro | 12.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25088 | TOSCOLANO MADERNO | Residential houses | Via Bezzuglio | 10 - Information Phase | 09.11.2021 09:04 | 4776 | | | No | No | | | | | euro |
| 401267 | | | Costruzione supermercato 1500mq ristorante 1700mq 2 piani interrati boxes | | Default Value | | Running | euro | 12.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25088 | TOSCOLANO MADERNO | Technical facilities | Via Religione 56 | 10 - Information Phase | 09.11.2021 09:04 | 4775 | | | No | No | | | | | euro |
| 401266 | | | Ristrutturazione e ampliamento Casa di Riposo | | Default Value | | Running | euro | 12.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25087 | SALO' | | Via Zane 10 | 10 - Information Phase | 09.11.2021 09:04 | 4774 | | | No | No | | | | | euro |
| 401265 | | | Costruzione ville residence 200 unita' abitative hotel e parco | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25087 | SALO' | Residential houses | Via Zette Ex Tavina | 10 - Information Phase | 09.11.2021 09:04 | 4773 | | | No | No | | | | | euro |
| 401264 | | | Costruzione edificio residenziale | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25080 | POLPENAZZE DEL GARDA | Residential houses | Via Vittorio Veneto | 10 - Information Phase | 09.11.2021 09:04 | 4772 | | | No | No | | | | | euro |
| 401263 | | | Costruzione nuovo palazzetto dello sport appalto integrato | | Default Value | | Running | euro | 01.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25035 | OSPITALETTO | | Via Leopardi | 10 - Information Phase | 09.11.2021 09:04 | 4771 | | | No | No | | | | | euro |
| 401262 | | | Ristrutturazione complesso di carattere commerciale | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | RONCADELLE | Technical facilities | Via Mandolossa 67 | 10 - Information Phase | 09.11.2021 09:04 | 4770 | | | No | No | | | | | euro |
| 401261 | | | Demoricostruzione edificio multip uso abitaz e boxes 30 appartam Classe A4 | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via G.B. Rota 19 | 10 - Information Phase | 09.11.2021 09:04 | 4769 | | | No | No | | | | | euro |
| 401260 | | | Costruzione 2 edifici 3 piani f.t. 24 appartamenti e boxes Classe A3 | | Default Value | | Running | euro | 13.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Papa Ratti 8 | 10 - Information Phase | 09.11.2021 09:04 | 4768 | | | No | No | | | | | euro |
| 401259 | | | Costruzione media struttura di vendita 1006 mq | | Default Value | | Running | euro | 13.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via Ghislandi 61 | 10 - Information Phase | 09.11.2021 09:04 | 4767 | | | No | No | | | | | euro |
| 401258 | | | Costruzione 2 edifici 25 appartam negozi e boxes Classe A riappalto lavori | | Default Value | | Running | euro | 13.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Ghislandi 10 | 10 - Information Phase | 09.11.2021 09:04 | 4766 | | | No | No | | | | | euro |
| 401257 | | | Costruzione edificio ad uso abitazione 10 unita' e boxes Classe A4 | | Default Value | | Running | euro | 13.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Ambrogio da Calepio 9 | 10 - Information Phase | 09.11.2021 09:04 | 4765 | | | No | No | | | | | euro |
| 401256 | | | Costruzione edificio ad uso abitazione boxes ed opere di urbanizzazionne | | Default Value | | Running | euro | 13.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Broseta 55 | 10 - Information Phase | 09.11.2021 09:04 | 4764 | | | No | No | | | | | euro |
| 401255 | | | Costruzione ville a schiera | | Default Value | | Running | euro | 13.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24060 | CHIUDUNO | Residential houses | Via Aldo Moro | 10 - Information Phase | 09.11.2021 09:04 | 4763 | | | No | No | | | | | euro |
| 401254 | | | Costruzione edificio ad uso abitazione e boxes 10 appartam Classe A | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24035 | CURNO | Residential houses | Vie Merena / Lombardia | 10 - Information Phase | 09.11.2021 09:04 | 4762 | | | No | No | | | | | euro |
| 401253 | | | Costruzione 4 edifici ad uso abitazione 100 unita' abitat Classe A4 | | Default Value | | Running | euro | 09.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO | Residential houses | Via Belfiore 73 | 10 - Information Phase | 09.11.2021 09:04 | 4761 | | | No | No | | | | | euro |
| 401252 | | | Rifunz immobile ex aula bunker x esigenze Motorizz Civile di Como e Lecco | | Default Value | | Running | euro | 12.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Via al Bassone | 10 - Information Phase | 09.11.2021 09:04 | 4760 | | | No | No | | | | | euro |
| 401251 | | | Ristrutturaz piano I e parte rialzato Padiglione Rossi dell'universita' | | Default Value | | Running | euro | 08.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | | Via O. Rossi | 10 - Information Phase | 09.11.2021 09:04 | 4759 | | | No | No | | | | | euro |
| 401250 | | | Costruzione supermercato Aldi 900 mq | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Viale Borri 46 | 10 - Information Phase | 09.11.2021 09:04 | 4758 | | | No | No | | | | | euro |
| 401249 | | | Costruzione 2 edifici commerciali 880+1800 mq Lotto 1 OOUU | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Technical facilities | Via Varese 38 | 10 - Information Phase | 09.11.2021 09:04 | 4757 | | | No | No | | | | | euro |
| 401248 | | | Collegamento ferroviario terminal 2 linea RFI Sempione | | Default Value | | Running | euro | 01.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21019 | SOMMA LOMBARDO | Technical facilities | Aeroporto MI Malpensa | 10 - Information Phase | 09.11.2021 09:04 | 4756 | | | No | No | | | | | euro |
| 401247 | | | Costruzione ville singole e a schiera 7 unita' abitative Classe A4 | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | Residential houses | Via Ranchet 26 | 10 - Information Phase | 09.11.2021 09:04 | 4755 | | | No | No | | | | | euro |
| 401246 | | | Costruzione edificio ad uso abitazione e boxes 10 unita' | | Default Value | | Running | euro | 14.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Baracca 22 | 10 - Information Phase | 09.11.2021 09:04 | 4754 | | | No | No | | | | | euro |
| 401245 | | | Costruzione edificio ad uso abitaz e boxes 8 unita' Classe A4 | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via F Gioia 30 | 10 - Information Phase | 09.11.2021 09:04 | 4753 | | | No | No | | | | | euro |
| 401244 | | | Costruzione edificio ad uso abitaz e boxes 6 unita' abitative Classe A4 | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via F. Gioia 2 | 10 - Information Phase | 09.11.2021 09:04 | 4752 | | | No | No | | | | | euro |
| 401243 | | | Ristrutturazione e ampliamento edificio commerciale | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20864 | AGRATE BRIANZA | Technical facilities | Via Marconi | 10 - Information Phase | 09.11.2021 09:04 | 4751 | | | No | No | | | | | euro |
| 401242 | | | Costruzione edificio 11 unita' abitative e boxes Classe A4 | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20841 | CARATE BRIANZA | Residential houses | Via Mascherpa 23 | 10 - Information Phase | 09.11.2021 09:04 | 4750 | | | No | No | | | | | euro |
| 401241 | | | Costruzione 3 palazzine residenziali 18 unita' abitative totali e boxes | | Default Value | | Running | euro | 04.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20841 | CARATE BRIANZA | Residential houses | Via A. Grandi 10 | 10 - Information Phase | 09.11.2021 09:04 | 4749 | | | No | No | | | | | euro |
| 401240 | | | Costruzione magazzino automatizzato e realativi spazi di gestione 12431 mq | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20832 | DESIO | Industry building | Via Filippo da Desio 60 | 10 - Information Phase | 09.11.2021 09:04 | 4748 | | | No | No | | | | | euro |
| 401239 | | | Ricostruzione con ampliamento edificio residenziale pubblico | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Via Macalle' 41 | 10 - Information Phase | 09.11.2021 09:04 | 4747 | | | No | No | | | | | euro |
| 401238 | | | Costruzione edificio ad uso abitaz e boxes 22 unita' abitative | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Via Cagnola 5 | 10 - Information Phase | 09.11.2021 09:04 | 4746 | | | No | No | | | | | euro |
| 401237 | | | Costruzione nuova biblioteca comunale partenariato pubblico privato PPP | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20811 | CESANO MADERNO | | Vie Solferino/Goito/San Martino | 10 - Information Phase | 09.11.2021 09:03 | 4745 | | | No | No | | | | | euro |
| 401236 | | | Costruzione edificio ad uso abitazione 14 appartamenti e boxes | | Default Value | | Running | euro | 07.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | MILANO | Residential houses | Via G.C. Abba 38 | 10 - Information Phase | 09.11.2021 09:03 | 4744 | | | No | No | | | | | euro |
| 401235 | | | Costruzione polo per le disabilita' di bambini e ragazzi 2470 mq | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | MILANO | | Viale Jenner 44 | 10 - Information Phase | 09.11.2021 09:03 | 4743 | | | No | No | | | | | euro |
| 401234 | | | Costruzione torre residenziale 150 appartamenti | | Default Value | | Running | euro | 07.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20157 | MILANO | Residential houses | Via G.B. Grassi 93 | 10 - Information Phase | 09.11.2021 09:03 | 4742 | | | No | No | | | | | euro |
| 401233 | | | Costruzione edificio e ristrutturazione capannone ad uso terziario | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | MILANO | Technical facilities | Via Varesina 204 | 10 - Information Phase | 09.11.2021 09:03 | 4741 | | | No | No | | | | | euro |
| 401232 | | | Demoricostruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 12.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20155 | MILANO | Residential houses | Via Govone 33 | 10 - Information Phase | 09.11.2021 09:03 | 4740 | | | No | No | | | | | euro |
| 401231 | | | Demoricostruzione edificio ad uso abitaz 7 appartamenti e boxes | | Default Value | | Running | euro | 01.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via Aleardo Aleardi 15 | 10 - Information Phase | 09.11.2021 09:03 | 4739 | | | No | No | | | | | euro |
| 401230 | | | Costruzione complesso direzionale Citywave 53500 mq primo lotto fondazioni | | Default Value | | Running | euro | 08.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20145 | MILANO | Technical facilities | Viali Duilio / Cassiodoro Citylife | 10 - Information Phase | 09.11.2021 09:03 | 4738 | | | No | No | | | | | euro |
| 401229 | | | Costruzione complesso Residence Bosconavigli 90 unita' abitat e parco | | Default Value | | Running | euro | 22.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | MILANO | Residential houses | Via San Cristoforo | 10 - Information Phase | 09.11.2021 09:03 | 4737 | | | No | No | | | | | euro |
| 401228 | | | Costruzione edificio ad uso abitazione 32 unita' abitative | | Default Value | | Running | euro | 01.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20143 | MILANO | Residential houses | Via Pestalozzi 21 | 10 - Information Phase | 09.11.2021 09:03 | 4736 | | | No | No | | | | | euro |
| 401227 | | | Costruzione edificio 5 piani f.t. 8 unita' abitative e boxes | | Default Value | | Running | euro | 06.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20142 | MILANO | Residential houses | Via Bordighiera 31 | 10 - Information Phase | 09.11.2021 09:03 | 4735 | | | No | No | | | | | euro |
| 401226 | | | Costruzione complesso multipiano per nuova sede aziendale SNAM 19000 mq | | Default Value | | Running | euro | 07.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20139 | MILANO | Technical facilities | Via Vezza d'Oglio 10 | 10 - Information Phase | 09.11.2021 09:03 | 4734 | | | No | No | | | | | euro |
| 401225 | | | Completamento complesso al rustico per residenza universitaria | | Default Value | | Running | euro | 07.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20139 | MILANO | Residential houses | Via Polesine 1 / Piazzale Ferrara | 10 - Information Phase | 09.11.2021 09:03 | 4733 | | | No | No | | | | | euro |
| 401223 | | | Ristrutturazione e adeguamento normativo residenza universitaria | | Default Value | | Running | euro | 01.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Residential houses | Via Santa Sofia 9 | 10 - Information Phase | 09.11.2021 09:03 | 4732 | | | No | No | | | | | euro |
| 401222 | | | Realizzazione centro natatorio coperto piscina Fatebenesorelle | | Default Value | | Running | euro | 11.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | | Via Fatebenesorelle | 10 - Information Phase | 09.11.2021 09:03 | 4731 | | | No | No | | | | | euro |
| 401221 | | | Realizzazione parcheggio a raso 800 posti auto | | Default Value | | Running | euro | 29.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20097 | SAN DONATO MILANESE | Technical facilities | Via Caduti di Nassirya | 10 - Information Phase | 09.11.2021 09:03 | 4730 | | | No | No | | | | | euro |
| 401220 | | | Completam 39 alloggi canone sociale e spazi x attivita' socio culturali | | Default Value | | Running | euro | 08.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20096 | PIOLTELLO | Residential houses | Vie Roma / La Malfa | 10 - Information Phase | 09.11.2021 09:03 | 4729 | | | No | No | | | | | euro |
| 401219 | | | Ristrutturazione edificio per supermercato | | Default Value | | Running | euro | 07.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20092 | CINISELLO BALSAMO | Technical facilities | Viale Fulvio Testi 140 | 10 - Information Phase | 09.11.2021 09:03 | 4728 | | | No | No | | | | | euro |
| 401218 | | | Costruzione supermercato U2 1500 mq negozio Tigota' 1000 mq e OOUU | | Default Value | | Running | euro | 24.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20029 | TURBIGO | Technical facilities | Vie Milano / D. Alighieri | 10 - Information Phase | 09.11.2021 09:03 | 4727 | | | No | No | | | | | euro |
| 401217 | | | Costruzione supermercato Eurospin Lotto 1 demolizioni | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20028 | SAN VITTORE OLONA | Technical facilities | Vie Sempione / Bellini | 10 - Information Phase | 09.11.2021 09:03 | 4726 | | | No | No | | | | | euro |
| 401216 | | | Costruzione supermercato | | Default Value | | Running | euro | 16.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20028 | SAN VITTORE OLONA | Technical facilities | S.S. del Sempione 9 | 10 - Information Phase | 09.11.2021 09:03 | 4725 | | | No | No | | | | | euro |
| 401215 | | | Costruzione 3 edifici ad uso abitaz e boxes 42 unita' Classe A4 | | Default Value | | Running | euro | 07.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20026 | NOVATE MILANESE | Residential houses | Vie Di Vittorio / Prampolini | 10 - Information Phase | 09.11.2021 09:03 | 4724 | | | No | No | | | | | euro |
| 401214 | | | Costruzione villa bifamiliare | | Default Value | | Running | euro | 04.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | MAGNAGO | Residential houses | Via Filzi | 10 - Information Phase | 09.11.2021 09:03 | 4723 | | | No | No | | | | | euro |
| 401213 | | | Costruzione nuovo stabilimento industriale produzione contenitori in vetro | | Default Value | | Running | euro | 14.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | BOFFALORA SOPRA TICINO | Industry building | S.P. n.225 Ex Saffa | 10 - Information Phase | 09.11.2021 09:03 | 4722 | | | No | No | | | | | euro |
| 401194-002 | | | HTA / DIREZIONALE SYMBIOSIS EDIFICIO F / SNAM SPA / MILANO | | Default Value | | Running | euro | 09.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20139 | Milano | Office building | Via Vezza d’Oglio | 30 - Tender & Submission Phase | 09.11.2021 07:08 | | | | No | No | | | | | euro |
| 401194-001 | | | MBT / DIREZIONALE SYMBIOSIS EDIFICIO F / SNAM SPA / MILANO | | Default Value | | Running | euro | 09.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20139 | Milano | Office building | Via Vezza d’Oglio | 30 - Tender & Submission Phase | 09.11.2021 07:08 | | | | No | No | | | | | euro |
| 401194 | | | DIREZIONALE SYMBIOSIS EDIFICIO F / SNAM SPA / MILANO | | Default Value | | Running | euro | 09.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20139 | Milano | Office building | Via Vezza d’Oglio | 30 - Tender & Submission Phase | 09.11.2021 07:05 | | | | No | No | | | | | euro |
| 400975-001 | | | HIT / BASSANA SRL / RICOSTRUZIONE / VIA LAMARMORA 5 LECCO | | Default Value | | Running | euro | 03.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23900 | LECCO (LC) | Residential houses | Via Lamarmora 5 | 40 - Realisation Phase | 03.11.2021 16:38 | | | | No | No | | | | | euro |
| 400975 | | | BASSANA SRL / RICOSTRUZIONE / VIA LAMARMORA 5 LECCO | | Default Value | | Running | euro | 03.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO (LC) | Residential houses | Via Lamarmora 5 | 40 - Realisation Phase | 03.11.2021 16:37 | | | | No | No | | | | | euro |
| 400901-001 | | | HIT / RANZETTA MARILENA / RESIDENZIALE / GRAVEDONA ED UNITI | | Default Value | | Running | euro | 02.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 22015 | GRAVEDONA ED UNITI | Residential houses | Via ai Ronchi snc | 40 - Realisation Phase | 02.11.2021 18:13 | | | | No | No | | | | | euro |
| 400901 | | | RANZETTA MARILENA / RESIDENZIALE / GRAVEDONA ED UNITI | | Default Value | | Running | euro | 02.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22015 | GRAVEDONA ED UNITI | Residential houses | Via ai Ronchi snc | 40 - Realisation Phase | 02.11.2021 18:11 | | | | No | No | | | | | euro |
| 400803-001 | | | HDB / RESIDENZIALE AT02a / DEA CAPITAL / 6 EDIFICI BASIGLIO | | Default Value | | Running | euro | 30.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20080 | Basiglio | Residential houses | Via Francesco Sforza | 30 - Tender & Submission Phase | 30.10.2021 15:54 | | | | No | No | | | | | euro |
| 400803 | | | RESIDENZIALE AT02a / DEA CAPITAL / 6 EDIFICI BASIGLIO | | Default Value | | Running | euro | 30.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20080 | Basiglio | Residential houses | Via Francesco Sforza | 30 - Tender & Submission Phase | 30.10.2021 15:50 | | | | No | No | | | | | euro |
| 400758-001 | | | HIT / POLO SPORTIVO / SAN GUGLIELMO / TORTONA | | Default Value | | Running | euro | 29.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 15057 | Tortona | Sports facility | Loc. San Guglielmo | 40 - Realisation Phase | 29.10.2021 06:29 | | | | No | No | | | | | euro |
| 400758 | | | POLO SPORTIVO / SAN GUGLIELMO / TORTONA | | Default Value | | Running | euro | 29.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 15057 | Tortona | Sports facility | Loc. San Guglielmo | 40 - Realisation Phase | 29.10.2021 06:26 | | | | No | No | | | | | euro |
| 400747-001 | | | HIT / CIVILE ABITAZIONE / VIA CARCANO VARESE | | Default Value | | Running | euro | 28.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21100 | Varese | Residential houses | Carcano | 30 - Tender & Submission Phase | 28.10.2021 15:50 | | | | No | No | | | | | euro |
| 400747 | | | CIVILE ABITAZIONE / VIA CARCANO VARESE | | Default Value | | Running | euro | 28.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | Varese | Residential houses | Carcano | 30 - Tender & Submission Phase | 28.10.2021 15:47 | | | | No | No | | | | | euro |
| 400667-001 | | | HDB / AREA AT9 / EDIFICI RESIDENZIALI / VIMODRONE | | Default Value | | Running | euro | 28.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Vimodrone | Residential houses | Via Rimembranze | 40 - Realisation Phase | 28.10.2021 06:53 | | | | No | Yes | | | | | euro |
| 400667 | | | AREA AT9 / EDIFICI RESIDENZIALI / VIMODRONE | | Default Value | | Running | euro | 28.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | Vimodrone | Residential houses | Via Rimembranze | 40 - Realisation Phase | 28.10.2021 06:51 | | | | No | No | | | | | euro |
| 400622-002 | | | GARA/ COSTRUZIONE DI DUE EDIFICI PLURIFAMILIARI RESIDENZIALI/COMMERCIALI A TRE PIANI FUORI TERRA / VOLPIANO | | Default Value | | Running | euro | 02.11.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 10088 | Volpiano | | * | 10 - Information Phase | 02.11.2021 16:31 | | | | No | No | | | | | euro |
| 400622-001 | | | CO.GE.FA / COSTRUZIONE DI DUE EDIFICI PLURIFAMILIARI RESIDENZIALI/COMMERCIALI A TRE PIANI FUORI TERRA / VOLPIANO / HIT | | Default Value | | Running | euro | 27.10.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10088 | Volpiano | | * | 10 - Information Phase | 27.10.2021 11:39 | | | | No | No | | | | | euro |
| 400622 | | | CO.GE.FA / COSTRUZIONE DI DUE EDIFICI PLURIFAMILIARI RESIDENZIALI/COMMERCIALI A TRE PIANI FUORI TERRA / VOLPIANO | | Default Value | | Running | euro | 27.10.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10088 | Volpiano | | * | 10 - Information Phase | 27.10.2021 11:39 | | | | No | No | | | | | euro |
| 400606 | | | Ristrutturazione restauro e ampliamento scuola materna Dante Alighieri | | Default Value | | Running | euro | 30.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO | | Via Claudia Augusta 38 | 10 - Information Phase | 27.10.2021 09:36 | 4721 | | | No | No | | | | | euro |
| 400605 | | | Ampliamento scuole elementari e costruzione asilo italiano | | Default Value | | Running | euro | 21.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39044 | EGNA | | Localita' Laghetti | 10 - Information Phase | 27.10.2021 09:36 | 4720 | | | No | No | | | | | euro |
| 400604 | | | Risanamento segheria per realizzazione sentiero latte e fieno | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39042 | BRESSANONE | | Localita' Monteponente | 10 - Information Phase | 27.10.2021 09:36 | 4719 | | | No | No | | | | | euro |
| 400603 | | | Costruzione circonvallazione stradale all'abitato | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39040 | VARNA | Technical facilities | S.S. n.12 | 10 - Information Phase | 27.10.2021 09:36 | 4718 | | | No | No | | | | | euro |
| 400602 | | | Adattamento ambulatorio oculistica e reparto palliativo | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39031 | BRUNICO | | Via Ospedale 11 | 10 - Information Phase | 27.10.2021 09:36 | 4717 | | | No | No | | | | | euro |
| 400601 | | | Completamento centro di mobilita' | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39031 | BRUNICO | Technical facilities | Piazzale Stazione | 10 - Information Phase | 27.10.2021 09:36 | 4716 | | | No | No | | | | | euro |
| 400600 | | | Costruzione campo da gioco a servizio della scuola elementare | | Default Value | | Running | euro | 28.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39031 | BRUNICO | | Localita' Riscone | 10 - Information Phase | 27.10.2021 09:36 | 4715 | | | No | No | | | | | euro |
| 400599 | | | Realizz circonvallazione stradale tra progressive Km 21,8 e 24,31 | | Default Value | | Running | euro | 09.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39030 | CHIENES | Technical facilities | S.S. N. 49 della Pusteria | 10 - Information Phase | 27.10.2021 09:36 | 4714 | | | No | No | | | | | euro |
| 400598 | | | Costruzione autorimessa Vigili del Fuoco | | Default Value | | Running | euro | 22.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39028 | SILANDRO | | Localita' Vezzano | 10 - Information Phase | 27.10.2021 09:36 | 4713 | | | No | No | | | | | euro |
| 400597 | | | Ristrutturazione e ampliamento Malga Brugger x ristorazione e caseificio | | Default Value | | Running | euro | 28.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39024 | MALLES VENOSTA | Technical facilities | Valle Zerzer Loc.Burgusio | 10 - Information Phase | 27.10.2021 09:36 | 4712 | | | No | No | | | | | euro |
| 400596 | | | Ampliamento scuola infanzia italiana e tedesca | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39022 | LAGUNDO | | Via Stenizer 4 | 10 - Information Phase | 27.10.2021 09:36 | 4711 | | | No | No | | | | | euro |
| 400595 | | | Costruzione Caserma Vigili del Fuoco | | Default Value | | Running | euro | 12.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39020 | PARCINES | | Localita' Rabla' | 10 - Information Phase | 27.10.2021 09:36 | 4710 | | | No | No | | | | | euro |
| 400594 | | | Costruzione 5 alloggi edilizia residenziale pubblica | | Default Value | | Running | euro | 09.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39020 | MARTELLO | Residential houses | Localita' Kirchacker | 10 - Information Phase | 27.10.2021 09:36 | 4709 | | | No | No | | | | | euro |
| 400593 | | | Ristrutturazione edificio a servizio della zona sportiva | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39018 | TERLANO | | Capoluogo | 10 - Information Phase | 27.10.2021 09:36 | 4708 | | | No | No | | | | | euro |
| 400592 | | | Ampliamento scuola materna | | Default Value | | Running | euro | 21.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39018 | TERLANO | | Via Chiesa 30 | 10 - Information Phase | 27.10.2021 09:36 | 4707 | | | No | No | | | | | euro |
| 400591 | | | Ristrutturazione edifici per 110 alloggi ERP localita' Sinigo | | Default Value | | Running | euro | 09.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39012 | MERANO | Residential houses | Via Damiano Chiesa 4 | 10 - Information Phase | 27.10.2021 09:36 | 4706 | | | No | No | | | | | euro |
| 400590 | | | Costruzione edificio a servizio del campo da calcio | | Default Value | | Running | euro | 21.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39010 | SAN MARTINO IN PASSIRIA | | Capoluogo | 10 - Information Phase | 27.10.2021 09:36 | 4705 | | | No | No | | | | | euro |
| 400589 | | | Ristrutturazione edificio per nuovi uffici comunali | | Default Value | | Running | euro | 05.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | Technical facilities | Via San Giovanni Bosco 10 | 10 - Information Phase | 27.10.2021 09:36 | 4704 | | | No | No | | | | | euro |
| 400588 | | | Redistribuzione parziale spazi interni Palazzo Economia Corpo D | | Default Value | | Running | euro | 28.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | | Via Inama 5 | 10 - Information Phase | 27.10.2021 09:36 | 4703 | | | No | No | | | | | euro |
| 400587 | | | Riorganizzazione UUOO ortopedia e chirurgia piano 3 corpo C1 | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38079 | TIONE DI TRENTO | | Via Ospedale 11 | 10 - Information Phase | 27.10.2021 09:36 | 4702 | | | No | No | | | | | euro |
| 400586 | | | Ampliamento ristrutturazione e adeguamento centro tennis | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38068 | ROVERETO | | Via Lungo Leno Destro | 10 - Information Phase | 27.10.2021 09:36 | 4701 | | | No | No | | | | | euro |
| 400585 | | | Opere x insediamento centro ricerca sport montagna e salute Modulo B.01 | | Default Value | | Running | euro | 28.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38068 | ROVERETO | Technical facilities | Piazza Manifattura 1 | 10 - Information Phase | 27.10.2021 09:36 | 4700 | | | No | No | | | | | euro |
| 400584 | | | Costruzione nuovo palasport | | Default Value | | Running | euro | 25.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38066 | RIVA DEL GARDA | | Localita' Baltera | 10 - Information Phase | 27.10.2021 09:36 | 4699 | | | No | No | | | | | euro |
| 400583 | | | Demoricostruzione edificio 5 unita' abitative e 6 posti auto | | Default Value | | Running | euro | 25.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38066 | RIVA DEL GARDA | Residential houses | Viale Rovereto | 10 - Information Phase | 27.10.2021 09:36 | 4698 | | | No | No | | | | | euro |
| 400582 | | | Costruzione 5 ville bifamiliari | | Default Value | | Running | euro | 23.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38066 | RIVA DEL GARDA | Residential houses | Via Gardesana 27 | 10 - Information Phase | 27.10.2021 09:36 | 4697 | | | No | No | | | | | euro |
| 400581 | | | Costruzione edificio ad uso abitaz e boxes 8 unita' abitative Classe A+ | | Default Value | | Running | euro | 17.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38066 | RIVA DEL GARDA | Residential houses | Via Mazzano 68 | 10 - Information Phase | 27.10.2021 09:36 | 4696 | | | No | No | | | | | euro |
| 400580 | | | Completamento centro polifunzionale protezione civile | | Default Value | | Running | euro | 22.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38050 | FIEROZZO | | Localita' Maso Ronca | 10 - Information Phase | 27.10.2021 09:36 | 4695 | | | No | No | | | | | euro |
| 400579 | | | Ampliamento magazzino Vigili del Fuoco | | Default Value | | Running | euro | 28.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38050 | NOVALEDO | | Via Valle 5 | 10 - Information Phase | 27.10.2021 09:36 | 4694 | | | No | No | | | | | euro |
| 400578 | | | Costruzione impianto depurazione | | Default Value | | Running | euro | 22.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38020 | RUMO | Technical facilities | Localita' Bodenes | 10 - Information Phase | 27.10.2021 09:36 | 4693 | | | No | No | | | | | euro |
| 400577 | | | Ristrutt e adeguam funzionale reparti degenza 1 e 2 piano | | Default Value | | Running | euro | 22.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38016 | MEZZOCORONA | | Via Baron Cristiani 38 | 10 - Information Phase | 27.10.2021 09:36 | 4692 | | | No | No | | | | | euro |
| 400576 | | | Costruzione fabbricato residenziale blocco B nuovo lotto | | Default Value | | Running | euro | 30.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38015 | LAVIS | Residential houses | Via Paganella | 10 - Information Phase | 27.10.2021 09:36 | 4691 | | | No | No | | | | | euro |
| 400475-001 | | | HBS / FONDAZIONE MAGLIO / RIGANTI SPA / SOLBIATE ARNO | | Default Value | | Running | euro | 26.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21048 | Solbiate Arno | | Via Vittorio Veneto 1 | 40 - Realisation Phase | 26.10.2021 08:19 | | | | No | No | | | | | euro |
| 400475 | | | FONDAZIONE MAGLIO / RIGANTI SPA / SOLBIATE ARNO | | Default Value | | Running | euro | 26.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21048 | Solbiate Arno | | Via Vittorio Veneto 1 | 40 - Realisation Phase | 26.10.2021 08:07 | | | | No | No | | | | | euro |
| 400371-001 | | | HIT / BURAGO SMART CITY - SKILL 3 / BURAGO MOLGORA | | Default Value | | Running | euro | 22.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20875 | Burago di Molgora | Residential houses | Via Madre Teresa di Calcutta | 30 - Tender & Submission Phase | 22.10.2021 14:22 | | | | No | No | | | | | euro |
| 400371 | | | BURAGO SMART CITY - SKILL 3 / BURAGO MOLGORA | | Default Value | | Running | euro | 22.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20875 | Burago di Molgora | Residential houses | Via Madre Teresa di Calcutta | 30 - Tender & Submission Phase | 22.10.2021 14:18 | | | | No | No | | | | | euro |
| 400300-001 | | | HIT / CIVILE ABITAZIONE / F.LLI CASTOLDI / MARIANO COMENSE | | Default Value | | Running | euro | 21.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 22066 | Mariano Comense | Residential houses | Via Cavour | 30 - Tender & Submission Phase | 21.10.2021 17:35 | | | | No | No | | | | | euro |
| 400300 | | | CIVILE ABITAZIONE / F.LLI CASTOLDI / MARIANO COMENSE | | Default Value | | Running | euro | 21.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22066 | Mariano Comense | | Via Cavour | 20 - Planning Phase | 21.10.2021 17:33 | | | | No | No | | | | | euro |
| 400296-001 | | | GARA / RICOSTRUZIONE E AMPLIAMENTO SEDE AZIENDALE / VARNA / HTA | | Default Value | | Running | euro | 21.10.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39040 | Varna | | * | 30 - Tender & Submission Phase | 21.10.2021 16:25 | | | | No | No | | | | 17.000,00 € | euro |
| 400296 | | | GARA / RICOSTRUZIONE E AMPLIAMENTO SEDE AZIENDALE / VARNA | | Default Value | | Running | euro | 21.10.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39040 | Varna | | * | 10 - Information Phase | 21.10.2021 16:25 | | | | No | No | | | | 17.000,00 € | euro |
| 400224 | | | RSA ISSIGLIO RIFUZUNALIZZAZIONE EDIFICIO ESISTENTE / TORINO | | Default Value | | Running | euro | 20.10.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 20.10.2021 17:25 | | | | No | No | | | | | euro |
| 399988-001 | | | COSTRUZIONE NUOVO ALBERGO "INTERCITY"- ROMA TIBURTINA HIT+HSD+HTA | | Default Value | | Running | euro | 15.10.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00162 | Roma | | Piazzale della Stazione Tiburtina | 30 - Tender & Submission Phase | 15.10.2021 11:20 | | | | No | No | | | | | euro |
| 399988 | | | COSTRUZIONE NUOVO ALBERGO "INTERCITY"- ROMA TIBURTINA | | Default Value | | Running | euro | 15.10.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00162 | Roma | | Piazzale della Stazione Tiburtina | 10 - Information Phase | 15.10.2021 11:12 | | | | No | No | | | | | euro |
| 399985-001 | | | Nuovo edificio in c.a. Z16M-ROMA /HDB | | Default Value | | Running | euro | 15.10.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00100 | ROMA | Residential houses | Tiburtina | 30 - Tender & Submission Phase | 15.10.2021 10:02 | | | | No | No | | | | | euro |
| 399985 | | | Nuovo edificio in c.a. Z16M-ROMA | | Default Value | | Running | euro | 15.10.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | Residential houses | Tiburtina | 10 - Information Phase | 15.10.2021 09:58 | | | | No | No | | | | | euro |
| 399731-001 | | | DISCARICA BELLOCAMPO / TELO BENTONITICO | | Default Value | | Running | euro | 12.10.2021 | | ISIC-SICILIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 90100 | PALERMO | | LOC. BELLOCAMPO | 10 - Information Phase | 12.10.2021 11:32 | | | | No | No | | | | | euro |
| 399731 | | | DISCARICA BELLOCAMPO | | Default Value | | Running | euro | 12.10.2021 | | ISIC-SICILIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 90100 | PALERMO | | LOC. BELLOCAMPO | 10 - Information Phase | 12.10.2021 11:30 | | | | No | No | | | | | euro |
| 399632-001 | | | WATERSTOP / MOSCONI / PROGETTO IN GARA IN VENETO / DA DEFINIRE | | Default Value | | Running | euro | 08.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 25048 | Edolo | | via marconi | 30 - Tender & Submission Phase | 08.10.2021 16:49 | | | | No | No | | | | | euro |
| 399632 | | | MOSCONI / PROGETTO IN GARA IN VENETO / DA DEFINIRE | | Default Value | | Running | euro | 08.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25048 | Edolo | | via marconi | 30 - Tender & Submission Phase | 08.10.2021 16:46 | | | | No | No | | | | | euro |
| 399631 | | | Costruzione 36 unita' abitative a schiera classe A+ | | Default Value | | Running | euro | 26.08.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58020 | SCARLINO | Residential houses | Lungomare Garibaldi Loc Puntone | 10 - Information Phase | 08.10.2021 16:01 | 4690 | | | No | No | | | | | euro |
| 399630 | | | Costruzione nuova sede produzione ricerca e sviluppo 5200 mq | | Default Value | | Running | euro | 24.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Technical facilities | Via Aurelia Loc. San Rossore | 10 - Information Phase | 08.10.2021 16:01 | 4689 | | | No | No | | | | | euro |
| 399629 | | | Costruzione nuovo liceo Montale | | Default Value | | Running | euro | 21.07.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56025 | PONTEDERA | | Via Salcioli Loc Villaggio Scolastico | 10 - Information Phase | 08.10.2021 16:00 | 4688 | | | No | No | | | | | euro |
| 399628 | | | Ampliamento edificio scolastico istituto professionale Marconi | | Default Value | | Running | euro | 23.07.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 53100 | SIENA | | Via Pisacane 5 | 10 - Information Phase | 08.10.2021 16:00 | 4687 | | | No | No | | | | | euro |
| 399627 | | | Adeg stadio Franchi e complesso sportivo Bertoni concessione lavori | | Default Value | | Running | euro | 18.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 53100 | SIENA | | Viale dei Mille / Via F. Coppi 11 | 10 - Information Phase | 08.10.2021 16:00 | 4686 | | | No | No | | | | | euro |
| 399626 | | | Costr compl industr reparti produttivi laboratorio ricerca uffici 10000 mq | | Default Value | | Running | euro | 24.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 53035 | MONTERIGGIONI | Industry building | Strada dei Laghi | 10 - Information Phase | 08.10.2021 16:00 | 4685 | | | No | No | | | | | euro |
| 399625 | | | Costruz edificio commerciale media struttura di vendita 2500 mq e OOUU | | Default Value | | Running | euro | 01.07.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52025 | MONTEVARCHI | Technical facilities | Vle L. Cadorna / Di Terranuova | 10 - Information Phase | 08.10.2021 16:00 | 4684 | | | No | No | | | | | euro |
| 399624 | | | Lavori di costruzione scuola media consortile G. Garibaldi | | Default Value | | Running | euro | 24.08.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52010 | CAPOLONA | | Viale Dante Alighieri | 10 - Information Phase | 08.10.2021 16:00 | 4683 | | | No | No | | | | | euro |
| 399623 | | | Costruzione edifici industriali ed artigianali | | Default Value | | Running | euro | 21.07.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 51100 | PISTOIA | Industry building | Vie Fermi / Borgioli | 10 - Information Phase | 08.10.2021 16:00 | 4682 | | | No | No | | | | | euro |
| 399622 | | | Costruzione residenza per studenti 400 posti letto | | Default Value | | Running | euro | 05.08.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Via di Novoli | 10 - Information Phase | 08.10.2021 16:00 | 4681 | | | No | No | | | | | euro |
| 399621 | | | Realizzazione nuovo biennio IIS Leonardo da Vinci II riappalto lavori | | Default Value | | Running | euro | 04.08.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Via di Terzolle 91 | 10 - Information Phase | 08.10.2021 16:00 | 4680 | | | No | No | | | | | euro |
| 399620 | | | Costruzione complesso multifunzionale 160 appartam = primo lotto fondazioni | | Default Value | | Running | euro | 26.07.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Cso Italia12/Via Solferino15 | 10 - Information Phase | 08.10.2021 16:00 | 4679 | | | No | No | | | | | euro |
| 399619 | | | Realizzazione passerella ciclo pedonale Argingrosso Csscine | | Default Value | | Running | euro | 22.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Fiume Arno | 10 - Information Phase | 08.10.2021 16:00 | 4678 | | | No | No | | | | | euro |
| 399618 | | | Costruzione 6 ville a schiera | | Default Value | | Running | euro | 21.07.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50018 | SCANDICCI | Residential houses | Via di Porto | 10 - Information Phase | 08.10.2021 16:00 | 4677 | | | No | No | | | | | euro |
| 399617 | | | Ampliamento sede IIS Campus Leonardo da Vinci | | Default Value | | Running | euro | 05.07.2021 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06019 | UMBERTIDE | | Via Tusicum | 10 - Information Phase | 08.10.2021 16:00 | 4676 | | | No | No | | | | | euro |
| 399361-001 | | | PEGASO COSTRUZIONI / SCUOLE DEL NUOVO MILLENIO / POSADA / HDB | | Default Value | | Running | euro | 05.10.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 08020 | Posada | | * | 40 - Realisation Phase | 05.10.2021 10:02 | | | | No | No | | | | | euro |
| 399361 | | | PEGASO COSTRUZIONI / SCUOLE DEL NUOVO MILLENIO / POSADA | | Default Value | | Running | euro | 05.10.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | Posada | | * | 10 - Information Phase | 05.10.2021 10:02 | | | | No | No | | | | | euro |
| 399331-001 | | | HIT / RESIDENZE LAGENKAMP.DK / LAVENO MOMBELLO | | Default Value | | Running | euro | 05.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21014 | LAVENO MOMBELLO | Residential houses | Via San Michele 1 | 30 - Tender & Submission Phase | 05.10.2021 07:47 | | | | No | No | | | | | euro |
| 399331 | | | RESIDENZE LAGENKAMP.DK / LAVENO MOMBELLO | | Default Value | | Running | euro | 05.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21014 | LAVENO MOMBELLO | Residential houses | Via San Michele 1 | 30 - Tender & Submission Phase | 05.10.2021 07:44 | | | | No | No | | | | | euro |
| 399306-001 | | | EDILGRIMANDI / PALAZZINA RESIDENZIALE BARDONECCHIA / TORINO / HIT | | Default Value | | Running | euro | 04.10.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | VIA BATTISTI 7 | 40 - Realisation Phase | 04.10.2021 11:42 | | | | No | No | | | | | euro |
| 399306 | | | EDILGRIMANDI / PALAZZINA RESIDENZIALE BARDONECCHIA / TORINO | | Default Value | | Running | euro | 04.10.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | VIA BATTISTI 7 | 10 - Information Phase | 04.10.2021 11:42 | | | | No | No | | | | | euro |
| 399172-001 | | | GARA / HOTEL HAMPTON / TRONCHETTO VE / HBT | | Default Value | | Running | euro | 30.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30100 | VENEZIA | | TRONCHETTO | 30 - Tender & Submission Phase | 30.09.2021 11:38 | | | | No | No | | | | | euro |
| 399172 | | | GARA / HOTEL HAMPTON / TRONCHETTO VE | | Default Value | | Running | euro | 30.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | | TRONCHETTO | 30 - Tender & Submission Phase | 30.09.2021 11:35 | | | | No | No | | | | | euro |
| 399055-001 | | | GRELE COSTRUZIONI / CONSERVAZIONE DEL PATRIMONIO EDILIZIO ESISTENTE DI PROPIRIETA' (RISTR.) / PRETORO (CH) / HIT | | Default Value | | Running | euro | 29.09.2021 | | IABR-ABRUZZO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 66010 | Pretoro | | VIA CASTELLO 15 | 40 - Realisation Phase | 29.09.2021 11:10 | | | | No | No | | | | | euro |
| 399055 | | | GRELE COSTRUZIONI / CONSERVAZIONE DEL PATRIMONIO EDILIZIO ESISTENTE DI PROPIRIETA' (RISTR.) / PRETORO (CH) | | Default Value | | Running | euro | 29.09.2021 | | IABR-ABRUZZO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 66010 | Pretoro | | VIA CASTELLO 15 | 10 - Information Phase | 29.09.2021 11:10 | | | | No | No | | | | | euro |
| 399016 | | | Costruzione parcheggio per 96 posti auto interrati | | Default Value | | Running | euro | 07.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46100 | MANTOVA | Technical facilities | Lungolago dei Gonzaga | 10 - Information Phase | 29.09.2021 09:01 | 4675 | | | No | No | | | | | euro |
| 399015 | | | Demoricostruzione 2 palazzine ad uso abitazione e boxes | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46100 | MANTOVA | Residential houses | Via Loria 2/4 | 10 - Information Phase | 29.09.2021 09:01 | 4674 | | | No | No | | | | | euro |
| 399014 | | | Costruzione complesso produttivo 48000 mq ed opere urbanizzazione | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46035 | OSTIGLIA | Industry building | Z.I. Canalbianco | 10 - Information Phase | 29.09.2021 09:01 | 4673 | | | No | No | | | | | euro |
| 399013 | | | Costruz 8 edifici ad uso abitazione 250 unita' abitative e parco 11000 mq | | Default Value | | Running | euro | 18.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26900 | LODI | Residential houses | Vle Pavia / Via Fascetti Ex ABB | 10 - Information Phase | 29.09.2021 09:01 | 4672 | | | No | No | | | | | euro |
| 399012 | | | Costruzione supermercato Lidl 1350 mq | | Default Value | | Running | euro | 26.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26866 | SANT'ANGELO LODIGIANO | Technical facilities | Viale Piave | 10 - Information Phase | 29.09.2021 09:01 | 4671 | | | No | No | | | | | euro |
| 399011 | | | Costruzione piattaforma logistica 12000 mq GLS Italia | | Default Value | | Running | euro | 02.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26858 | SORDIO | Industry building | Viale delle Industrie | 10 - Information Phase | 29.09.2021 09:01 | 4670 | | | No | No | | | | | euro |
| 399010 | | | Costruzione 6 edifici x 270 appartamenti social housing Classe A | | Default Value | | Running | euro | 06.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Vie Cimabue / Robusti | 10 - Information Phase | 29.09.2021 09:01 | 4669 | | | No | No | | | | | euro |
| 399009 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 17.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Sorelle Agazzi 20 | 10 - Information Phase | 29.09.2021 09:01 | 4668 | | | No | No | | | | | euro |
| 399008 | | | Costruzione edificio 4 piani f.t. per 8 unita' abitative e boxes | | Default Value | | Running | euro | 17.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Riccobelli 20 | 10 - Information Phase | 29.09.2021 09:01 | 4667 | | | No | No | | | | | euro |
| 399007 | | | Opere civili per la realizzazione linea AV / AC | | Default Value | | Running | euro | 26.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25080 | MAZZANO | Technical facilities | CALCINATO / LONATO | 10 - Information Phase | 29.09.2021 09:01 | 4666 | | | No | No | | | | | euro |
| 399006 | | | Costruzione polo logistico 80000 mq e opere di urbanizzazione | | Default Value | | Running | euro | 24.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25032 | CHIARI | Industry building | Vie Roccafranca / San Quilleri | 10 - Information Phase | 29.09.2021 09:01 | 4665 | | | No | No | | | | | euro |
| 399005 | | | Costruzione villa unifamiliare | | Default Value | | Running | euro | 21.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25032 | CHIARI | Residential houses | Via Cavalieri della Repubblica Italiana | 10 - Information Phase | 29.09.2021 09:01 | 4664 | | | No | No | | | | | euro |
| 399004 | | | Realizzazione impianto di depurazione e collettamento | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | MAIRANO | Technical facilities | Capoluogo | 10 - Information Phase | 29.09.2021 09:01 | 4663 | | | No | No | | | | | euro |
| 399003 | | | Demoricostruzione polo scolastico e palestra | | Default Value | | Running | euro | 05.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25020 | ALFIANELLO | | Via Usignolo | 10 - Information Phase | 29.09.2021 09:01 | 4662 | | | No | No | | | | | euro |
| 399002 | | | Realizzazione nuova scuola primaria Don Milani | | Default Value | | Running | euro | 24.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25010 | BORGOSATOLLO | | Capoluogo | 10 - Information Phase | 29.09.2021 09:01 | 4661 | | | No | No | | | | | euro |
| 399001 | | | Costruzione parcheggio interrato multipiano opere di completamento | | Default Value | | Running | euro | 04.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via della Fara | 10 - Information Phase | 29.09.2021 09:01 | 4660 | | | No | No | | | | | euro |
| 399000 | | | Costruzione edificio ad uso abitazione box e OO UU | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Broseta 55 | 10 - Information Phase | 29.09.2021 09:01 | 4659 | | | No | No | | | | | euro |
| 398999 | | | Costruzione media struttura di vendita 1006 mq | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via V. Ghislandi 61 | 10 - Information Phase | 29.09.2021 09:01 | 4658 | | | No | No | | | | | euro |
| 398998 | | | Real opere stradali nell'ambito accordo programma nuovo palazzetto sport | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Rondo' delle Valli / Loc diverse | 10 - Information Phase | 29.09.2021 09:01 | 4657 | | | No | No | | | | | euro |
| 398997 | | | Realizzazione passerella ciclopedonale sul fiume Oglio | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24062 | COSTA VOLPINO | Technical facilities | Vie Battisti / Prudenzini | 10 - Information Phase | 29.09.2021 09:01 | 4656 | | | No | No | | | | | euro |
| 398996 | | | Lavori di realizzazione 2 capannoni merci e relative opere urbanizzazione | | Default Value | | Running | euro | 18.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | ORIO AL SERIO | Industry building | Aeroporto | 10 - Information Phase | 29.09.2021 09:01 | 4655 | | | No | No | | | | | euro |
| 398995 | | | Costruzione scuola elementare Dante Alighieri | | Default Value | | Running | euro | 13.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24030 | MAPELLO | | Via E. Agazzi | 10 - Information Phase | 29.09.2021 09:01 | 4654 | | | No | No | | | | | euro |
| 398994-002 | | | HBS-HBT / IAMA ONLUS / RSA / OLGIATE MOLGORA | | Default Value | | Running | euro | 17.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23887 | OLGIATE MOLGORA | | Via Cantu' | 40 - Realisation Phase | 17.11.2021 08:12 | 4653 | | | No | No | | | | | euro |
| 398994-001 | | | HDB / IAMA ONLUS / RSA / OLGIATE MOLGORA | | Default Value | | Running | euro | 11.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23887 | OLGIATE MOLGORA | | Via Cantu' | 40 - Realisation Phase | 11.11.2021 12:20 | 4653 | | | No | No | | | | | euro |
| 398994 | | | IAMA ONLUS / RSA / OLGIATE MOLGORA | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23887 | OLGIATE MOLGORA | | Via Cantu' | 40 - Realisation Phase | 29.09.2021 09:01 | 4653 | | | No | No | | | | | euro |
| 398993 | | | Costruzione 2 palazzine ad uso abitazione 30 unita' abitative NZEB | | Default Value | | Running | euro | 01.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23870 | CERNUSCO LOMBARDONE | Residential houses | Via C. Balbo | 10 - Information Phase | 29.09.2021 09:01 | 4652 | | | No | No | | | | | euro |
| 398992 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 12.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23036 | TEGLIO | Residential houses | S.S. n.38 Localita' San Giacomo | 10 - Information Phase | 29.09.2021 09:01 | 4651 | | | No | No | | | | | euro |
| 398991 | | | Costruzione edificio polifunzionale 2 ristoranti uffici noleggio sci/bici | | Default Value | | Running | euro | 01.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23030 | LIVIGNO | Technical facilities | Via Bondi 473 | 10 - Information Phase | 29.09.2021 09:01 | 4650 | | | No | No | | | | | euro |
| 398990 | | | Costruzione nuova sede Croce Rossa Italiana | | Default Value | | Running | euro | 12.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22074 | LOMAZZO | Technical facilities | Via dello Sport | 10 - Information Phase | 29.09.2021 09:01 | 4649 | | | No | No | | | | | euro |
| 398989 | | | Demoricostruzione edificio ad uso abitaz e boxes 18 unita' Classe A4 | | Default Value | | Running | euro | 21.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Residential houses | Via Petrarca 24 | 10 - Information Phase | 29.09.2021 09:01 | 4648 | | | No | No | | | | | euro |
| 398988 | | | Costruzione supermercato e opere di urbanizzazione | | Default Value | | Running | euro | 24.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Technical facilities | Via Miola 29 | 10 - Information Phase | 29.09.2021 09:01 | 4647 | | | No | No | | | | | euro |
| 398987 | | | Realizzazione nuova palestra polifunzionale | | Default Value | | Running | euro | 13.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21017 | SAMARATE | | Via Borsi | 10 - Information Phase | 29.09.2021 09:01 | 4646 | | | No | No | | | | | euro |
| 398986 | | | Costruzione supermercato Eurospin | | Default Value | | Running | euro | 08.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21017 | SAMARATE | Technical facilities | Via Torino | 10 - Information Phase | 29.09.2021 09:01 | 4645 | | | No | No | | | | | euro |
| 398985 | | | Costruzione 7 villette a schiera | | Default Value | | Running | euro | 24.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | Residential houses | Via L. Ranchet 26 | 10 - Information Phase | 29.09.2021 09:01 | 4644 | | | No | No | | | | | euro |
| 398984 | | | Ristrutturazione immobile logistico 40000 mq | | Default Value | | Running | euro | 23.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20877 | RONCELLO | Industry building | Zona Industriale | 10 - Information Phase | 29.09.2021 09:00 | 4643 | | | No | No | | | | | euro |
| 398983 | | | Demoricostruzione edificio ad uso abitazione e boxes 7 unita' | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | Residential houses | Via Motta 107 | 10 - Information Phase | 29.09.2021 09:00 | 4642 | | | No | No | | | | | euro |
| 398982 | | | Costruzione palazzina 4 piani f.t. 15 appartamenti Classe A4 | | Default Value | | Running | euro | 23.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20853 | BIASSONO | Residential houses | Via G. Tintori 16 | 10 - Information Phase | 29.09.2021 09:00 | 4641 | | | No | No | | | | | euro |
| 398981 | | | Demoricostruzione edificio ad uso abitaz 12 appartamenti e boxes | | Default Value | | Running | euro | 07.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Via Mentana 102 | 10 - Information Phase | 29.09.2021 09:00 | 4640 | | | No | No | | | | | euro |
| 398980 | | | Costruzione supermercato Aldi 1700mq edif commerciale 590mq e urbanizzaz | | Default Value | | Running | euro | 21.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20843 | VERANO BRIANZA | Technical facilities | Vie Comasina / N. Sauro | 10 - Information Phase | 29.09.2021 09:00 | 4639 | | | No | No | | | | | euro |
| 398979 | | | Costruzione e completamento 4 edifici ad uso abitaz 60 appartam e boxes | | Default Value | | Running | euro | 26.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20833 | GIUSSANO | Residential houses | Viale Monza 82 | 10 - Information Phase | 29.09.2021 09:00 | 4638 | | | No | No | | | | | euro |
| 398978 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 24.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Via Locatelli | 10 - Information Phase | 29.09.2021 09:00 | 4637 | | | No | No | | | | | euro |
| 398977 | | | Costruzione 2 edifici a torre per 124 appartamenti e boxes | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20159 | MILANO | Residential houses | Via G. Bovio 10 | 10 - Information Phase | 29.09.2021 09:00 | 4636 | | | No | No | | | | | euro |
| 398976 | | | Costruzione edificio ad uso abitazione 14 appartamenti e boxes | | Default Value | | Running | euro | 15.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | MILANO | Residential houses | Via G.C. Abba 38 | 10 - Information Phase | 29.09.2021 09:00 | 4635 | | | No | No | | | | | euro |
| 398975 | | | Realizzazione nuovo plesso scolastico di Cascina Merlata | | Default Value | | Running | euro | 23.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | MILANO | | Via E. Jona 15 | 10 - Information Phase | 29.09.2021 09:00 | 4634 | | | No | No | | | | | euro |
| 398974 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 01.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via A. di Toqueville 7/D | 10 - Information Phase | 29.09.2021 09:00 | 4633 | | | No | No | | | | | euro |
| 398973 | | | Cost edif 10 piani f.t.170appartam e boxes Lotto R.5.3 PII Cascina Merlata | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | MILANO | Residential houses | Via P.Pasolini | 10 - Information Phase | 29.09.2021 09:00 | 4632 | | | No | No | | | | | euro |
| 398972 | | | Costruzione edifi 10 piani f.t. 50 appartam Lotto 3.0 PII Cascina Merlata | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | MILANO | Residential houses | Via G. W. Daimler | 10 - Information Phase | 29.09.2021 09:00 | 4631 | | | No | No | | | | | euro |
| 398971 | | | Lavori di riqualificazione complesso ad uso uffici 40000 mq | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20149 | MILANO | Technical facilities | Via Monte Rosa 91 | 10 - Information Phase | 29.09.2021 09:00 | 4630 | | | No | No | | | | | euro |
| 398970 | | | Demoricostruz edif 7 piani f.t.uso abitaz e boxes 12 appartam Classe A4 | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20149 | MILANO | Residential houses | Via Mose' Bianchi 27 | 10 - Information Phase | 29.09.2021 09:00 | 4629 | | | No | No | | | | | euro |
| 398969 | | | Demoricostruzione edifici di Edilizia Residenziale Pubblica | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20146 | MILANO | Residential houses | Via Lorenteggio 181 | 10 - Information Phase | 29.09.2021 09:00 | 4628 | | | No | No | | | | | euro |
| 398968 | | | Costruzione complesso multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20141 | MILANO | Residential houses | Via Rutilia 32 | 10 - Information Phase | 29.09.2021 09:00 | 4627 | | | No | No | | | | | euro |
| 398967 | | | Costruzione nuova sede concessionaria automobili Fratelli Giacomel | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20139 | MILANO | Technical facilities | Via Cassano d'Adda 1 | 10 - Information Phase | 29.09.2021 09:00 | 4626 | | | No | No | | | | | euro |
| 398966 | | | Costruzione edificio ad uso abitazione 28 appartamenti e boxes | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20138 | MILANO | Residential houses | Via Freikofel 26 | 10 - Information Phase | 29.09.2021 09:00 | 4625 | | | No | No | | | | | euro |
| 398965 | | | Realizzazione nuovo padiglione ortofrutta c/o comprensorio agroalimentare | | Default Value | | Running | euro | 05.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20137 | MILANO | Industry building | Via Lombroso | 10 - Information Phase | 29.09.2021 09:00 | 4624 | | | No | No | | | | | euro |
| 398964 | | | Costruzione 2 torri residenziali 50 appartamenti classe A4 | | Default Value | | Running | euro | 09.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20137 | MILANO | Residential houses | Via Bonfadini 107 | 10 - Information Phase | 29.09.2021 09:00 | 4623 | | | No | No | | | | | euro |
| 398963 | | | Ristrutturazione edificio ad uso ricettivo 6000 mq | | Default Value | | Running | euro | 23.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20136 | MILANO | Technical facilities | Vie Sforza / Bettinelli 3 | 10 - Information Phase | 29.09.2021 09:00 | 4622 | | | No | No | | | | | euro |
| 398962 | | | Costruzione complesso multipiano 58 appartamenti e boxes riappalto lavori | | Default Value | | Running | euro | 22.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20135 | MILANO | Residential houses | Via Verona 5 ex ATM | 10 - Information Phase | 29.09.2021 09:00 | 4621 | | | No | No | | | | | euro |
| 398961 | | | Ristrutturazione edificio al rustico per alloggi in locazione 5643 mq | | Default Value | | Running | euro | 23.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20134 | MILANO | Residential houses | Via L. Bistolfi 1 | 10 - Information Phase | 29.09.2021 09:00 | 4620 | | | No | No | | | | | euro |
| 398960 | | | Ristrutt edilizia e risanamento conservativo edif x nuova sede aziendale | | Default Value | | Running | euro | 28.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20134 | MILANO | Technical facilities | Via E. Folli 50 | 10 - Information Phase | 29.09.2021 09:00 | 4619 | | | No | No | | | | | euro |
| 398959 | | | Costruzione edificio a torre a uso terziario | | Default Value | | Running | euro | 23.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO | Technical facilities | Via Palatucci | 10 - Information Phase | 29.09.2021 09:00 | 4618 | | | No | No | | | | | euro |
| 398958 | | | Costruzione edificio multipiano per nuova sede aziendale | | Default Value | | Running | euro | 21.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO | Technical facilities | Via Cornalia 17 | 10 - Information Phase | 29.09.2021 09:00 | 4617 | | | No | No | | | | | euro |
| 398957 | | | Demoricostruzione edificio 6 piani f.t. ad uso abitaz e boxes 10 unita' | | Default Value | | Running | euro | 30.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO | Residential houses | Via I. Rossellini 27 | 10 - Information Phase | 29.09.2021 08:59 | 4616 | | | No | No | | | | | euro |
| 398956 | | | Ristr Palazzo Venezia per hotel ***** 73 camere ristorante catena Melia | | Default Value | | Running | euro | 22.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Technical facilities | Piazza Cordusio 2 | 10 - Information Phase | 29.09.2021 08:59 | 4615 | | | No | No | | | | | euro |
| 398955 | | | Ristrutturazione edificio ad uso uffici | | Default Value | | Running | euro | 21.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Technical facilities | Via F. Wittgens 2 | 10 - Information Phase | 29.09.2021 08:59 | 4614 | | | No | No | | | | | euro |
| 398954 | | | Restauro e risanamento conservativo edificio ad uso uffici | | Default Value | | Running | euro | 21.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Technical facilities | Via dell'Unione 1 | 10 - Information Phase | 29.09.2021 08:59 | 4613 | | | No | No | | | | | euro |
| 398953 | | | Costruzione nuovo complesso direzionale primo lotto demolizione | | Default Value | | Running | euro | 07.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Technical facilities | Via delle Orsole 4 | 10 - Information Phase | 29.09.2021 08:59 | 4612 | | | No | No | | | | | euro |
| 398952 | | | Riqualificazione immobile ad uso uffici 12200 mq | | Default Value | | Running | euro | 21.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Technical facilities | Corso Italia 19 | 10 - Information Phase | 29.09.2021 08:59 | 4611 | | | No | No | | | | | euro |
| 398951 | | | Ristrutt edificio 5 piani fuori terra uso direzionale commerciale 4000 mq | | Default Value | | Running | euro | 21.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | Technical facilities | Via Bassano Porrone 6 | 10 - Information Phase | 29.09.2021 08:59 | 4610 | | | No | No | | | | | euro |
| 398950 | | | Rest conservativo e ristrutt edificio 4000 MQ = nuova sede CORE:MILANO | | Default Value | | Running | euro | 21.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | Technical facilities | Corso G. Matteotti 14 | 10 - Information Phase | 29.09.2021 08:59 | 4609 | | | No | No | | | | | euro |
| 398949 | | | Costr 2 edifici 74+99 alloggi negozi I lotto opere provvisionali e scavi | | Default Value | | Running | euro | 13.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Durando / Andreoli | 10 - Information Phase | 29.09.2021 08:59 | 4608 | | | No | No | | | | | euro |
| 398948 | | | Demoricostruzione piscina coperta comunale project-financing | | Default Value | | Running | euro | 30.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | CESANO BOSCONE | | Via Cascina Nuova | 10 - Information Phase | 29.09.2021 08:59 | 4607 | | | No | No | | | | | euro |
| 398947 | | | Lavori di potenziamento impianto di depurazione | | Default Value | | Running | euro | 02.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20068 | PESCHIERA BORROMEO | Technical facilities | Via Roma | 10 - Information Phase | 29.09.2021 08:59 | 4606 | | | No | No | | | | | euro |
| 398946 | | | Costruzione 3 edifici a corte 40 unita' abitat totali e opere urbanizzaz | | Default Value | | Running | euro | 28.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20060 | PESSANO CON BORNAGO | Residential houses | Via Carlo Porta | 10 - Information Phase | 29.09.2021 08:59 | 4605 | | | No | No | | | | | euro |
| 398945 | | | Costruzione palazzina ad uso abitazione 5 unita' abitative classe A4 | | Default Value | | Running | euro | 09.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Via Modena 12 | 10 - Information Phase | 29.09.2021 08:59 | 4604 | | | No | No | | | | | euro |
| 398944 | | | Costruzione edificio ad uso abitazione 8 unita' abitative classe A | | Default Value | | Running | euro | 09.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Via Liguria 50 | 10 - Information Phase | 29.09.2021 08:59 | 4603 | | | No | No | | | | | euro |
| 398943 | | | Costruzione villette singole e bifamiliari 14 unita' abitative tot e OOUU | | Default Value | | Running | euro | 09.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Vie Liguria / delle Palme | 10 - Information Phase | 29.09.2021 08:59 | 4602 | | | No | No | | | | | euro |
| 398942 | | | Costruzione palazzina ad uso abitazione 6 unita' abitative | | Default Value | | Running | euro | 09.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Via Monte Nevoso | 10 - Information Phase | 29.09.2021 08:59 | 4601 | | | No | No | | | | | euro |
| 398941 | | | Realizzazione nuovo asilo nido | | Default Value | | Running | euro | 01.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | LAINATE | | Via Val Seriana | 10 - Information Phase | 29.09.2021 08:59 | 4600 | | | No | No | | | | | euro |
| 398940 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 24.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | SOLARO | Residential houses | Via Galvani 71 | 10 - Information Phase | 29.09.2021 08:59 | 4599 | | | No | No | | | | | euro |
| 398939 | | | Costruzione edificio ad uso abitazione 10 appartamenti e boxes | | Default Value | | Running | euro | 07.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20015 | PARABIAGO | Residential houses | Via Thaon de Revel | 10 - Information Phase | 29.09.2021 08:59 | 4598 | | | No | No | | | | | euro |
| 398886-001 | | | Porto di Livorno - Bacino Galleggiante "MEDITERRANEO" / MBT | | Default Value | | Running | euro | 28.09.2021 | | ITOS-TOSCANA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 57100 | LIVORNO | Infrastructural facility | PORTO DI LIVORNO | 30 - Tender & Submission Phase | 28.09.2021 15:09 | | | | No | No | | | | | euro |
| 398886 | | | Porto di Livorno - Bacino Galleggiante "MEDITERRANEO" | | Default Value | | Running | euro | 28.09.2021 | | ITOS-TOSCANA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 57100 | LIVORNO | Infrastructural facility | PORTO DI LIVORNO | 10 - Information Phase | 28.09.2021 14:46 | | | | No | No | | | | | euro |
| 398866-001 | | | CANDELA / INSEDIAMENTO COMMERCIALE / MONOPOLI / FK5 | | Default Value | | Running | euro | 28.09.2021 | | IPUG-PUGLIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 70043 | Monopoli | | VIA PUCCINI | 30 - Tender & Submission Phase | 28.09.2021 11:02 | | | | No | No | | | | | euro |
| 398866 | | | CANDELA / INSEDIAMENTO COMMERCIALE / MONOPOLI | | Default Value | | Running | euro | 28.09.2021 | | IPUG-PUGLIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 70043 | Monopoli | | VIA PUCCINI | 10 - Information Phase | 28.09.2021 11:01 | | | | No | No | | | | | euro |
| 398851-001 | | | GARA / POLO TECN UNI CARPI / HDB | | Default Value | | Running | euro | 28.09.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 41012 | Carpi | | -- | 30 - Tender & Submission Phase | 28.09.2021 09:22 | | | | No | No | | | | | euro |
| 398851 | | | GARA / POLO TECN UNI CARPI | | Default Value | | Running | euro | 28.09.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41012 | Carpi | | -- | 10 - Information Phase | 28.09.2021 09:21 | | | | No | No | | | | | euro |
| 398715 | | | BELLETTI & BARONI / Costruzione edificio 7 piani f.t. uso abitaz e boxes 8 appartam Classe A4 | | Default Value | | Running | euro | 12.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Residential houses | Vie Redi 6 / Pananti | 10 - Information Phase | 24.09.2021 16:01 | 4597 | | | No | No | | | | | euro |
| 398714 | | | ZINI / Costruzione villa quadrifamiliare e palazzina 8 unita' abitat Lotti 1 e 2 | | Default Value | | Running | euro | 13.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40026 | IMOLA | Residential houses | Via Ca' Borghese | 10 - Information Phase | 24.09.2021 16:01 | 4596 | | | No | No | | | | | euro |
| 398713 | | | GEOPARMA / Costruzione fabbricato residenziale plurifamiliare edificio A | | Default Value | | Running | euro | 09.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Residential houses | Via Calatafimi 9 | 10 - Information Phase | 24.09.2021 16:01 | 4595 | | | No | No | | | | | euro |
| 398712 | | | CME / Realizzazione nuova sede corpo Polizia Locale | | Default Value | | Running | euro | 06.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41049 | SASSUOLO | | Via San Pietro 6 | 10 - Information Phase | 24.09.2021 16:01 | 4594 | | | No | No | | | | | euro |
| 398711 | | | VINCENZI E GIBERTINI / Costruzione 2 edifici ad uso abitaz e boxes 8+8 unita' abitative | | Default Value | | Running | euro | 15.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Residential houses | Via Luca della Robbia | 10 - Information Phase | 24.09.2021 16:01 | 4593 | | | No | No | | | | | euro |
| 398710 | | | GARC / Costruzione 2 edifici ad uso abitazione 8+8 appartamenti e box | | Default Value | | Running | euro | 23.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41012 | CARPI | Residential houses | Via G. Cesare 23 | 10 - Information Phase | 24.09.2021 16:01 | 4592 | | | No | No | | | | | euro |
| 398709 | | | OPERA / Costruzione nuovo fabbricato ad uso produttivo 3015 mq e uffici | | Default Value | | Running | euro | 23.08.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40055 | CASTENASO | Industry building | Via Pederzana | 10 - Information Phase | 24.09.2021 16:01 | 4591 | | | No | No | | | | | euro |
| 398708 | | | ??? / Ampliamento edif uso commercio all'ingrosso 3031mq e urbanizzaz a scomputo | | Default Value | | Running | euro | 12.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Technical facilities | Via Varisco 18 | 10 - Information Phase | 24.09.2021 16:01 | 4590 | | | No | No | | | | | euro |
| 398707 | | | INTEGRA / Realizzazione museo del territorio presso l'ex Fornace Piva | | Default Value | | Running | euro | 05.08.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47838 | RICCIONE | Technical facilities | Ex Fornace Piva | 10 - Information Phase | 24.09.2021 16:01 | 4589 | | | No | No | | | | | euro |
| 398706 | | | PANDOLFINI / Costruzione edificio 5 piani f.t.uso abitaz e boxes 18 appartam Classe A3 | | Default Value | | Running | euro | 12.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Residential houses | Via Flaminia Conca 23 | 10 - Information Phase | 24.09.2021 16:01 | 4588 | | | No | No | | | | | euro |
| 398705 | | | AR.CO / Costruzione nuova biblioteca e centro civico polivalente | | Default Value | | Running | euro | 21.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40013 | CASTEL MAGGIORE | | Via Bondanello | 10 - Information Phase | 24.09.2021 16:01 | 4587 | | | No | No | | | | | euro |
| 398704 | | | INCOM / Costruzione media struttura di vendita 1992 mq e opere infrastrutturali | | Default Value | | Running | euro | 24.08.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47100 | FORLI' | Technical facilities | Via E. Bertini 1 | 10 - Information Phase | 24.09.2021 16:01 | 4586 | | | No | No | | | | | euro |
| 398703 | | | SCIENTIA / Costruzione scuola primaria | | Default Value | | Running | euro | 05.08.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47042 | CESENATICO | | Viale Torino | 10 - Information Phase | 24.09.2021 16:01 | 4585 | | | No | No | | | | | euro |
| 398702 | | | ITALPREFABB / Costruzione punto vendita Globo 2500 mq | | Default Value | | Running | euro | 21.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Technical facilities | Viale Virgilio 9 | 10 - Information Phase | 24.09.2021 16:01 | 4584 | | | No | No | | | | | euro |
| 398701 | | | TCS / Costruzione RSA 75 posti centro diurno 20 posti riappalto lavori | | Default Value | | Running | euro | 24.08.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | | Vie San Faustino / Padovani | 10 - Information Phase | 24.09.2021 16:01 | 4583 | | | No | No | | | | | euro |
| 398700 | | | BELTRAMI / Realizz Cemtralized Compounding Centre Fase 2 farmacia | | Default Value | | Running | euro | 09.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47014 | MELDOLA | Technical facilities | Via Maroncelli | 10 - Information Phase | 24.09.2021 16:01 | 4582 | | | No | No | | | | | euro |
| 398699 | | | PAVONI / Costruzione edificio commerciale 3000 mq e OO UU a scomputo | | Default Value | | Running | euro | 22.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | Technical facilities | Via Faentina 214 | 10 - Information Phase | 24.09.2021 16:01 | 4581 | | | No | No | | | | | euro |
| 398698 | | | ??? / Costruzione magazzino logistico comparto C 8 lotto B 10 | | Default Value | | Running | euro | 25.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Industry building | Via dell'Agricoltura | 10 - Information Phase | 24.09.2021 16:01 | 4580 | | | No | No | | | | | euro |
| 398696 | | | OASI / Costruzione 3 edifici 4 piani f.t. uso abitaz e boxes 53 unita' abitative | | Default Value | | Running | euro | 12.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Residential houses | Via Rubicone 18 | 10 - Information Phase | 24.09.2021 16:01 | 4578 | | | No | No | | | | | euro |
| 398695 | | | MEDIL (GEOM. FURLAN) / Lavori di ristrutturazione 2 fabbricati denominati 24 e 25 6 OTT VISITA SENTIRSI FINE NOVEMBRE | | Default Value | | Running | euro | 06.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Technical facilities | Via Camillo Ranzani 2/4 | 10 - Information Phase | 24.09.2021 16:01 | 4577 | | | No | No | | | | | euro |
| 398694 | | | DIPIERRI / Costruzione complesso ad uso abitaz e boxes 59 appartam Classe A4 | | Default Value | | Running | euro | 21.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Residential houses | Via Greta Garbo | 10 - Information Phase | 24.09.2021 16:01 | 4576 | | | No | No | | | | | euro |
| 398693 | | | CIAB /Riqualificazione padiglione 5 nuove patologie ala A e B | | Default Value | | Running | euro | 15.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Massarenti Osp.S.Orsola Malpighi | 10 - Information Phase | 24.09.2021 16:00 | 4575 | | | No | No | | | | | euro |
| 398692 | | | ??? / Costruzione parco commerciale 7 edifici non alimentare e opere urbanizzaz | | Default Value | | Running | euro | 23.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47100 | FORLI' | Technical facilities | Vie P. Artusi / L. Vasumini | 10 - Information Phase | 24.09.2021 16:00 | 4574 | | | No | No | | | | | euro |
| 398691 | | | ANTONELLI / Costruzione nuova sede magazzino 11600 mq uffici 1900 mq bike park | | Default Value | | Running | euro | 24.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47034 | FORLIMPOPOLI | Technical facilities | Via Amendola Ex Sfir | 10 - Information Phase | 24.09.2021 16:00 | 4573 | | | No | No | | | | | euro |
| 398690 | | | PICHLER / Costruz edificio direzionale per nuovo headquarter NZEB 6200 mq | | Default Value | | Running | euro | 09.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40012 | CALDERARA DI RENO | Technical facilities | Via C. Bonfiglioli 1 | 10 - Information Phase | 24.09.2021 16:00 | 4572 | | | No | No | | | | | euro |
| 398688 | | | AR.CO / Lavori di realizz nuovo fabbricato ospedaliero dip materno infantile | | Default Value | | Running | euro | 25.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | | Via G. Campi Policlinico | 10 - Information Phase | 24.09.2021 16:00 | 4570 | | | No | No | | | | | euro |
| 398687 | | | ALLODI / Realizzaz nuovo edificio materno infantile MIRE Arcispedale S Maria Nuova | | Default Value | | Running | euro | 06.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | | Viale Risorgimento | 10 - Information Phase | 24.09.2021 16:00 | 4569 | | | No | No | | | | | euro |
| 398684 | | | ??? /Costruzione edificio destinato ad ambulatori PDL Terraglio UMI 4.2 | | Default Value | | Running | euro | 09.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | | Via Borgo Pezzana | 10 - Information Phase | 24.09.2021 15:31 | 4568 | | | No | No | | | | | euro |
| 398683 | | | DALLA VERDE / Costruzione ville a schiera 10 unita' abitative | | Default Value | | Running | euro | 08.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36077 | ALTAVILLA VICENTINA | Residential houses | Via Roma 117 | 10 - Information Phase | 24.09.2021 15:31 | 4567 | | | No | No | | | | | euro |
| 398682 | | | GIC / Costruzione supermercato blocco A | | Default Value | | Running | euro | 26.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | Technical facilities | Via G. Mameli 75 Ex Bam | 10 - Information Phase | 24.09.2021 15:31 | 4566 | | | No | No | | | | | euro |
| 398681 | | | AGRIBETON /Costruzione supermercato Famila e opere di urbanizzazione | | Default Value | | Running | euro | 30.06.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35028 | PIOVE DI SACCO | Technical facilities | Via Carrarese 5 | 10 - Information Phase | 24.09.2021 15:31 | 4565 | | | No | No | | | | | euro |
| 398680 | | | MAEG / mpliamento stabilimento produttivo 5000 mq e opere urbanizazz a scomputo | | Default Value | | Running | euro | 07.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31013 | CODOGNE' | Industry building | Via del Lavoro 52 | 10 - Information Phase | 24.09.2021 15:31 | 4564 | | | No | No | | | | | euro |
| 398679 | | | ??? / Costruzione edificio ad uso logistico | | Default Value | | Running | euro | 09.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Industry building | Via Istituto S. Maria della Pieta' | 10 - Information Phase | 24.09.2021 15:31 | 4563 | | | No | No | | | | | euro |
| 398678 | | | SETTEN / Lavori per realizz Museo della natura e dell'uomo Palazzo Cavalli | | Default Value | | Running | euro | 18.06.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Technical facilities | Via Vescovado 86 | 10 - Information Phase | 24.09.2021 15:31 | 4562 | | | No | No | | | | | euro |
| 398677 | | | ??? / Costruzione residenza sanitaria assistenziale 120 anziani non autosuff | | Default Value | | Running | euro | 09.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | | Via Ugo Vallenari Favaro Veneto | 10 - Information Phase | 24.09.2021 15:31 | 4561 | | | No | No | | | | | euro |
| 398673-001 | | | Variante di san Marco dei Cavoti (Bn) Lotto 1° Stralcio 2° /MBT | | Default Value | | Running | euro | 24.09.2021 | | ICAM-CAMPANIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 82030 | Ponte | Infrastructural facilities (Railway) | Via Ex S.S. 372 | 30 - Tender & Submission Phase | 24.09.2021 15:23 | | | | No | No | | | | | euro |
| 398673 | | | Variante di san Marco dei Cavoti (Bn) Lotto 1° Stralcio 2° | | Default Value | | Running | euro | 23.09.2021 | | ICAM-CAMPANIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 82030 | Ponte | Infrastructural facilities (Railway) | Via Ex S.S. 372 | 10 - Information Phase | 24.09.2021 15:23 | | | | No | No | | | | | euro |
| 398666 | | | EDILBI / Costr complesso residenz denominato Residence Geneve 8 unita' abitative | | Default Value | | Running | euro | 18.06.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | UDINE | Residential houses | Via Cormon Basso | 10 - Information Phase | 24.09.2021 14:56 | 4560 | | | No | No | | | | | euro |
| 398665 | | | LO GIUDICE / Costr edificio 3 piani ft ad uso abitazione 11 unita' abitative classe A4 | | Default Value | | Running | euro | 18.06.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33170 | PORDENONE | Residential houses | Via Borgo Casoni | 10 - Information Phase | 24.09.2021 14:56 | 4559 | | | No | No | | | | | euro |
| 398664 | | | ??? / Costruzione edif 4 piani f.t.Residenza Sanitaria Assistenz 110 posti letto | | Default Value | | Running | euro | 07.07.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34074 | MONFALCONE | | Via Galilei 1 | 10 - Information Phase | 24.09.2021 14:56 | 4558 | | | No | No | | | | | euro |
| 398663 | | | FENIX CONS STAB / Realizzazione 2 palazzine 96 posti letto cadauna | | Default Value | | Running | euro | 26.07.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33097 | SPILIMBERGO | | Localita' Tauriano | 10 - Information Phase | 24.09.2021 14:56 | 4557 | | | No | No | | | | | euro |
| 398662 | | | BORDIGNON / Costr stabilim produzione alimenti secchi x animali d'affezione 21000 mq | | Default Value | | Running | euro | 23.07.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33078 | SAN VITO AL TAGLIAMENTO | Industry building | Via Castelnovo del Friuli | 10 - Information Phase | 24.09.2021 14:56 | 4556 | | | No | No | | | | | euro |
| 398661 | | | BETTIOL / Costruzione centro di proton terapia | | Default Value | | Running | euro | 23.07.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33081 | AVIANO | | Via F. Gallini 2 | 10 - Information Phase | 24.09.2021 14:56 | 4555 | | | No | No | | | | | euro |
| 398626-001 | | | PROGETTO / EX MERCATO ORTOFR Q.RE NAVILE / BOLOGNA / HIT | | Default Value | | Running | euro | 24.09.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | Q.RE NAVILE | 20 - Planning Phase | 24.09.2021 14:06 | | | | No | No | | | | | euro |
| 398626 | | | PROGETTO / EX MERCATO ORTOFR Q.RE NAVILE / BOLOGNA | | Default Value | | Running | euro | 24.09.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Q.RE NAVILE | 20 - Planning Phase | 24.09.2021 11:52 | | | | No | No | | | | | euro |
| 398360-001 | | | TERREAL / RISTRUTTURAZIONE EDILIZIA, DEMOLIZIONE E RICOSTRUZIONE A PARITA' DI VOLUME / RIMINI / FK5 | | Default Value | | Running | euro | 22.09.2021 | | IEMI-EMILIA ROMAGNA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 47900 | RIMINI | | via delle officine 47-79 | 10 - Information Phase | 22.09.2021 08:22 | | | | No | No | | | | | euro |
| 398360 | | | TERREAL / RISTRUTTURAZIONE EDILIZIA, DEMOLIZIONE E RICOSTRUZIONE A PARITA' DI VOLUME / RIMINI | | Default Value | | Running | euro | 22.09.2021 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | | via delle officine 47-79 | 10 - Information Phase | 22.09.2021 08:22 | | | | No | No | | | | | euro |
| 398351-001 | | | HBS / MATTEOTTI 5 / PRELIOS / MILANO | | Default Value | | Running | euro | 21.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20121 | Milano | | corso matteotti | 30 - Tender & Submission Phase | 21.09.2021 17:50 | | | | No | No | | | | | euro |
| 398351 | | | MATTEOTTI 5 / PRELIOS / MILANO | | Default Value | | Running | euro | 21.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | Milano | | corso matteotti | 30 - Tender & Submission Phase | 21.09.2021 17:49 | | | | No | No | | | | | euro |
| 398339-001 | | | GIUNTI / IIS LUIGI EINAUDI / ADEGUAMENTO SISMICO / CREMONA | | Default Value | | Running | euro | 21.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 26100 | Cremona | Educational facility | Via Bissolati | 20 - Planning Phase | 21.09.2021 16:29 | | | | No | No | | | | | euro |
| 398339 | | | IIS LUIGI EINAUDI / ADEGUAMENTO SISMICO / CREMONA | | Default Value | | Running | euro | 21.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | Cremona | Educational facility | Via Bissolati | 20 - Planning Phase | 21.09.2021 16:27 | | | | No | No | | | | | euro |
| 398336-001 | | | ALFANO / COMPLETAMENTO E RISTRUTTURAZIONE DELL'ISTITUTO COMPRENSIVO ED ADEGUAMENTO ALLE NORMATIVE DI SICUREZZA / AGRIGENTO / GIUNTI | | Default Value | | Running | euro | 21.09.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 92010 | Alessandria della Rocca | | * | 10 - Information Phase | 21.09.2021 15:25 | | | | No | No | | | | 4.500,00 € | euro |
| 398336 | | | ALFANO / COMPLETAMENTO E RISTRUTTURAZIONE DELL'ISTITUTO COMPRENSIVO ED ADEGUAMENTO ALLE NORMATIVE DI SICUREZZA / AGRIGENTO | | Default Value | | Running | euro | 21.09.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 92010 | Alessandria della Rocca | | * | 10 - Information Phase | 21.09.2021 15:25 | | | | No | No | | | | 4.500,00 € | euro |
| 398293-001 | | | HK5 / RECUPERO CASCINA PALAZZETTA / CUSAGO | | Default Value | | Running | euro | 21.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Cusago | | Via Gaggiano | 30 - Tender & Submission Phase | 21.09.2021 10:24 | | | | No | No | | | | | euro |
| 398293 | | | RECUPERO CASCINA PALAZZETTA / CUSAGO | | Default Value | | Running | euro | 21.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | Cusago | | Via Gaggiano | 20 - Planning Phase | 21.09.2021 10:23 | | | | No | No | | | | | euro |
| 398240-001 | | | GARA METROBUS / PADOVA / HSD | | Default Value | | Running | euro | 20.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 35100 | PADOVA | | -- | 30 - Tender & Submission Phase | 20.09.2021 16:42 | | | | No | No | | | | | euro |
| 398240 | | | GARA METROBUS / PADOVA | | Default Value | | Running | euro | 20.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | | -- | 10 - Information Phase | 20.09.2021 16:40 | | | | No | No | | | | | euro |
| 398078-001 | | | GARA / AMPLIAMENTO CENTRO LOGISTICO DELL' EDIFICIO PRODUTTIVO MILA LATTE / BOLZANO / HDB / HBT / HBS | | Default Value | | Running | euro | 16.09.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 16.09.2021 16:42 | | | | No | No | | | | 100.000,00 € | euro |
| 398078 | | | GARA / AMPLIAMENTO CENTRO LOGISTICO DELL' EDIFICIO PRODUTTIVO MILA LATTE / BOLZANO | | Default Value | | Running | euro | 16.09.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 16.09.2021 16:39 | | | | No | No | | | | 100.000,00 € | euro |
| 398055-001 | | | ANESE / NUOVO CANALE / VENETO/ HBT | | Default Value | | Running | euro | 16.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30023 | Concordia Sagittaria | | ---- | 40 - Realisation Phase | 16.09.2021 14:39 | | | | No | No | | | | | euro |
| 398055 | | | ANESE / NUOVO CANALE / VENETO | | Default Value | | Running | euro | 16.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30023 | Concordia Sagittaria | | ---- | 10 - Information Phase | 16.09.2021 14:36 | | | | No | No | | | | | euro |
| 397654 | | | LOMBARDIA / CTE / PANNELLI SANDWICH / 14-16 SETTEMBRE | | Default Value | | Running | euro | 13.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20129 | Milano | | VIALE PIAVE 10 | 10 - Information Phase | 13.09.2021 08:17 | | | | No | No | | | | | euro |
| 397638-001 | | | SACAIM / STEVANATO UFFICI / HUC | | Default Value | | Running | euro | 10.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 31030 | Riese Pio X | | -- | 40 - Realisation Phase | 10.09.2021 16:56 | | | | No | No | | | | | euro |
| 397638 | | | SACAIM / STEVANATO UFFICI | | Default Value | | Running | euro | 10.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31030 | Riese Pio X | | -- | 40 - Realisation Phase | 10.09.2021 16:55 | | | | No | No | | | | | euro |
| 397368-002 | | | HDB / EDIFICIO MR93 COIMA / MILANO | | Default Value | | Running | euro | 15.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20149 | Milano | Office building | via Monte Rosa, 93 | 30 - Tender & Submission Phase | 15.09.2021 07:10 | | | | No | No | | | | | euro |
| 397368-001 | | | HBT / EDIFICIO MR93 COIMA / MILANO | | Default Value | | Running | euro | 07.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20149 | Milano | Office building | via Monte Rosa, 93 | 30 - Tender & Submission Phase | 07.09.2021 18:53 | | | | No | No | | | | | euro |
| 397368 | | | EDIFICIO MR93 COIMA / MILANO | | Default Value | | Running | euro | 07.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20149 | Milano | Office building | via Monte Rosa, 93 | 30 - Tender & Submission Phase | 07.09.2021 18:48 | | | | No | No | | | | | euro |
| 397366-001 | | | HTA / INNOVATION BUILDING – HUMANITAS UNIVERSITY / PIEVE EMANUELE | | Default Value | | Running | euro | 07.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Parent Project | Halfen System Account | Italy | 20090 | Pieve Emanuele | Educational facility | Via Rita Levi Montalcini, 4 | 30 - Tender & Submission Phase | 07.09.2021 18:41 | | | | No | No | | | | | euro |
| 397366 | | | INNOVATION BUILDING – HUMANITAS UNIVERSITY / PIEVE EMANUELE | | Default Value | | Running | euro | 07.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Parent Project | Halfen System Account | Italy | 20090 | Pieve Emanuele | Educational facility | Via Rita Levi Montalcini, 4 | 30 - Tender & Submission Phase | 07.09.2021 18:38 | | | | No | No | | | | | euro |
| 397290-001 | | | TERREAL / REALIZZAZIONE DI UN PIANO DI RECUPERO DI INIZIATIVA PRIVATA / TERAMO / FK5 | | Default Value | | Running | euro | 07.09.2021 | | IABR-ABRUZZO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 64100 | Teramo | | via duca d'aosta 37 | 10 - Information Phase | 07.09.2021 09:06 | | | | No | No | | | | | euro |
| 397290 | | | TERREAL / REALIZZAZIONE DI UN PIANO DI RECUPERO DI INIZIATIVA PRIVATA / TERAMO | | Default Value | | Running | euro | 07.09.2021 | | IABR-ABRUZZO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 64100 | Teramo | | via duca d'aosta 37 | 10 - Information Phase | 07.09.2021 09:06 | | | | No | No | | | | | euro |
| 397245-001 | | | GARA / CAVALLINO BIANCO FAMILY SPA BEACH RESORT / CAORLE (VE) / HDB E HTT | | Default Value | | Running | euro | 06.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30020 | Caorle | | * | 30 - Tender & Submission Phase | 06.09.2021 15:22 | | | | No | No | | | | | euro |
| 397245 | | | GARA / CAVALLINO BIANCO FAMILY SPA BEACH RESORT / CAORLE (VE) | | Default Value | | Running | euro | 06.09.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30020 | Caorle | | * | 30 - Tender & Submission Phase | 06.09.2021 15:21 | | | | No | No | | | | | euro |
| 396698-001 | | | CODING / PROGETTAZIONE DEFINITIVA DEL SISTEMA DEGLI ASSI DI FORZA PER IL SISTEMA PUBBLICO LOCALE / GENOVA / HCC | | Default Value | | Running | euro | 03.09.2021 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | | * | 30 - Tender & Submission Phase | 03.09.2021 10:05 | | | | No | No | | | | 50.000,00 € | euro |
| 396698 | | | CODING / PROGETTAZIONE DEFINITIVA DEL SISTEMA DEGLI ASSI DI FORZA PER IL SISTEMA PUBBLICO LOCALE / GENOVA | | Default Value | | Running | euro | 03.09.2021 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | * | 10 - Information Phase | 03.09.2021 10:05 | | | | No | No | | | | 50.000,00 € | euro |
| 396660-001 | | | GARA / CANTINA DONORATICO / GROSSETO / HBT / HBS / HSC / HB | | Default Value | | Running | euro | 02.09.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 58100 | Grosseto | | * | 30 - Tender & Submission Phase | 02.09.2021 15:31 | | | | No | No | | | | 60.000,00 € | euro |
| 396660 | | | GARA / CANTINA DONORATICO / GROSSETO | | Default Value | | Running | euro | 02.09.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58100 | Grosseto | | * | 10 - Information Phase | 02.09.2021 15:31 | | | | No | No | | | | 60.000,00 € | euro |
| 396652-001 | | | HTA-CE A4 / DATA CENTER QUINIX ML07 / SETTIMO MILANESE MI | | Default Value | | Running | euro | 02.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20019 | Settimo Milanese | | Via Reiss Romoli, 40 | 40 - Realisation Phase | 02.09.2021 15:00 | | | | No | No | | | | | euro |
| 396652 | | | DATA CENTER QUINIX ML07 / SETTIMO MILANESE MI | | Default Value | | Running | euro | 02.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20019 | Settimo Milanese | | Via Reiss Romoli, 40 | 30 - Tender & Submission Phase | 02.09.2021 14:56 | | | | No | No | | | | | euro |
| 396400-001 | | | GARA / COIMA RES / MILANO / HDB | | Default Value | | Running | euro | 31.08.2021 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 02124 | MILANO | | VIA MONTEROSA 93 | 30 - Tender & Submission Phase | 31.08.2021 08:32 | | | | No | No | | | | 4.700,00 € | euro |
| 396400 | | | GARA / COIMA RES / MILANO | | Default Value | | Running | euro | 31.08.2021 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 02124 | MILANO | | VIA MONTEROSA 93 | 10 - Information Phase | 31.08.2021 08:32 | | | | No | No | | | | 4.700,00 € | euro |
| 396258-002 | | | HBT / GB04 / GREEN BUILDING CAMPUS ENERGY PARK / VIMERCATE MB | | Default Value | | Running | euro | 27.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20871 | Vimercate | Educational facility | Via Energy Park | 30 - Tender & Submission Phase | 27.08.2021 17:17 | | | | No | No | | | | | euro |
| 396258-001 | | | DETAN / GB04 / GREEN BUILDING CAMPUS ENERGY PARK / VIMERCATE MB | | Default Value | | Running | euro | 27.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20871 | Vimercate | Educational facility | Via Energy Park | 30 - Tender & Submission Phase | 27.08.2021 10:54 | | | | No | No | | | | | euro |
| 396258 | | | GB04 / GREEN BUILDING CAMPUS ENERGY PARK / VIMERCATE MB | | Default Value | | Running | euro | 27.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | Vimercate | Educational facility | Via Energy Park | 30 - Tender & Submission Phase | 27.08.2021 10:51 | | | | No | No | | | | | euro |
| 394985-001 | | | GIAMPI / ALTA VELOCITA' FRANCESE / DETAN | | Default Value | | Running | euro | 06.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 31100 | TREVISO (TV) | | --- | 30 - Tender & Submission Phase | 06.08.2021 14:07 | | | | No | No | | | | | euro |
| 394985 | | | GIAMPI / ALTA VELOCITA' FRANCESE | | Default Value | | Running | euro | 06.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO (TV) | | --- | 10 - Information Phase | 06.08.2021 13:58 | | | | No | No | | | | | euro |
| 394944-001 | | | NUOVA INSEDIAMENTO SIDERURGICIO TRIESTE / HCC | | Default Value | | Running | euro | 05.08.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 34100 | TRIESTE | | PORTO | 30 - Tender & Submission Phase | 05.08.2021 13:54 | | | | No | No | | | | | euro |
| 394944 | | | NUOVA INSEDIAMENTO SIDERURGICIO TRIESTE | | Default Value | | Running | euro | 05.08.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | PORTO | 30 - Tender & Submission Phase | 05.08.2021 13:53 | | | | No | No | | | | | euro |
| 394942-001 | | | STRUTTURA IN CARPENTERIA SICILIA / DETAN | | Default Value | | Running | euro | 05.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 90100 | PALERMO | | --- | 20 - Planning Phase | 05.08.2021 13:52 | | | | No | No | | | | | euro |
| 394942 | | | STRUTTURA IN CARPENTERIA SICILIA | | Default Value | | Running | euro | 05.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 90100 | PALERMO | | --- | 20 - Planning Phase | 05.08.2021 13:51 | | | | No | No | | | | | euro |
| 394940-001 | | | CEV TORRI RESIDENZIALE JESOLO / HDB | | Default Value | | Running | euro | 05.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30016 | Jesolo | | --- | 10 - Information Phase | 05.08.2021 13:50 | | | | No | No | | | | | euro |
| 394940 | | | CEV TORRI RESIDENZIALE JESOLO | | Default Value | | Running | euro | 05.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30016 | Jesolo | | --- | 10 - Information Phase | 05.08.2021 13:49 | | | | No | No | | | | | euro |
| 394938-002 | | | PORTO PETROLI SESTRI PONENTE NUOVA CALATA / MBT o DEMU | | Default Value | | Running | euro | 10.09.2021 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 16153 | SESTRI PONENTE (GE) | | PORTO PETROLI | 30 - Tender & Submission Phase | 10.09.2021 11:26 | | | | No | No | | | | | euro |
| 394938-001 | | | PORTO PETROLI SESTRI PONENTE NUOVA CALATA / HSD CRET | | Default Value | | Running | euro | 05.08.2021 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 16153 | SESTRI PONENTE (GE) | | PORTO PETROLI | 30 - Tender & Submission Phase | 05.08.2021 13:40 | | | | No | No | | | | | euro |
| 394938 | | | PORTO PETROLI SESTRI PONENTE NUOVA CALATA | | Default Value | | Running | euro | 05.08.2021 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 16153 | SESTRI PONENTE (GE) | | PORTO PETROLI | 30 - Tender & Submission Phase | 05.08.2021 13:39 | | | | No | No | | | | | euro |
| 394801-001 | | | MBT-ETHA / P759 ARMY FAMILY HOUSING / CASERMA EDERLE | | Default Value | | Running | euro | 03.08.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 36100 | Vicenza | Residential houses | VIA CASERMETTE 125 | 30 - Tender & Submission Phase | 03.08.2021 16:01 | | | | No | No | | | | | euro |
| 394801 | | | PERCASSI / P759 ARMY FAMILY HOUSING / CASERMA EDERLE | | Default Value | | Running | euro | 03.08.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36100 | Vicenza | Residential houses | VIA CASERMETTE 125 | 30 - Tender & Submission Phase | 03.08.2021 15:46 | | | | No | No | | | | | euro |
| 394799-001 | | | FRANCESCO VENTURA / DEMOLIZIONE CON RICOSTRUZIONE CASA AGUAI / TRENTO (VILLE DI FIEMME) / HIT | | Default Value | | Running | euro | 03.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 38120 | TRENTO | | LOC. AGUAI C.C. CARANO | 40 - Realisation Phase | 03.08.2021 15:31 | | | | No | No | | | | | euro |
| 394799 | | | FRANCESCO VENTURA / DEMOLIZIONE CON RICOSTRUZIONE CASA AGUAI / TRENTO (VILLE DI FIEMME) | | Default Value | | Running | euro | 03.08.2021 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 38120 | TRENTO | | LOC. AGUAI C.C. CARANO | 10 - Information Phase | 03.08.2021 15:31 | | | | No | No | | | | | euro |
| 394774-001 | | | RESIDENZIALE PORDENONE / HIT | | Default Value | | Running | euro | 03.08.2021 | | IFRI-FRIULI VENEZIA GIULIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 33080 | Prata di Pordenone | | __ | 10 - Information Phase | 03.08.2021 11:18 | | | | No | No | | | | | euro |
| 394774 | | | RESIDENZIALE PORDENONE | | Default Value | | Running | euro | 03.08.2021 | | IFRI-FRIULI VENEZIA GIULIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 33080 | Prata di Pordenone | | __ | 10 - Information Phase | 03.08.2021 11:08 | | | | No | No | | | | | euro |
| 394648-001 | | | COSEDIL / ST MICROELECTRONICS / CATANIA / HTA | | Default Value | | Running | euro | 30.07.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 95100 | CATANIA | | * | 30 - Tender & Submission Phase | 30.07.2021 11:52 | | | | No | No | | | | 52.000,00 € | euro |
| 394648 | | | COSEDIL / ST MICROELECTRONICS / CATANIA | | Default Value | | Running | euro | 30.07.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 95100 | CATANIA | | * | 10 - Information Phase | 30.07.2021 11:52 | | | | No | No | | | | 52.000,00 € | euro |
| 394479-001 | | | FOCCHI / TER / ROMA / HZM | | Default Value | | Running | euro | 28.07.2021 | | ILAZ-LAZIO | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 00100 | ROMA | | X | 40 - Realisation Phase | 28.07.2021 10:19 | | | | No | No | | | | 160.000,00 € | euro |
| 394479 | | | FOCCHI / TER / ROMA | | Default Value | | Running | euro | 28.07.2021 | | ILAZ-LAZIO | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | | X | 10 - Information Phase | 28.07.2021 10:18 | | | | No | No | | | | 160.000,00 € | euro |
| 394376-001 | | | HK5 / UNIFAMILIARE via delle Caselle, Ripalta Cremasca CR | | Default Value | | Running | euro | 27.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 26010 | Ripalta Cremasca | | via delle Caselle | 20 - Planning Phase | 27.07.2021 07:25 | | | | No | No | | | | | euro |
| 394376 | | | UNIFAMILIARE via delle Caselle, Ripalta Cremasca CR | | Default Value | | Running | euro | 27.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26010 | Ripalta Cremasca | | via delle Caselle | 20 - Planning Phase | 27.07.2021 07:21 | | | | No | No | | | | | euro |
| 394275-001 | | | TERREAL / NUOVA PALAZZINA / BRUGHERIO / FK5 | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 20861 | Brugherio | | via S.G. Bosco | 30 - Tender & Submission Phase | 23.07.2021 14:37 | | | | No | No | | | | | euro |
| 394275 | | | TERREAL / NUOVA PALAZZINA / BRUGHERIO | | Default Value | | Running | euro | 23.07.2021 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 20861 | Brugherio | | via S.G. Bosco | 10 - Information Phase | 23.07.2021 14:37 | | | | No | No | | | | | euro |
| 394164-001 | | | TRINACRIA IMMOBILIARE / POLO LOGISTICO AMAZON / PALERMO / GIUNTI | | Default Value | | Running | euro | 22.07.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 90100 | PALERMO | | * | 30 - Tender & Submission Phase | 22.07.2021 11:03 | | | | No | No | | | | 60.000,00 € | euro |
| 394164 | | | TRINACRIA IMMOBILIARE / POLO LOGISTICO AMAZON / PALERMO | | Default Value | | Running | euro | 22.07.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 90100 | PALERMO | | * | 10 - Information Phase | 22.07.2021 11:03 | | | | No | No | | | | 60.000,00 € | euro |
| 394146 | | | COMPLESSO RESIDENZIALE E ALBERGHIERO "COLLE VEIO" | | Default Value | | Running | euro | 22.07.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00189 | Roma | Residential houses | Via Di Grottarossa | 10 - Information Phase | 22.07.2021 09:46 | | | | No | No | | | | | euro |
| 394137 | | | NUOVO HYPER CLOUD DATACENTER ARUBA | | Default Value | | Running | euro | 22.07.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00131 | Roma | Office building | Via G. Peroni | 10 - Information Phase | 22.07.2021 09:18 | | | | No | No | | | | | euro |
| 394133-001 | | | HIT / RESIDENZIALE / MAFFATTI FRANCESCA / MONTAGNA IN VALTELLINA | | Default Value | | Running | euro | 22.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Parent Project | Halfen System Account | Italy | 23020 | Montagna in Valtellina | | Via Cà Paroni | 30 - Tender & Submission Phase | 22.07.2021 09:08 | | | | No | No | | | | | euro |
| 394133 | | | RESIDENZIALE / MAFFATTI FRANCESCA / MONTAGNA IN VALTELLINA | | Default Value | | Running | euro | 22.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Parent Project | Halfen System Account | Italy | 23020 | Montagna in Valtellina | | Via Cà Paroni | 30 - Tender & Submission Phase | 22.07.2021 09:04 | | | | No | No | | | | | euro |
| 393996-001 | | | BUILDING SPA / RISTRUTTURAZIONE EDILIZIA PER TRASFORMAZIONE DA RESIDENZA STUDENTATO IN CIVILE ABITAZIONE CON MODIFICHE INTERNE E DI FACCIATA / TORINO / HIT | | Default Value | | Running | euro | 20.07.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | * | 40 - Realisation Phase | 20.07.2021 12:16 | | | | No | No | | | | | euro |
| 393996 | | | BUILDING SPA / RISTRUTTURAZIONE EDILIZIA PER TRASFORMAZIONE DA RESIDENZA STUDENTATO IN CIVILE ABITAZIONE CON MODIFICHE INTERNE E DI FACCIATA / TORINO | | Default Value | | Running | euro | 20.07.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 20.07.2021 12:15 | | | | No | No | | | | | euro |
| 393988-001 | | | I.G.C / OPERE PER LA MITIGAZIONE DELLE CRITICITA' IDROLOGICHE A DIFESA DEL CENTRO ABITATO E DEL RIONE BARCA / RAFFADALI / MBT | | Default Value | | Running | euro | 20.07.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 92015 | Raffadali | | * | 10 - Information Phase | 20.07.2021 11:26 | | | | No | No | | | | 150.000,00 € | euro |
| 393988 | | | I.G.C / OPERE PER LA MITIGAZIONE DELLE CRITICITA' IDROLOGICHE A DIFESA DEL CENTRO ABITATO E DEL RIONE BARCA / RAFFADALI | | Default Value | | Running | euro | 20.07.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 92015 | Raffadali | | * | 10 - Information Phase | 20.07.2021 11:26 | | | | No | No | | | | 150.000,00 € | euro |
| 393841-001 | | | FREA & FREA / AMPLIAMENTO FERRERO / ALBA / DETAN | | Default Value | | Running | euro | 16.07.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 12051 | Alba | | * | 30 - Tender & Submission Phase | 16.07.2021 16:13 | | | | No | No | | | | 22.000,00 € | euro |
| 393841 | | | FREA & FREA / AMPLIAMENTO FERRERO / ALBA | | Default Value | | Running | euro | 16.07.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 12051 | Alba | | * | 10 - Information Phase | 16.07.2021 16:13 | | | | No | No | | | | 22.000,00 € | euro |
| 393687-001 | | | NUOVO HYPER CLOUD / ARUBA / TECNO POLO / ROMA | | Default Value | | Running | euro | 15.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 00131 | Roma | | VIA TIBURTINA | 10 - Information Phase | 15.07.2021 07:15 | | | | No | No | | | | | euro |
| 393687 | | | NUOVO HYPER CLOUD / ARUBA / TECNO POLO / ROMA | | Default Value | | Running | euro | 15.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 00131 | Roma | | VIA TIBURTINA | 10 - Information Phase | 15.07.2021 07:14 | | | | No | No | | | | | euro |
| 393636-001 | | | PERIN COSTRUZIONI / NUOVA COSTRUZIONE DI UN FABBRICATO AD USO RESIDENZIALE / PADOVA/ HIT | | Default Value | | Running | euro | 14.07.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 35010 | Borgoricco | | * | 40 - Realisation Phase | 14.07.2021 14:18 | | | | No | No | | | | | euro |
| 393636 | | | PERIN COSTRUZIONI / NUOVA COSTRUZIONE DI UN FABBRICATO AD USO RESIDENZIALE / PADOVA | | Default Value | | Running | euro | 14.07.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 35010 | Borgoricco | | * | 10 - Information Phase | 14.07.2021 13:51 | | | | No | No | | | | | euro |
| 393606-001 | | | TERREAL / ABITAZIONE VILLA / MODENA/FK5 | | Default Value | | Running | euro | 14.07.2021 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 41120 | MODENA | | VIA DEL SAGITTARIO | 10 - Information Phase | 14.07.2021 09:57 | | | | No | No | | | | | euro |
| 393606 | | | TERREAL / ABITAZIONE VILLA / MODENA | | Default Value | | Running | euro | 14.07.2021 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 41120 | MODENA | | VIA DEL SAGITTARIO | 10 - Information Phase | 14.07.2021 09:33 | | | | No | No | | | | | euro |
| 393447-001 | | | HDB / Ampliamento del CNAO - PAVIA / | | Default Value | | Running | euro | 12.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 27100 | Pavia | Medical facility | Strada Campeggi 53 | 30 - Tender & Submission Phase | 12.07.2021 15:10 | | | | No | No | | | | | euro |
| 393447 | | | Ampliamento del CNAO - PAVIA / | | Default Value | | Running | euro | 12.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | Pavia | Medical facility | Strada Campeggi 53 | 30 - Tender & Submission Phase | 12.07.2021 15:07 | | | | No | No | | | | | euro |
| 393209-001 | | | HDB / CAMPUS BIO-MEDICO / ROMA | | Default Value | | Running | euro | 26.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 00128 | Roma | Medical facility | Via Álvaro del Portillo | 40 - Realisation Phase | 26.10.2021 17:56 | | | | No | No | | | | | euro |
| 393209 | | | CAMPUS BIO-MEDICO / ROMA | | Default Value | | Running | euro | 08.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 00128 | Roma | | Via Álvaro del Portillo | 40 - Realisation Phase | 08.07.2021 11:40 | | | | No | No | | | | | euro |
| 393112-001 | | | HSD / COIMA / RIQUALIFICAZIONE EDIFICIO / VIA PIRELLI 35 MILANO | | Default Value | | Running | euro | 07.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | | VIA PIRELLI 25 | 30 - Tender & Submission Phase | 07.07.2021 15:24 | | | | No | No | | | | | euro |
| 393112 | | | COIMA / RIQUALIFICAZIONE EDIFICIO / VIA PIRELLI 35 MILANO | | Default Value | | Running | euro | 07.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | | VIA PIRELLI 25 | 30 - Tender & Submission Phase | 07.07.2021 15:23 | | | | No | No | | | | | euro |
| 393013-001 | | | HIT / COMPLESSO 4 TORRI / PROGETTO 2018 / VIA BELFIORE LECCO | | Default Value | | Running | euro | 06.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23900 | LECCO (LC) | Residential houses | Via Belfiore | 30 - Tender & Submission Phase | 06.07.2021 17:51 | | | | No | No | | | | | euro |
| 393013 | | | COMPLESSO 4 TORRI / PROGETTO 2018 / VIA BELFIORE LECCO | | Default Value | | Running | euro | 06.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO (LC) | Residential houses | Via Belfiore | 30 - Tender & Submission Phase | 06.07.2021 17:49 | | | | No | No | | | | | euro |
| 392859-001 | | | RECUPERO "FORTEZZA MARGHERA" MESTRE / DETAN | | Default Value | | Running | euro | 05.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30171 | Mestre | | " FORTEZZA" | 30 - Tender & Submission Phase | 05.07.2021 15:31 | | | | No | No | | | | | euro |
| 392859 | | | RECUPERO "FORTEZZA MARGHERA" MESTRE | | Default Value | | Running | euro | 05.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30171 | Mestre | | " FORTEZZA" | 30 - Tender & Submission Phase | 05.07.2021 15:31 | | | | No | No | | | | | euro |
| 392834-001 | | | GARA / NUOVE SCUOLE PROFESSIONALI "MARCONI" / MERANO / HDB | | Default Value | | Running | euro | 05.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39010 | Merano | | Via Maso Hilber | 30 - Tender & Submission Phase | 05.07.2021 14:07 | | | | No | No | | | | 40.000,00 € | euro |
| 392834 | | | GARA / NUOVE SCUOLE PROFESSIONALI "MARCONI" / MERANO | | Default Value | | Running | euro | 05.07.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39010 | Merano | | Via Maso Hilber | 10 - Information Phase | 05.07.2021 14:07 | | | | No | No | | | | 40.000,00 € | euro |
| 392706 | | | GARA / EX TEATRO FIRENZE / FIRENZE | | Default Value | | Running | euro | 02.07.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | * | 10 - Information Phase | 02.07.2021 10:43 | | | | No | No | | | | | euro |
| 392661-001 | | | AMPLIAMENTO COLLEGIO ROMANO DELLA SANTA CROCE /GIUNTI | | Default Value | | Running | euro | 01.07.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00189 | Roma | | Via di Grottarossa 1375 | 40 - Realisation Phase | 01.07.2021 18:35 | | | | No | No | | | | | euro |
| 392661 | | | AMPLIAMENTO COLLEGIO ROMANO DELLA SANTA CROCE | | Default Value | | Running | euro | 01.07.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00189 | Roma | | Via di Grottarossa 1375 | 10 - Information Phase | 01.07.2021 18:33 | | | | No | No | | | | | euro |
| 392544-001 | | | RICOSTRUZIONE ITIS-Divini /HDB | | Default Value | | Running | euro | 30.06.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 62027 | San Severino Marche | | Piazza Alessandro Luzio | 10 - Information Phase | 30.06.2021 16:41 | | | | No | No | | | | | euro |
| 392544 | | | RICOSTRUZIONE ITIS-Divini | | Default Value | | Running | euro | 30.06.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62027 | San Severino Marche | | Piazza Alessandro Luzio | 10 - Information Phase | 30.06.2021 16:37 | | | | No | No | | | | | euro |
| 392451-001 | | | GARA / RIQUALIFICAZIONE IMMOBILE / MILANO / HSD | | Default Value | | Running | euro | 29.06.2021 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 02124 | MILANO | | VIA PIRELLI 35 | 30 - Tender & Submission Phase | 29.06.2021 16:36 | | | | No | No | | | | 30.000,00 € | euro |
| 392451 | | | GARA / RIQUALIFICAZIONE IMMOBILE / MILANO | | Default Value | | Running | euro | 29.06.2021 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 02124 | MILANO | | VIA PIRELLI 35 | 10 - Information Phase | 29.06.2021 16:36 | | | | No | No | | | | 30.000,00 € | euro |
| 392391-001 | | | GARA / RIQUALIFICAZIONE SCUOLA / VERNIO / GIUNTI | | Default Value | | Running | euro | 29.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 59024 | Vernio | | * | 30 - Tender & Submission Phase | 29.06.2021 11:25 | | | | No | No | | | | 8.000,00 € | euro |
| 392391 | | | GARA / RIQUALIFICAZIONE SCUOLA / VERNIO | | Default Value | | Running | euro | 29.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59024 | Vernio | | * | 10 - Information Phase | 29.06.2021 11:25 | | | | No | No | | | | 8.000,00 € | euro |
| 392168-001 | | | COMPLESSO RESIDENZIALE PORDENONE / HIT | | Default Value | | Running | euro | 25.06.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33080 | Prata di Pordenone | | -- | 40 - Realisation Phase | 25.06.2021 09:44 | | | | No | No | | | | | euro |
| 392168 | | | COMPLESSO RESIDENZIALE PORDENONE | | Default Value | | Running | euro | 25.06.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33080 | Prata di Pordenone | | -- | 40 - Realisation Phase | 25.06.2021 09:29 | | | | No | No | | | | | euro |
| 392075-003 | | | RESIDENCE CORTE ARANCI BARDOLINO / VITI ACC | | Default Value | | Running | euro | 27.07.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37011 | Bardolino | | VIA MONSUREI | 40 - Realisation Phase | 27.07.2021 14:58 | | | | No | No | | | | | euro |
| 392075-001 | | | RESIDENCE CORTE ARANCI / HIT | | Default Value | | Running | euro | 24.06.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37011 | Bardolino | | VIA MONSUREI | 40 - Realisation Phase | 24.06.2021 10:53 | | | | No | No | | | | | euro |
| 392075 | | | RESIDENCE CORTE ARANCI BARDOLINO | | Default Value | | Running | euro | 24.06.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37011 | Bardolino | | VIA MONSUREI | 40 - Realisation Phase | 24.06.2021 10:49 | | | | No | No | | | | | euro |
| 391992 | | | Realizzazione 350 loculi e 96 nicchie nel cimitero di San Michele | | Default Value | | Running | euro | 01.06.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Piazza Dei Castellani 2 | 10 - Information Phase | 23.06.2021 11:45 | 4554 | | | No | No | | | | | euro |
| 391991 | | | Recup alloggi/immobili inutilizzati da adibire a servizi valenza sociale | | Default Value | | Running | euro | 01.06.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Via S. Maria Goretti Ex scuola | 10 - Information Phase | 23.06.2021 11:45 | 4553 | | | No | No | | | | | euro |
| 391990 | | | Complet lavori di recupero scuola all'aperto A. Mereu x realizz asilo nido | | Default Value | | Running | euro | 27.04.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Viale Regina Elena | 10 - Information Phase | 23.06.2021 11:45 | 4552 | | | No | No | | | | | euro |
| 391989 | | | Restauro palazzo storico ad uso residenziale ricettivo | | Default Value | | Running | euro | 22.04.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Largo C. Felice 6 | 10 - Information Phase | 23.06.2021 11:45 | 4551 | | | No | No | | | | | euro |
| 391988 | | | Lavori di manutenzione straordinaria plesso scuole elementari | | Default Value | | Running | euro | 01.06.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09099 | URAS | | Via G. Deledda 2 | 10 - Information Phase | 23.06.2021 11:45 | 4550 | | | No | No | | | | | euro |
| 391987 | | | Messa in sicurezza e restauro Chiesa Parrocchiale S.Pietro Apostolo | | Default Value | | Running | euro | 27.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09078 | SCANO DI MONTIFERRO | Technical facilities | Viale Monsignor Contini | 10 - Information Phase | 23.06.2021 11:45 | 4549 | | | No | No | | | | | euro |
| 391986 | | | Lavori di completamento del cimitero comunale (1� stralcio) | | Default Value | | Running | euro | 18.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | VILLAPUTZU | Technical facilities | Capoluogo | 10 - Information Phase | 23.06.2021 11:45 | 4548 | | | No | No | | | | | euro |
| 391985 | | | Lavori di restauro Chiesa S. Andrea e riqualificazione PIazza | | Default Value | | Running | euro | 27.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09032 | ASSEMINI | Technical facilities | Piazza S. Andrea / Via Sardegna | 10 - Information Phase | 23.06.2021 11:45 | 4547 | | | No | No | | | | | euro |
| 391984 | | | Lavori di realizzazione fabbricato ad uso deposito | | Default Value | | Running | euro | 04.06.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09026 | SAN SPERATE | Industry building | Via delle Canne | 10 - Information Phase | 23.06.2021 11:45 | 4546 | | | No | No | | | | | euro |
| 391983 | | | Ristr campo calcio ex Casmez rifac erba sintetica opere di completamento | | Default Value | | Running | euro | 27.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09016 | IGLESIAS | | Localita' Monte Figu | 10 - Information Phase | 23.06.2021 11:45 | 4545 | | | No | No | | | | | euro |
| 391982 | | | Adeg statico normativa antincendio/adeg scuola primaria Villaggio Operaio | | Default Value | | Running | euro | 26.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09016 | IGLESIAS | | Via Calabria 64 | 10 - Information Phase | 23.06.2021 11:45 | 4544 | | | No | No | | | | | euro |
| 391981 | | | Lavori di completamento palestra stalcio funzionale | | Default Value | | Running | euro | 28.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | VILLAMASSARGIA | | Localita' Le Aie | 10 - Information Phase | 23.06.2021 11:45 | 4543 | | | No | No | | | | | euro |
| 391980 | | | Lavori del progetto parco e centro servizi del Monte Gonare | | Default Value | | Running | euro | 20.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08026 | ORANI | | Su Suercone Loc Monte Gonare | 10 - Information Phase | 23.06.2021 11:45 | 4542 | | | No | No | | | | | euro |
| 391979 | | | Lavori di ristrutturazione e messa a norma impianto sportivo Campo Italia | | Default Value | | Running | euro | 14.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08013 | BOSA | | Via Logudoro 2 | 10 - Information Phase | 23.06.2021 11:45 | 4541 | | | No | No | | | | | euro |
| 391978 | | | Lavori di riqualificazione Piazza Civica | | Default Value | | Running | euro | 10.06.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Via Columbano / Piazza Civica | 10 - Information Phase | 23.06.2021 11:45 | 4540 | | | No | No | | | | | euro |
| 391977 | | | Interv edili/impiantistici messa in sicur adeg compl teatrale Michelucci | | Default Value | | Running | euro | 30.04.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Via Cesare Pavese | 10 - Information Phase | 23.06.2021 11:45 | 4539 | | | No | No | | | | | euro |
| 391976 | | | Lavori di recupero e restauro della Chiesa di San Pietro | | Default Value | | Running | euro | 28.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07025 | LURAS | | Localita' Silonis | 10 - Information Phase | 23.06.2021 11:45 | 4538 | | | No | No | | | | | euro |
| 391975 | | | Costruzione nuova scuola primaria e dell'infanzia | | Default Value | | Running | euro | 27.04.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | LOIRI PORTO SAN PAOLO | | Viale Dante | 10 - Information Phase | 23.06.2021 11:45 | 4537 | | | No | No | | | | | euro |
| 391646-001 | | | HDB / UNIMI / CAMPUS SCIENTIFICO DELL'UNIVERSITA' / MIND EX EXPO | | Default Value | | Running | euro | 20.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20157 | Milano | Educational facility | via Belgioioso | 40 - Realisation Phase | 20.06.2021 17:27 | | | | No | No | | | | | euro |
| 391646 | | | UNIMI / CAMPUS SCIENTIFICO DELL'UNIVERSITA' / MIND EX EXPO | | Default Value | | Running | euro | 20.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20157 | Milano | Educational facility | via Belgioioso | 40 - Realisation Phase | 20.06.2021 17:16 | | | | No | No | | | | | euro |
| 391637-001 | | | MBT / TORRE FARO A2A / SYMBIOSIS MILANO | | Default Value | | Running | euro | 18.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20139 | Milano | Residential houses | Via Brembo | 30 - Tender & Submission Phase | 18.06.2021 17:20 | | | | No | No | | | | | euro |
| 391637 | | | TORRE FARO A2A / SYMBIOSIS MILANO | | Default Value | | Running | euro | 18.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20139 | Milano | Residential houses | Via Brembo | 20 - Planning Phase | 18.06.2021 17:17 | | | | No | No | | | | | euro |
| 391550-001 | | | GARA / INTERVENTI DI MIGLIORAMENTO DELLE OPERE D'ARTE LOTTO 1 "VIADOTTO BORIO" / CUNEO / HBT | | Default Value | | Running | euro | 18.06.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 12100 | Cuneo | | * | 30 - Tender & Submission Phase | 18.06.2021 09:28 | | | | No | No | | | | 4.000,00 € | euro |
| 391550 | | | GARA / INTERVENTI DI MIGLIORAMENTO DELLE OPERE D'ARTE LOTTO 1 "VIADOTTO BORIO" / CUNEO | | Default Value | | Running | euro | 18.06.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 12100 | Cuneo | | * | 10 - Information Phase | 18.06.2021 09:28 | | | | No | No | | | | 4.000,00 € | euro |
| 391461-001 | | | HDB / TORRE D RESIDENZIALE / VIMERCATE / GIAMBELLI | | Default Value | | Running | euro | 17.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20871 | Vimercate | Residential houses | VUIA tORRI bIANCHE | 40 - Realisation Phase | 17.06.2021 12:56 | | | | No | No | | | | | euro |
| 391461 | | | TORRE D RESIDENZIALE / VIMERCATE / GIAMBELLI | | Default Value | | Running | euro | 17.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | Vimercate | | VUIA tORRI bIANCHE | 40 - Realisation Phase | 17.06.2021 12:55 | | | | No | No | | | | | euro |
| 391410 | | | Costruzione (demoricostruzione) edificio ad uso abitazione | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46100 | MANTOVA | Residential houses | Via A. Loria | 10 - Information Phase | 17.06.2021 09:00 | 4536 | | | No | No | | | | | euro |
| 391409 | | | Lavori di riqualif ospedale psichiatrico per nuova REMS 120 posti letto | | Default Value | | Running | euro | 23.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46043 | CASTIGLIONE DELLE STIVIERE | | Loc. Ghisiola | 10 - Information Phase | 17.06.2021 09:00 | 4535 | | | No | No | | | | | euro |
| 391408 | | | Costruzione supermercato Eurospin | | Default Value | | Running | euro | 06.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27036 | MORTARA | Technical facilities | Viale Vecellio | 10 - Information Phase | 17.06.2021 09:00 | 4534 | | | No | No | | | | | euro |
| 391407 | | | Completamento nuovo ponte sul fiume Ticino | | Default Value | | Running | euro | 24.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27029 | VIGEVANO | Technical facilities | S.S. n.494 | 10 - Information Phase | 17.06.2021 09:00 | 4533 | | | No | No | | | | | euro |
| 391406 | | | Demoricostruzione edificio polifunzionale nuova sede AFM Crema | | Default Value | | Running | euro | 08.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Technical facilities | Vie Gramsci / Samarani | 10 - Information Phase | 17.06.2021 09:00 | 4532 | | | No | No | | | | | euro |
| 391405 | | | Costruzione supermercato Famila 3800 mq ed opere urbanizzazione | | Default Value | | Running | euro | 03.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Technical facilities | Via Gaeta | 10 - Information Phase | 17.06.2021 09:00 | 4531 | | | No | No | | | | | euro |
| 391404 | | | Costruzione RSA 120 posti anziani non autosufficienti + CDI 20 posti | | Default Value | | Running | euro | 30.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via Romiglia | 10 - Information Phase | 17.06.2021 09:00 | 4530 | | | No | No | | | | | euro |
| 391403 | | | Demoricostruz supermercato 1500mq ristorante 1700mq 2 piani interr boxes | | Default Value | | Running | euro | 26.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25088 | TOSCOLANO MADERNO | Technical facilities | Via Religione 56 | 10 - Information Phase | 17.06.2021 09:00 | 4529 | | | No | No | | | | | euro |
| 391402 | | | Costruzione polo oncologico 3 piani 2500 mq=opere impiantistiche | | Default Value | | Running | euro | 21.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25025 | MANERBIO | | Lungomella Valsecchi | 10 - Information Phase | 17.06.2021 09:00 | 4528 | | | No | No | | | | | euro |
| 391401 | | | Costruzione edificio 4 unita' abitative ad uso abitazione e boxes | | Default Value | | Running | euro | 09.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24068 | SERIATE | Residential houses | Via Galvani 8/C | 10 - Information Phase | 17.06.2021 09:00 | 4527 | | | No | No | | | | | euro |
| 391400 | | | Costruzione efificio ad uso abitazione e boxes 9 unita' abitative | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24068 | SERIATE | Residential houses | Via Paderno 35 | 10 - Information Phase | 17.06.2021 09:00 | 4526 | | | No | No | | | | | euro |
| 391399 | | | Demoricostruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 01.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO | Residential houses | Vie Resegone / Don Piatti | 10 - Information Phase | 17.06.2021 09:00 | 4525 | | | No | No | | | | | euro |
| 391398 | | | Costruzione supermercato 1600 mq edificio E ex area Pagani e OO UU | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO | Technical facilities | Via Belfiore 73 | 10 - Information Phase | 17.06.2021 09:00 | 4524 | | | No | No | | | | | euro |
| 391397 | | | Costruzione edificio ad uso abitazione 6 piani ft 24 unita' abitative | | Default Value | | Running | euro | 14.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO | Residential houses | Via Caduti Lecchesi A Fossoli 13 | 10 - Information Phase | 17.06.2021 09:00 | 4523 | | | No | No | | | | | euro |
| 391396 | | | Costruzione passerella ciclopedonale a scavalco della SS 36 | | Default Value | | Running | euro | 14.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23895 | NIBIONNO | Technical facilities | S.S. N. 36 | 10 - Information Phase | 17.06.2021 09:00 | 4522 | | | No | No | | | | | euro |
| 391395 | | | Riqualificazione impianto selezione rifiuti riciclabili project-financing | | Default Value | | Running | euro | 05.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23879 | VERDERIO | Technical facilities | Via Piave Zona Industriale | 10 - Information Phase | 17.06.2021 09:00 | 4521 | | | No | No | | | | | euro |
| 391394 | | | Costruzione nuova sede | | Default Value | | Running | euro | 04.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23100 | SONDRIO | Technical facilities | Piazzale Croce Rossa 1 | 10 - Information Phase | 17.06.2021 09:00 | 4520 | | | No | No | | | | | euro |
| 391393 | | | Costruzione edificio 6 piani fuori terra ad uso abitazione e box | | Default Value | | Running | euro | 29.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Via Borgo Vico 215 | 10 - Information Phase | 17.06.2021 09:00 | 4519 | | | No | No | | | | | euro |
| 391392 | | | Costruzione supermercato 1500 mq | | Default Value | | Running | euro | 28.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22038 | TAVERNERIO | Technical facilities | Via Briantea 1 | 10 - Information Phase | 17.06.2021 09:00 | 4518 | | | No | No | | | | | euro |
| 391391 | | | Costruzione supermercato Eurospin | | Default Value | | Running | euro | 04.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22030 | CASTELMARTE | Technical facilities | Via delle Marcite | 10 - Information Phase | 17.06.2021 09:00 | 4517 | | | No | No | | | | | euro |
| 391390 | | | Realizzazione complesso natatorio coperto | | Default Value | | Running | euro | 22.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22018 | PORLEZZA | | Via Osteno | 10 - Information Phase | 17.06.2021 09:00 | 4516 | | | No | No | | | | | euro |
| 391389 | | | Costruz 12 ville x villaggio turistico alberghiero piscina spa ristorante | | Default Value | | Running | euro | 25.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22010 | CLAINO CON OSTENO | Residential houses | Via Brenta | 10 - Information Phase | 17.06.2021 09:00 | 4515 | | | No | No | | | | | euro |
| 391388 | | | Costr supermercato 3500 mq centro sportivo con piscina olimpionica parco | | Default Value | | Running | euro | 27.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Via S. Sanvito 80 Ex Aermacchi | 10 - Information Phase | 17.06.2021 09:00 | 4514 | | | No | No | | | | | euro |
| 391387 | | | Costruzione 3 edifici multipiano uso abitaz e boxes 110 unita' abitative | | Default Value | | Running | euro | 29.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | | Via della Concordia 3 | 10 - Information Phase | 17.06.2021 09:00 | 4513 | | | No | No | | | | | euro |
| 391386 | | | Costruzione 2 medie superfici di vendita Lotti B e C | | Default Value | | Running | euro | 29.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Cso Sempione/Via S Gottardo | 10 - Information Phase | 17.06.2021 09:00 | 4512 | | | No | No | | | | | euro |
| 391385 | | | Costruzione supermercato 900 MQ | | Default Value | | Running | euro | 23.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Viale G. Borri 46 | 10 - Information Phase | 17.06.2021 09:00 | 4511 | | | No | No | | | | | euro |
| 391384 | | | Costruz supermercato alimentare+2 medie superfici vendita ripresa lavori | | Default Value | | Running | euro | 29.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21041 | ALBIZZATE | Technical facilities | Via Alberto da Giussano 4 | 10 - Information Phase | 17.06.2021 09:00 | 4510 | | | No | No | | | | | euro |
| 391383 | | | Costruzione edificio industriale produttivo con uffici 3700 mq | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | Industry building | Vie Gorizia / Bernini | 10 - Information Phase | 17.06.2021 09:00 | 4509 | | | No | No | | | | | euro |
| 391382 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 14.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Paganini | 10 - Information Phase | 17.06.2021 09:00 | 4508 | | | No | No | | | | | euro |
| 391381 | | | Costruzione palazzina 5 piani f.t. 8 unita' abitative Classe A4 | | Default Value | | Running | euro | 12.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Cefalonia 1 | 10 - Information Phase | 17.06.2021 08:59 | 4507 | | | No | No | | | | | euro |
| 391380 | | | Costruzione edificio commerciale showroom service 330 p.auto 13250 mq | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Technical facilities | Via Ercolano / Viale Stucchi | 10 - Information Phase | 17.06.2021 08:59 | 4506 | | | No | No | | | | | euro |
| 391379 | | | Costruzione edificio ad uso abitazione 30 appartamenti Classe A | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Viale Foscolo 13 | 10 - Information Phase | 17.06.2021 08:59 | 4505 | | | No | No | | | | | euro |
| 391378 | | | Costruzione 3 edifici 6 piani f.t. ad uso abitaz e boxes | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Buonarroti 105 | 10 - Information Phase | 17.06.2021 08:59 | 4504 | | | No | No | | | | | euro |
| 391377 | | | Costruzione 2 edifici ad uso abitaz e boxes 21+21 alloggi | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Perosi | 10 - Information Phase | 17.06.2021 08:59 | 4503 | | | No | No | | | | | euro |
| 391376 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Leoncavallo 48 | 10 - Information Phase | 17.06.2021 08:59 | 4502 | | | No | No | | | | | euro |
| 391375 | | | Costruzione supermercato 1690 mq | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Technical facilities | Vie Lombardia / Taccona | 10 - Information Phase | 17.06.2021 08:59 | 4501 | | | No | No | | | | | euro |
| 391374 | | | Ristrutturazione edificio 5 piani f.t. ad uso social housing | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Viale Romagna 40 | 10 - Information Phase | 17.06.2021 08:59 | 4500 | | | No | No | | | | | euro |
| 391373 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Marelli 14 | 10 - Information Phase | 17.06.2021 08:59 | 4499 | | | No | No | | | | | euro |
| 391372 | | | Recupero ex convento Cappuccini per 8 unita' abitative a schiera | | Default Value | | Running | euro | 22.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Marsala 44 | 10 - Information Phase | 17.06.2021 08:59 | 4498 | | | No | No | | | | | euro |
| 391371 | | | Demoricostruzione 2 edifici multipiano ad uso abitaz e boxes 35 unita' tot | | Default Value | | Running | euro | 22.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Viale Europa 12 | 10 - Information Phase | 17.06.2021 08:59 | 4497 | | | No | No | | | | | euro |
| 391370 | | | Costr edif residenziale a torre 14 pft 56 app in edilizia convenzionata | | Default Value | | Running | euro | 10.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | Residential houses | Via Falcone e Borsellino | 10 - Information Phase | 17.06.2021 08:59 | 4496 | | | No | No | | | | | euro |
| 391369 | | | Costruzione 2 edifici ad uso abitazione 6+17 unita' abitative | | Default Value | | Running | euro | 14.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | Residential houses | Via V. Bellini 3 | 10 - Information Phase | 17.06.2021 08:59 | 4495 | | | No | No | | | | | euro |
| 391368 | | | Costruzione 2 edifici ad uso abitazione e boxes 9 unita' abitative | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | Residential houses | Via dei Mille 14 | 10 - Information Phase | 17.06.2021 08:59 | 4494 | | | No | No | | | | | euro |
| 391367 | | | Ristrutturaz edificio ad uso abitaz 8 unita' e autorimesse interrate | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | Residential houses | Piazza Castellana 16 | 10 - Information Phase | 17.06.2021 08:59 | 4493 | | | No | No | | | | | euro |
| 391366 | | | Costruzione complesso multipiano ad uso abitaz e boxes 60 unita' abitative | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20861 | BRUGHERIO | Residential houses | Piazza Donne della Resistenza | 10 - Information Phase | 17.06.2021 08:59 | 4492 | | | No | No | | | | | euro |
| 391365 | | | Costruzione palazzina 4 unita' abitative e villa unifamiliare | | Default Value | | Running | euro | 10.06.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Via B. Buozzi 14 | 10 - Information Phase | 17.06.2021 08:59 | 4491 | | | No | No | | | | | euro |
| 391364 | | | Demoricostruzione edificio commerciale artigianale 1600 mq | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20835 | MUGGIO' | Industry building | LISSONE Via Gen.Giardino | 10 - Information Phase | 17.06.2021 08:59 | 4490 | | | No | No | | | | | euro |
| 391363 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 28.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Via Boccaccio 11 | 10 - Information Phase | 17.06.2021 08:59 | 4489 | | | No | No | | | | | euro |
| 391362 | | | Costruzione edificio ad uso abitazione e boxes 5 unita' abitative | | Default Value | | Running | euro | 28.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Via Bolsena 9 | 10 - Information Phase | 17.06.2021 08:59 | 4488 | | | No | No | | | | | euro |
| 391361 | | | Costruzione edificio ad uso abitazione e boxes 12 unita' abitative | | Default Value | | Running | euro | 28.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Via San Vitale 31 | 10 - Information Phase | 17.06.2021 08:59 | 4487 | | | No | No | | | | | euro |
| 391360 | | | Costruzione 9 ville singole e un edif plurifamiliare 4 unita' abitative | | Default Value | | Running | euro | 28.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20826 | MISINTO | Residential houses | Via Misentasca 93 | 10 - Information Phase | 17.06.2021 08:59 | 4486 | | | No | No | | | | | euro |
| 391359 | | | Completamento edificio industriale | | Default Value | | Running | euro | 28.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20823 | LENTATE SUL SEVESO | Industry building | Via Brianza 34 | 10 - Information Phase | 17.06.2021 08:59 | 4485 | | | No | No | | | | | euro |
| 391358 | | | Ampliamento e modifica della sotto stazione elettrica | | Default Value | | Running | euro | 24.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20822 | SEVESO | Technical facilities | Piazza Mazzini 6 | 10 - Information Phase | 17.06.2021 08:59 | 4484 | | | No | No | | | | | euro |
| 391357 | | | Costruzione 2 torri residenziali 12+8 piani f.t. 60 appalrtam Classe A+ | | Default Value | | Running | euro | 26.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20161 | MILANO | Residential houses | Via Assietta 19 | 10 - Information Phase | 17.06.2021 08:59 | 4483 | | | No | No | | | | | euro |
| 391356 | | | Realizzazione nuovo edificio scolastico appalto integrato | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20159 | MILANO | | Via B. Crespi 40 | 10 - Information Phase | 17.06.2021 08:59 | 4482 | | | No | No | | | | | euro |
| 391355 | | | Recupero edificio ad uso abitazione | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20159 | MILANO | Residential houses | Via Porro Lambertenghi 5 | 10 - Information Phase | 17.06.2021 08:59 | 4481 | | | No | No | | | | | euro |
| 391354 | | | Lavori di ristrutturazione Edif 9 piani ft 26749 mq uffici LEED platinum | | Default Value | | Running | euro | 20.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | MILANO | Technical facilities | Via Bernina 7 | 10 - Information Phase | 17.06.2021 08:59 | 4480 | | | No | No | | | | | euro |
| 391353 | | | Costruzione edificio multipiano ad uso abitaz e boxes 21 unita' abitative | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20155 | MILANO | Residential houses | Via Cuzzi 5 | 10 - Information Phase | 17.06.2021 08:59 | 4479 | | | No | No | | | | | euro |
| 391352 | | | Costruz nuovo Ospedale dei Bambini c/o PO Buzzi appalto integrato | | Default Value | | Running | euro | 19.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | | Via L. Castelvetro 32 | 10 - Information Phase | 17.06.2021 08:59 | 4478 | | | No | No | | | | | euro |
| 391351 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 12.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via Piero della Francesca 29 | 10 - Information Phase | 17.06.2021 08:59 | 4477 | | | No | No | | | | | euro |
| 391350 | | | Ristrutturazione edificio ad uso uffici 11000 mq | | Default Value | | Running | euro | 11.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Technical facilities | Via Quadrio 17 | 10 - Information Phase | 17.06.2021 08:59 | 4476 | | | No | No | | | | | euro |
| 391348 | | | Ristrutturazione edificio ad uso abitazione e boxes 20 unita' abitative | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via Stilicone 39 | 10 - Information Phase | 17.06.2021 08:59 | 4475 | | | No | No | | | | | euro |
| 391347 | | | Costruzione 3 edifici a torre residenziali 130 appartam totali 8500 mq | | Default Value | | Running | euro | 19.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | MILANO | Residential houses | Via Gallarate 1/3 | 10 - Information Phase | 17.06.2021 08:59 | 4474 | | | No | No | | | | | euro |
| 391346 | | | Costruzione 4 edifici multip 317 appartam e 6 unita' commerciali | | Default Value | | Running | euro | 29.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | MILANO | Residential houses | Via Pasolini Lotto R6 Cascina Merlata | 10 - Information Phase | 17.06.2021 08:59 | 4473 | | | No | No | | | | | euro |
| 391345 | | | Ristrutturazione edificio multipiano direzionale | | Default Value | | Running | euro | 24.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20146 | MILANO | Technical facilities | Via Roncaglia 12 | 10 - Information Phase | 17.06.2021 08:59 | 4472 | | | No | No | | | | | euro |
| 391344 | | | Costruzione IEO Proton Center 3200 mq | | Default Value | | Running | euro | 20.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20141 | MILANO | | Via Ripamonti 435 | 10 - Information Phase | 17.06.2021 08:59 | 4471 | | | No | No | | | | | euro |
| 391343 | | | Costruzione edificio 5 piani f.t. 20 unita' abitative e boxes | | Default Value | | Running | euro | 26.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20141 | MILANO | Residential houses | Via Neera 47 | 10 - Information Phase | 17.06.2021 08:59 | 4470 | | | No | No | | | | | euro |
| 391342 | | | Demoricostruzione edificio 15 unita' abitative e boxes Classe A | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20133 | MILANO | Residential houses | Via Giovanni da Milano 11 | 10 - Information Phase | 17.06.2021 08:59 | 4469 | | | No | No | | | | | euro |
| 391341 | | | Costruzione edif 5 piani ft ad uso abitaz e boxes 35 appartam Classe A4 | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20132 | MILANO | Residential houses | Via Tarabella 7 | 10 - Information Phase | 17.06.2021 08:59 | 4468 | | | No | No | | | | | euro |
| 391340 | | | Recupero e restauro edificio per nuova sede | | Default Value | | Running | euro | 20.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Technical facilities | Via Caradosso 16 | 10 - Information Phase | 17.06.2021 08:59 | 4467 | | | No | No | | | | | euro |
| 391339 | | | Costruzione termovalorizzatore biopiattaforma integrata | | Default Value | | Running | euro | 12.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20099 | SESTO SAN GIOVANNI | Industry building | Via Manin | 10 - Information Phase | 17.06.2021 08:59 | 4466 | | | No | No | | | | | euro |
| 391338 | | | Costruzione complesso multipiano ad uso abitaz e boxes 62 unita' abitative | | Default Value | | Running | euro | 22.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20092 | CINISELLO BALSAMO | Residential houses | Via Monte Nevoso 25 | 10 - Information Phase | 17.06.2021 08:59 | 4465 | | | No | No | | | | | euro |
| 391337 | | | Costruzione centro direzionale terziario Data Center 15000 mq | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SETTALA | Industry building | SS Nuova Paullese / Via G.di Vittorio | 10 - Information Phase | 17.06.2021 08:59 | 4464 | | | No | No | | | | | euro |
| 391336 | | | Costruzione centro logistico settore farmaceutico | | Default Value | | Running | euro | 25.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SETTALA | Industry building | Via Don Minzoni 81 | 10 - Information Phase | 17.06.2021 08:59 | 4463 | | | No | No | | | | | euro |
| 391335 | | | Potenziamento S.P. n.103 tratta B lotto 1 stralcio 2 | | Default Value | | Running | euro | 19.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | PIOLTELLO Via Cassanese | 10 - Information Phase | 17.06.2021 08:59 | 4462 | | | No | No | | | | | euro |
| 391334 | | | Costruzione nuova sede aziendale 1500 mq | | Default Value | | Running | euro | 22.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | Vie Martiri di Cefalonia/Venezia Giulia | 10 - Information Phase | 17.06.2021 08:59 | 4461 | | | No | No | | | | | euro |
| 391333 | | | Costruzione 2 palazzine 14+14 unita' abitative lotti O e P | | Default Value | | Running | euro | 14.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20069 | POZZO D'ADDA | Residential houses | Via Unita' D'Italia | 10 - Information Phase | 17.06.2021 08:59 | 4460 | | | No | No | | | | | euro |
| 391332 | | | Riqualif scuola primaria e centro riabilitaz Don Gnocchi appalto integrato | | Default Value | | Running | euro | 21.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20066 | MELZO | | Via Bologna 14 | 10 - Information Phase | 17.06.2021 08:59 | 4459 | | | No | No | | | | | euro |
| 391331 | | | Costruzione 2 edifici ad uso abitaz e boxes 27 unita' abitative totali | | Default Value | | Running | euro | 22.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20037 | PADERNO DUGNANO | Residential houses | Via Villoresi 13 | 10 - Information Phase | 17.06.2021 08:59 | 4458 | | | No | No | | | | | euro |
| 391330 | | | Costruzione palazzina ad uso abitazione 6 unita' abitative | | Default Value | | Running | euro | 29.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Via Monte Nevoso 13 | 10 - Information Phase | 17.06.2021 08:59 | 4457 | | | No | No | | | | | euro |
| 391329 | | | Costruzione edificio ad uso abitazione 4 pft 9 appartamenti classe A4 | | Default Value | | Running | euro | 27.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Via A. Gramsci 43 | 10 - Information Phase | 17.06.2021 08:59 | 4456 | | | No | No | | | | | euro |
| 391294-001 | | | TERREAL / CASA TREVISO / FK5 | | Default Value | | Running | euro | 16.06.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 31100 | TREVISO (TV) | | _ | 20 - Planning Phase | 16.06.2021 14:48 | | | | No | No | | | | | euro |
| 391294 | | | TERREAL / CASA TREVISO | | Default Value | | Running | euro | 16.06.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO (TV) | | _ | 10 - Information Phase | 16.06.2021 14:47 | | | | No | No | | | | | euro |
| 391251 | | | SUNIVEST / Costruzione magazzino logistico U.M.I. 1 comparto A Dese Nord | | Default Value | | Running | euro | 21.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Industry building | Via Istituto S.Maria della Pieta' | 10 - Information Phase | 16.06.2021 11:26 | 4455 | | | No | No | | | | | euro |
| 391250 | | | TIEMME / Costr edificio multipiano ad uso abitazione 20 unita' abitative e piscina | | Default Value | | Running | euro | 21.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30016 | IESOLO | Residential houses | Via Rovigo | 10 - Information Phase | 16.06.2021 11:26 | 4454 | | | No | No | | | | | euro |
| 391249 | | | FINNOCCHIARO / Costruzione nuovo plesso scolastico primario | | Default Value | | Running | euro | 30.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31044 | MONTEBELLUNA | | Fraz Biadene e Pederiva | 10 - Information Phase | 16.06.2021 11:26 | 4453 | | | No | No | | | | | euro |
| 391248 | | | FURGONI / Lavori di costruzione nuovo depuratore | | Default Value | | Running | euro | 12.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37050 | OPPEANO | Technical facilities | Via Isolo | 10 - Information Phase | 16.06.2021 11:26 | 4452 | | | No | No | | | | | euro |
| 391247 | | | RUFFATO / Recupero e riqualif Arsenale Austriaco 1� lotto restauro conservativo | | Default Value | | Running | euro | 12.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | Piazza Arsenale 11 | 10 - Information Phase | 16.06.2021 11:26 | 4451 | | | No | No | | | | | euro |
| 391246 | | | LOVISOTTO e ITI / Costr (demoricostr) nuovo istituto IPSIA Einaudi Scarpa (1� 2� 3� str.) | | Default Value | | Running | euro | 29.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31044 | MONTEBELLUNA | | Via Biagi | 10 - Information Phase | 16.06.2021 11:26 | 4450 | | | No | No | | | | | euro |
| 391245 | | | ITEC / Costruzione nuova sede aziendale per laboratori ed uffici | | Default Value | | Running | euro | 14.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Mestre | 10 - Information Phase | 16.06.2021 11:26 | 4449 | | | No | No | | | | | euro |
| 391244 | | | ??? / Costruzione nuova sede aziendale GIBUS uffici 3000 mq produzione 22000 mq | | Default Value | | Running | euro | 14.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35037 | TEOLO | Technical facilities | Z.I. Selve | 10 - Information Phase | 16.06.2021 11:26 | 4448 | | | No | No | | | | | euro |
| 391243 | | | ITINERA / Lavori di riqualificazione ed ampliamento terminal partenze | | Default Value | | Running | euro | 04.06.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37069 | VILLAFRANCA DI VERONA | Technical facilities | Aeroporto | 10 - Information Phase | 16.06.2021 11:26 | 4447 | | | No | No | | | | | euro |
| 391238 | | | PRE SYSTEM / Costr stabil produzione imbottigliamento e confezionamento vini 7000 mq | | Default Value | | Running | euro | 21.05.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33040 | POVOLETTO | Industry building | Via Subida Loc Bellazoia | 10 - Information Phase | 16.06.2021 11:19 | 4446 | | | No | No | | | | | euro |
| 391237 | | | ANASI / Ricostruz canale principale tra nodo idraulico Rivotta e deviaz S Gottardo | | Default Value | | Running | euro | 17.05.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | UDINE | Technical facilities | Capoluogo | 10 - Information Phase | 16.06.2021 11:19 | 4445 | | | No | No | | | | | euro |
| 391231 | | | ??? / Realizzazione Parco del Mare Lungomare Sud complet tratto 1 lotto 1 | | Default Value | | Running | euro | 14.05.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Technical facilities | Lgmare Tintori Loc. Marina Centro | 10 - Information Phase | 16.06.2021 11:04 | 4444 | | | No | No | | | | | euro |
| 391230 | | | ??? / Costr 2 palazzine 4 piani ft 10+10 unita' abitative stralcio B1 e B2 | | Default Value | | Running | euro | 28.05.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Residential houses | Via Belli | 10 - Information Phase | 16.06.2021 11:04 | 4443 | | | No | No | | | | | euro |
| 391229 | | | ANDREOLA / Realizzazione nuovo padiglione aule presso Campus ingegneria Enzo Ferrari | | Default Value | | Running | euro | 17.05.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | | Via Zanoni | 10 - Information Phase | 16.06.2021 11:04 | 4442 | | | No | No | | | | | euro |
| 391228 | | | CMB / Realizz palestra scolastica parcheggio inter 245 p.auto supermercato 900mq | | Default Value | | Running | euro | 06.05.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Technical facilities | Via Buon Pastore Ex AMCM | 10 - Information Phase | 16.06.2021 11:04 | 4441 | | | No | No | | | | | euro |
| 391227 | | | COBAR (BARI) / Realizzazione di nuovi manufatti per esigenze DCAOC/DACCC | | Default Value | | Running | euro | 04.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 44028 | POGGIO RENATICO | | Sedime Militare A.M. | 10 - Information Phase | 16.06.2021 11:04 | 4440 | | | No | No | | | | | euro |
| 391226 | | | REM / Real opere sostitut passaggio livello sottovia rampe colleg e 3 rotatorie | | Default Value | | Running | euro | 05.05.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48012 | BAGNACAVALLO | Technical facilities | Km. 17+748 Castel Bolognese Ravenna | 10 - Information Phase | 16.06.2021 11:04 | 4439 | | | No | No | | | | | euro |
| 391225 | | | AR.CO. / Riqualificazione e sviluppo compendio portuale project financing | | Default Value | | Running | euro | 03.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48015 | CERVIA | Technical facilities | Loc. Milano Maittima | 10 - Information Phase | 16.06.2021 11:04 | 4438 | | | No | No | | | | | euro |
| 391224 | | | ??? / Ampliamento per 4800 mq complesso produttivo e riqualificazione terme | | Default Value | | Running | euro | 24.05.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Industry building | Via della Torretta 2 | 10 - Information Phase | 16.06.2021 11:04 | 4437 | | | No | No | | | | | euro |
| 391223 | | | FUTURA COST / Costruzione supermercato alimentare+2 edif uso abitaz e boxes 50 appartam | | Default Value | | Running | euro | 22.04.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40064 | OZZANO DELL'EMILIA | Technical facilities | Via Emilia 42 | 10 - Information Phase | 16.06.2021 11:04 | 4436 | | | No | No | | | | | euro |
| 391222 | | | GSE / Costruzione 2 edifici logistici 49500 mq totali uffici 1420 mq | | Default Value | | Running | euro | 23.04.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41011 | CAMPOGALLIANO | Industry building | Via Strasburgo | 10 - Information Phase | 16.06.2021 11:04 | 4435 | | | No | No | | | | | euro |
| 391221 | | | ICM / Realizzazione nuovo Data Center | | Default Value | | Running | euro | 20.05.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Technical facilities | Via Stalingrado Ex Manifattura | 10 - Information Phase | 16.06.2021 11:04 | 4434 | | | No | No | | | | | euro |
| 390969-001 | | | ARKE / RECUPERO DI UNA PORZIONE DEL COMPLESSO DI SAN GIUSEPPE / EMPOLI / HDB | | Default Value | | Running | euro | 14.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 50053 | Empoli | | * | 10 - Information Phase | 14.06.2021 10:43 | | | | No | No | | | | 8.500,00 € | euro |
| 390969 | | | ARKE / RECUPERO DI UNA PORZIONE DEL COMPLESSO DI SAN GIUSEPPE / EMPOLI | | Default Value | | Running | euro | 14.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50053 | Empoli | | * | 10 - Information Phase | 14.06.2021 10:43 | | | | No | No | | | | 8.500,00 € | euro |
| 390962 | | | GARA / THE S.S 12 BOZEN BYPASS / BOLZANO | | Default Value | | Running | euro | 14.06.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 14.06.2021 09:55 | | | | No | No | | | | | euro |
| 390701 | | | ING. FERRARI / IST EUROPEO TUMORI MILANO | | Default Value | | Running | euro | 09.06.2021 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | VIA RIPAMONTI | 10 - Information Phase | 09.06.2021 14:28 | | | | No | No | | | | | euro |
| 390682-001 | | | CENTRO TERMALE / ASCOLI PICENO /DETAN INOX | | Default Value | | Running | euro | 09.06.2021 | | ILAZ-LAZIO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 63100 | Ascoli Piceno | | --- | 20 - Planning Phase | 09.06.2021 12:23 | | | | No | No | | | | | euro |
| 390682 | | | CENTRO TERMALE / ASCOLI PICENO | | Default Value | | Running | euro | 09.06.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 63100 | Ascoli Piceno | | --- | 20 - Planning Phase | 09.06.2021 12:11 | | | | No | No | | | | | euro |
| 390435-003 | | | CIMOLAI / NUOVA STAZIONE MILANO SESTO EX AREA FALCK / MBT | | Default Value | | Running | euro | 02.12.2021 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20099 | Sesto San Giovanni | | -- | 40 - Realisation Phase | 02.12.2021 12:00 | | | | No | No | | | | | euro |
| 390435-002 | | | IL CANTIERE / NUOVA STAZIONE MILANO SESTO EX AREA FALCK / HBS SD | | Default Value | | Running | euro | 10.06.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20099 | Sesto San Giovanni | | -- | 40 - Realisation Phase | 10.06.2021 19:22 | | | | No | No | | | | | euro |
| 390435-001 | | | CIMOLAI / NUOVA STAZIONE MILANO SESTO EX AREA FALCK / DETAN | | Default Value | | Running | euro | 04.06.2021 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20099 | Sesto San Giovanni | | -- | 40 - Realisation Phase | 04.06.2021 14:43 | | | | No | No | | | | | euro |
| 390435 | | | CIMOLAI / NUOVA STAZIONE MILANO SESTO EX AREA FALCK | | Default Value | | Running | euro | 04.06.2021 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 20099 | Sesto San Giovanni | | -- | 40 - Realisation Phase | 04.06.2021 14:41 | | | | No | No | | | | | euro |
| 390154-001 | | | LOVISOTTO / RSA VERONA / GIUNTI | | Default Value | | Running | euro | 01.06.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | --- | 10 - Information Phase | 01.06.2021 15:39 | | | | No | No | | | | | euro |
| 390154 | | | LOVISOTTO / RSA VERONA | | Default Value | | Running | euro | 01.06.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | --- | 10 - Information Phase | 01.06.2021 15:37 | | | | No | No | | | | | euro |
| 390152-001 | | | GARA BNL DIREZIONALE NOVOLI VIALE TOSCANA FIRENZE / HBT | | Default Value | | Running | euro | 01.06.2021 | | ITOS-TOSCANA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | VIALE TOSCANA | 30 - Tender & Submission Phase | 01.06.2021 15:18 | | | | No | No | | | | | euro |
| 390152 | | | GARA BNL DIREZIONALE NOVOLI VIALE TOSCANA FIRENZE | | Default Value | | Running | euro | 01.06.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | VIALE TOSCANA | 10 - Information Phase | 01.06.2021 15:17 | | | | No | No | | | | | euro |
| 389968-001 | | | COGEFA / KLEPIERRE SHOPVILLE LE GRU / GRUGLIASCO / GIUNTI | | Default Value | | Running | euro | 28.05.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10095 | Grugliasco | | * | 30 - Tender & Submission Phase | 28.05.2021 15:50 | | | | No | No | | | | 80.000,00 € | euro |
| 389968 | | | COGEFA / KLEPIERRE SHOPVILLE LE GRU / GRUGLIASCO | | Default Value | | Running | euro | 28.05.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10095 | Grugliasco | | * | 10 - Information Phase | 28.05.2021 15:49 | | | | No | No | | | | 80.000,00 € | euro |
| 389960-001 | | | EKORU / STRUCTURAMA/ HCC / HOP / WAL SHOE / HEK | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | | X | 10 - Information Phase | 28.05.2021 13:56 | | | | No | No | | | | | euro |
| 389960 | | | EKORU / STRUCTURAMA | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 24124 | Bergamo | | X | 10 - Information Phase | 28.05.2021 13:55 | | | | No | No | | | | | euro |
| 389920-001 | | | DETAN / NUOVA STRUTTURA ALBERGHIERA EX SANTO SPIRTO / BERGAMO VIA T. TASSO | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24127 | Bergamo | Infrastructural facility | IN VIA TORQUATO TASSO N. 82/84 | 30 - Tender & Submission Phase | 28.05.2021 09:30 | | | | No | No | | | | | euro |
| 389920 | | | NUOVA STRUTTURA ALBERGHIERA EX SANTO SPIRTO / BERGAMO VIA T. TASSO | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24127 | Bergamo | Infrastructural facility | IN VIA TORQUATO TASSO N. 82/84 | 30 - Tender & Submission Phase | 28.05.2021 09:29 | | | | No | Yes | | | | | euro |
| 389894-002 | | | HSD / RESIDENZIALE COMELICO 39/41 MILANO | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20135 | Milano | | Via Comelico 39/41 | 30 - Tender & Submission Phase | 28.05.2021 08:06 | | | | No | No | | | | | euro |
| 389894-001 | | | HDB / RESIDENZIALE COMELICO 39/41 MILANO | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20135 | Milano | | Via Comelico 39/41 | 30 - Tender & Submission Phase | 28.05.2021 08:05 | | | | No | No | | | | | euro |
| 389894 | | | RESIDENZIALE COMELICO 39/41 MILANO | | Default Value | | Running | euro | 28.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20135 | Milano | | Via Comelico 39/41 | 30 - Tender & Submission Phase | 28.05.2021 07:48 | | | | No | No | | | | | euro |
| 389836 | | | CDS HOLDING / WATER FRONT / GENOVA | | Default Value | | Running | euro | 27.05.2021 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | * | 10 - Information Phase | 27.05.2021 11:50 | | | | No | No | | | | | euro |
| 389826-001 | | | CONSORZIO STABILE SAC / REALIZZAZIONE POLO SCOLASTICO D'ECCELLENZA / AVELLINO / HDB | | Default Value | | Running | euro | 27.05.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 83100 | Avellino | | PIAZZA SAN FRANCESCO | 40 - Realisation Phase | 27.05.2021 11:21 | | | | No | No | | | | 1.500,00 € | euro |
| 389826 | | | CONSORZIO STABILE SAC / REALIZZAZIONE POLO SCOLASTICO D'ECCELLENZA / AVELLINO | | Default Value | | Running | euro | 27.05.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 83100 | Avellino | | PIAZZA SAN FRANCESCO | 10 - Information Phase | 27.05.2021 11:21 | | | | No | No | | | | 1.500,00 € | euro |
| 388926 | | | AMPLIAMENTO STAB KRONOSPAN ITALIA / SAN VITO ALA TAGLIAMENTO | | Default Value | | Running | euro | 17.05.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33078 | San Vito al Tagliamento | | -- | 10 - Information Phase | 17.05.2021 14:04 | | | | No | No | | | | | euro |
| 388854-001 | | | SCUOLA ELEMENTARE DI BELFIORE / DETAN | | Default Value | | Running | euro | 14.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30020 | Belfiore | | -- | 10 - Information Phase | 14.05.2021 14:24 | | | | No | No | | | | | euro |
| 388854 | | | SCUOLA ELEMENTARE DI BELFIORE | | Default Value | | Running | euro | 14.05.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30020 | Belfiore | | -- | 10 - Information Phase | 14.05.2021 14:19 | | | | No | No | | | | | euro |
| 388768-001 | | | S.EUSANIO FORCONESE/AQ/RIPRISTINO PALAZZO COLONNA SEGUITO SISMA 2009/tiranti per catene | | Default Value | | Running | euro | 12.05.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 67020 | Sant'Eusanio Forconese | | Piazza del Popolo | 30 - Tender & Submission Phase | 12.05.2021 13:23 | | | | No | No | | | | | euro |
| 388768 | | | S.EUSANIO FORCONESE/AQ/RIPRISTINO PALAZZO COLONNA SEGUITO SISMA 2009 | | Default Value | | Running | euro | 12.05.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 67020 | Sant'Eusanio Forconese | | Piazza del Popolo | 10 - Information Phase | 12.05.2021 13:22 | | | | No | No | | | | | euro |
| 388741-001 | | | GARA / SOC. TENUTA SUVERETO / QUERCETO / BIBBONA (LI) / HIT | | Default Value | | Running | euro | 12.05.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 57020 | Bibbona | | X | 30 - Tender & Submission Phase | 12.05.2021 10:35 | | | | No | No | | | | | euro |
| 388741 | | | GARA / SOC. TENUTA SUVERETO / QUERCETO / BIBBONA (LI) | | Default Value | | Running | euro | 12.05.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57020 | Bibbona | | X | 10 - Information Phase | 12.05.2021 10:34 | | | | No | Yes | | | | | euro |
| 388692-001 | | | HSC / HIT / BLU ESTONE / CRESCENZAGO 105 / MILANO | | Default Value | | Running | euro | 12.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20132 | Milano | | Crescenzago 105 | 30 - Tender & Submission Phase | 12.05.2021 07:49 | | | | No | No | | | | | euro |
| 388692 | | | BLU ESTONE / CRESCENZAGO 105 / MILANO | | Default Value | | Running | euro | 12.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20132 | Milano | | Crescenzago 105 | 30 - Tender & Submission Phase | 12.05.2021 07:47 | | | | No | No | | | | | euro |
| 388538-001 | | | ITINERA / NUOVO POLO UNIVERSITARIO DELLE SCIENZE / GRUGLIASCO / HDB | | Default Value | | Running | euro | 10.05.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10095 | Grugliasco | | * | 30 - Tender & Submission Phase | 10.05.2021 14:23 | | | | No | No | | | | 70.000,00 € | euro |
| 388538 | | | ITINERA / NUOVO POLO UNIVERSITARIO DELLE SCIENZE / GRUGLIASCO | | Default Value | | Running | euro | 10.05.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10095 | Grugliasco | | * | 10 - Information Phase | 10.05.2021 14:23 | | | | No | No | | | | 70.000,00 € | euro |
| 388349-003 | | | BRA L4 FV / RESIDENZIALE R6 / CASCINA MERLATA MILANO | | Default Value | | Running | euro | 18.12.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | | via P.P. Pasolini | 10 - Information Phase | 18.12.2021 11:37 | | | | No | No | | | | | euro |
| 388349-002 | | | CRET-V /RESIDENZIALE R6 / CASCINA MERLATA MILANO | | Default Value | | Running | euro | 14.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | | via P.P. Pasolini | 30 - Tender & Submission Phase | 14.05.2021 11:05 | | | | No | No | | | | | euro |
| 388349-001 | | | HDB / HSD RESIDENZIALE R6 / CASCINA MERLATA MILANO | | Default Value | | Running | euro | 07.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | | via P.P. Pasolini | 30 - Tender & Submission Phase | 07.05.2021 06:09 | | | | No | No | | | | | euro |
| 388349 | | | RESIDENZIALE R6 / CASCINA MERLATA MILANO | | Default Value | | Running | euro | 07.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | Milano | | via P.P. Pasolini | 30 - Tender & Submission Phase | 07.05.2021 06:08 | | | | No | No | | | | | euro |
| 388194-001 | | | IMPRESA RAFFAELLO PELLEGRINI / PARCHEGGIO UNIVERSITA' / CAGLIARI / GIUNTI | | Default Value | | Running | euro | 05.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 09100 | CAGLIARI | | * | 10 - Information Phase | 05.05.2021 14:14 | | | | No | No | | | | 59.000,00 € | euro |
| 388194 | | | IMPRESA RAFFAELLO PELLEGRINI / PARCHEGGIO UNIVERSITA' / CAGLIARI | | Default Value | | Running | euro | 05.05.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | * | 10 - Information Phase | 05.05.2021 14:14 | | | | No | No | | | | 59.000,00 € | euro |
| 388136-001 | | | PFEIFER PARTNERS / REALIZZAZIONE NUOVA PALESTRA / POSTAL (BZ) / MBT | | Default Value | | Running | euro | 04.05.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39014 | Postal | | * | 30 - Tender & Submission Phase | 04.05.2021 15:00 | | | | No | No | | | | 16.000,00 € | euro |
| 388136 | | | PFEIFER PARTNERS / REALIZZAZIONE NUOVA PALESTRA / POSTAL (BZ) | | Default Value | | Running | euro | 04.05.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39014 | Postal | | * | 10 - Information Phase | 04.05.2021 15:00 | | | | No | No | | | | 16.000,00 € | euro |
| 388131 | | | Costruzione scuola secondaria superiore all'interno del polo scolastico | | Default Value | | Running | euro | 12.04.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | | Localita' San Giusto | 10 - Information Phase | 04.05.2021 14:26 | 4433 | | | No | No | | | | | euro |
| 388130 | | | Costruzione scuola dell'infanzia Coltellini | | Default Value | | Running | euro | 09.04.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57100 | LIVORNO | | Via Coltellini | 10 - Information Phase | 04.05.2021 14:26 | 4432 | | | No | No | | | | | euro |
| 388129 | | | Costruzione supermercato DPIU' 5 unita' commerciali e OOUU | | Default Value | | Running | euro | 04.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57100 | LIVORNO | Technical facilities | Strada Comunale Crocino 120 | 10 - Information Phase | 04.05.2021 14:26 | 4431 | | | No | No | | | | | euro |
| 388128 | | | Costruzione polo ospedaliero universitario opere edili | | Default Value | | Running | euro | 12.04.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | | Via Paradisa Loc. Cisanello | 10 - Information Phase | 04.05.2021 14:26 | 4430 | | | No | No | | | | | euro |
| 388127 | | | Costruzione centro sanitario diagnostico riabilitativo | | Default Value | | Running | euro | 12.04.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56025 | PONTEDERA | | Via Profeti 10 | 10 - Information Phase | 04.05.2021 14:26 | 4429 | | | No | No | | | | | euro |
| 388126 | | | Costruzione 2 Residenze Sanitarie Assistenziali 80+40 posti letto | | Default Value | | Running | euro | 04.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55032 | CASTELNUOVO DI GARFAGNANA | | Via Passo delle Radici | 10 - Information Phase | 04.05.2021 14:26 | 4428 | | | No | No | | | | | euro |
| 388125 | | | Costruz complesso per uffici e laboratori 3000 mq 1� lotto demolizione | | Default Value | | Running | euro | 11.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52037 | SANSEPOLCRO | Technical facilities | Via Dei Filosofi Ex Buitoni | 10 - Information Phase | 04.05.2021 14:26 | 4427 | | | No | No | | | | | euro |
| 388124 | | | Ristrutturaz edifici 4-5-11 per polo culturale multifunzionale 24000 mq | | Default Value | | Running | euro | 09.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Via Delle Cascine 35 Ex Manifattura | 10 - Information Phase | 04.05.2021 14:26 | 4426 | | | No | No | | | | | euro |
| 388123 | | | Risanamento conservativo ex Meyer per servizi gestione emergenza abitativa | | Default Value | | Running | euro | 11.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Via Fra' Domenico Buonvicini | 10 - Information Phase | 04.05.2021 14:26 | 4425 | | | No | No | | | | | euro |
| 388122 | | | Realizzazione palestra struttura leggera presso liceo Checchi | | Default Value | | Running | euro | 24.02.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50054 | FUCECCHIO | | Via Padre Arturo Checchi | 10 - Information Phase | 04.05.2021 14:26 | 4424 | | | No | No | | | | | euro |
| 388121 | | | Costruzione nuovo edificio scolastico | | Default Value | | Running | euro | 18.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50053 | EMPOLI | | Via R. Sanzio | 10 - Information Phase | 04.05.2021 14:26 | 4423 | | | No | No | | | | | euro |
| 388120 | | | Lavori di ampliam e ristrutturaz ospedale Santa Verdiana fase 2 1� lotto | | Default Value | | Running | euro | 12.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50051 | CASTELFIORENTINO | | Via Dei Mille 1 | 10 - Information Phase | 04.05.2021 14:26 | 4422 | | | No | No | | | | | euro |
| 388119 | | | Costruzione edificio direzionale 2800mq Classe A4 | | Default Value | | Running | euro | 30.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50018 | SCANDICCI | Technical facilities | Via Barontini 8 | 10 - Information Phase | 04.05.2021 14:26 | 4421 | | | No | No | | | | | euro |
| 388118 | | | Costr resort hotel 5 stelle 71 camere 4 nuovi borghi golf club SPA congres | | Default Value | | Running | euro | 15.04.2021 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06100 | PERUGIA | Technical facilities | Strada Antognolla | 10 - Information Phase | 04.05.2021 14:26 | 4420 | | | No | No | | | | | euro |
| 387993-001 | | | PIZZAROTTI / PREZZI SPECIALI 2021 / PARMA / KKT | | Default Value | | Running | euro | 03.05.2021 | | IEMI-EMILIA ROMAGNA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 43100 | PARMA | | * | 10 - Information Phase | 03.05.2021 15:28 | | | | No | No | | | | | euro |
| 387993 | | | PIZZAROTTI / PREZZI SPECIALI 2021 / PARMA | | Default Value | | Running | euro | 03.05.2021 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | * | 10 - Information Phase | 03.05.2021 15:27 | | | | No | No | | | | | euro |
| 387944 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26900 | LODI | Residential houses | Via C. Scacchi | 10 - Information Phase | 03.05.2021 10:03 | 4419 | | | No | No | | | | | euro |
| 387943 | | | Realizzazione nuova scuola primaria secondo lotto fase 2 | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26839 | ZELO BUON PERSICO | | Via fratelli Cervi 11 | 10 - Information Phase | 03.05.2021 10:03 | 4418 | | | No | No | | | | | euro |
| 387942 | | | Costruzione edificio commerciale | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Via Castelleone 39 | 10 - Information Phase | 03.05.2021 10:03 | 4417 | | | No | No | | | | | euro |
| 387941 | | | Costruzione supermercato | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Via Cadore 130 Ex Snum | 10 - Information Phase | 03.05.2021 10:03 | 4416 | | | No | No | | | | | euro |
| 387940 | | | Costr 3 ville singole 3 bifamiliari 2 quadrifamiliari 1 palazzina residenz | | Default Value | | Running | euro | 19.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26041 | CASALMAGGIORE | Residential houses | Via Cairoli 173 | 10 - Information Phase | 03.05.2021 10:03 | 4415 | | | No | No | | | | | euro |
| 387939 | | | Costruzione edificio ad uso abitaz e boxes 12 unita' abitative | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Residential houses | Via A. Ferrario | 10 - Information Phase | 03.05.2021 10:03 | 4414 | | | No | No | | | | | euro |
| 387938 | | | Costruzione 12 ville a schiera e palazzina 6 unita' abitative | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Residential houses | Via Monsignor Mussi | 10 - Information Phase | 03.05.2021 10:03 | 4413 | | | No | No | | | | | euro |
| 387937 | | | Costruzione edificio artiglianale 2800 mq coperti e uffici | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Industry building | Via del Serpente 81 | 10 - Information Phase | 03.05.2021 10:03 | 4412 | | | No | No | | | | | euro |
| 387936 | | | Costruzione 5 ville singole | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Pialorsi | 10 - Information Phase | 03.05.2021 10:03 | 4411 | | | No | No | | | | | euro |
| 387935 | | | Demoricostruzione edificio ad uso abitazione | | Default Value | | Running | euro | 09.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Sega 11 | 10 - Information Phase | 03.05.2021 10:03 | 4410 | | | No | No | | | | | euro |
| 387934 | | | Costruzione palazzina uffici | | Default Value | | Running | euro | 09.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Via G.di Vittorio 2 C | 10 - Information Phase | 03.05.2021 10:03 | 4409 | | | No | No | | | | | euro |
| 387933 | | | Costruzione ville a schiera 5 unita' abitative | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25087 | SALO' | Residential houses | Via Muro | 10 - Information Phase | 03.05.2021 10:03 | 4408 | | | No | No | | | | | euro |
| 387932 | | | Costruzione edificio ad uso abitaz e boxes 10 unita' Classe A4 | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25064 | GUSSAGO | Residential houses | Via Manzoni 14 | 10 - Information Phase | 03.05.2021 10:03 | 4407 | | | No | No | | | | | euro |
| 387931 | | | Costruzione 3 palazzine ad uso abitazione 20 unita' abitative | | Default Value | | Running | euro | 19.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25049 | ISEO | Residential houses | Via S. Bonomelli 25 | 10 - Information Phase | 03.05.2021 10:03 | 4406 | | | No | No | | | | | euro |
| 387930 | | | Costruzione edificio 2 piani ft ad uso abitaz negozi e boxes 12 unita' | | Default Value | | Running | euro | 12.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | CASTELCOVATI | Residential houses | Vie De Gasperi / Chiari | 10 - Information Phase | 03.05.2021 10:03 | 4405 | | | No | No | | | | | euro |
| 387929 | | | Costruzione unita' abitative a schiera con piscina | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25019 | SIRMIONE | Residential houses | Via San Martino della Battaglia | 10 - Information Phase | 03.05.2021 10:03 | 4404 | | | No | No | | | | | euro |
| 387928 | | | Costruzione complesso residenziale ville con piscina nuovo lotto | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25019 | SIRMIONE | Residential houses | Vie Chiodi / Verona | 10 - Information Phase | 03.05.2021 10:03 | 4403 | | | No | No | | | | | euro |
| 387927 | | | Costruzione edificio commerciale | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25017 | LONATO | Technical facilities | Via Tiracollo | 10 - Information Phase | 03.05.2021 10:03 | 4402 | | | No | No | | | | | euro |
| 387926 | | | Costruzione edificio ad uso abitaz 20 unita' abitative con piscina | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25015 | DESENZANO DEL GARDA | Residential houses | Via Eridio 2 | 10 - Information Phase | 03.05.2021 10:03 | 4401 | | | No | No | | | | | euro |
| 387925 | | | Costruzione edificio ad uso abitazione 10 unita' abitative e box classe A4 | | Default Value | | Running | euro | 15.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Ambrogio Da Calepio 9 | 10 - Information Phase | 03.05.2021 10:03 | 4400 | | | No | No | | | | | euro |
| 387924 | | | Costruzione palazzina ad uso abitaz e boxes 11 unita' abitative Classe A3 | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via E.Pirovano 13 | 10 - Information Phase | 03.05.2021 10:03 | 4399 | | | No | No | | | | | euro |
| 387923 | | | Costruzione supermercato | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via F.Corridoni 29 | 10 - Information Phase | 03.05.2021 10:03 | 4398 | | | No | No | | | | | euro |
| 387922 | | | Riqualificazione ex complesso industriale | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Industry building | Via del Ponte di Pietra 2 | 10 - Information Phase | 03.05.2021 10:03 | 4397 | | | No | No | | | | | euro |
| 387921 | | | Lavori di valorizzazione del Centro Piacentiniano lotto 2 | | Default Value | | Running | euro | 26.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Piazza Cavour | 10 - Information Phase | 03.05.2021 10:03 | 4396 | | | No | No | | | | | euro |
| 387920 | | | Costruzione palazzina ad uso abitazione e boxes 4 unita' | | Default Value | | Running | euro | 08.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24068 | SERIATE | Residential houses | Via Galvani 8 | 10 - Information Phase | 03.05.2021 10:03 | 4395 | | | No | No | | | | | euro |
| 387919 | | | Lavori di ampliamento casa di riposo | | Default Value | | Running | euro | 26.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24065 | LOVERE | | Via P. Gobetti | 10 - Information Phase | 03.05.2021 10:03 | 4394 | | | No | No | | | | | euro |
| 387918 | | | Ampliamento edificio logistico | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | COVO | Industry building | Via G.Gregis | 10 - Information Phase | 03.05.2021 10:02 | 4393 | | | No | No | | | | | euro |
| 387917 | | | Costruzione supermercato alimentare 2500 mq e opere di urbanizzazione | | Default Value | | Running | euro | 08.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Technical facilities | Viale Porta / Via Castolda | 10 - Information Phase | 03.05.2021 10:02 | 4392 | | | No | No | | | | | euro |
| 387916 | | | Costruzione palazzina ad uso abitazione e boxes 12 appartam Classe A3 | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Residential houses | Viale Ariosto 3 | 10 - Information Phase | 03.05.2021 10:02 | 4391 | | | No | No | | | | | euro |
| 387915 | | | Costruzione 2 edifici multip uso abitaz e boxes 16+20 appartam Classe A | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Residential houses | Via C. Terni 33 | 10 - Information Phase | 03.05.2021 10:02 | 4390 | | | No | No | | | | | euro |
| 387914 | | | Costruzione edificio commerciale | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24043 | CARAVAGGIO | Technical facilities | Via Treviglio | 10 - Information Phase | 03.05.2021 10:02 | 4389 | | | No | No | | | | | euro |
| 387913 | | | Ampliamento complesso industriale magazzini ed uffici 4225 mq | | Default Value | | Running | euro | 15.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24023 | CLUSONE | Industry building | Viale Europa 47 | 10 - Information Phase | 03.05.2021 10:02 | 4388 | | | No | No | | | | | euro |
| 387912 | | | Costuzione nuova scuola media primo lotto | | Default Value | | Running | euro | 04.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23880 | CASATENOVO | | Via San Giacomo | 10 - Information Phase | 03.05.2021 10:02 | 4387 | | | No | No | | | | | euro |
| 387911 | | | Costruzione supermercato Eurospin 1450 mq e opere urbanizzazione | | Default Value | | Running | euro | 14.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23864 | MALGRATE | Technical facilities | Via Stabilini 22 | 10 - Information Phase | 03.05.2021 10:02 | 4386 | | | No | No | | | | | euro |
| 387910 | | | Costruzione edificio ad uso abitazione negozi e boxes | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23848 | OGGIONO | Residential houses | Via Primo Maggio 52 | 10 - Information Phase | 03.05.2021 10:02 | 4385 | | | No | No | | | | | euro |
| 387909 | | | Demoricostruzione edificio x supermercato Eurospin 1450mq e urbanizzaz | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Via P.Paoli 9/A | 10 - Information Phase | 03.05.2021 10:02 | 4384 | | | No | No | | | | | euro |
| 387908 | | | Ristrutturazione edificio per supermarcato Iperal 2500 mq | | Default Value | | Running | euro | 18.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22066 | MARIANO COMENSE | Technical facilities | Via Lombardia 78 | 10 - Information Phase | 03.05.2021 10:02 | 4383 | | | No | No | | | | | euro |
| 387907 | | | Costruzione 2 edifici 6 piani f.t.36 unita' abitat totali Classe A3 | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Residential houses | Via Dante Alighieri 37 | 10 - Information Phase | 03.05.2021 10:02 | 4382 | | | No | No | | | | | euro |
| 387906 | | | Realizzaz nuovo circolo canoa e sala civica polivalente c/o Nuova Marna | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21018 | SESTO CALENDE | | Vie Barbieri / Roma | 10 - Information Phase | 03.05.2021 10:02 | 4381 | | | No | No | | | | | euro |
| 387905 | | | Demoricostruzione complesso residenziale | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | Residential houses | Via A.Curioni 10 | 10 - Information Phase | 03.05.2021 10:02 | 4380 | | | No | No | | | | | euro |
| 387904 | | | Costruz 17 edifici e parco 1� lotto 4 edifici 100 unita' abitative tot | | Default Value | | Running | euro | 02.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Val D'Ossola 21 | 10 - Information Phase | 03.05.2021 10:02 | 4379 | | | No | No | | | | | euro |
| 387903 | | | Costruzione edificio 3 piani f.t. ad uso abitaz e boxes 12 unita' abitat | | Default Value | | Running | euro | 02.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Vie B, Pizzagalli / Adigrat | 10 - Information Phase | 03.05.2021 10:02 | 4378 | | | No | No | | | | | euro |
| 387902 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20864 | AGRATE BRIANZA | Residential houses | Via Rossini | 10 - Information Phase | 03.05.2021 10:02 | 4377 | | | No | No | | | | | euro |
| 387901 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20863 | CONCOREZZO | Residential houses | Via A. di Savoia 9 | 10 - Information Phase | 03.05.2021 10:02 | 4376 | | | No | No | | | | | euro |
| 387900 | | | Costruzione edificio ad uso abitazione e boxes 8 unita' abitative | | Default Value | | Running | euro | 09.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20842 | BESANA IN BRIANZA | Residential houses | Via del Castano 19 | 10 - Information Phase | 03.05.2021 10:02 | 4375 | | | No | No | | | | | euro |
| 387899 | | | Costruzione edificio produttivo 1000 mq ed uffici 450 mq | | Default Value | | Running | euro | 24.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20835 | MUGGIO' | Industry building | Via Legnano 8 | 10 - Information Phase | 03.05.2021 10:02 | 4374 | | | No | No | | | | | euro |
| 387898 | | | Collegamento autostradale Dalmine-Como-Varese Tratte B2 e C | | Default Value | | Running | euro | 04.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20823 | LENTATE SUL SEVESO | Technical facilities | SEVESO / CESANO MADERNO | 10 - Information Phase | 03.05.2021 10:02 | 4373 | | | No | No | | | | | euro |
| 387897 | | | Costruzione 3 medie strutture di vendita | | Default Value | | Running | euro | 09.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20821 | MEDA | Technical facilities | Via General Giardino 10 | 10 - Information Phase | 03.05.2021 10:02 | 4372 | | | No | No | | | | | euro |
| 387896 | | | Costruzione supermercato Iperal e opere di urbanizzazione | | Default Value | | Running | euro | 08.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20814 | VAREDO | Technical facilities | Corso Milano Ex SNIA | 10 - Information Phase | 03.05.2021 10:02 | 4371 | | | No | No | | | | | euro |
| 387895 | | | Costruzione edificio multipiano ad uso abitaz e boxes | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20162 | MILANO | Residential houses | Via Guido da Velate 4 | 10 - Information Phase | 03.05.2021 10:02 | 4370 | | | No | No | | | | | euro |
| 387894 | | | Costruzione complesso ad uso abitaz 58 unita' abitat negozi e boxes | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20162 | MILANO | Residential houses | Via G.B.Passerini 11 | 10 - Information Phase | 03.05.2021 10:02 | 4369 | | | No | No | | | | | euro |
| 387893 | | | Costruzione residenza sanitaria assitenz 120p letto+28 appartam protetti | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20162 | MILANO | | Viale F.Testi / Esperia | 10 - Information Phase | 03.05.2021 10:02 | 4368 | | | No | No | | | | | euro |
| 387892 | | | Costruzione complesso residenziale ad uso abitaz e boxes | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20161 | MILANO | Residential houses | Via A.Astesani 45 | 10 - Information Phase | 03.05.2021 10:02 | 4367 | | | No | No | | | | | euro |
| 387891 | | | Completamento residenza universitaria U42 | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20161 | MILANO | Residential houses | Via Comasina 42 | 10 - Information Phase | 03.05.2021 10:02 | 4366 | | | No | No | | | | | euro |
| 387890 | | | Costruzione edificio ad uso abitaz e boxes 6 unita' abitative | | Default Value | | Running | euro | 11.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | MILANO | Residential houses | Via G.Guerzoni 9 | 10 - Information Phase | 03.05.2021 10:02 | 4365 | | | No | No | | | | | euro |
| 387889 | | | Costruzione supermercato | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | MILANO | Technical facilities | Via Privata A.Maffucci 73 | 10 - Information Phase | 03.05.2021 10:02 | 4364 | | | No | No | | | | | euro |
| 387888 | | | Costruzioni 2 edifici a torre residenziali | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20157 | MILANO | Residential houses | Via Eritrea 62 | 10 - Information Phase | 03.05.2021 10:02 | 4363 | | | No | No | | | | | euro |
| 387887 | | | Demoricostruzione complesso ad uso abitazione e boxes | | Default Value | | Running | euro | 03.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | MILANO | Residential houses | Via L.di Breme 26 | 10 - Information Phase | 03.05.2021 10:02 | 4362 | | | No | No | | | | | euro |
| 387886 | | | Ristrutturazione complesso industriale per laboratori uffici primo lotto | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | MILANO | Technical facilities | Via Varesina 204 | 10 - Information Phase | 03.05.2021 10:02 | 4361 | | | No | No | | | | | euro |
| 387885 | | | Costruzione complesso residenziale 11719 mq | | Default Value | | Running | euro | 02.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | MILANO | Residential houses | Via A.Brunetti 26 | 10 - Information Phase | 03.05.2021 10:01 | 4360 | | | No | No | | | | | euro |
| 387884 | | | Costruzione edif 7 piani f.t. 18 appartam Classe A e 2 p interrati boxes | | Default Value | | Running | euro | 11.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via Piero della Francesca 29 | 10 - Information Phase | 03.05.2021 10:01 | 4359 | | | No | No | | | | | euro |
| 387883 | | | Costruzione edificio ad uso abitazione 3 pft 13 unita' abitative e box | | Default Value | | Running | euro | 15.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20153 | MILANO | Residential houses | Via Caldera 132 | 10 - Information Phase | 03.05.2021 10:01 | 4358 | | | No | No | | | | | euro |
| 387882 | | | Completamento edif multipiano al rustico uso residenziale 71 unita' abitat | | Default Value | | Running | euro | 02.03.2021 | 03.05.2021 | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | MILANO | Residential houses | Via Gallarate 311/15 | 10 - Information Phase | 03.05.2021 10:01 | 4357 | | | No | No | | | | | euro |
| 387881 | | | Ristrut fabbricato multifunzione servizio vettovagliamento e sale convegno | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20147 | MILANO | | Piazzale Perrucchetti 1 | 10 - Information Phase | 03.05.2021 10:01 | 4356 | | | No | No | | | | | euro |
| 387880 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 03.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20146 | MILANO | Residential houses | Via P.Cavalcabo' 2 | 10 - Information Phase | 03.05.2021 10:01 | 4355 | | | No | No | | | | | euro |
| 387879 | | | Costruzione edificio ad uso abitaz 28 appartamenti e 27 boxes | | Default Value | | Running | euro | 03.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | MILANO | Residential houses | Via Salaino 14 | 10 - Information Phase | 03.05.2021 10:01 | 4354 | | | No | No | | | | | euro |
| 387878 | | | Costruzione campus universitario 700 posti letto | | Default Value | | Running | euro | 03.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20138 | MILANO | Residential houses | Via G. Ripamonti 35 Ex Consorzio | 10 - Information Phase | 03.05.2021 10:01 | 4353 | | | No | No | | | | | euro |
| 387877 | | | Costruzione 4 edifici multipiano 9 piani f.t. 107 unita' abitative totali | | Default Value | | Running | euro | 07.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20134 | MILANO | Residential houses | Via Dei Canzi | 10 - Information Phase | 03.05.2021 10:01 | 4352 | | | No | No | | | | | euro |
| 387876 | | | Costruzione complesso direzionale 50000mq prima fase=demoliz e bonifica | | Default Value | | Running | euro | 09.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20132 | MILANO | Technical facilities | Via A.Rizzoli 2 | 10 - Information Phase | 03.05.2021 10:01 | 4351 | | | No | No | | | | | euro |
| 387875 | | | Costruzione nuovo headquarters | | Default Value | | Running | euro | 03.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20128 | MILANO | Technical facilities | Via W. Von Siemens | 10 - Information Phase | 03.05.2021 10:01 | 4350 | | | No | No | | | | | euro |
| 387874 | | | Costruzione edificio ad uso abitaz e boxes 10 unita' abitative | | Default Value | | Running | euro | 25.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20127 | MILANO | Residential houses | Via V.Russo 22 | 10 - Information Phase | 03.05.2021 10:01 | 4349 | | | No | No | | | | | euro |
| 387873 | | | Costruzione edificio ad uso uffici ambito PL3 Ansaldo | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20126 | MILANO | Technical facilities | Viale Sarca 336 | 10 - Information Phase | 03.05.2021 10:01 | 4348 | | | No | No | | | | | euro |
| 387872 | | | Ristrutturazione edificio ad uso uffici | | Default Value | | Running | euro | 01.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20126 | MILANO | Technical facilities | Viale Sarca 336 | 10 - Information Phase | 03.05.2021 10:01 | 4347 | | | No | No | | | | | euro |
| 387871 | | | Costruzione edificio universitario U10.1 e residenza universitaria U10.2 | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20126 | MILANO | | Viale dell'Innovazione | 10 - Information Phase | 03.05.2021 10:01 | 4346 | | | No | No | | | | | euro |
| 387870 | | | Costruzione residenza temporanea per studenti | | Default Value | | Running | euro | 17.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20126 | MILANO | Residential houses | Via Frigia 19 | 10 - Information Phase | 03.05.2021 10:01 | 4345 | | | No | No | | | | | euro |
| 387869 | | | Costruzione edificio ad uso abitazione 35 appartamenti e box | | Default Value | | Running | euro | 03.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Residential houses | Vie Magione 4 / Papiniano 53 | 10 - Information Phase | 03.05.2021 10:01 | 4344 | | | No | No | | | | | euro |
| 387868 | | | Ristrutturazione edificio residenziale di pregio per 13 unita' abitative | | Default Value | | Running | euro | 08.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Residential houses | Via Donizetti 41 | 10 - Information Phase | 03.05.2021 10:01 | 4343 | | | No | No | | | | | euro |
| 387867-001 | | | MBT / Costruzione edificio multip ad uso abitaz 30 appart 23 boxes interrati | | Default Value | | Running | euro | 27.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20122 | MILANO | Residential houses | Via San Martino 15 | 40 - Realisation Phase | 27.07.2021 06:54 | 4342 | | | No | No | | | | | euro |
| 387867 | | | Costruzione edificio multip ad uso abitaz 30 appart 23 boxes interrati | | Default Value | | Running | euro | 02.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Residential houses | Via San Martino 15 | 40 - Realisation Phase | 03.05.2021 10:01 | 4342 | | | No | No | | | | | euro |
| 387866 | | | Costr parch sotteraneo 4 p. a rotaz 236 p.auto privati 89 p.auto pubblici | | Default Value | | Running | euro | 01.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Technical facilities | Via Borgogna | 10 - Information Phase | 03.05.2021 10:01 | 4341 | | | No | No | | | | | euro |
| 387865 | | | Ristrutturazione edif per Radisson Hotel 160 camere ristorante roof bar | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Technical facilities | Via Santa Sofia 37 | 10 - Information Phase | 03.05.2021 10:01 | 4340 | | | No | No | | | | | euro |
| 387864 | | | Riqualificazione immobile ad uso uffici 12200 mq | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Technical facilities | Corso Italia 19 | 10 - Information Phase | 03.05.2021 10:01 | 4339 | | | No | No | | | | | euro |
| 387863 | | | Manutenzione straordinaria bonifica e stripout Torre Velasca | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | MILANO | Technical facilities | Piazza Velasca 3 | 10 - Information Phase | 03.05.2021 10:01 | 4338 | | | No | No | | | | | euro |
| 387862 | | | Costruzione edificio multipiano ad uso abitaz monolocali di prestigio | | Default Value | | Running | euro | 08.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | Residential houses | Via Anfiteatro 7 | 10 - Information Phase | 03.05.2021 10:01 | 4337 | | | No | No | | | | | euro |
| 387861 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | Residential houses | Via Moscova 64 | 10 - Information Phase | 03.05.2021 10:01 | 4336 | | | No | No | | | | | euro |
| 387860 | | | Completamento edificio ad uso alberghiero SPA ristorante ecc | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | Technical facilities | Via Brera 19 | 10 - Information Phase | 03.05.2021 10:01 | 4335 | | | No | No | | | | | euro |
| 387859 | | | Riqualificazione edificio ad uso commerciale direzionale 12000 mq | | Default Value | | Running | euro | 31.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | Technical facilities | Via della Spiga 26 | 10 - Information Phase | 03.05.2021 10:01 | 4334 | | | No | No | | | | | euro |
| 387858 | | | Costruzione 3 edifici ad uso abitaz e boxes 36 unita' totali | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20098 | SAN GIULIANO MILANESE | Residential houses | Via O. Fallaci | 10 - Information Phase | 03.05.2021 10:00 | 4333 | | | No | No | | | | | euro |
| 387857 | | | Costruzione media struttura di vendita 2499 mq | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20098 | SAN GIULIANO MILANESE | Technical facilities | Vie Volturno / Giotto | 10 - Information Phase | 03.05.2021 10:00 | 4332 | | | No | No | | | | | euro |
| 387856 | | | Costruzione polo logistico 8000 mq | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20096 | PIOLTELLO | Industry building | Via Primo Maggio | 10 - Information Phase | 03.05.2021 10:00 | 4331 | | | No | No | | | | | euro |
| 387855 | | | Costruzione 3 edifici ad uso abitazione e boxes | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20063 | CERNUSCO SUL NAVIGLIO | Residential houses | Via Padre Turoldo | 10 - Information Phase | 03.05.2021 10:00 | 4330 | | | No | No | | | | | euro |
| 387854 | | | Costruzione edificio logistico con uffici Lotto 4 ex Nokia | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20060 | CASSINA DE' PECCHI | Industry building | Strada Padana Superiore | 10 - Information Phase | 03.05.2021 10:00 | 4329 | | | No | No | | | | | euro |
| 387853 | | | Costruzione 2 edifici ad uso abitaz e boxes 12+12 appartamenti Classe A4 | | Default Value | | Running | euro | 29.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20060 | CASSINA DE' PECCHI | Residential houses | Via Don G. Caselli | 10 - Information Phase | 03.05.2021 10:00 | 4328 | | | No | No | | | | | euro |
| 387852 | | | Costruzione 2 palazzine ad uso abitazione e boxes 19 unita' abitative | | Default Value | | Running | euro | 12.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20056 | TREZZO SULL'ADDA | Residential houses | Vie Alessandrini / Rossa | 10 - Information Phase | 03.05.2021 10:00 | 4327 | | | No | No | | | | | euro |
| 387822 | | | PRESENTAZIONE HLX / IMPRESE LOMBARDIA | | Default Value | | Running | euro | 01.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | | Piazza Città di Lombardia 1 | 10 - Information Phase | 01.05.2021 09:47 | | | | No | No | | | | | euro |
| 387808-001 | | | DETAN-S / POSTAZIONE DI RICARICA / COIMA MILANO | | Default Value | | Running | euro | 30.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20154 | Milano | | Piazza Gae Aulenti | 30 - Tender & Submission Phase | 30.04.2021 15:28 | | | | No | No | | | | | euro |
| 387808 | | | POSTAZIONE DI RICARICA / COIMA MILANO | | Default Value | | Running | euro | 30.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | Milano | | Piazza Gae Aulenti | 30 - Tender & Submission Phase | 30.04.2021 15:26 | | | | No | Yes | | | | | euro |
| 387687-001 | | | TERREAL / VILLA BIGAGNOLO / BARDOLINO / FK5 | | Default Value | | Running | euro | 29.04.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 37011 | Bardolino | | _ | 20 - Planning Phase | 29.04.2021 11:27 | | | | No | No | | | | | euro |
| 387687 | | | TERREAL / VILLA BIGAGNOLO / BARDOLINO | | Default Value | | Running | euro | 29.04.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 37011 | Bardolino | | _ | 10 - Information Phase | 29.04.2021 11:22 | | | | No | No | | | | | euro |
| 387685-001 | | | TERREAL / IMPIANTO SUVERETO / LIVORNO / FK5 | | Default Value | | Running | euro | 29.04.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 57028 | Suvereto | | _ | 30 - Tender & Submission Phase | 29.04.2021 11:18 | | | | No | No | | | | | euro |
| 387685 | | | TERREAL / IMPIANTO SUVERETO / LIVORNO / FK5 | | Default Value | | Running | euro | 29.04.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 57028 | Suvereto | | _ | 10 - Information Phase | 29.04.2021 11:17 | | | | No | No | | | | | euro |
| 387523 | | | Realizzazione nuovo deposito automezzi Cotral | | Default Value | | Running | euro | 15.04.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 04026 | MINTURNO | Industry building | Via Lungomare 62 | 10 - Information Phase | 27.04.2021 14:34 | 4326 | | | No | No | | | | | euro |
| 387522 | | | Riqualif funzionale e messa a norma Palazzo dei Servizi Generali | | Default Value | | Running | euro | 23.02.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00185 | ROMA | | Piazzale Aldo Moro 5 | 10 - Information Phase | 27.04.2021 14:34 | 4325 | | | No | No | | | | | euro |
| 387521 | | | Lavori di realizzaz nuovi reparti di terapia intensiva e sub intensiva | | Default Value | | Running | euro | 12.03.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00184 | ROMA | | HP San Camillo / HP San Giovanni | 10 - Information Phase | 27.04.2021 14:34 | 4324 | | | No | No | | | | | euro |
| 387520 | | | ENG 2K /Costruzione polo logistico | | Default Value | | Running | euro | 09.04.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00155 | ROMA | Industry building | Via R. Birolli 19 | 10 - Information Phase | 27.04.2021 14:34 | 4323 | | | No | No | | | | | euro |
| 387497 | | | Costruzione nuova sede direzionale 4 piani 4000mq | | Default Value | | Running | euro | 29.03.2021 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62100 | MACERATA | Technical facilities | Contrada Acquevive ex SAM | 10 - Information Phase | 27.04.2021 11:37 | 4322 | | | No | No | | | | | euro |
| 387496 | | | Realizzazione edificio polifunzionale Unicam Student Center | | Default Value | | Running | euro | 08.04.2021 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62032 | CAMERINO | | Via D'Accorso Campus Universitario | 10 - Information Phase | 27.04.2021 11:37 | 4321 | | | No | No | | | | | euro |
| 387448-001 | | | GARA / AUTOCITY REALIZZAZIONE DI UN AUTOSALONE / TRENTO / HBS / GIUNTI | | Default Value | | Running | euro | 26.04.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 38100 | TRENTO | | * | 30 - Tender & Submission Phase | 26.04.2021 15:30 | | | | No | No | | | | | euro |
| 387448 | | | GARA / AUTOCITY REALIZZAZIONE DI UN AUTOSALONE / TRENTO | | Default Value | | Running | euro | 26.04.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | | * | 10 - Information Phase | 26.04.2021 15:29 | | | | No | No | | | | | euro |
| 387438-001 | | | CONTRACOS M / RESIDENZAIALE /VERONA / VIA SICILIA / HIT | | Default Value | | Running | euro | 26.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | VIALE SICILIA | 40 - Realisation Phase | 26.04.2021 14:30 | | | | No | No | | | | | euro |
| 387438 | | | CONTRACOS / RESIDENZAIALE /VERONA / VIA SICILIA | | Default Value | | Running | euro | 26.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | VIALE SICILIA | 10 - Information Phase | 26.04.2021 14:30 | | | | No | No | | | | | euro |
| 387271 | | | BARZON / Costruzione edificio ad uso abitazione e boxes 5 unita' abitative | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Residential houses | Via Chiabrera 12 | 10 - Information Phase | 22.04.2021 16:55 | 4320 | | | No | No | | | | | euro |
| 387270 | | | BORDIGNON / Ristrutturazione e consolidamento sismico succursale Liceo A. Veronese | | Default Value | | Running | euro | 12.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31044 | MONTEBELLUNA | | Viale Della Vittoria | 10 - Information Phase | 22.04.2021 16:55 | 4319 | | | No | No | | | | | euro |
| 387269 | | | CAR / Costruzione nuova scuola elementare G. Marconi | | Default Value | | Running | euro | 25.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30028 | SAN MICHELE AL TAGLIAMENTO | | Via Nazionale 27 | 10 - Information Phase | 22.04.2021 16:55 | 4318 | | | No | No | | | | | euro |
| 387268 | | | EDILVILLA / Costruz edificio con destinazione mista resid/commerc e direzionale | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36100 | VICENZA | Residential houses | Viale Riviera Berica | 10 - Information Phase | 22.04.2021 16:55 | 4317 | | | No | No | | | | | euro |
| 387267 | | | NICO VELO / Costruzione edificio ad uso laboratorio ed uffici | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36100 | VICENZA | Technical facilities | Viale L. Da Vinci 52 | 10 - Information Phase | 22.04.2021 16:55 | 4316 | | | No | No | | | | | euro |
| 387266 | | | DALLA LIBERA / Ampliamento ISIS Florence Nightingale nuova palestra | | Default Value | | Running | euro | 04.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31033 | CASTELFRANCO VENETO | | Via Verdi | 10 - Information Phase | 22.04.2021 16:55 | 4315 | | | No | No | | | | | euro |
| 387265 | | | PEF / Costruzione 2 edifici ad uso abitazione 5+5 unita' abitative classe A4 | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO | Residential houses | Via Luigi Stefanini | 10 - Information Phase | 22.04.2021 16:55 | 4314 | | | No | No | | | | | euro |
| 387264 | | | ECODEM / Demoricostruzione supermercato | | Default Value | | Running | euro | 17.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37014 | CASTELNUOVO DEL GARDA | Technical facilities | Via Gardesana 12 | 10 - Information Phase | 22.04.2021 16:55 | 4313 | | | No | No | | | | | euro |
| 387263 | | | ??? / Costruzione supermercato | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37014 | CASTELNUOVO DEL GARDA | Technical facilities | Via Stazione 1 | 10 - Information Phase | 22.04.2021 16:55 | 4312 | | | No | No | | | | | euro |
| 387262 | | | ??? / Costruzione complesso produttivo 3500 mq coperti | | Default Value | | Running | euro | 29.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31036 | ISTRANA | Industry building | Via Filzi | 10 - Information Phase | 22.04.2021 16:55 | 4311 | | | No | No | | | | | euro |
| 387261 | | | SETTEN M / Adeguam sismico ITIS Galilei primo stralcio lotto A aule lotto B officine | | Default Value | | Running | euro | 09.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31015 | CONEGLIANO | | Via Galilei 16 | 10 - Information Phase | 22.04.2021 16:55 | 4310 | | | No | No | | | | | euro |
| 387259 | | | SUSANNA / Lavori di realizzazione nuova autostazione autobus ATVO | | Default Value | | Running | euro | 12.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30027 | SAN DONA' DI PIAVE | Technical facilities | Via G. Baron | 10 - Information Phase | 22.04.2021 16:55 | 4308 | | | No | No | | | | | euro |
| 387258 | | | ??? / Costruzione nuovo edificio produttivo | | Default Value | | Running | euro | 09.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Industry building | Via Triestina 214 | 10 - Information Phase | 22.04.2021 16:55 | 4307 | | | No | No | | | | | euro |
| 387257 | | | B & B BALLAN M / Costr scuola primaria unitaria (1�lotto) con trasferim immobile comunale | | Default Value | | Running | euro | 24.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36010 | ZANE' | | Via A. De Gasperi | 10 - Information Phase | 22.04.2021 16:55 | 4306 | | | No | No | | | | | euro |
| 387256 | | | B &B BALLAN M / Costruzione concessionaria automobili | | Default Value | | Running | euro | 19.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Technical facilities | Via G. Transalgardo 2 | 10 - Information Phase | 22.04.2021 16:55 | 4305 | | | No | No | | | | | euro |
| 387255 | | | TREVISAN / Costr 3 edifici polifunzionali commercio uffici residenza 1� lotto OOUU | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35035 | MESTRINO | Technical facilities | Via Trieste Ex Consorzio | 10 - Information Phase | 22.04.2021 16:55 | 4304 | | | No | No | | | | | euro |
| 387254 | | | CEV M e T / Costruzione edificio direzionale e showroom 3300 mq | | Default Value | | Running | euro | 02.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31053 | PIEVE DI SOLIGO | Technical facilities | Via G. Galilei 35 | 10 - Information Phase | 22.04.2021 16:55 | 4303 | | | No | No | | | | | euro |
| 387253 | | | EGI ZANOTTO / Costruzione nuova palestra | | Default Value | | Running | euro | 17.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36016 | THIENE | | Via San Gaetano | 10 - Information Phase | 22.04.2021 16:55 | 4302 | | | No | No | | | | | euro |
| 387252 | | | ENG 2K / Costruzione polo logistico Amazon 4000 mq | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31032 | CASALE SUL SILE | Industry building | Via Valli | 10 - Information Phase | 22.04.2021 16:55 | 4301 | | | No | No | | | | | euro |
| 387251 | | | VENETA 21 M / Opere sostitutive soppress passaggi a livello linea Mestre Castelfranco V. | | Default Value | | Running | euro | 25.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30033 | NOALE | Technical facilities | KM. 14+550 e KM. 16+132 | 10 - Information Phase | 22.04.2021 16:55 | 4300 | | | No | No | | | | | euro |
| 387250 | | | DE BIASI M /Costruzione residenza sanitaria assistenziale 120 posti letto | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35036 | MONTEGROTTO TERME | | Via Virgilio 16 | 10 - Information Phase | 22.04.2021 16:55 | 4299 | | | No | No | | | | | euro |
| 387249 | | | SUNINVEST M / Costruzione 7 edifici resid 49 unita' abitative tot Classe energetica A | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | Residential houses | Via Marche | 10 - Information Phase | 22.04.2021 16:55 | 4298 | | | No | No | | | | | euro |
| 387248 | | | ITI M / Lavori di recupero e riqualif complesso Casa Studente A. Fusinato | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | | Via Marzolo | 10 - Information Phase | 22.04.2021 16:55 | 4297 | | | No | No | | | | | euro |
| 387247 | | | TECTA M / Costruzione polo logistico 8051 mq e uffici | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36100 | VICENZA | Industry building | Viale Della Serenissima 74 | 10 - Information Phase | 22.04.2021 16:55 | 4296 | | | No | No | | | | | euro |
| 387246 | | | SUNINVEST / Costruzione 20 villette 3 palazzine 15 appartamenti totali | | Default Value | | Running | euro | 18.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Residential houses | Mestre Vie Tinto / Frisotti | 10 - Information Phase | 22.04.2021 16:55 | 4295 | | | No | No | | | | | euro |
| 387245 | | | PGM (CER) / Costruzione 2 edifici logistici e uffici 22500 mq totali | | Default Value | | Running | euro | 02.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Industry building | Via Del Progresso 17 | 10 - Information Phase | 22.04.2021 16:55 | 4294 | | | No | No | | | | | euro |
| 387244 | | | ???? M / Costruzione media struttura di vendita 3 piani 13000 mq | | Default Value | | Running | euro | 15.04.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36075 | MONTECCHIO MAGGIORE | Technical facilities | Vle Verona Ex Faeda | 10 - Information Phase | 22.04.2021 16:55 | 4293 | | | No | No | | | | | euro |
| 387243 | | | ??? / Recupero complesso industriale ex Galileo 160 unita' cohousing | | Default Value | | Running | euro | 09.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Residential houses | Via Flli Bandiera 9 Marghera | 10 - Information Phase | 22.04.2021 16:55 | 4292 | | | No | No | | | | | euro |
| 387242 | | | LOGIMAN (CER) / Costruzione centro logistico 38000 mq | | Default Value | | Running | euro | 30.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | Industry building | Strada Delle Trincee 8 | 10 - Information Phase | 22.04.2021 16:55 | 4291 | | | No | No | | | | | euro |
| 387187 | | | RH BUILDER / Realizzaz palestra polifunzionale nel plesso scolastico e riqualif spazi | | Default Value | | Running | euro | 11.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48010 | FUSIGNANO | | Vie Giovanni XXIII/Falcone e Borsellino | 10 - Information Phase | 22.04.2021 11:15 | 4290 | | | No | No | | | | | euro |
| 387186 | | | CAMAR / Realizzazione nuova biblioteca scientifica centralizzata al campus | | Default Value | | Running | euro | 04.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | Parco Area delle Scienze | 10 - Information Phase | 22.04.2021 11:15 | 4289 | | | No | No | | | | | euro |
| 387185 | | | GARC / Costruzione edificio commerciale | | Default Value | | Running | euro | 19.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41012 | CARPI | Technical facilities | Via Nazioni Unite / S.P. 46 R | 10 - Information Phase | 22.04.2021 11:15 | 4288 | | | No | No | | | | | euro |
| 387184 | | | COGEFI / Riqualificazione Via Darsena lotto A ex Mof Darsena | | Default Value | | Running | euro | 23.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 44100 | FERRARA | Technical facilities | Via Darsena | 10 - Information Phase | 22.04.2021 11:15 | 4287 | | | No | No | | | | | euro |
| 387183 | | | CEAR / Lavori di ristrutturazione ed ampliamento scuola primaria G. Rodari | | Default Value | | Running | euro | 11.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42025 | CAVRIAGO | | Via Guardanavona 9 | 10 - Information Phase | 22.04.2021 11:15 | 4286 | | | No | No | | | | | euro |
| 387182 | | | QUARTAROLI / Costruzione edificio 12 unita' abitative Classe A4 NZEB | | Default Value | | Running | euro | 24.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Residential houses | Strada Langhirano 122 | 10 - Information Phase | 22.04.2021 11:15 | 4285 | | | No | No | | | | | euro |
| 387181 | | | BOTTOLI / Costruzione nuovo reparto produttivo con uffici | | Default Value | | Running | euro | 19.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40019 | SANT'AGATA BOLOGNESE | Industry building | Via Modena 12 | 10 - Information Phase | 22.04.2021 11:15 | 4284 | | | No | No | | | | | euro |
| 387180 | | | GARC M / Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 24.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40033 | CASALECCHIO DI RENO | Residential houses | Via L.Da Vinci | 10 - Information Phase | 22.04.2021 11:14 | 4283 | | | No | No | | | | | euro |
| 387179 | | | POLIEDRO / Realizzazione nuova palestra complesso Via Toscana | | Default Value | | Running | euro | 07.04.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | Piazzale Sicilia | 10 - Information Phase | 22.04.2021 11:14 | 4282 | | | No | No | | | | | euro |
| 387178 | | | COPAV / Costruzione nuovo insediamento industriale logistico | | Default Value | | Running | euro | 24.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29010 | CADEO | Industry building | Via Emilia Localita' Fontana Fredda | 10 - Information Phase | 22.04.2021 11:14 | 4281 | | | No | No | | | | | euro |
| 387177 | | | CONSCOOP / Realizzazione nuovo edificio scolastico scuola media Manara Valgimigli | | Default Value | | Running | euro | 07.04.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47021 | BAGNO DI ROMAGNA | | Via Sauro / Piazza Martiri | 10 - Information Phase | 22.04.2021 11:14 | 4280 | | | No | No | | | | | euro |
| 387176 | | | TEBI / Ampliamento edificio industriale 5500 mq | | Default Value | | Running | euro | 24.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Industry building | Via Ugo Ferrandi | 10 - Information Phase | 22.04.2021 11:14 | 4279 | | | No | No | | | | | euro |
| 387175 | | | CIMS / Miglioramento sismico convitto Istituto ITAS Scarabelli | | Default Value | | Running | euro | 18.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40026 | IMOLA | Residential houses | Via Ascari | 10 - Information Phase | 22.04.2021 11:14 | 4278 | | | No | No | | | | | euro |
| 387174 | | | RENNOVA / Realizzazione struttura anziani non autosufficienti SPRA | | Default Value | | Running | euro | 24.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | Localita' Villa Parma | 10 - Information Phase | 22.04.2021 11:14 | 4277 | | | No | No | | | | | euro |
| 387173 | | | ALE / Costruzione edificio industriale | | Default Value | | Running | euro | 24.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41014 | CASTELVETRO DI MODENA | Industry building | S.S. n.569 173 | 10 - Information Phase | 22.04.2021 11:14 | 4276 | | | No | No | | | | | euro |
| 387172 | | | CONSCOOP / Raddoppio condotta acquedotto della Romagna | | Default Value | | Running | euro | 17.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48026 | RUSSI | Technical facilities | BAGNACAVALLO / COTIGNOLA | 10 - Information Phase | 22.04.2021 11:14 | 4275 | | | No | No | | | | | euro |
| 387171 | | | ZINI M / Costruzione supermercato 2500 mq magazzino 1000 mq ristorante OOUU | | Default Value | | Running | euro | 12.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40026 | IMOLA | Technical facilities | Vie G. Marconi / Senerina | 10 - Information Phase | 22.04.2021 11:14 | 4274 | | | No | No | | | | | euro |
| 387170 | | | RESEARCH CONS (ENZO) Costruzione Citta' delle Arti e dello Sport riappalto lavori | | Default Value | | Running | euro | 11.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | | Viale Europa | 10 - Information Phase | 22.04.2021 11:14 | 4273 | | | No | No | | | | | euro |
| 387169 | | | ALLODI / Costruz ville singole edificio 16 app RSA 70 anziani non autosuff parco | | Default Value | | Running | euro | 02.04.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Residential houses | Vie Edison Volta / La Spezia | 10 - Information Phase | 22.04.2021 11:14 | 4272 | | | No | No | | | | | euro |
| 387168 | | | GSE / Costruzione 3 edifici logistici 66271 mq coperti tot e opere urbanizzaz | | Default Value | | Running | euro | 03.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40012 | CALDERARA DI RENO | Industry building | Via Papa Giovanni XXIII Loc.Lippo | 10 - Information Phase | 22.04.2021 11:14 | 4271 | | | No | No | | | | | euro |
| 387167 | | | AKNO / Costruzione polo logistico 76000 mq | | Default Value | | Running | euro | 11.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29100 | PIACENZA | Industry building | S.R. 10 / Via Anna Solenghi | 10 - Information Phase | 22.04.2021 11:14 | 4270 | | | No | No | | | | | euro |
| 387166 | | | ENG 2K / Costruzione piattaforma logistica 2 edifici palazzina uffici e OOUU | | Default Value | | Running | euro | 02.04.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29017 | FIORENZUOLA D'ARDA | Industry building | SP 462 Loc Barabasca | 10 - Information Phase | 22.04.2021 11:14 | 4269 | | | No | No | | | | | euro |
| 387165 | | | MARTINI / Costruzione stabilimento industriale (GIA' FORNITI HCC) | | Default Value | | Running | euro | 24.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41013 | CASTELFRANCO EMILIA | Industry building | Via Cartiera | 10 - Information Phase | 22.04.2021 11:14 | 4268 | | | No | No | | | | | euro |
| 387164 | | | DE SANCTIS / Prolungamento SS9 tangenziale nord da San Prospero Strinati a Corte Tegge | | Default Value | | Running | euro | 14.04.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Technical facilities | Via Emilia / SS n 9 | 10 - Information Phase | 22.04.2021 11:14 | 4267 | | | No | No | | | | | euro |
| 387151 | | | FRIULANA / Lavori di costruzione palestra c/o istituto comprensivo riappalto lavori | | Default Value | | Running | euro | 09.04.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33039 | SEDEGLIANO | | Via M. Della Liberta' 19 | 10 - Information Phase | 22.04.2021 10:27 | 4266 | | | No | No | | | | | euro |
| 387150-001 | | | CRS COSTR / Recupero ex Cavallerizza caserma Osoppo a uso polifunzionale / DETAN | | Default Value | | Running | euro | 22.09.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33100 | UDINE | | Via Brigata Re 29 | 40 - Realisation Phase | 22.09.2021 11:46 | 4265 | | | No | No | | | | | euro |
| 387150 | | | IFAF M / Recupero ex Cavallerizza caserma Osoppo a uso polifunzionale | | Default Value | | Running | euro | 25.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | UDINE | | Via Brigata Re 29 | 40 - Realisation Phase | 22.04.2021 10:27 | 4265 | | | No | No | | | | | euro |
| 387149 | | | ISA SERVIZI (ENZO) M / Lavori di realizzazione nuova sede biblioteca ed auditorium 200 posti | | Default Value | | Running | euro | 25.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33081 | AVIANO | | Via Stretta | 10 - Information Phase | 22.04.2021 10:27 | 4264 | | | No | No | | | | | euro |
| 387148 | | | ITEC M / Realizzazione nuovi edifici area sede Protezione Civile | | Default Value | | Running | euro | 14.04.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33057 | PALMANOVA | Technical facilities | Via Natisone | 10 - Information Phase | 22.04.2021 10:27 | 4263 | | | No | No | | | | | euro |
| 387147 | | | ICI M / Realizzazione centro per la logistica integrata appalto integrato | | Default Value | | Running | euro | 08.04.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33028 | TOLMEZZO | Industry building | Capoluogo | 10 - Information Phase | 22.04.2021 10:27 | 4262 | | | No | No | | | | | euro |
| 387146 | | | MANELLI M / Costr palazz di 144 p.letto all servizio collettivo personale volontario | | Default Value | | Running | euro | 01.04.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33080 | ZOPPOLA | | Localita' Orcenico Superiore | 10 - Information Phase | 22.04.2021 10:27 | 4261 | | | No | No | | | | | euro |
| 386882-001 | | | ANGELO MARINO STUDIO D'ARCHITETTURA / REALIZZAZIONE PONTE PEDONALE / SANTA MARIA DEL CEDRO (CS) / DETAN | | Default Value | | Running | euro | 20.04.2021 | | ICAL-CALABRIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 87020 | Santa Maria del Cedro | | VIA DEL MARE 105 | 30 - Tender & Submission Phase | 20.04.2021 08:54 | | | | No | No | | | | 4.000,00 € | euro |
| 386882 | | | ANGELO MARINO STUDIO D'ARCHITETTURA / REALIZZAZIONE PONTE PEDONALE / SANTA MARIA DEL CEDRO (CS) | | Default Value | | Running | euro | 20.04.2021 | | ICAL-CALABRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 87020 | Santa Maria del Cedro | | VIA DEL MARE 105 | 10 - Information Phase | 20.04.2021 08:54 | | | | No | No | | | | 4.000,00 € | euro |
| 386773-001 | | | RISTRUTTURAZIONE FACCIATE CONDOMINI VIA DEGLI ASTRI-ROMA / COPRIGIUNTI | | Default Value | | Running | euro | 19.04.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00144 | Roma | | Via Degli Astri | 40 - Realisation Phase | 19.04.2021 09:40 | | | | No | No | | | | | euro |
| 386773 | | | RISTRUTTURAZIONE FACCIATE CONDOMINI VIA DEGLI ASTRI-ROMA | | Default Value | | Running | euro | 16.03.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00144 | Roma | | Via Degli Astri | 10 - Information Phase | 19.04.2021 09:39 | | | | No | No | | | | | euro |
| 386608-001 | | | UNIONBAU / NOI TECH. EDIFICIO DI RICERCA / BOLZANO / HDB / HTA | | Default Value | | Running | euro | 15.04.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 15.04.2021 16:31 | | | | No | No | | | | 26.000,00 € | euro |
| 386608 | | | UNIONBAU / NOI TECH. EDIFICIO DI RICERCA / BOLZANO | | Default Value | | Running | euro | 15.04.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 15.04.2021 16:30 | | | | No | No | | | | 26.000,00 € | euro |
| 386561-001 | | | HDB / STUDENTATO / VIA CEVEDALE 5 MILANO | | Default Value | | Running | euro | 15.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20158 | Milano | Educational facility | Via Cevedale 5 | 30 - Tender & Submission Phase | 15.04.2021 11:22 | | | | No | No | | | | | euro |
| 386561 | | | STUDENTATO / VIA CEVEDALE 5 MILANO | | Default Value | | Running | euro | 15.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | Milano | | Via Cevedale 5 | 30 - Tender & Submission Phase | 15.04.2021 11:20 | | | | No | No | | | | | euro |
| 386470-002 | | | HDB / IMMOBILE / PASSIVHAUS / MONZA / GEP IMMOBILIARE | | Default Value | | Running | euro | 14.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20900 | Monza | Residential houses | Via Carlo Emanuele I, 1 | 30 - Tender & Submission Phase | 14.04.2021 14:49 | | | | No | No | | | | | euro |
| 386470-001 | | | HIT / IMMOBILE / PASSIVHAUS / MONZA / GEP IMMOBILIARE | | Default Value | | Running | euro | 14.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20900 | Monza | Residential houses | Via Carlo Emanuele I, 1 | 30 - Tender & Submission Phase | 14.04.2021 13:58 | | | | No | No | | | | | euro |
| 386470 | | | IMMOBILE / PASSIVHAUS / MONZA / GEP IMMOBILIARE | | Default Value | | Running | euro | 14.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | Monza | Residential houses | Via Carlo Emanuele I, 1 | 30 - Tender & Submission Phase | 14.04.2021 13:57 | | | | No | No | | | | | euro |
| 386429 | | | GARA / NUONA PALAZZINA RESIDENZIALE RESIDENCE ROSE COMPOSTO DA 20 ALLOGGI E PIANO INTERRATO / TIRES (BZ) | | Default Value | | Running | euro | 14.04.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39050 | Tires | | * | 10 - Information Phase | 14.04.2021 10:46 | | | | No | No | | | | 3.100,00 € | euro |
| 386367-001 | | | D'AGOSTINO / OSPEDALE SIBARITIDE / CORIGLIANO CALABRO / MBT | | Default Value | | Running | euro | 13.04.2021 | | ICAL-CALABRIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 87060 | Corigliano Calabro | | C.DA INSITI SP. 195 | 40 - Realisation Phase | 13.04.2021 16:28 | | | | No | No | | | | 17.000,00 € | euro |
| 386367 | | | D'AGOSTINO / OSPEDALE SIBARITIDE / CORIGLIANO CALABRO | | Default Value | | Running | euro | 13.04.2021 | | ICAL-CALABRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 87060 | Corigliano Calabro | | C.DA INSITI SP. 195 | 10 - Information Phase | 13.04.2021 16:27 | | | | No | No | | | | 17.000,00 € | euro |
| 386141 | | | GARA / NUOVO OSPESALE 425 POSTI LETTO, CAMERE SINGOLE / SIRACUSA | | Default Value | | Running | euro | 12.04.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 96100 | Siracusa | | VIA TESTAFERRATA | 10 - Information Phase | 12.04.2021 10:09 | | | | No | No | | | | | euro |
| 386088-001 | | | TERMO-BREAK / CARPENTIERI LOMBARDIA / TERMO-BREAK / SST ANCON / HIT-SC | | Default Value | | Running | euro | 09.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | | piazza città di lombardia 1 | 10 - Information Phase | 09.04.2021 18:59 | | | | No | No | | | | | euro |
| 386088 | | | CARPENTIERI LOMBARDIA / TERMO-BREAK / SST ANCON / HIT-SC | | Default Value | | Running | euro | 09.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | | piazza città di lombardia 1 | 10 - Information Phase | 09.04.2021 18:58 | | | | No | No | | | | | euro |
| 386080-001 | | | CANDELA / SUPERMERCATO TIGROS / SARONNO / FK5 | | Default Value | | Running | euro | 09.04.2021 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 21047 | Saronno | | Via Miola | 30 - Tender & Submission Phase | 09.04.2021 15:58 | | | | No | No | | | | | euro |
| 386080 | | | CANDELA / SUPERMERCATO TIGROS / SARONNO / FK5 | | Default Value | | Running | euro | 09.04.2021 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 21047 | Saronno | | Via Miola | 10 - Information Phase | 09.04.2021 15:56 | | | | No | No | | | | | euro |
| 385893-001 | | | COSEDIL / COSTRUZIONE DI DUE FABBRICATI, NUOVA CABINA ELETTRICA E AMPLIAMENTO LOCALI MACCHINE / CATANIA / HDB | | Default Value | | Running | euro | 07.04.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 95100 | CATANIA | | * | 30 - Tender & Submission Phase | 07.04.2021 16:38 | | | | No | No | | | | 6.000,00 € | euro |
| 385893 | | | COSEDIL / COSTRUZIONE DI DUE FABBRICATI, NUOVA CABINA ELETTRICA E AMPLIAMENTO LOCALI MACCHINE / CATANIA | | Default Value | | Running | euro | 07.04.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 95100 | CATANIA | | * | 10 - Information Phase | 07.04.2021 16:38 | | | | No | No | | | | 6.000,00 € | euro |
| 385766-001 | | | GARA / AMPLIAMENTO COOP / CALDARO / HSD | | Default Value | | Running | euro | 06.04.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39052 | Caldaro sulla strada del vino | | * | 30 - Tender & Submission Phase | 06.04.2021 11:12 | | | | No | No | | | | 6.000,00 € | euro |
| 385766 | | | GARA / AMPLIAMENTO COOP / CALDARO | | Default Value | | Running | euro | 06.04.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39052 | Caldaro sulla strada del vino | | * | 10 - Information Phase | 06.04.2021 11:12 | | | | No | No | | | | 6.000,00 € | euro |
| 385554-001 | | | STUDIO ROSELLI E ASSOCIATI / COPERTURA PALESTRA / FAGAGNA / DETAN | | Default Value | | Running | euro | 31.03.2021 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 33034 | Fagagna | | * | 30 - Tender & Submission Phase | 31.03.2021 11:18 | | | | No | No | | | | 10.000,00 € | euro |
| 385554 | | | STUDIO ROSELLI E ASSOCIATI / COPERTURA PALESTRA / FAGAGNA | | Default Value | | Running | euro | 31.03.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33034 | Fagagna | | * | 10 - Information Phase | 31.03.2021 11:18 | | | | No | No | | | | 10.000,00 € | euro |
| 385533-001 | | | GRUPPO DAL PONT / ADEGUAMENTO SISMICO DEL COMPLESSO SEDE DEL I.P.S.I.A BRUSTOLON / BELLUNO / DETAN | | Default Value | | Running | euro | 31.03.2021 | | IVEN-VENETO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 12020 | Bellino | | * | 30 - Tender & Submission Phase | 31.03.2021 09:56 | | | | No | No | | | | 10.000,00 € | euro |
| 385533 | | | GRUPPO DAL PONT / ADEGUAMENTO SISMICO DEL COMPLESSO SEDE DEL I.P.S.I.A BRUSTOLON / BELLUNO | | Default Value | | Running | euro | 31.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 12020 | Bellino | | * | 10 - Information Phase | 31.03.2021 09:56 | | | | No | No | | | | 10.000,00 € | euro |
| 385180-003 | | | GALLERIA D'ITALIA / P.ZZA SAN CARLO TORINO / EDILTECNO | | Default Value | | Running | euro | 27.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 10121 | Torino | Shopping center | piazza San Carlo | 40 - Realisation Phase | 27.03.2021 11:26 | | | | No | No | | | | | euro |
| 385180-002 | | | HDB-GALLERIA D'ITALIA / P.ZZA SAN CARLO TORINO / EDILTECNO | | Default Value | | Running | euro | 27.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 10121 | Torino | Shopping center | piazza San Carlo | 40 - Realisation Phase | 27.03.2021 11:25 | | | | No | No | | | | | euro |
| 385180-001 | | | HDB / GALLERIA D'ITALIA / P.ZZA SAN CARLO TORINO / EDILTECNO | | Default Value | | Running | euro | 27.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 10121 | Torino | Shopping center | piazza San Carlo | 40 - Realisation Phase | 27.03.2021 11:25 | | | | No | No | | | | | euro |
| 385180 | | | GALLERIA D'ITALIA / P.ZZA SAN CARLO TORINO / EDILTECNO | | Default Value | | Running | euro | 27.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 10121 | Torino | Shopping center | piazza San Carlo | 40 - Realisation Phase | 27.03.2021 11:24 | | | | No | No | | | | | euro |
| 385095-001 | | | HIT / CARTIER MANUFACTURE / NUOVO IMPIANTO / TORINO | | Default Value | | Running | euro | 26.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 10154 | Torino | Industry building | Strada Basse di Stura, 68 | 30 - Tender & Submission Phase | 26.03.2021 07:49 | | | | No | No | | | | | euro |
| 385095 | | | CARTIER MANUFACTURE / NUOVO IMPIANTO / TORINO | | Default Value | | Running | euro | 26.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 10154 | Torino | | Strada Basse di Stura, 68 | 30 - Tender & Submission Phase | 26.03.2021 07:46 | | | | Yes | No | | | | | euro |
| 385049-001 | | | BOGGIA (ENZO) / CASA DELLA SALUTE DI CASALGRANDE / MBT | | Default Value | | Running | euro | 25.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 42013 | Casalgrande | | X | 30 - Tender & Submission Phase | 25.03.2021 14:05 | | | | No | No | | | | | euro |
| 385049 | | | BOGGIA / CASA DELLA SALUTE DI CASALGRANDE | | Default Value | | Running | euro | 25.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42013 | Casalgrande | | X | 10 - Information Phase | 25.03.2021 14:05 | | | | No | No | | | | | euro |
| 384950 | | | CMC RAVENNA / LAVORI EX VASCA NAVALE / UNIVERSITA' DEGLI STUDI DI ROMA | | Default Value | | Running | euro | 24.03.2021 | | ILAZ-LAZIO | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | | VIA DELLA VASCA NAVALE | 10 - Information Phase | 24.03.2021 16:05 | | | | No | No | | | | | euro |
| 384930-001 | | | LARCHER / ALPERIA / MERANO / DT | | Default Value | | Running | euro | 24.03.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39010 | Merano | | X | 30 - Tender & Submission Phase | 24.03.2021 15:05 | | | | No | No | | | | | euro |
| 384930 | | | LARCHER / ALPERIA / MERANO | | Default Value | | Running | euro | 24.03.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39010 | Merano | | X | 10 - Information Phase | 24.03.2021 15:04 | | | | No | No | | | | | euro |
| 384554 | | | GARA / CASA DI RIPOSO / SALORNO | | Default Value | | Running | euro | 19.03.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39040 | Salorno | | * | 10 - Information Phase | 19.03.2021 17:09 | | | | No | No | | | | 3.000,00 € | euro |
| 384551 | | | Adeguamento funzionale edificio scolastico ITI Othoca | | Default Value | | Running | euro | 14.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | | Via Zara | 10 - Information Phase | 19.03.2021 15:28 | 4259 | | | No | No | | | | | euro |
| 384550 | | | Ristrutturazione edificio ex hangar per centro di aggregazione sociale | | Default Value | | Running | euro | 01.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Localita' Is Mirrionis | 10 - Information Phase | 19.03.2021 15:28 | 4258 | | | No | No | | | | | euro |
| 384549 | | | Lavori di ammodernamento della palestra | | Default Value | | Running | euro | 04.02.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09094 | MARRUBIU | | Via Gramsci | 10 - Information Phase | 19.03.2021 15:28 | 4257 | | | No | No | | | | | euro |
| 384548 | | | Riqualif polo scolastico intercomunale M' Imparas Tue (1� lotto) | | Default Value | | Running | euro | 20.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09080 | NEONELI | | Via Scanu | 10 - Information Phase | 19.03.2021 15:28 | 4256 | | | No | No | | | | | euro |
| 384547 | | | Ristrutturazione e adeguamento normativo casa riposo Papa Giovanni XXIII | | Default Value | | Running | euro | 21.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | SENORBI' | | Via Brigata Sassari | 10 - Information Phase | 19.03.2021 15:28 | 4255 | | | No | No | | | | | euro |
| 384546 | | | Manutenzione straordinaria del municipio secondo stralcio | | Default Value | | Running | euro | 05.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | SEGARIU | | Via Municipio 11 | 10 - Information Phase | 19.03.2021 15:28 | 4254 | | | No | No | | | | | euro |
| 384545 | | | Costruzione scuola di volo internazionale | | Default Value | | Running | euro | 21.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09033 | DECIMOMANNU | | S.S.n.196 Aeroporto Militare | 10 - Information Phase | 19.03.2021 15:28 | 4253 | | | No | No | | | | | euro |
| 384544 | | | Sistem zona adiacente sc media x attivita' sportive (lotto 1) campi tennis | | Default Value | | Running | euro | 03.02.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09030 | SAMASSI | | Via Curie 2 | 10 - Information Phase | 19.03.2021 15:28 | 4252 | | | No | No | | | | | euro |
| 384543 | | | Ristrutt edificio da adibire a Caserma Carabinieri (2� lotto funzionale) | | Default Value | | Running | euro | 04.02.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09020 | VILLANOVAFRANCA | | Via G. Galilei | 10 - Information Phase | 19.03.2021 15:28 | 4251 | | | No | No | | | | | euro |
| 384542 | | | Lavori di riqualificazione della cittadella sportiva | | Default Value | | Running | euro | 27.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09013 | CARBONIA | | Via Balilla | 10 - Information Phase | 19.03.2021 15:28 | 4250 | | | No | No | | | | | euro |
| 384541 | | | Efficient ed adeguam impianto di compostaggio c/o piattaforma ambientale | | Default Value | | Running | euro | 03.02.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | Industry building | Z.I. Macchiareddu | 10 - Information Phase | 19.03.2021 15:28 | 4249 | | | No | No | | | | | euro |
| 384540 | | | Adeguamento campo di calcio alle normative CONI | | Default Value | | Running | euro | 21.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | | Localita' Sa e Sulis | 10 - Information Phase | 19.03.2021 15:28 | 4248 | | | No | No | | | | | euro |
| 384539 | | | Ristrutturazione e adeguamento normativo locali ex I.S.O.L.A. | | Default Value | | Running | euro | 15.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08030 | ATZARA | | Via Vittorio Emanuele 9 | 10 - Information Phase | 19.03.2021 15:28 | 4247 | | | No | No | | | | | euro |
| 384538 | | | Messa in sicurezza e adeguamento palestra comunale | | Default Value | | Running | euro | 21.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | IRGOLI | | Via Verdi | 10 - Information Phase | 19.03.2021 15:28 | 4246 | | | No | No | | | | | euro |
| 384537 | | | Realizzazione centro servizi informazioni turistiche Parco di Tepilora | | Default Value | | Running | euro | 14.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | TORPE' | | S.P. n.95 | 10 - Information Phase | 19.03.2021 15:28 | 4245 | | | No | No | | | | | euro |
| 384536 | | | Ristrutturazione 5 unita' immobiliari | | Default Value | | Running | euro | 28.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | Residential houses | Capoluogo | 10 - Information Phase | 19.03.2021 15:28 | 4244 | | | No | No | | | | | euro |
| 384535 | | | Messa in sicurezza piccoli ampliam/manut sc primaria e secondaria 1�grado | | Default Value | | Running | euro | 10.02.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07026 | OLBIA | | Via Vicenza | 10 - Information Phase | 19.03.2021 15:28 | 4243 | | | No | No | | | | | euro |
| 384534 | | | Lavori di ristrutturazione padiglione Ex Fiera | | Default Value | | Running | euro | 28.01.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07023 | CALANGIANUS | | Centro abitato | 10 - Information Phase | 19.03.2021 15:28 | 4242 | | | No | No | | | | | euro |
| 384533 | | | Effic palazzo municipale/museo/palestra real rete colleg microrete intell | | Default Value | | Running | euro | 16.02.2021 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07010 | ITTIREDDU | | Via San Giacomo | 10 - Information Phase | 19.03.2021 15:28 | 4241 | | | No | No | | | | | euro |
| 384518 | | | GARA / OSPEDALE / EMPOLI | | Default Value | | Running | euro | 19.03.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50053 | Empoli | | -- | 10 - Information Phase | 19.03.2021 14:49 | | | | No | No | | | | | euro |
| 384511 | | | TECTA / AMAZON / VICENZA | | Default Value | | Running | euro | 19.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36100 | Vicenza | | VIA SERENISSIMA | 10 - Information Phase | 19.03.2021 13:45 | | | | No | No | | | | | euro |
| 384468-001 | | | CMSA / COSTRUZIONI NUOVI INSEDIAMENTI UNIVERSITARI DI NAPOLI / NAPOLI / / HDB | | Default Value | | Running | euro | 19.03.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 80100 | NAPOLI | | * | 30 - Tender & Submission Phase | 19.03.2021 09:53 | | | | No | No | | | | 20.000,00 € | euro |
| 384468 | | | CMSA / COSTRUZIONI NUOVI INSEDIAMENTI UNIVERSITARI DI NAPOLI / NAPOLI | | Default Value | | Running | euro | 19.03.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 80100 | NAPOLI | | * | 10 - Information Phase | 19.03.2021 09:53 | | | | No | No | | | | 20.000,00 € | euro |
| 384430-001 | | | HDB / NEXITY GIULIO CARCANO 6/8 / MILANO | | Default Value | | Running | euro | 18.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20141 | Milano | Residential houses | Via Giulio Carcano 6/8 | 30 - Tender & Submission Phase | 18.03.2021 18:24 | | | | No | No | | | | | euro |
| 384430 | | | NEXITY GIULIO CARCANO 6/8 / MILANO | | Default Value | | Running | euro | 18.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20141 | Milano | Residential houses | Via Giulio Carcano 6/8 | 30 - Tender & Submission Phase | 18.03.2021 18:20 | | | | No | No | | | | | euro |
| 384121 | | | NUOVO OSPEDALE / SALERNO | | Default Value | | Running | euro | 16.03.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 84100 | SALERNO | | -- | 10 - Information Phase | 16.03.2021 15:07 | | | | No | No | | | | | euro |
| 384112 | | | EX SIRMA / MARGHERA | | Default Value | | Running | euro | 16.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30175 | Marghera | | -- | 10 - Information Phase | 16.03.2021 14:24 | | | | No | No | | | | | euro |
| 384029-001 | | | BETTEGA ENNIO / REALIZZAZIONE NUOVA SEDE SUCCURSALE SCUOLA / TRENTO / DETAN | | Default Value | | Running | euro | 15.03.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 38100 | TRENTO | | * | 30 - Tender & Submission Phase | 15.03.2021 16:46 | | | | No | No | | | | 100.000,00 € | euro |
| 384029 | | | BETTEGA ENNIO / REALIZZAZIONE NUOVA SEDE SUCCURSALE SCUOLA / TRENTO | | Default Value | | Running | euro | 15.03.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | | * | 10 - Information Phase | 15.03.2021 16:46 | | | | No | No | | | | 100.000,00 € | euro |
| 383959-001 | | | ICM / TECNOPOLO "DATACENTER" CINECA / BOLOGNA / MBT | | Default Value | | Running | euro | 05.08.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | -- | 40 - Realisation Phase | 05.08.2021 13:35 | | | | No | No | | | | | euro |
| 383959 | | | ICM / TECNOPOLO "DATACENTER" CINECA / BOLOGNA | | Default Value | | Running | euro | 15.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | -- | 10 - Information Phase | 15.03.2021 11:25 | | | | No | No | | | | | euro |
| 383895-001 | | | HDB / GIARDINO NASCOSTO / PERCASSI / PIAZZA ASPROMONTE MILANO | | Default Value | | Running | euro | 15.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20131 | Milano | Residential houses | piazza Aspromonte 13 | 30 - Tender & Submission Phase | 15.03.2021 06:58 | | | | No | No | | | | | euro |
| 383895 | | | GIARDINO NASCOSTO / PERCASSI / PIAZZA ASPROMONTE MILANO | | Default Value | | Running | euro | 15.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20131 | Milano | Residential houses | piazza Aspromonte 13 | 30 - Tender & Submission Phase | 15.03.2021 06:52 | | | | No | No | | | | | euro |
| 383786 | | | CEV / HOTEL AMPEZZO / CORTINA | | Default Value | | Running | euro | 12.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32043 | CORTINA D'AMPEZZO | | -- | 10 - Information Phase | 12.03.2021 10:00 | | | | No | No | | | | | euro |
| 383760-001 | | | HDB / TORRE ELEFANTE / ARCORE / DEVERO COSTRUZIONI | | Default Value | | Running | euro | 12.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20862 | Arcore | | Via Bestetti | 40 - Realisation Phase | 12.03.2021 06:23 | | | | No | No | | | | | euro |
| 383760 | | | TORRE ELEFANTE / ARCORE / DEVERO COSTRUZIONI | | Default Value | | Running | euro | 12.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20862 | Arcore | | Via Bestetti | 40 - Realisation Phase | 12.03.2021 06:21 | | | | No | No | | | | | euro |
| 383669-001 | | | CARRON BAU / RISTRUTTURAZIONE E AMPLIAMENTO CASA DI RIPOSO / LAIVES / HDB / HBT / HIT | | Default Value | | Running | euro | 11.03.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39055 | Laives | | * | 30 - Tender & Submission Phase | 11.03.2021 10:33 | | | | No | No | | | | 5.000,00 € | euro |
| 383669 | | | CARRON BAU / RISTRUTTURAZIONE E AMPLIAMENTO CASA DI RIPOSO / LAIVES | | Default Value | | Running | euro | 11.03.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39055 | Laives | | * | 10 - Information Phase | 11.03.2021 10:33 | | | | No | No | | | | 5.000,00 € | euro |
| 383615-001 | | | EDIFICIO RESIDENZIALE / CAORLE / HGB 38 17 A4 | | Default Value | | Running | euro | 10.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30020 | Caorle | | VIA ROMA 38 | 30 - Tender & Submission Phase | 10.03.2021 15:03 | | | | No | No | | | | | euro |
| 383615 | | | EDIFICIO RESIDENZIALE / CAORLE | | Default Value | | Running | euro | 10.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30020 | Caorle | | VIA ROMA 38 | 10 - Information Phase | 10.03.2021 15:00 | | | | No | No | | | | | euro |
| 383579 | | | GARC M / UNICOM / CARPI | | Default Value | | Running | euro | 10.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41012 | Carpi (MO) | | VIA NAZIONI UNITE 5 | 10 - Information Phase | 10.03.2021 11:23 | | | | No | No | | | | | euro |
| 383419 | | | CEV M / BATTISTELLA HQ / PIEVE DI SOLIGO | | Default Value | | Running | euro | 09.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31053 | Pieve di Soligo | | --- | 10 - Information Phase | 09.03.2021 09:58 | | | | No | No | | | | | euro |
| 383334-001 | | | BRANCACCIO COSTRUZIONI / FABBRICATO TECNOLOGICO POSTO CENTRALE SCC TORINO LINGOTTO / LINGOTTO / HDB | | Default Value | | Running | euro | 08.03.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | * | 40 - Realisation Phase | 08.03.2021 14:38 | | | | No | No | | | | 4.000,00 € | euro |
| 383334 | | | BRANCACCIO COSTRUZIONI / FABBRICATO TECNOLOGICO POSTO CENTRALE SCC TORINO LINGOTTO / LINGOTTO | | Default Value | | Running | euro | 08.03.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 08.03.2021 14:38 | | | | No | No | | | | 4.000,00 € | euro |
| 383286-001 | | | TANCREDI RESTAURI / NUOVO CENTRO ADDESTRAMENTO A TERRA / GALATINA / HCC | | Default Value | | Running | euro | 08.03.2021 | | IPUG-PUGLIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 73013 | Galatina | | * | 10 - Information Phase | 08.03.2021 11:54 | | | | No | No | | | | 10.000,00 € | euro |
| 383286 | | | TANCREDI RESTAURI / NUOVO CENTRO ADDESTRAMENTO A TERRA / GALATINA | | Default Value | | Running | euro | 08.03.2021 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 73013 | Galatina | | * | 10 - Information Phase | 08.03.2021 11:54 | | | | No | No | | | | 10.000,00 € | euro |
| 383206-001 | | | ING. MONTIGLIO / LAVORI DI MIGLIORAMENTO SISMICO, EFFICIENTAMENTO ENERGETICO ED ADEGUAMENTO NORMATIVO / ALESSANDRIA / DETAN-E | | Default Value | | Running | euro | 05.03.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 15100 | ALESSANDRIA | | * | 10 - Information Phase | 05.03.2021 14:24 | | | | No | No | | | | 78.000,00 € | euro |
| 383206 | | | ING. MONTIGLIO / LAVORI DI MIGLIORAMENTO SISMICO, EFFICIENTAMENTO ENERGETICO ED ADEGUAMENTO NORMATIVO / ALESSANDRIA | | Default Value | | Running | euro | 05.03.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 15100 | ALESSANDRIA | | * | 10 - Information Phase | 05.03.2021 14:23 | | | | No | No | | | | 78.000,00 € | euro |
| 383112-002 | | | HBT / COMPAGNONI 12 REAL ESTATE / MILANO | | Default Value | | Running | euro | 06.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20129 | Milano | | VIA COMPAGNONI 12 | 40 - Realisation Phase | 06.03.2021 14:28 | | | | No | No | | | | | euro |
| 383112-001 | | | HDB / COMPAGNONI 12 REAL ESTATE / MILANO | | Default Value | | Running | euro | 05.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20129 | Milano | | VIA COMPAGNONI 12 | 40 - Realisation Phase | 05.03.2021 06:44 | | | | No | No | | | | | euro |
| 383112 | | | COMPAGNONI 12 REAL ESTATE / MILANO | | Default Value | | Running | euro | 05.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20129 | Milano | | VIA COMPAGNONI 12 | 40 - Realisation Phase | 05.03.2021 06:41 | | | | No | No | | | | | euro |
| 383044-001 | | | OCAM / RINFORZO PONTE DOSOLO-GUASTALLA / DETAN | | Default Value | | Running | euro | 04.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 42016 | Guastalla | | PONTE GUASTALLA DOSOLO | 30 - Tender & Submission Phase | 04.03.2021 12:53 | | | | No | No | | | | | euro |
| 383044 | | | OCAM / RINFORZO PONTE DOSOLO-GUASTALLA | | Default Value | | Running | euro | 04.03.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42016 | Guastalla | | PONTE GUASTALLA DOSOLO | 30 - Tender & Submission Phase | 04.03.2021 12:49 | | | | No | No | | | | | euro |
| 382994 | | | Costruzione SS 340 Regina variante alla Tremezzina | | Default Value | | Running | euro | 05.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22010 | COLONNO | Technical facilities | SALA COMACINA / TREMEZZINA ECC | 10 - Information Phase | 04.03.2021 08:46 | 4240 | | | No | No | | | | | euro |
| 382993 | | | Costruzione variante stradale alla S.S. n.9 Via Emilia primo stralcio | | Default Value | | Running | euro | 01.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26841 | CASALPUSTERLENGO | Technical facilities | S.S. n.9 | 10 - Information Phase | 04.03.2021 08:46 | 4239 | | | No | No | | | | | euro |
| 382992 | | | Recupero edifici Ex Enel per abitazioni di prestigio | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Foscolo 16 | 10 - Information Phase | 04.03.2021 08:46 | 4238 | | | No | No | | | | | euro |
| 382991 | | | Costruzione 3 edifici multip residenziale direzionale e supermercato Aldi | | Default Value | | Running | euro | 21.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Technical facilities | Vie Varese / Balaguer | 10 - Information Phase | 04.03.2021 08:46 | 4237 | | | No | No | | | | | euro |
| 382990 | | | Costruzione complesso ad uso abitazione per 99 appartamenti 105 box | | Default Value | | Running | euro | 29.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20137 | MILANO | Residential houses | Via G. B. Piranesi 18 | 10 - Information Phase | 04.03.2021 08:46 | 4236 | | | No | No | | | | | euro |
| 382989 | | | Costruz complesso multipiano 12 p.f.t. uso abitaz e boxes 75 appartamenti | | Default Value | | Running | euro | 08.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20146 | MILANO | Residential houses | Via Lodovico Pogliaghi 5 | 10 - Information Phase | 04.03.2021 08:46 | 4235 | | | No | No | | | | | euro |
| 382988 | | | Costruzione 2 edifici per 61 unita' abitative con spazi comuni | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Guerrazzi | 10 - Information Phase | 04.03.2021 08:46 | 4234 | | | No | No | | | | | euro |
| 382987 | | | Demoricostruzione 8 edifici ALER per alloggi ERP | | Default Value | | Running | euro | 26.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20147 | MILANO | Residential houses | Via Manzano 4 | 10 - Information Phase | 04.03.2021 08:46 | 4233 | | | No | No | | | | | euro |
| 382986 | | | Realizzaz polo didattico scienze farmaco e locali tecnici interdipartiment | | Default Value | | Running | euro | 08.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | PAVIA | | Vie Bassi / Aselli / Taramelli | 10 - Information Phase | 04.03.2021 08:46 | 4232 | | | No | No | | | | | euro |
| 382985 | | | Recupero complesso Santo Spirito per hotel | | Default Value | | Running | euro | 22.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via T. Tasso 82/84 | 10 - Information Phase | 04.03.2021 08:46 | 4231 | | | No | No | | | | | euro |
| 382984 | | | Costr edificio ad uso abitazione 32 alloggi classe A riappalto lavori | | Default Value | | Running | euro | 04.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | MILANO | Residential houses | Via Savona 120 | 10 - Information Phase | 04.03.2021 08:46 | 4230 | | | No | No | | | | | euro |
| 382983 | | | Costruzione edificio ad uso abitaz e boxes 28 appartamenti | | Default Value | | Running | euro | 10.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Via E.De Amicis 23 | 10 - Information Phase | 04.03.2021 08:46 | 4229 | | | No | No | | | | | euro |
| 382982 | | | Ristrutturazione complesso ad uso abitazione 18 unita' abitative | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Da Vinci 74 | 10 - Information Phase | 04.03.2021 08:46 | 4228 | | | No | No | | | | | euro |
| 382981 | | | Costruzione edificio multipiano 11 pft 13 unita' abitative e box | | Default Value | | Running | euro | 18.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Residential houses | Via Padre P. reina 8 | 10 - Information Phase | 04.03.2021 08:46 | 4227 | | | No | No | | | | | euro |
| 382980 | | | Costruzione edificio ad uso abitaz e boxes 20 unita' e farmacia comunale | | Default Value | | Running | euro | 26.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25015 | DESENZANO DEL GARDA | Residential houses | Via dal Molin 106 | 10 - Information Phase | 04.03.2021 08:46 | 4226 | | | No | No | | | | | euro |
| 382979 | | | Costruzione oratorio primo lotto scavi e bonifiche | | Default Value | | Running | euro | 26.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO | Technical facilities | Via San Nicolo' P.A. Ex Faini | 10 - Information Phase | 04.03.2021 08:46 | 4225 | | | No | No | | | | | euro |
| 382978 | | | Costruzione 2 edifici 5 piani ft ad uso abitazione e boxes | | Default Value | | Running | euro | 09.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23100 | SONDRIO | Residential houses | Via Paribelli | 10 - Information Phase | 04.03.2021 08:46 | 4224 | | | No | No | | | | | euro |
| 382977 | | | Costruzione edificio multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 08.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Residential houses | Via G.B.Vico 14 | 10 - Information Phase | 04.03.2021 08:46 | 4223 | | | No | No | | | | | euro |
| 382976 | | | Ampliam scuola primaria Don Milani nuovo corpo didattico appalto integrato | | Default Value | | Running | euro | 09.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25017 | LONATO | | Via Accordini | 10 - Information Phase | 04.03.2021 08:46 | 4222 | | | No | No | | | | | euro |
| 382975 | | | Costruzione parcheggio interrato 2 piani per 232 posti auto | | Default Value | | Running | euro | 17.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46100 | MANTOVA | Technical facilities | Lungolago dei Gonzaga | 10 - Information Phase | 04.03.2021 08:46 | 4221 | | | No | No | | | | | euro |
| 382974 | | | Costruzione supermercato 1500 mq | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Via Nicolini 5 | 10 - Information Phase | 04.03.2021 08:46 | 4220 | | | No | No | | | | | euro |
| 382973 | | | Costruzione edif multipiano ad uso abitaz e boxes 18 appartam Classe A3 | | Default Value | | Running | euro | 03.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | MILANO | Residential houses | Via L.Tolstoj 46 | 10 - Information Phase | 04.03.2021 08:46 | 4219 | | | No | No | | | | | euro |
| 382972 | | | Costruzione media struttuta alimentare 2 piani 1500 mq | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | PAVIA | Technical facilities | Viale Cremona 69 | 10 - Information Phase | 04.03.2021 08:46 | 4218 | | | No | No | | | | | euro |
| 382971 | | | Costruzione supermercato 1290 mq | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Vie Gusmini 8 / Corridoni 72 | 10 - Information Phase | 04.03.2021 08:46 | 4217 | | | No | No | | | | | euro |
| 382970 | | | Recupero cascina per centro accoglienza 14 persone e centro diurno | | Default Value | | Running | euro | 01.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22063 | CANTU' | | Via per Alzate 76 Localita' Fecchio | 10 - Information Phase | 04.03.2021 08:46 | 4216 | | | No | No | | | | | euro |
| 382969 | | | Costruzione centro cottura pasti project-financing | | Default Value | | Running | euro | 08.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Via Monte Santo 12 | 10 - Information Phase | 04.03.2021 08:46 | 4215 | | | No | No | | | | | euro |
| 382968 | | | Costruzione edificio 3 piani f.t. ad uso abitaz e boxes 12 unita' abitat | | Default Value | | Running | euro | 16.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via B.Pizzagalli | 10 - Information Phase | 04.03.2021 08:45 | 4214 | | | No | No | | | | | euro |
| 382967 | | | Ristrutturazione Palazzo Gonzaghesco sede municipale Lotto 2 | | Default Value | | Running | euro | 05.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46025 | POGGIO RUSCO | | Piazza I Maggio 5 | 10 - Information Phase | 04.03.2021 08:45 | 4213 | | | No | No | | | | | euro |
| 382966 | | | Costruzione supermercato Aldi 1400 mq | | Default Value | | Running | euro | 21.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25080 | MONIGA DEL GARDA | Technical facilities | Via Trevisago | 10 - Information Phase | 04.03.2021 08:45 | 4212 | | | No | No | | | | | euro |
| 382965 | | | Costruzione supermercato catena Lidl 2000 mq slp | | Default Value | | Running | euro | 18.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25069 | VILLA CARCINA | Technical facilities | Vie Marconi / Lavoratori TLM | 10 - Information Phase | 04.03.2021 08:45 | 4211 | | | No | No | | | | | euro |
| 382964 | | | Costruzione palazzina ad uso abitaz e boxes 11 unita' abitative Classe A3 | | Default Value | | Running | euro | 09.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via E.Pirovano 13 | 10 - Information Phase | 04.03.2021 08:45 | 4210 | | | No | No | | | | | euro |
| 382963 | | | Costruzione due edifici ad uso abitazione primo lotto | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Guzzanica 71 | 10 - Information Phase | 04.03.2021 08:45 | 4209 | | | No | No | | | | | euro |
| 382962 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 19.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via della Bullona 5 | 10 - Information Phase | 04.03.2021 08:45 | 4208 | | | No | No | | | | | euro |
| 382961 | | | Realizzazione nuova scuola dell'infanzia e mensa | | Default Value | | Running | euro | 09.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26027 | RIVOLTA D'ADDA | | Via Galileo Galilei 1 | 10 - Information Phase | 04.03.2021 08:45 | 4207 | | | No | No | | | | | euro |
| 382960 | | | Costruzione edificio destinato ad uffici e mensa aziendale | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Via A.Lamarmora 230 | 10 - Information Phase | 04.03.2021 08:45 | 4206 | | | No | No | | | | | euro |
| 382959 | | | Costruzione edificio ad uso abitaz 11 unita' abitative e boxes interrati | | Default Value | | Running | euro | 04.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Residential houses | Via L.Caronni 13 | 10 - Information Phase | 04.03.2021 08:45 | 4205 | | | No | No | | | | | euro |
| 382958 | | | Costruzione centro per l'autismo | | Default Value | | Running | euro | 21.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | | Via Ferraris 28 | 10 - Information Phase | 04.03.2021 08:45 | 4204 | | | No | No | | | | | euro |
| 382957 | | | Demoricostruzione 2 edifici ad uso abitaz e boxes 9 unita' abitative tot | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20161 | MILANO | Residential houses | Via Bellerio 9 | 10 - Information Phase | 04.03.2021 08:45 | 4203 | | | No | No | | | | | euro |
| 382956 | | | Costruzione edificio per attivita' di ricerca e formazione | | Default Value | | Running | euro | 05.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21027 | ISPRA | Technical facilities | Via Fermi 2479 | 10 - Information Phase | 04.03.2021 08:45 | 4202 | | | No | No | | | | | euro |
| 382955 | | | Costruzione nuova palestra comunale | | Default Value | | Running | euro | 21.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24060 | ADRARA SAN MARTINO | | Via Marconi | 10 - Information Phase | 04.03.2021 08:45 | 4201 | | | No | No | | | | | euro |
| 382954 | | | Costruzione caserma Arma Carabinieri | | Default Value | | Running | euro | 28.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27038 | ROBBIO | | Via Palestro 118 | 10 - Information Phase | 04.03.2021 08:45 | 4200 | | | No | No | | | | | euro |
| 382953 | | | Costruzione scuola dell'infanzia appalto integrato | | Default Value | | Running | euro | 05.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24021 | ALBINO | | Vie IV Novembre / Martiri di Cefalonia | 10 - Information Phase | 04.03.2021 08:45 | 4199 | | | No | No | | | | | euro |
| 382952 | | | Costruzione edificio produttivo 1000 mq e uffici 450 mq | | Default Value | | Running | euro | 17.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20835 | MUGGIO' | Industry building | Via Legnano 8 | 10 - Information Phase | 04.03.2021 08:45 | 4198 | | | No | No | | | | | euro |
| 382951 | | | Costruzione 8 unita' abitative in villa | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Bissolati 5 | 10 - Information Phase | 04.03.2021 08:45 | 4197 | | | No | No | | | | | euro |
| 382950 | | | Costruzione palazzina ad uso abitazione 30 unita' in villa tot primo lotto | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Grismondi 13 | 10 - Information Phase | 04.03.2021 08:45 | 4196 | | | No | No | | | | | euro |
| 382949 | | | Costruzione ville bifamiliari e quadrifamiliari | | Default Value | | Running | euro | 03.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46034 | BORGO VIRGILIO | Residential houses | Via L.B.Alberti | 10 - Information Phase | 04.03.2021 08:45 | 4195 | | | No | No | | | | | euro |
| 382948 | | | Costruzione edificio 6 unita' abitative e villa unifamiliare | | Default Value | | Running | euro | 21.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27058 | VOGHERA | Residential houses | Via Stelvio | 10 - Information Phase | 04.03.2021 08:45 | 4194 | | | No | No | | | | | euro |
| 382947 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 12.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24068 | SERIATE | Residential houses | Via G. Marconi 51/A | 10 - Information Phase | 04.03.2021 08:45 | 4193 | | | No | No | | | | | euro |
| 382946 | | | Costruzione palazzina ad uso abitazione e boxes 6 unita' abitative | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Voa Goldoni 26 | 10 - Information Phase | 04.03.2021 08:45 | 4192 | | | No | No | | | | | euro |
| 382945 | | | Costruzione edificio ad uso abitaz e boxes 5 unita' Classe A4 | | Default Value | | Running | euro | 09.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via del Riolo 11 | 10 - Information Phase | 04.03.2021 08:45 | 4191 | | | No | No | | | | | euro |
| 382944 | | | Ampliamento pronto soccorso ospedaliero | | Default Value | | Running | euro | 26.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20832 | DESIO | | Via Mazzini | 10 - Information Phase | 04.03.2021 08:45 | 4190 | | | No | No | | | | | euro |
| 382943 | | | Costruzione 2 edifici ad uso abitazione 35+13 unita' abitative | | Default Value | | Running | euro | 22.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Vie Venini 3 / Reg.Teodolinda 23 | 10 - Information Phase | 04.03.2021 08:45 | 4189 | | | No | No | | | | | euro |
| 382942 | | | Costruzione ostello e spazi pubblici | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO | Technical facilities | Viale A.Doria 54 | 10 - Information Phase | 04.03.2021 08:45 | 4188 | | | No | No | | | | | euro |
| 382941 | | | Realizzazione nuova caserma comando stazione Arma Carabinieri | | Default Value | | Running | euro | 03.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26855 | LODI VECCHIO | | Via Codazzi | 10 - Information Phase | 04.03.2021 08:45 | 4187 | | | No | No | | | | | euro |
| 382940 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via della Bornata 3 | 10 - Information Phase | 04.03.2021 08:45 | 4186 | | | No | No | | | | | euro |
| 382939 | | | Costruzione edificio 4 unita' abitative nuovo lotto | | Default Value | | Running | euro | 09.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25032 | CHIARI | Residential houses | Via Elettra 24 | 10 - Information Phase | 04.03.2021 08:45 | 4185 | | | No | No | | | | | euro |
| 382938 | | | Costruzione edificio ad uso abitazione | | Default Value | | Running | euro | 13.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Bianzana 61 | 10 - Information Phase | 04.03.2021 08:45 | 4184 | | | No | No | | | | | euro |
| 382937 | | | Costruzione palazzina uso abitazione e opere di urbanizzazione a scomputo | | Default Value | | Running | euro | 28.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Residential houses | Via Ferrario | 10 - Information Phase | 04.03.2021 08:45 | 4183 | | | No | No | | | | | euro |
| 382936 | | | Costruzione nuovo oratorio primo lotto | | Default Value | | Running | euro | 04.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24015 | SAN GIOVANNI BIANCO | Technical facilities | Via Tasso | 10 - Information Phase | 04.03.2021 08:44 | 4182 | | | No | No | | | | | euro |
| 382935 | | | Costruzione edificio trifamiliare | | Default Value | | Running | euro | 26.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46043 | CASTIGLIONE DELLE STIVIERE | Residential houses | Via Pastorio | 10 - Information Phase | 04.03.2021 08:44 | 4181 | | | No | No | | | | | euro |
| 382934 | | | Costruzione palazzina ad uso abitazione nuovo lotto comparto 21 | | Default Value | | Running | euro | 26.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46043 | CASTIGLIONE DELLE STIVIERE | Residential houses | Via Istria | 10 - Information Phase | 04.03.2021 08:44 | 4180 | | | No | No | | | | | euro |
| 382933 | | | Completamento edif al rustico per campus sportivo Palaghiaccio Project F | | Default Value | | Running | euro | 01.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | | Via Minghetti / SS n.33 | 10 - Information Phase | 04.03.2021 08:44 | 4179 | | | No | No | | | | | euro |
| 382836-002 | | | GARA / LABOMAR 1° LOTTO / ISTRANA / BENTONITICO | | Default Value | | Running | euro | 03.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 31036 | Istrana | | VIA FILZI | 30 - Tender & Submission Phase | 03.03.2021 12:20 | | | | No | No | | | | | euro |
| 382836-001 | | | GARA / LABOMAR 1° LOTTO / ISTRANA / HBT | | Default Value | | Running | euro | 03.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 31036 | Istrana | | VIA FILZI | 30 - Tender & Submission Phase | 03.03.2021 12:19 | | | | No | No | | | | | euro |
| 382836 | | | GARA / LABOMAR 1° LOTTO / ISTRANA | | Default Value | | Running | euro | 03.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31036 | Istrana | | VIA FILZI | 30 - Tender & Submission Phase | 03.03.2021 12:16 | | | | No | No | | | | | euro |
| 382785-001 | | | COGEFA / REALIZZAZIONE NUOVO MAGAZZINO LIDL / CARMAGNOLA / GIUNTI | | Default Value | | Running | euro | 03.03.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10022 | Carmagnola | | * | 30 - Tender & Submission Phase | 03.03.2021 09:09 | | | | No | No | | | | 6.000,00 € | euro |
| 382785 | | | COGEFA / REALIZZAZIONE NUOVO MAGAZZINO LIDL / CARMAGNOLA | | Default Value | | Running | euro | 03.03.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10022 | Carmagnola | | * | 10 - Information Phase | 03.03.2021 09:09 | | | | No | No | | | | 6.000,00 € | euro |
| 382761 | | | PRESENTAZIONE HTA-CE DETAN / SERRAMENTISTI LOMBARDIA | | Default Value | | Running | euro | 03.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | | Piazza Città di Lombardia 1 | 10 - Information Phase | 03.03.2021 07:32 | | | | No | No | | | | | euro |
| 382751-001 | | | NIGERIA / FISSAGGI / HTA-CE 5030 P | | Default Value | | Running | euro | 02.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30016 | Jesolo | | --- | 40 - Realisation Phase | 02.03.2021 16:24 | | | | No | No | | | | | euro |
| 382751 | | | NIGERIA / FISSAGGI | | Default Value | | Running | euro | 02.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30016 | Jesolo | | --- | 40 - Realisation Phase | 02.03.2021 16:09 | | | | No | No | | | | | euro |
| 382749-001 | | | SILMA FER / DETAN ANCON INOX / FRIULI / DETAN | | Default Value | | Running | euro | 02.03.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33030 | Campoformido | | -- | 40 - Realisation Phase | 02.03.2021 15:53 | | | | No | No | | | | | euro |
| 382749 | | | SILMA FER / DETAN ANCON INOX / FRIULI | | Default Value | | Running | euro | 02.03.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33030 | Campoformido | | -- | 40 - Realisation Phase | 02.03.2021 15:51 | | | | No | No | | | | | euro |
| 382746-001 | | | PROGETTO / RESDIENZIALE / SAN MARTINO B ALBERGO / HCC e HA | | Default Value | | Running | euro | 02.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37036 | San Martino Buon Albergo | | -- | 30 - Tender & Submission Phase | 02.03.2021 15:46 | | | | No | No | | | | | euro |
| 382746 | | | PROGETTO / RESDIENZIALE / SAN MARTINO B ALBERGO | | Default Value | | Running | euro | 02.03.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37036 | San Martino Buon Albergo | | -- | 30 - Tender & Submission Phase | 02.03.2021 15:44 | | | | No | No | | | | | euro |
| 382234-001 | | | MBT / RIQUALIFICAZIONE SEDE ENEL / VIALE REGINA MARGHERITA ROMA | | Default Value | | Running | euro | 30.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 00198 | Roma | Office building | VIALE REGINA MARGHERITA | 40 - Realisation Phase | 30.07.2021 06:38 | | | | No | No | | | | | euro |
| 382234 | | | RIQUALIFICAZIONE SEDE ENEL / VIALE REGINA MARGHERITA ROMA | | Default Value | | Running | euro | 25.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 00198 | Roma | Office building | VIALE REGINA MARGHERITA | 40 - Realisation Phase | 25.02.2021 07:23 | | | | No | No | | | | | euro |
| 382109-002 | | | PAVI / PARK INTERRATO AFFORI / MILANO / FNM | | Default Value | | Running | euro | 14.04.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20161 | Milano | Infrastructural facilities (Metro) | Via Alessandro Artesani | 40 - Realisation Phase | 14.04.2021 17:28 | | | | No | No | | | | | euro |
| 382109-001 | | | HDB / PARK INTERRATO AFFORI / MILANO / FNM | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20161 | Milano | Infrastructural facilities (Metro) | Via Alessandro Artesani | 40 - Realisation Phase | 23.02.2021 17:01 | | | | No | No | | | | | euro |
| 382109 | | | PARK INTERRATO AFFORI / MILANO / FNM | | Default Value | | Running | euro | 23.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20161 | Milano | Infrastructural facilities (Metro) | Via Alessandro Artesani | 40 - Realisation Phase | 23.02.2021 16:58 | | | | No | No | | | | | euro |
| 382108-001 | | | TECO / SCUOLA SECONDARIA G. TONIOLO / ISTRANA / HIT | | Default Value | | Running | euro | 23.02.2021 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 31036 | Istrana | | _ | 10 - Information Phase | 23.02.2021 16:59 | | | | No | No | | | | | euro |
| 382108 | | | TECO / SCUOLA SECONDARIA G. TONIOLO / ISTRANA | | Default Value | | Running | euro | 23.02.2021 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 31036 | Istrana | | _ | 10 - Information Phase | 23.02.2021 16:57 | | | | No | No | | | | | euro |
| 382106-001 | | | Riqualificazione FORO AUGUSTEO di ROMA / SUK | | Default Value | | Running | euro | 23.02.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00186 | Roma | Educational facility | Piazza Ugusto Imperatore | 10 - Information Phase | 23.02.2021 16:45 | | | | No | No | | | | | euro |
| 382106 | | | Riqualificazione FORO AUGUSTEO di ROMA | | Default Value | | Running | euro | 10.09.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00186 | Roma | Educational facility | Piazza Ugusto Imperatore | 10 - Information Phase | 23.02.2021 16:44 | | | | No | No | | | | | euro |
| 382099 | | | Demoricostruzione edificio per nuovo plesso scolastico Rosa Galanti | | Default Value | | Running | euro | 05.01.2021 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 63040 | VENAROTTA | | Via V.Valentini 50 | 10 - Information Phase | 23.02.2021 16:13 | 4178 | | | No | No | | | | | euro |
| 382098 | | | Ricostruzione scuola ITIS Divini riappalto lavori | | Default Value | | Running | euro | 05.01.2021 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62027 | SAN SEVERINO MARCHE | | Via Mazzini | 10 - Information Phase | 23.02.2021 16:13 | 4177 | | | No | No | | | | | euro |
| 382097 | | | Costruzione nuovo polo scolastico localita' Borgo Pintura | | Default Value | | Running | euro | 27.01.2021 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62010 | MORROVALLE | | Via M.L.King | 10 - Information Phase | 23.02.2021 16:13 | 4176 | | | No | No | | | | | euro |
| 382081 | | | TECHBAU / Costruzione polo logistico 56000 mq | | Default Value | | Running | euro | 29.01.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 02032 | FARA IN SABINA | Industry building | Localita' Passo Corese | 10 - Information Phase | 23.02.2021 15:19 | 4175 | | | No | No | | | | | euro |
| 382080 | | | Costruzione nuova sede concessionaria automobili | | Default Value | | Running | euro | 21.01.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00146 | ROMA | Technical facilities | Via della Magliana 309 | 10 - Information Phase | 23.02.2021 15:19 | 4174 | | | No | No | | | | | euro |
| 382079 | | | Adeguamento sismico scuola media Aldo Moro | | Default Value | | Running | euro | 14.01.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00013 | FONTE NUOVA | | Via Nomentana Km 18,400 | 10 - Information Phase | 23.02.2021 15:19 | 4173 | | | No | No | | | | | euro |
| 381964 | | | Costruzione nuova casa della salute | | Default Value | | Running | euro | 18.02.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57021 | CAMPIGLIA MARITTIMA | | Largo Della Fiera Loc. Venturina | 10 - Information Phase | 22.02.2021 16:19 | 4172 | | | No | No | | | | | euro |
| 381963 | | | Costruzione edificio multipiano ad uso abitazione 24 appartamenti e box | | Default Value | | Running | euro | 28.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Pellizzi 7 Ex Monopolio | 10 - Information Phase | 22.02.2021 16:19 | 4171 | | | No | No | | | | | euro |
| 381962 | | | Completamento 2 torri 14 piani f.t.per 86 appartam e piastra commerciale | | Default Value | | Running | euro | 01.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Bargagna | 10 - Information Phase | 22.02.2021 16:19 | 4170 | | | No | No | | | | | euro |
| 381961 | | | Costruzione edificio polifunzionale primo lotto funzionale | | Default Value | | Running | euro | 21.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55023 | BORGO A MOZZANO | | Localita' Diecimo | 10 - Information Phase | 22.02.2021 16:19 | 4169 | | | No | No | | | | | euro |
| 381960 | | | Lavori di ampliamento ospedale pediatrico Delle Apuane 3000 mq | | Default Value | | Running | euro | 20.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 54100 | MASSA | | Via Aurelia Sud | 10 - Information Phase | 22.02.2021 16:19 | 4168 | | | No | No | | | | | euro |
| 381959 | | | Costruzione scuola materna a completamento della cittadella scolastica | | Default Value | | Running | euro | 29.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52015 | PRATOVECCHIO STIA | | Area Ex Segheria Rossi | 10 - Information Phase | 22.02.2021 16:19 | 4167 | | | No | No | | | | | euro |
| 381958 | | | Costruzione edificio commerciale 1000 mq | | Default Value | | Running | euro | 04.02.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 51100 | PISTOIA | Technical facilities | Via P. Gherardini | 10 - Information Phase | 22.02.2021 16:19 | 4166 | | | No | No | | | | | euro |
| 381957 | | | Costruzione scuola primaria E.Toti | | Default Value | | Running | euro | 07.01.2021 | | IEMI-EMILIA ROMAGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50018 | SCANDICCI | | Piazza Fratelli Vezzosi | 10 - Information Phase | 22.02.2021 16:19 | 4165 | | | No | No | | | | | euro |
| 381956 | | | Costruzione centro sportivo 22000 mq | | Default Value | | Running | euro | 10.02.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50012 | BAGNO A RIPOLI | | Vie Pian Di Ripoli / Villa Cedri | 10 - Information Phase | 22.02.2021 16:19 | 4164 | | | No | No | | | | | euro |
| 381955 | | | Costruzione centro logistico 5000 mq coperti | | Default Value | | Running | euro | 01.01.2021 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06063 | MAGIONE | Industry building | Via Santa Giuliana Localita' Bacanella | 10 - Information Phase | 22.02.2021 16:19 | 4163 | | | No | No | | | | | euro |
| 381954 | | | Costruzione supermercato 1000 mq | | Default Value | | Running | euro | 21.01.2021 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | Technical facilities | Via Piermatti | 10 - Information Phase | 22.02.2021 16:19 | 4162 | | | No | No | | | | | euro |
| 381953 | | | Costruzione residenza per anziani non autosufficienti 60 posti letto | | Default Value | | Running | euro | 07.01.2021 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | | Vie Lambruschini / Radice | 10 - Information Phase | 22.02.2021 16:19 | 4161 | | | No | No | | | | | euro |
| 381952 | | | Ampliamento reparto oncologia | | Default Value | | Running | euro | 01.01.2021 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | | Viale Tristano da Joannuccio | 10 - Information Phase | 22.02.2021 16:19 | 4160 | | | No | No | | | | | euro |
| 381941 | | | F.LLI FERRARA M / Costruzione nuovo polo scolastico scuola infanzia ed elementare Tempesta 06/10/21 SCAVO SENTIRE | | Default Value | | Running | euro | 03.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Martelli 37 | 10 - Information Phase | 22.02.2021 15:40 | 4159 | | | No | No | | | | | euro |
| 381940 | | | AR.CO M / Costruzione edificio commerciale=nuovo lotto 25/3 FINITO ??? ACG?? | | Default Value | | Running | euro | 18.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | Technical facilities | Viale Europa | 10 - Information Phase | 22.02.2021 15:40 | 4158 | | | No | No | | | | | euro |
| 381939 | | | ??? / Ampliamento stabilimento produttivo | | Default Value | | Running | euro | 26.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | Industry building | Via del Campo Sportivo 40 | 10 - Information Phase | 22.02.2021 15:40 | 4157 | | | No | No | | | | | euro |
| 381938 | | | CG2 M /Costruzione supermercato Conad 1500 mq | | Default Value | | Running | euro | 01.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Technical facilities | Via Emilia Ovest 621 | 10 - Information Phase | 22.02.2021 15:40 | 4156 | | | No | No | | | | | euro |
| 381937 | | | MOLETTA GINO / Recupero ex Gil per nuova sede Commissariato Polizia e Polizia Stradale | | Default Value | | Running | euro | 05.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41037 | MIRANDOLA | | Viale V Martiri | 10 - Information Phase | 22.02.2021 15:40 | 4155 | | | No | No | | | | | euro |
| 381936 | | | GALLIONI M / Costruzione (demoricostruzione) 2 edifici ad uso abitazione e box | | Default Value | | Running | euro | 29.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Residential houses | Viale Dei Mille 112 | 10 - Information Phase | 22.02.2021 15:40 | 4154 | | | No | No | | | | | euro |
| 381935 | | | ??? / Ampliamento edificio industriale 5500 mq | | Default Value | | Running | euro | 01.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Industry building | Via Ugo Ferrandi | 10 - Information Phase | 22.02.2021 15:40 | 4153 | | | No | No | | | | | euro |
| 381934 | | | ???? / Costruzione fabbricato ad uso magazzino e OOUU primaria | | Default Value | | Running | euro | 20.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Industry building | Via Napoli | 10 - Information Phase | 22.02.2021 15:40 | 4152 | | | No | No | | | | | euro |
| 381933 | | | WOLF / Costruzione centro per Alta Formazione Industria 4.0 1200 mq | | Default Value | | Running | euro | 07.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40053 | VALSAMOGGIA | Technical facilities | Localita' Crespellano | 10 - Information Phase | 22.02.2021 15:40 | 4151 | | | No | No | | | | | euro |
| 381932 | | | MARZANO BUILD / Realizzaz centro sportivo paralimpico Nord Italia presso ospedale Verdi | | Default Value | | Running | euro | 13.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29010 | VILLANOVA SULL'ARDA | | Via Dante 23 | 10 - Information Phase | 22.02.2021 15:40 | 4150 | | | No | No | | | | | euro |
| 381931 | | | ???? / Costruzione edificio produttivo e palazzina uffici | | Default Value | | Running | euro | 26.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41030 | SAN PROSPERO | Industry building | Via Canaletto | 10 - Information Phase | 22.02.2021 15:40 | 4149 | | | No | No | | | | | euro |
| 381930 | | | CASONE / Costruzione nuovo magazzino industriale 7200 mq | | Default Value | | Running | euro | 15.01.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | NOCETO | Industry building | Via Mainino 12 | 10 - Information Phase | 22.02.2021 15:40 | 4148 | | | No | No | | | | | euro |
| 381872 | | | ELECTRIX / Costruzione e adeguamento sismico scuola primaria Butkovic | | Default Value | | Running | euro | 26.01.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34070 | SAVOGNA D'ISONZO | | Via Primo Maggio | 10 - Information Phase | 22.02.2021 11:16 | 4147 | | | No | No | | | | | euro |
| 381871 | | | BATTISTELLA / Lavori di costruzione nuova scuola primaria | | Default Value | | Running | euro | 10.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33080 | ZOPPOLA | | Localita' Castions | 10 - Information Phase | 22.02.2021 11:16 | 4146 | | | No | No | | | | | euro |
| 381870 | | | C.P. COSTRUZIONI / Ristrutturazione edificio Narodni Dom Casa della Cultura | | Default Value | | Running | euro | 10.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | Strada di Guardiella 25 | 10 - Information Phase | 22.02.2021 11:16 | 4145 | | | No | No | | | | | euro |
| 381869 | | | ADRIASTRADE / Costruzione sottopasso ferroviario | | Default Value | | Running | euro | 21.01.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33057 | PALMANOVA | Technical facilities | Viale San Marco | 10 - Information Phase | 22.02.2021 11:16 | 4144 | | | No | No | | | | | euro |
| 381868 | | | ??? / Ristrutturazione e ampliamento stabilimento termale primo lotto hotel **** | | Default Value | | Running | euro | 03.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33054 | LIGNANO SABBIADORO | Technical facilities | Lgmare R.Riva 1/C | 10 - Information Phase | 22.02.2021 11:16 | 4143 | | | No | No | | | | | euro |
| 381867 | | | ITI M / Riqualificazione area ex Polstrada x asilo nido parcheggio verde pubblico | | Default Value | | Running | euro | 18.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | Via Montorsino Loc Roiano | 10 - Information Phase | 22.02.2021 11:16 | 4142 | | | No | No | | | | | euro |
| 381866 | | | SAC CONSORZIO / Riqualificazione funzionale galleria stradale Montebello | | Default Value | | Running | euro | 09.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | Technical facilities | Piazza dei Foraggi | 10 - Information Phase | 22.02.2021 11:16 | 4141 | | | No | No | | | | | euro |
| 381865 | | | ??? / Realizzaz centro sportivo albergo 38 p.letto ristorante clinica sportiva | | Default Value | | Running | euro | 01.01.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | Piazzale delle Puglie Loc.Ponziana | 10 - Information Phase | 22.02.2021 11:16 | 4140 | | | No | No | | | | | euro |
| 381825 | | | MUBRE T / Costruzione nuova scuola primaria | | Default Value | | Running | euro | 04.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31037 | LORIA | | Localita' Castione | 10 - Information Phase | 22.02.2021 09:11 | 4138 | | | No | No | | | | | euro |
| 381824 | | | ZANOTTO M / Ampliamento impianto depurazione secondo stralcio vasca ossidazione | | Default Value | | Running | euro | 14.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35013 | CITTADELLA | Technical facilities | Via Sansughe | 10 - Information Phase | 22.02.2021 09:11 | 4137 | | | No | No | | | | | euro |
| 381823 | | | B & B M / Costruzione edificio industriale | | Default Value | | Running | euro | 22.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35011 | CAMPODARSEGO | Industry building | Via Marcello 24 | 10 - Information Phase | 22.02.2021 09:11 | 4136 | | | No | No | | | | | euro |
| 381822 | | | ITI M / Costruzione polo scolastico secondo stralcio palestra riappalto lavori | | Default Value | | Running | euro | 15.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31030 | CARBONERA | | Via IV Novembre | 10 - Information Phase | 22.02.2021 09:11 | 4135 | | | No | No | | | | | euro |
| 381821 | | | DALLA LIBERA M / Costr scuola secondaria di 1� grado polo scolastico di Puos D'Alpago | | Default Value | | Running | euro | 16.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32016 | ALPAGO | | Via Roma | 10 - Information Phase | 22.02.2021 09:11 | 4134 | | | No | No | | | | | euro |
| 381820 | | | MAROSO / Costruzione polo scolastico | | Default Value | | Running | euro | 21.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35018 | SAN MARTINO DI LUPARI | | Vie Trento/Trieste/Firenze | 10 - Information Phase | 22.02.2021 09:11 | 4133 | | | No | No | | | | | euro |
| 381819 | | | PETAS / Realizzazione nuova struttura ricettiva presso Parco dell'Amicizia | | Default Value | | Running | euro | 01.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37010 | COSTERMANO | Technical facilities | Localita' Baesse | 10 - Information Phase | 22.02.2021 09:11 | 4132 | | | No | No | | | | | euro |
| 381817 | | | NIDACO / Realizzaz Istituto Penale Minorenni Triveneto c/o ex Casa Circondariale 18/3 NIENTE CENTRO CITTA RISTRUTT | | Default Value | | Running | euro | 26.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 45100 | ROVIGO | | Via Verdi 2/A | 10 - Information Phase | 22.02.2021 09:11 | 4130 | | | No | No | | | | | euro |
| 381816 | | | EDIL FERRO M / Ampliamento casa di cura 18/3 GETTO FONDAZIONI | | Default Value | | Running | euro | 10.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 45014 | PORTO VIRO | | Via N Badaloni 25 | 10 - Information Phase | 22.02.2021 09:11 | 4129 | | | No | No | | | | | euro |
| 381815 | | | SETTEN M / Ampliam RSA non autosufficienti 5600 mq 90 posti letto e centro alzheimer | | Default Value | | Running | euro | 12.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | | Via Cardinal Urbani 4 | 10 - Information Phase | 22.02.2021 09:11 | 4128 | | | No | No | | | | | euro |
| 381814 | | | ??? / Ristrutturazione ex Colonia Principi Di Piemonte resort 120 camere SPA | | Default Value | | Running | euro | 05.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Str Malamocco Alberoni Loc. Lido | 10 - Information Phase | 22.02.2021 09:11 | 4127 | | | No | No | | | | | euro |
| 381813 | | | TECHBAU / Costruzione polo logistico 59000 mq / AMAZON?? | | Default Value | | Running | euro | 18.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31056 | RONCADE | Industry building | Strada Treviso Mare | 10 - Information Phase | 22.02.2021 09:11 | 4126 | | | No | No | | | | | euro |
| 381771-001 | | | PROGETTO / RIPRISTINO PONTE / FRIULI / CASSETTE CON HBS | | Default Value | | Running | euro | 19.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33100 | Udine | | FRIULI GENERICO | 30 - Tender & Submission Phase | 19.02.2021 16:36 | | | | No | No | | | | | euro |
| 381771 | | | PROGETTO / RIPRISTINO PONTE / FRIULI | | Default Value | | Running | euro | 19.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | Udine | | FRIULI GENERICO | 20 - Planning Phase | 19.02.2021 16:35 | | | | No | No | | | | | euro |
| 381689 | | | SETTEN M / RISTRUTTURAZIONE EDIFICIO GIUDECCA / VENEZIA | | Default Value | | Running | euro | 19.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30133 | Venezia | | Fondamenta San Giacomo 209 Alla Giudecca | 10 - Information Phase | 19.02.2021 09:12 | | | | No | No | | | | | euro |
| 381496-001 | | | ITINERA / PROGETTAZIONE E COSTRUZIONE DEL CENTRO POLIFUNZIONALE DENOMINATO “CASELLE OPEN MALL” (COM) / CASELLE (TORINO) / GIUNTI / HBT | | Default Value | | Running | euro | 17.02.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 35030 | Caselle | | * | 10 - Information Phase | 17.02.2021 15:41 | | | | No | No | | | | | euro |
| 381496 | | | ITINERA / PROGETTAZIONE E COSTRUZIONE DEL CENTRO POLIFUNZIONALE DENOMINATO “CASELLE OPEN MALL” (COM) / CASELLE (TORINO) | | Default Value | | Running | euro | 17.02.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 35030 | Caselle | | * | 10 - Information Phase | 17.02.2021 15:39 | | | | No | No | | | | | euro |
| 381451 | | | GALLIERA HOSPITAL / GALLIERA GE | | Default Value | | Running | euro | 17.02.2021 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40015 | Galliera | | -- | 10 - Information Phase | 17.02.2021 13:05 | | | | No | No | | | | | euro |
| 381312-001 | | | HDB / DS SMITH PACKAGING ITALIA SPA / NUOVO STABILIMENTO | | Default Value | | Running | euro | 16.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 41013 | Castelfranco Emilia | Industry building | Via Cartiera 8 | 40 - Realisation Phase | 16.02.2021 14:23 | | | | No | No | | | | | euro |
| 381312 | | | DS SMITH PACKAGING ITALIA SPA / NUOVO STABILIMENTO | | Default Value | | Running | euro | 16.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 41013 | Castelfranco Emilia | Industry building | Via Cartiera 8 | 40 - Realisation Phase | 16.02.2021 12:18 | | | | No | No | | | | | euro |
| 381228 | | | GARA / AMAZON / S.SALVO | | Default Value | | Running | euro | 15.02.2021 | | IABR-ABRUZZO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 66050 | San Salvo | | * | 10 - Information Phase | 15.02.2021 16:16 | | | | No | No | | | | | euro |
| 381174-001 | | | STORCI / RISTRUTTURAZIONE CANSAGLIA / BOLOGNA / HBS | | Default Value | | Running | euro | 15.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | VIA CASTENASO | 40 - Realisation Phase | 15.02.2021 13:41 | | | | No | No | | | | | euro |
| 381174 | | | STORCI / RISTRUTTURAZIONE CANSAGLIA / BOLOGNA | | Default Value | | Running | euro | 15.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | VIA CASTENASO | 10 - Information Phase | 15.02.2021 13:40 | | | | No | No | | | | | euro |
| 381126 | | | ITI / EX FONDERIA / MODENA | | Default Value | | Running | euro | 15.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | | " EX FONDERIA" | 10 - Information Phase | 15.02.2021 10:49 | | | | No | No | | | | | euro |
| 380865-001 | | | GARA / COSTRUZIONE DI UN NUOVO EDIFICIO AZIENDALE / BOLZANO / HBT / HTA / HDB | | Default Value | | Running | euro | 12.02.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 12.02.2021 12:06 | | | | No | No | | | | 6.000,00 € | euro |
| 380865 | | | GARA / COSTRUZIONE DI UN NUOVO EDIFICIO AZIENDALE / BOLZANO | | Default Value | | Running | euro | 12.02.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 12.02.2021 12:05 | | | | No | No | | | | 6.000,00 € | euro |
| 380599-001 | | | COLLINI LAVORI / AMPLIAMENTO NUOVA SEDE S.I.T / PADOVA / HDB | | Default Value | | Running | euro | 10.02.2021 | | IVEN-VENETO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 35100 | PADOVA | | * | 30 - Tender & Submission Phase | 10.02.2021 09:52 | | | | No | No | | | | 11.000,00 € | euro |
| 380599 | | | COLLINI LAVORI / AMPLIAMENTO NUOVA SEDE S.I.T / PADOVA | | Default Value | | Running | euro | 10.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | | * | 10 - Information Phase | 10.02.2021 09:52 | | | | No | No | | | | 11.000,00 € | euro |
| 380526-001 | | | BETTEGA ENNIO / PISTA CICLO PEDONALE, SISTEMAZIONE TRATTO RONCOGNO SP17 E PONTI RIO FARINELLA E SILLA / TRENTO / DETAN | | Default Value | | Running | euro | 09.02.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 38100 | TRENTO | | * | 30 - Tender & Submission Phase | 09.02.2021 15:41 | | | | No | No | | | | 7.000,00 € | euro |
| 380526 | | | BETTEGA ENNIO / PISTA CICLO PEDONALE, SISTEMAZIONE TRATTO RONCOGNO SP17 E PONTI RIO FARINELLA E SILLA / TRENTO | | Default Value | | Running | euro | 09.02.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | | * | 10 - Information Phase | 09.02.2021 15:41 | | | | No | No | | | | 7.000,00 € | euro |
| 380413-001 | | | FERROBETON T / REALIZZAZIONE DI LOCALI INTERNI DELL'IMPIANTO DI RISLITA / CORVARA IN BADIA / HDB | | Default Value | | Running | euro | 09.02.2021 | | ITRE-TRENTINO ALTO ADIGE | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 39033 | Corvara in Badia | | * | 30 - Tender & Submission Phase | 09.02.2021 09:13 | | | | No | No | | | | | euro |
| 380413 | | | FERROBETON / REALIZZAZIONE DI LOCALI INTERNI IN CONNESSIONE CON IL RIFACIMENTO DELL'IMPIANTO DI RISLITA / CORVARA IN BADIA | | Default Value | | Running | euro | 09.02.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39033 | Corvara in Badia | | * | 10 - Information Phase | 09.02.2021 09:13 | | | | No | No | | | | | euro |
| 380357-002 | | | HBT SK / +SEGREEN / EUROPA RISORSE / SEGRATE | | Default Value | | Running | euro | 11.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Segrate | Residential houses | VIA RIVOLTANA 14 | 40 - Realisation Phase | 11.02.2021 18:48 | | | | No | No | | | | | euro |
| 380357-001 | | | HDB / +SEGREEN / EUROPA RISORSE / SEGRATE | | Default Value | | Running | euro | 08.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Segrate | Residential houses | IA RIVOLTANA 14 | 40 - Realisation Phase | 08.02.2021 14:49 | | | | No | No | | | | | euro |
| 380357 | | | +SEGREEN / EUROPA RISORSE / SEGRATE | | Default Value | | Running | euro | 08.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | Segrate | Residential houses | IA RIVOLTANA 14 | 40 - Realisation Phase | 08.02.2021 14:47 | | | | No | No | | | | | euro |
| 380343-001 | | | METALGIOTTO / TETTOIA ATLAS / FIORANO / DETAN | | Default Value | | Running | euro | 08.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 41042 | Fiorano Modenese | | VIA CANALETTO | 40 - Realisation Phase | 08.02.2021 14:37 | | | | No | No | | | | | euro |
| 380343 | | | METALGIOTTO T / TETTOIA ATLAS / FIORANO | | Default Value | | Running | euro | 08.02.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41042 | Fiorano Modenese | | VIA CANALETTO | 40 - Realisation Phase | 08.02.2021 14:32 | | | | No | No | | | | | euro |
| 380339-001 | | | INCOS / MULTIAPP / PADOVA / HBT | | Default Value | | Running | euro | 08.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 35100 | PADOVA | | -- | 40 - Realisation Phase | 08.02.2021 14:25 | | | | No | No | | | | | euro |
| 380339 | | | INCOS T / MULTIAPP / PADOVA | | Default Value | | Running | euro | 08.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | | -- | 40 - Realisation Phase | 08.02.2021 14:24 | | | | No | No | | | | | euro |
| 380335-001 | | | ING. FERRARI / FERRERO / BALVANO PZ / GIUNTI | | Default Value | | Running | euro | 08.02.2021 | | ICAL-CALABRIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 85050 | Balvano | | STAB FERRERO | 40 - Realisation Phase | 08.02.2021 14:20 | | | | No | No | | | | | euro |
| 380304 | | | PROGETTO / PONTE STRADALE ALBIANO MALGRA | | Default Value | | Running | euro | 08.02.2021 | | ITOS-TOSCANA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 54010 | ALBIANO MAGRA (MS) | | -- | 10 - Information Phase | 08.02.2021 11:49 | | | | No | No | | | | | euro |
| 380299-001 | | | SP GROUP / EDIFICIO DIGNANO UD / DETAN | | Default Value | | Running | euro | 08.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33030 | Dignano | | -- | 40 - Realisation Phase | 08.02.2021 11:34 | | | | No | No | | | | | euro |
| 380299 | | | SP GROUP / EDIFICIO DIGNANO UD | | Default Value | | Running | euro | 08.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33030 | Dignano | | -- | 40 - Realisation Phase | 08.02.2021 11:32 | | | | No | No | | | | | euro |
| 380296-001 | | | GARA / BIBLIOTECA TIRABOSCHI / BERGAMO / FK5 | | Default Value | | Running | euro | 08.02.2021 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 24122 | Bergamo | | Via S. Bernardino 74 | 30 - Tender & Submission Phase | 08.02.2021 11:37 | | | | No | No | | | | | euro |
| 380296 | | | GARA / BIBLIOTECA TIRABOSCHI / BERGAMO | | Default Value | | Running | euro | 08.02.2021 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 24122 | Bergamo | | Via S. Bernardino 74 | 10 - Information Phase | 08.02.2021 11:25 | | | | No | No | | | | | euro |
| 380295-001 | | | GARA / RIFACIMENTO SPONDA FIUME / HBT e HBS | | Default Value | | Running | euro | 08.02.2021 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 19030 | Ameglia | | FOCE DI MAGRA | 20 - Planning Phase | 08.02.2021 11:28 | | | | No | No | | | | | euro |
| 380295 | | | GARA / RIFACIMENTO SPONDA FIUME MAGRA | | Default Value | | Running | euro | 08.02.2021 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 19030 | Ameglia | | FOCE DI MAGRA | 20 - Planning Phase | 08.02.2021 11:25 | | | | No | No | | | | | euro |
| 380225-001 | | | HDB / MBT / LOTTO 5 SAN GERARDO / MONZA / CMB | | Default Value | | Running | euro | 07.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20900 | Monza | Medical facility | Via Pergolesi, 33 | 40 - Realisation Phase | 07.02.2021 07:59 | | | | No | No | | | | | euro |
| 380225 | | | LOTTO 5 SAN GERARDO / MONZA / CMB | | Default Value | | Running | euro | 07.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | Monza | Medical facility | Via Pergolesi, 33 | 40 - Realisation Phase | 07.02.2021 07:57 | | | | No | No | | | | | euro |
| 380220-001 | | | PROGETTO / EDIFICIO USO UFFICIO / ROSIGNANO MARITTIMO / HIT | | Default Value | | Running | euro | 05.02.2021 | | ITOS-TOSCANA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 57016 | Rosignano Marittimo | | -- | 20 - Planning Phase | 05.02.2021 16:03 | | | | No | No | | | | | euro |
| 380220 | | | EDIFICIO USO UFFICIO / ROSIGNANO MARITTIMO | | Default Value | | Running | euro | 05.02.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57016 | Rosignano Marittimo | | -- | 10 - Information Phase | 05.02.2021 16:02 | | | | No | No | | | | | euro |
| 380212-001 | | | RANAGALLE / DUBAI / BOCCOLE DEMU | | Default Value | | Running | euro | 05.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 34073 | Grado | | --- | 10 - Information Phase | 05.02.2021 15:26 | | | | No | No | | | | | euro |
| 380212 | | | RANAGALLE T / DUBAI | | Default Value | | Running | euro | 05.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34073 | Grado | | --- | 10 - Information Phase | 05.02.2021 15:22 | | | | No | No | | | | | euro |
| 380210-001 | | | F.LLI CARRARO / SCUOLA CAMPOFORMIDO / DETAN | | Default Value | | Running | euro | 05.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33030 | Campoformido | | -- | 10 - Information Phase | 05.02.2021 15:21 | | | | No | No | | | | | euro |
| 380210 | | | F.LLI CARRARO / SCUOLA CAMPOFORMIDO | | Default Value | | Running | euro | 05.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33030 | Campoformido | | -- | 10 - Information Phase | 05.02.2021 15:18 | | | | No | No | | | | | euro |
| 380205-001 | | | ICI / CANTIERE / OSOPPO / WATERSTOP | | Default Value | | Running | euro | 05.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33010 | Osoppo | | -- | 40 - Realisation Phase | 05.02.2021 15:14 | | | | No | No | | | | | euro |
| 380205 | | | ICI T / CANTIERE / OSOPPO | | Default Value | | Running | euro | 05.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33010 | Osoppo | | -- | 10 - Information Phase | 05.02.2021 15:10 | | | | No | No | | | | | euro |
| 380188-001 | | | HIT / SPG IMMOBILI / PALAZZINA MILANO | | Default Value | | Running | euro | 05.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20144 | Milano | Residential houses | Via Gnocchi Viani 2 | 30 - Tender & Submission Phase | 05.02.2021 13:56 | | | | No | No | | | | | euro |
| 380188 | | | SPG IMMOBILI / PALAZZINA MILANO | | Default Value | | Running | euro | 05.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | Milano | Residential houses | Via Gnocchi Viani 2 | 30 - Tender & Submission Phase | 05.02.2021 13:54 | | | | No | No | | | | | euro |
| 380057-001 | | | GARA / PRELIOS SGR / ROMA / DETAN | | Default Value | | Running | euro | 04.02.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00100 | ROMA | | VIA VITTORIO VENETO | 30 - Tender & Submission Phase | 04.02.2021 13:07 | | | | No | No | | | | | euro |
| 380057 | | | GARA / PRELIOS SGR / ROMA | | Default Value | | Running | euro | 04.02.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | | VIA VITTORIO VENETO | 30 - Tender & Submission Phase | 04.02.2021 13:05 | | | | No | No | | | | | euro |
| 379945-001 | | | GARA / MARGINAMENTO CANALE SUD / FUSINA MARGHERA / HSD | | Default Value | | Running | euro | 03.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30175 | Marghera | | FUSINA | 30 - Tender & Submission Phase | 03.02.2021 17:09 | | | | No | No | | | | | euro |
| 379945 | | | GARA / MARGINAMENTO CANALE SUD / FUSINA MARGHERA | | Default Value | | Running | euro | 03.02.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30175 | Marghera | | FUSINA | 10 - Information Phase | 03.02.2021 17:06 | | | | No | No | | | | | euro |
| 379944-001 | | | EDIFICIO 4 UFO / SIT GROUP / PADOVA / HDB | | Default Value | | Running | euro | 03.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 35129 | Padova | Industry building | VIA DELL' INDUSTRIA 31 | 30 - Tender & Submission Phase | 03.02.2021 17:18 | | | | No | No | | | | | euro |
| 379944 | | | EDIFICIO 4 UFO / SIT GROUP / PADOVA | | Default Value | | Running | euro | 03.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 35129 | Padova | Industry building | VIA DELL' INDUSTRIA 31 | 30 - Tender & Submission Phase | 03.02.2021 16:46 | | | | No | No | | | | | euro |
| 379924-001 | | | CLGE STUDIO TECNICO ASSOCIATO / REALIZZAZIONE PARCHEG5GIO MULTIPIANO / PISTOIA / MBT | | Default Value | | Running | euro | 03.02.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 51031 | Agliana | | * | 30 - Tender & Submission Phase | 03.02.2021 15:15 | | | | No | No | | | | 10.000,00 € | euro |
| 379924 | | | CLGE STUDIO TECNICO ASSOCIATO / REALIZZAZIONE PARCHEG5GIO MULTIPIANO / PISTOIA | | Default Value | | Running | euro | 03.02.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 51031 | Agliana | | * | 10 - Information Phase | 03.02.2021 15:15 | | | | No | No | | | | 10.000,00 € | euro |
| 379906-001 | | | ISEDIO / CONGREGAZIONE TESTIMONI DI GEOVA / RESIDENZIALE BOLOGNA | | Default Value | | Running | euro | 03.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 40133 | Bologna | Residential houses | via Nanni Costa 28 | 30 - Tender & Submission Phase | 03.02.2021 14:45 | | | | No | No | | | | | euro |
| 379906 | | | CONGREGAZIONE TESTIMONI DI GEOVA / RESIDENZIALE BOLOGNA | | Default Value | | Running | euro | 03.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 40133 | Bologna | Residential houses | via Nanni Costa 28 | 30 - Tender & Submission Phase | 03.02.2021 14:28 | | | | No | No | | | | | euro |
| 379816 | | | Realizz distretto cantieristica avamporto est 2� lotto funz opere a mare | | Default Value | | Running | euro | 17.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Industry building | Porto Canale | 10 - Information Phase | 03.02.2021 09:14 | 4125 | | | No | No | | | | | euro |
| 379815 | | | Lavori di demoliz silos e riqualif aree circostanti zona Riva di Ponente | | Default Value | | Running | euro | 23.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Porto | 10 - Information Phase | 03.02.2021 09:14 | 4124 | | | No | No | | | | | euro |
| 379814 | | | Lavori di ristrutturazione Casa Atzeni per museo e polo culturale | | Default Value | | Running | euro | 16.12.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09098 | TERRALBA | | Via Marceddi' | 10 - Information Phase | 03.02.2021 09:14 | 4123 | | | No | No | | | | | euro |
| 379813 | | | Lavori di riqualificazione struttura scolastica | | Default Value | | Running | euro | 05.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09091 | ALES | | Capoluogo | 10 - Information Phase | 03.02.2021 09:14 | 4122 | | | No | No | | | | | euro |
| 379812 | | | Ristrutt ed adeguam impianto di depurazione consortile (2� stralcio) | | Default Value | | Running | euro | 05.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09039 | VILLACIDRO | Technical facilities | Zona Industriale | 10 - Information Phase | 03.02.2021 09:14 | 4121 | | | No | No | | | | | euro |
| 379811 | | | Costruzione piscina all'aperto nell'area campo sportivo San Martino | | Default Value | | Running | euro | 23.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09025 | SANLURI | | Via San Martino | 10 - Information Phase | 03.02.2021 09:14 | 4120 | | | No | No | | | | | euro |
| 379810 | | | Lavori complet itinerario in variante 4�lotto 2�stralcio riappalto lavori | | Default Value | | Running | euro | 26.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08048 | TORTOLI' | Technical facilities | TERTENIA S.S. 125 | 10 - Information Phase | 03.02.2021 09:14 | 4119 | | | No | No | | | | | euro |
| 379809 | | | Adeg tecnologico normativo centro aggregaz sociale e serv socio educativi | | Default Value | | Running | euro | 25.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08029 | SINISCOLA | | Localita' Duai | 10 - Information Phase | 03.02.2021 09:14 | 4118 | | | No | No | | | | | euro |
| 379808 | | | Costruzione campus dell'istruzione riappalto lavori | | Default Value | | Running | euro | 30.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | POSADA | | Via Peppino Mereu | 10 - Information Phase | 03.02.2021 09:14 | 4117 | | | No | No | | | | | euro |
| 379807 | | | Lavori di adeguamento funzionale e messa a norma impianti sportivi | | Default Value | | Running | euro | 03.12.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08017 | SILANUS | | Via A. Volta Loc. Casamarzos | 10 - Information Phase | 03.02.2021 09:14 | 4116 | | | No | No | | | | | euro |
| 379806 | | | Lavori di ristrutturazione scuola secondaria di primo grado | | Default Value | | Running | euro | 10.12.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Gorizia 26 | 10 - Information Phase | 03.02.2021 09:14 | 4115 | | | No | No | | | | | euro |
| 379805 | | | Lavori complementari recup Ex Fondaz Brigata Sassari sistemaz aree esterne | | Default Value | | Running | euro | 19.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | Technical facilities | Via Carlo Felice 1 | 10 - Information Phase | 03.02.2021 09:14 | 4114 | | | No | No | | | | | euro |
| 379804 | | | Lavori di completamento strada Sassari Alghero (1� lotto) | | Default Value | | Running | euro | 23.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07041 | ALGHERO | Technical facilities | Via V. Emanuele / SP 105 | 10 - Information Phase | 03.02.2021 09:14 | 4113 | | | No | No | | | | | euro |
| 379803 | | | Riqual urbana/paesaggistica parco urbano naturale La Spiaggia e' L'Agora' | | Default Value | | Running | euro | 20.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07031 | CASTELSARDO | Technical facilities | Loc. Lu Bagnu | 10 - Information Phase | 03.02.2021 09:14 | 4112 | | | No | No | | | | | euro |
| 379802 | | | Riqual parco tematico realizz percorsi sensoriali x turismo accessibile | | Default Value | | Running | euro | 23.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07030 | TERGU | | Viale Dei Benedettini | 10 - Information Phase | 03.02.2021 09:14 | 4111 | | | No | No | | | | | euro |
| 379801 | | | Opere di captazione subalveo rio Padrongiano/miscelazione reflui lotto P2 | | Default Value | | Running | euro | 15.12.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Localita' Serra Alveghes | 10 - Information Phase | 03.02.2021 09:14 | 4110 | | | No | No | | | | | euro |
| 379800 | | | Itinierario palazzi signorili e valorizzaz centro documentale archeologia | | Default Value | | Running | euro | 19.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07025 | LURAS | | Centro abitato | 10 - Information Phase | 03.02.2021 09:14 | 4109 | | | No | No | | | | | euro |
| 379799 | | | Lavori di restyling convitto Istituto Alberghiero Professionale (1� lotto) | | Default Value | | Running | euro | 06.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07021 | ARZACHENA | Technical facilities | Viale P. Dettori 90 | 10 - Information Phase | 03.02.2021 09:14 | 4108 | | | No | No | | | | | euro |
| 379798 | | | Ampliamento ed adeguamento sede comunale | | Default Value | | Running | euro | 21.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | PADRU | | Viale Italia 13 | 10 - Information Phase | 03.02.2021 09:14 | 4107 | | | No | No | | | | | euro |
| 379797 | | | Riqualificazione energetica del mercato civico (lotto n.2) | | Default Value | | Running | euro | 17.11.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07012 | BONORVA | Technical facilities | Via Passamar | 10 - Information Phase | 03.02.2021 09:14 | 4106 | | | No | No | | | | | euro |
| 379761-001 | | | HDB / SASSETTI 27 / MERIDIANO SECONDO / MILANO | | Default Value | | Running | euro | 02.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | Office building | Via Filippo Sassetti 27 | 30 - Tender & Submission Phase | 02.02.2021 18:18 | | | | No | No | | | | | euro |
| 379761 | | | SASSETTI 27 / MERIDIANO SECONDO / MILANO | | Default Value | | Running | euro | 02.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | Office building | Via Filippo Sassetti 27 | 30 - Tender & Submission Phase | 02.02.2021 18:14 | | | | No | No | | | | | euro |
| 379547-004 | | | IMPLEMENETAZIONE VENDITE HCC / GUERRINI | | Default Value | | Running | euro | 02.02.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24128 | Bergamo | | FLLI BRONZETTI | 10 - Information Phase | 02.02.2021 10:40 | | | | No | No | | | | | euro |
| 379547-003 | | | IMPLEMENETAZIONE VENDITE HCC / STERCHELE | | Default Value | | Running | euro | 01.02.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24128 | Bergamo | | FLLI BRONZETTI | 10 - Information Phase | 01.02.2021 13:45 | | | | No | No | | | | | euro |
| 379547-002 | | | IMPLEMENETAZIONE VENDITE HCC / CEMENTAL | | Default Value | | Running | euro | 01.02.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24128 | Bergamo | | FLLI BRONZETTI | 10 - Information Phase | 01.02.2021 11:26 | | | | No | No | | | | | euro |
| 379547-001 | | | IMPLEMENETAZIONE VENDITE HCC / ISOCELL | | Default Value | | Running | euro | 01.02.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24128 | Bergamo | | FLLI BRONZETTI | 40 - Realisation Phase | 01.02.2021 11:26 | | | | No | No | | | | | euro |
| 379547 | | | IMPLEMENETAZIONE VENDITE HCC | | Default Value | | Running | euro | 01.02.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 24128 | Bergamo | | FLLI BRONZETTI | 10 - Information Phase | 01.02.2021 11:25 | | | | No | No | | | | | euro |
| 379471-001 | | | COVI COSTRUZIONI / COSTRUZIONE CITTADELLA POLI / TRENTO / HDB | | Default Value | | Running | euro | 29.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 38100 | TRENTO | | VIA BRENNERO | 40 - Realisation Phase | 29.01.2021 15:47 | | | | No | No | | | | 17.000,00 € | euro |
| 379471 | | | COVI COSTRUZIONI / COSTRUZIONE CITTADELLA POLI / TRENTO | | Default Value | | Running | euro | 29.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | | VIA BRENNERO | 10 - Information Phase | 29.01.2021 15:47 | | | | No | No | | | | 17.000,00 € | euro |
| 379463-002 | | | DEON / ARGINE BORGO PIAVE / BELLUNO / WATERSTOP PVC | | Default Value | | Running | euro | 29.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 32100 | Belluno | | BORGO PIAVE | 40 - Realisation Phase | 29.01.2021 15:29 | | | | No | No | | | | | euro |
| 379463 | | | DEON T / ARGINE BORGO PIAVE / BELLUNO | | Default Value | | Running | euro | 29.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32100 | Belluno | | BORGO PIAVE | 10 - Information Phase | 29.01.2021 15:26 | | | | No | No | | | | | euro |
| 379458-002 | | | MUBRE / DEPURATORE LATTEBUSCHE SPA / CESIOMAGGIORE BL / BENTONITICO | | Default Value | | Running | euro | 29.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 32030 | Cesiomaggiore | | LOC BUSCHE | 40 - Realisation Phase | 29.01.2021 15:20 | | | | No | No | | | | | euro |
| 379458-001 | | | MUBRE / DEPURATORE LATTEBUSCHE SPA / CESIOMAGGIORE BL / HSD | | Default Value | | Running | euro | 29.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 32030 | Cesiomaggiore | | LOC BUSCHE | 40 - Realisation Phase | 29.01.2021 15:20 | | | | No | No | | | | | euro |
| 379458 | | | MUBRE T / DEPURATORE LATTEBUSCHE SPA / CESIOMAGGIORE BL | | Default Value | | Running | euro | 29.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32030 | Cesiomaggiore | | LOC BUSCHE | 40 - Realisation Phase | 29.01.2021 15:18 | | | | No | No | | | | | euro |
| 379451-003 | | | ZANUTTA / DESPAR EX MADDALENA / TRIESTE / HIT | | Default Value | | Running | euro | 29.01.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 34100 | TRIESTE | | VIA DELL'ISTRIA | 40 - Realisation Phase | 29.01.2021 15:16 | | | | No | No | | | | | euro |
| 379451 | | | ZANUTTA T / DESPAR EX MADDALENA / TRIESTE | | Default Value | | Running | euro | 29.01.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | VIA DELL'ISTRIA | 40 - Realisation Phase | 29.01.2021 14:40 | | | | No | No | | | | | euro |
| 379168-001 | | | IMET / AMPLIAMENTO SCRUOLA SUPERIORE "A.VOLTA" / PAVIA / HDB | | Default Value | | Running | euro | 27.01.2021 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 27100 | Pavia | | VIA ABBIATEGRASSO 38 | 30 - Tender & Submission Phase | 27.01.2021 11:27 | | | | No | No | | | | 7.000,00 € | euro |
| 379168 | | | IMET / AMPLIAMENTO SCRUOLA SUPERIORE "A.VOLTA" / PAVIA | | Default Value | | Running | euro | 27.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | Pavia | | VIA ABBIATEGRASSO 38 | 10 - Information Phase | 27.01.2021 11:27 | | | | No | No | | | | 7.000,00 € | euro |
| 379165-002 | | | HBS SEISMIC / FABBRICATO COMMERCIALE / S.S. REGINA DONGO | | Default Value | | Running | euro | 27.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 22014 | Dongo | Shopping center | Via S.S.340 REGINA | 30 - Tender & Submission Phase | 27.01.2021 11:16 | | | | No | No | | | | | euro |
| 379165-001 | | | DETAN-S / FABBRICATO COMMERCIALE / S.S. REGINA DONGO | | Default Value | | Running | euro | 27.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 22014 | Dongo | Shopping center | Via S.S.340 REGINA | 30 - Tender & Submission Phase | 27.01.2021 11:13 | | | | No | Yes | | | | | euro |
| 379165 | | | FABBRICATO COMMERCIALE / S.S. REGINA DONGO | | Default Value | | Running | euro | 27.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22014 | Dongo | Shopping center | Via S.S.340 REGINA | 30 - Tender & Submission Phase | 27.01.2021 11:11 | | | | No | Yes | | | | | euro |
| 379149-001 | | | RAGGI COSTRUZIONI / CANTINE ANTINORI / GUADO AL TASSO / MARINA DI CASTAGNETO / DEMU 4010 | | Default Value | | Running | euro | 27.01.2021 | | ITOS-TOSCANA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 57022 | Marina di Castagneto Carducci | Industry building | X | 40 - Realisation Phase | 27.01.2021 10:00 | | | | No | No | | | | | euro |
| 379149 | | | RAGGI COSTRUZIONI / CANTINE ANTINORI / GUADO AL TASSO / MARINA DI CASTAGNETO | | Default Value | | Running | euro | 27.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57022 | Marina di Castagneto Carducci | Industry building | X | 10 - Information Phase | 27.01.2021 10:00 | | | | No | Yes | | | | | euro |
| 379108-001 | | | MERCURIO COSTRUZIONI/ ED. RESIDENZIALE / MONCALIERI /HIT | | Default Value | | Running | euro | 26.01.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 10024 | Moncalieri (TO) | | Strada Loreto 13 | 40 - Realisation Phase | 26.01.2021 21:18 | | | | No | No | | | | | euro |
| 379108 | | | MERCURIO COSTRUZIONI/ ED. RESIDENZIALE / MONCALIERI | | Default Value | | Running | euro | 26.01.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10024 | Moncalieri (TO) | | Strada Loreto 13 | 10 - Information Phase | 26.01.2021 21:17 | | | | No | No | | | | | euro |
| 379097-001 | | | CARRON BAU / REALIZZAZIONE PARCHEGGIO SOTTERRANEO SULLA PIAZZA MUNICIPALE / LANA / HDB | | Default Value | | Running | euro | 26.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39011 | Lana | | * | 30 - Tender & Submission Phase | 26.01.2021 16:09 | | | | No | No | | | | 13.000,00 € | euro |
| 379097 | | | CARRON BAU / REALIZZAZIONE PARCHEGGIO SOTTERRANEO SULLA PIAZZA MUNICIPALE / LANA | | Default Value | | Running | euro | 26.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39011 | Lana | | * | 10 - Information Phase | 26.01.2021 16:09 | | | | No | No | | | | 13.000,00 € | euro |
| 379085-001 | | | PRODOMI GROUP / RITRUTTURAZIONE PALESTRA-SCUOLA / SAN GIOVANNI LUPATOTO (VR) / DETAN | | Default Value | | Running | euro | 26.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37057 | San Giovanni Lupatoto | | * | 40 - Realisation Phase | 26.01.2021 15:07 | | | | No | No | | | | 3.500,00 € | euro |
| 379085 | | | PRODOMI GROUP / RITRUTTURAZIONE PALESTRA-SCUOLA / SAN GIOVANNI LUPATOTO (VR) | | Default Value | | Running | euro | 26.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37057 | San Giovanni Lupatoto | | * | 10 - Information Phase | 26.01.2021 15:07 | | | | No | No | | | | 3.500,00 € | euro |
| 378760-001 | | | HDB / RICOVERO MEZZI / ITB IMPRESE TURISTICHE BARZIESI | | Default Value | | Running | euro | 22.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23816 | Barzio | Industry building | località La Piazza 1 | 30 - Tender & Submission Phase | 22.01.2021 10:27 | | | | No | No | | | | | euro |
| 378760 | | | RICOVERO MEZZI / ITB IMPRESE TURISTICHE BARZIESI | | Default Value | | Running | euro | 22.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23816 | Barzio | | località La Piazza 1 | 20 - Planning Phase | 22.01.2021 10:25 | | | | No | No | | | | | euro |
| 378740-001 | | | GARA / BRETELLA DI COLLEGAMENTO TRA AUTOSTRADA TIRRENICA A12 E IL PORTO DI PIOMBINO / VAL DI CORNIA / DEMU / HTA / PARD | | Default Value | | Running | euro | 22.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 57100 | LIVORNO | | * | 10 - Information Phase | 22.01.2021 09:02 | | | | No | No | | | | | euro |
| 378740 | | | GARA / BRETELLA DI COLLEGAMENTO TRA AUTOSTRADA TIRRENICA A12 E IL PORTO DI PIOMBINO / VAL DI CORNIA | | Default Value | | Running | euro | 22.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57100 | LIVORNO | | * | 10 - Information Phase | 22.01.2021 09:00 | | | | No | No | | | | | euro |
| 378612-001 | | | CENTRO COMMERCIALE MAXIMAL OPLONTI POMPEII / TORRE ANNUNZIATA / HDB | | Default Value | | Running | euro | 21.01.2021 | | ICAM-CAMPANIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 80058 | Torre Annunziata | | X | 30 - Tender & Submission Phase | 21.01.2021 09:20 | | | | No | No | | | | | euro |
| 378612 | | | CENTRO COMMERCIALE MAXIMAL OPLONTI POMPEII / TORRE ANNUNZIATA | | Default Value | | Running | euro | 21.01.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 80058 | Torre Annunziata | | X | 10 - Information Phase | 21.01.2021 09:19 | | | | No | No | | | | | euro |
| 378553-001 | | | TERREAL / CASA A BUSSOLENGO / FK5 | | Default Value | | Running | euro | 20.01.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 37012 | Bussolengo | | Piazzale Vittorio Veneto 63 | 30 - Tender & Submission Phase | 20.01.2021 16:31 | | | | No | No | | | | | euro |
| 378553 | | | TERREAL / CASA A BUSSOLENGO | | Default Value | | Running | euro | 20.01.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 37012 | Bussolengo | | Piazzale Vittorio Veneto 63 | 10 - Information Phase | 20.01.2021 16:30 | | | | No | No | | | | | euro |
| 378514-001 | | | STUDIO ELIO BURATO/ COSTRUZIONE VILLETTA /SAN DONà DI PIAVE /FK5 | | Default Value | | Running | euro | 20.01.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 30027 | SAN DONÀ DI PIAVE | | _ | 20 - Planning Phase | 20.01.2021 14:08 | | | | No | No | | | | | euro |
| 378514 | | | STUDIO ELIO BURATO/ COSTRUZIONE VILLETTA /SAN DONà DI PIAVE | | Default Value | | Running | euro | 20.01.2021 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 30027 | SAN DONÀ DI PIAVE | | _ | 10 - Information Phase | 20.01.2021 14:06 | | | | No | No | | | | | euro |
| 378316-001 | | | SCHIAVO / RISTRUTTURAZIONE EDIFICIO ESISTENTE ADIBITO A MUNICIPIO E CENTRO AGGREGAZIONE PER GIOVANI E ANZIANI / RUTINO (SA) / GIUNTO | | Default Value | | Running | euro | 19.01.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 84070 | Rutino | | * | 10 - Information Phase | 19.01.2021 10:55 | | | | No | No | | | | 8.000,00 € | euro |
| 378316 | | | SCHIAVO / RISTRUTTURAZIONE EDIFICIO ESISTENTE ADIBITO A MUNICIPIO E CENTRO AGGREGAZIONE PER GIOVANI E ANZIANI / RUTINO (SA) | | Default Value | | Running | euro | 19.01.2021 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 84070 | Rutino | | * | 10 - Information Phase | 19.01.2021 10:54 | | | | No | No | | | | 8.000,00 € | euro |
| 378301-003 | | | MATINI / HCC / SPECIAL PRICE CONDITION 2021 | | Default Value | | Running | euro | 20.01.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | | X | 40 - Realisation Phase | 20.01.2021 13:55 | | | | No | No | | | | | euro |
| 378301-001 | | | HCC / SPECIAL PRICE CONDITION 2021 | | Default Value | | Running | euro | 19.01.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | | X | 10 - Information Phase | 19.01.2021 09:57 | | | | No | No | | | | | euro |
| 378301 | | | HCC / SPECIAL PRICE CONDITION 2021 | | Default Value | | Running | euro | 19.01.2021 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 24124 | Bergamo | | X | 10 - Information Phase | 19.01.2021 09:57 | | | | No | No | | | | | euro |
| 378288-001 | | | CARUSO / SCUOLA INFANZIA / ALESSANDRIA / HB | | Default Value | | Running | euro | 19.01.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 15100 | ALESSANDRIA | | * | 10 - Information Phase | 19.01.2021 09:20 | | | | No | No | | | | | euro |
| 378288 | | | CARUSO / SCUOLA INFANZIA / ALESSANDRIA | | Default Value | | Running | euro | 19.01.2021 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 15100 | ALESSANDRIA | | * | 10 - Information Phase | 19.01.2021 09:20 | | | | No | No | | | | | euro |
| 378080 | | | TORRE RESIDENZIALE / VIA POLA-VIA BOSSI SARONNO / SIG.MA EDIL | | Default Value | | Running | euro | 16.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | Saronno | Residential houses | Via Pola | 10 - Information Phase | 16.01.2021 08:00 | | | | No | No | | | | | euro |
| 378077-001 | | | HIT / COMPARTO T / SEI MILANO / CALCHI TAEGGI | | Default Value | | Running | euro | 16.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20152 | Milano | Office building | Via dei Calchi Taeggi | 40 - Realisation Phase | 16.01.2021 07:15 | | | | No | No | | | | | euro |
| 378077 | | | COMPARTO T / SEI MILANO / CALCHI TAEGGI | | Default Value | | Running | euro | 16.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20152 | Milano | Office building | Via dei CAlchi Taeggi | 40 - Realisation Phase | 16.01.2021 07:00 | | | | No | No | | | | | euro |
| 378075-001 | | | HIT / EDIFICIO RESIDENZIALE / VIA L. DI BREME 26 MILANO / ANTARES SRL | | Default Value | | Running | euro | 16.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20156 | Milano | Residential houses | Ludovico di Breme 26 | 30 - Tender & Submission Phase | 16.01.2021 06:51 | | | | No | No | | | | | euro |
| 378075 | | | EDIFICIO RESIDENZIALE / VIA L. DI BREME 26 MILANO / ANTARES SRL | | Default Value | | Running | euro | 16.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | Milano | | Ludovico di Breme 26 | 30 - Tender & Submission Phase | 16.01.2021 06:47 | | | | No | No | | | | | euro |
| 377903-001 | | | CANDELA/ESSELUNGA TORINO/ TORINO / ML | | Default Value | | Running | euro | 14.01.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | Via Bramante | 40 - Realisation Phase | 14.01.2021 11:32 | | | | No | No | | | | | euro |
| 377903 | | | CANDELA/ESSELUNGA TORINO/ TORINO | | Default Value | | Running | euro | 14.01.2021 | | IPIE-PIEMONTE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | Via Bramante | 40 - Realisation Phase | 14.01.2021 11:30 | | | | No | No | | | | | euro |
| 377749 | | | SICAP / Costruzione supermercato Despar 1500 mq ed opere di urbanizzazione | | Default Value | | Running | euro | 10.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48022 | LUGO | Technical facilities | Vie De' Brozzi / Canaletto | 10 - Information Phase | 13.01.2021 09:47 | 4105 | | | No | No | | | | | euro |
| 377748 | | | ORIOLI ENEA M / Costruz edificio multipiano 9 pft per hotel **** SPA 37 camere / 25/3 DEMOLITO | | Default Value | | Running | euro | 23.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48015 | CERVIA | Technical facilities | Viale Romagna 85 | 10 - Information Phase | 13.01.2021 09:47 | 4104 | | | No | No | | | | | euro |
| 377747 | | | CGM MILANO CERIANI / Costruzione nuova scuola primaria appalto integrato 18/3 PREP CANTIERE | | Default Value | | Running | euro | 09.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 44042 | CENTO | | Localita' Renazzo | 10 - Information Phase | 13.01.2021 09:47 | 4103 | | | No | No | | | | | euro |
| 377746 | | | LOLLI / Ristrutturazione e riqualificazione palestre Sterlino appalto integrato 12/1021 NIENTE >>> PRESENTAZIONE | | Default Value | | Running | euro | 25.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Murri 113 | 10 - Information Phase | 13.01.2021 09:47 | 4102 | | | No | No | | | | | euro |
| 377745 | | | AHRCOS / Ristrutturazione scuola media Carlo Jussi | | Default Value | | Running | euro | 18.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40068 | SAN LAZZARO DI SAVENA | | Via Kennedy | 10 - Information Phase | 13.01.2021 09:47 | 4101 | | | No | No | | | | | euro |
| 377744-003 | | | AEC M / Ampliamento caserma Guardia di Finanza E.Bertarini 26/3 NON ACCESS / ISEDIO | | Default Value | | Running | euro | 01.10.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Tanari | 40 - Realisation Phase | 01.10.2021 08:57 | 4100 | | | No | No | | | | | euro |
| 377744-002 | | | AEC M / Ampliamento caserma Guardia di Finanza E.Bertarini 26/3 NON ACCESS / HBT | | Default Value | | Running | euro | 10.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Tanari | 40 - Realisation Phase | 10.06.2021 19:16 | 4100 | | | No | No | | | | | euro |
| 377744 | | | AEC M / Ampliamento caserma Guardia di Finanza E.Bertarini 26/3 NON ACCESS | | Default Value | | Running | euro | 24.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Tanari | 40 - Realisation Phase | 13.01.2021 09:47 | 4100 | | | No | No | | | | | euro |
| 377743 | | | AR.CO M / Costruzione (demoricostruzione) scuola dell'infanzia Luigi Ferrari 25/3 FONDAZIONI ACG?? | | Default Value | | Running | euro | 13.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | | Via Gambalunga | 10 - Information Phase | 13.01.2021 09:47 | 4099 | | | No | No | | | | | euro |
| 377742 | | | REALE / Riqualificazione architettonica e funzion Capannone 17 Parco Innovazione | | Default Value | | Running | euro | 07.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | | Piazzale Europa | 10 - Information Phase | 13.01.2021 09:47 | 4098 | | | No | No | | | | | euro |
| 377741 | | | TREVI M / Ristrutturazione banchina c.d. Magazzini Generali 25/3 NON ACCESSIBILE | | Default Value | | Running | euro | 07.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | Technical facilities | Porto Canale | 10 - Information Phase | 13.01.2021 09:47 | 4097 | | | No | No | | | | | euro |
| 377740 | | | ???? Costruz 3 edifici ad uso abitaz e boxes 6+6+18 appartamenti Lotto A-B-C | | Default Value | | Running | euro | 01.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40054 | BUDRIO | Residential houses | Viale Primo Maggio | 10 - Information Phase | 13.01.2021 09:47 | 4096 | | | No | No | | | | | euro |
| 377739 | | | MONACELLI / Restauro e risanamento conservativo Padiglione Sauli Saffi | | Default Value | | Running | euro | 12.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47100 | FORLI' | | Via della Torre 1 | 10 - Information Phase | 13.01.2021 09:46 | 4095 | | | No | No | | | | | euro |
| 377738 | | | CIAB (INTEGRA) /Realizzazione Polo Dinamico=edificio scolastico / 26/3 PLATEA >>> PRESENTAZIONE | | Default Value | | Running | euro | 20.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Zacconi | 10 - Information Phase | 13.01.2021 09:46 | 4094 | | | No | No | | | | | euro |
| 377737 | | | ALLODI / Riqualificazione e recupero funz capannone 15 B/C Ex Officine Reggiane | | Default Value | | Running | euro | 23.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | | Piazzale Europa / V.le Ramazzini | 10 - Information Phase | 13.01.2021 09:46 | 4093 | | | No | No | | | | | euro |
| 377736 | | | ALLODI / Lavori di realizz edificio 1 Food Project c/o campus scienze e tecnologie | | Default Value | | Running | euro | 17.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | Viale Delle Scienze | 10 - Information Phase | 13.01.2021 09:46 | 4092 | | | No | No | | | | | euro |
| 377735 | | | ARTDIL SRLS M / Costruzione torre residenziale negozi piano terra piazza pubblica 18/3 DEMOLIZIONI | | Default Value | | Running | euro | 26.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 44022 | COMACCHIO | Residential houses | V.le Carducci 64 Loc.Lido degli Estensi | 10 - Information Phase | 13.01.2021 09:46 | 4091 | | | No | No | | | | | euro |
| 377734 | | | EDIFICANDA / Realizzazione nuovo polo oncologico integrato comprensivo di day hospital | | Default Value | | Running | euro | 06.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | Via Volturno | 10 - Information Phase | 13.01.2021 09:46 | 4090 | | | No | No | | | | | euro |
| 377733 | | | ITI M / Realizzazione nuovo edificio universitario presso Arcispedale Sant'Anna 18/3 PREP CANTIERE | | Default Value | | Running | euro | 07.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 44100 | FERRARA | | Via Aldo Moro Localita' Cona | 10 - Information Phase | 13.01.2021 09:46 | 4089 | | | No | No | | | | | euro |
| 377732 | | | ???? Costruz supermercato ESSELUNGA 2500 mq social housing 199 all p.multip 180 p.auto 15/5 DEMOLIZIONE PER REAL PARCHEGGIO | | Default Value | | Running | euro | 12.11.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Technical facilities | Via Canaletto Ex Consorzio | 10 - Information Phase | 13.01.2021 09:46 | 4088 | | | No | No | | | | | euro |
| 377726 | | | ARMELLIN / Costruzione supermercato ALI 2300 mq ed opere di urbanizzazione a scomputo | | Default Value | | Running | euro | 19.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31015 | CONEGLIANO | Technical facilities | Via Maggiore G. Piovesana 65 | 10 - Information Phase | 13.01.2021 09:25 | 4087 | | | No | No | | | | | euro |
| 377725 | | | BELTRAMI / Lavori di ristrutturazione e riorganizzazione funzionale dell' ospedale | | Default Value | | Running | euro | 10.12.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32033 | LAMON | | Via Balin | 10 - Information Phase | 13.01.2021 09:25 | 4086 | | | No | No | | | | | euro |
| 377724 | | | SETTEN / Restauro conservativo palazzo storico per 3 unita' abitative di prestigio | | Default Value | | Running | euro | 23.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO | Residential houses | Piazza G. Matteotti 1 | 10 - Information Phase | 13.01.2021 09:25 | 4085 | | | No | No | | | | | euro |
| 377723 | | | A T EUROPE???? / Costruzione piscina comunale 3 piscine interne palestre spogliatoi bar | | Default Value | | Running | euro | 21.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30038 | SPINEA | | Via 11 Settembre 2001 | 10 - Information Phase | 13.01.2021 09:25 | 4084 | | | No | No | | | | | euro |
| 377722 | | | MENGATO / Costruzione supermercato ALI 1.500 mq deposito 1.200 mq e OO UU | | Default Value | | Running | euro | 30.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35020 | SAONARA | Technical facilities | Vie Dei Vivai / V. Emanuele | 10 - Information Phase | 13.01.2021 09:25 | 4083 | | | No | No | | | | | euro |
| 377721 | | | RUSALEM / Lavori di ampliamento complesso industriale | | Default Value | | Running | euro | 05.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31019 | PORTOBUFFOLE' | Industry building | Via Bastie | 10 - Information Phase | 13.01.2021 09:25 | 4082 | | | No | No | | | | | euro |
| 377720 | | | ESTEEL / Riqualificazione Stadio Euganeo primo stralcio | | Default Value | | Running | euro | 10.12.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | | Via Nereo Rocco 60 | 10 - Information Phase | 13.01.2021 09:25 | 4081 | | | No | No | | | | | euro |
| 377719 | | | SETTEN / Lavori di riordino polo nautico ed opere complementari | | Default Value | | Running | euro | 13.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | | Via San Giuliano | 10 - Information Phase | 13.01.2021 09:25 | 4080 | | | No | No | | | | | euro |
| 377718 | | | TONON / Lavori di ampliamento casa di riposo | | Default Value | | Running | euro | 10.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31010 | FREGONA | | Via D. Alighieri 8 | 10 - Information Phase | 13.01.2021 09:25 | 4079 | | | No | No | | | | | euro |
| 377717 | | | BOTTOLI T (MN) /Realizzazione nuovo parcheggio pluripiano Re Teodorico | | Default Value | | Running | euro | 13.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | Technical facilities | Viale Dell'Industria | 10 - Information Phase | 13.01.2021 09:25 | 4078 | | | No | No | | | | | euro |
| 377716 | | | EMAPRICE T / Costr edif multip (10 pft) direzion piastra commerc 1400 mq terminal bus 19/2 inzi privata in attesa del mercato | | Default Value | | Running | euro | 16.12.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31033 | CASTELFRANCO VENETO | Technical facilities | Via Melchiori | 10 - Information Phase | 13.01.2021 09:25 | 4077 | | | No | No | | | | | euro |
| 377715-002 | | | MANELLI / CEPAV 2 / DISTANZIATORI / Opere civili linea ferroviar AV/AC MI-VR tra km.135+116,62 e km.140+090,52 | | Default Value | | Running | euro | 23.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37014 | CASTELNUOVO DEL GARDA | Technical facilities | Localita' diverse | 10 - Information Phase | 23.01.2021 12:10 | 4076 | | | No | No | | | | | euro |
| 377715-001 | | | MANELLI / CEPAV 2 / WATERSTOP / Opere civili linea ferroviar AV/AC MI-VR tra km.135+116,62 e km.140+090,52 | | Default Value | | Running | euro | 22.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37014 | CASTELNUOVO DEL GARDA | Technical facilities | Localita' diverse | 40 - Realisation Phase | 22.01.2021 15:12 | 4076 | | | No | No | | | | | euro |
| 377715 | | | MANELLI T / CEPAV 2 Opere civili linea ferroviar AV/AC MI-VR tra km.135+116,62 e km.140+090,52 | | Default Value | | Running | euro | 03.12.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37014 | CASTELNUOVO DEL GARDA | Technical facilities | Localita' diverse | 10 - Information Phase | 13.01.2021 09:25 | 4076 | | | No | No | | | | | euro |
| 377714 | | | TECHNE / Ristruttur RSA Marmarole ed ex hotel Dolomie' x RSA (con gestione 20 anni) | | Default Value | | Running | euro | 16.12.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32044 | PIEVE DI CADORE | | Vie G. Carducci 38 / Dolomiti 18 | 10 - Information Phase | 13.01.2021 09:25 | 4075 | | | No | No | | | | | euro |
| 377674 | | | R & C / Costruzione stabilimento uffici e centro ricerca 1900 mq | | Default Value | | Running | euro | 26.11.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33020 | AMARO | Industry building | Zona Industriale | 10 - Information Phase | 12.01.2021 17:22 | 4074 | | | No | No | | | | | euro |
| 377673 | | | ??? Costruzione edificio ad uso abitazione 27 unita' abitative | | Default Value | | Running | euro | 06.11.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | UDINE | Residential houses | Via Sabbadini Gradenico 33 | 10 - Information Phase | 12.01.2021 17:22 | 4073 | | | No | No | | | | | euro |
| 377672 | | | EDIFICANDA / Costruzione nuovo edificio scolastico | | Default Value | | Running | euro | 04.12.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33170 | PORDENONE | | Via Interna 12 | 10 - Information Phase | 12.01.2021 17:22 | 4072 | | | No | No | | | | | euro |
| 377671 | | | ???? / Costruzione Residenza Protetta per anziani 120 posti letto | | Default Value | | Running | euro | 16.12.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34077 | RONCHI DEI LEGIONARI | | Via Mazzini 44 | 10 - Information Phase | 12.01.2021 17:22 | 4071 | | | No | No | | | | | euro |
| 377658 | | | Costruzione 2 torri residenziali e centro sportivo semi ipogeo | | Default Value | | Running | euro | 16.12.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | Residential houses | Via Del Commerzio 106 | 10 - Information Phase | 12.01.2021 15:41 | 4070 | | | No | No | | | | | euro |
| 377657 | | | Ristrutturazione complesso ad uso residenziale 37 unita' abitative | | Default Value | | Running | euro | 04.12.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | Residential houses | Via Imperiale 41 | 10 - Information Phase | 12.01.2021 15:41 | 4069 | | | No | No | | | | | euro |
| 377656 | | | Realizz e manut nuovo DEA partenariato pubblico privato prog def esecutiva | | Default Value | | Running | euro | 21.10.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | Largo R. Benzi 10 | 10 - Information Phase | 12.01.2021 15:41 | 4068 | | | No | No | | | | | euro |
| 377655 | | | Costruz impianto sportivo polifunzionale primo lotto palazzetto sport | | Default Value | | Running | euro | 03.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 15057 | TORTONA | | S.P. 211 Loc. San Guglielmo | 10 - Information Phase | 12.01.2021 15:41 | 4067 | | | No | No | | | | | euro |
| 377654 | | | Costruz 2 medie strutture di vendita 1997 mq (lotto A) 664 mq (lotto B) | | Default Value | | Running | euro | 15.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | Technical facilities | Corso Grosseto 40 | 10 - Information Phase | 12.01.2021 15:41 | 4066 | | | No | No | | | | | euro |
| 377652 | | | Costr 6 edifici 260 all social housing autorim int 7500 mq sub ambito 1 | | Default Value | | Running | euro | 15.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | Residential houses | Via Degli Ulivi | 10 - Information Phase | 12.01.2021 15:41 | 4064 | | | No | No | | | | | euro |
| 377651 | | | Costr parcheggio plurip interr 4 p. x 676 p.a. area cittadella politecnica | | Default Value | | Running | euro | 04.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | Technical facilities | Corso Ferrucci 119 | 10 - Information Phase | 12.01.2021 15:41 | 4063 | | | No | No | | | | | euro |
| 377650 | | | Costruzione studentato 600 posti letto RTA parco p.interrato 158 posti | | Default Value | | Running | euro | 06.11.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | Residential houses | Vie Moretta / Frejus Ex Diatto | 10 - Information Phase | 12.01.2021 15:41 | 4062 | | | No | No | | | | | euro |
| 377649 | | | Costruzione nuova stazione linea ferroviaria metropolitana SFM5 | | Default Value | | Running | euro | 12.11.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10043 | ORBASSANO | Technical facilities | Strada San Luigi | 10 - Information Phase | 12.01.2021 15:41 | 4061 | | | No | No | | | | | euro |
| 377648 | | | GSE / Costruzione nuovo deposito logistico 50000 mq | | Default Value | | Running | euro | 04.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10036 | SETTIMO TORINESE | Industry building | Via Brescia Ex Ceat | 10 - Information Phase | 12.01.2021 15:41 | 4060 | | | No | No | | | | | euro |
| 377583-001 | | | STANCANELLI / PROGETTO DI DEMOLIZIONE E RICOSTRUZIONE DI DUE EDIFICI / CATANIA / HDB | | Default Value | | Running | euro | 12.01.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 95100 | CATANIA | | VIA DELLA MARINA | 30 - Tender & Submission Phase | 12.01.2021 11:34 | | | | No | No | | | | 27.000,00 € | euro |
| 377583 | | | STANCANELLI / PROGETTO DI DEMOLIZIONE E RICOSTRUZIONE DI DUE EDIFICI / CATANIA | | Default Value | | Running | euro | 12.01.2021 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 95100 | CATANIA | | VIA DELLA MARINA | 10 - Information Phase | 12.01.2021 11:34 | | | | No | No | | | | 27.000,00 € | euro |
| 377474 | | | Lavori relativi opere civili x adeg a sagoma PC/80 gallerie ferroviarie | | Default Value | | Running | euro | 20.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | Technical facilities | VERNIO | 10 - Information Phase | 11.01.2021 14:12 | 4059 | | | No | No | | | | | euro |
| 377473 | | | Costruzione edificio ad uso abitazione 9 unita' abitative e box | | Default Value | | Running | euro | 12.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | Residential houses | Vie Delle Ruote / Dell'Olmo | 10 - Information Phase | 11.01.2021 14:12 | 4058 | | | No | No | | | | | euro |
| 377472 | | | Costruzione supermercato Penny Market | | Default Value | | Running | euro | 12.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | Technical facilities | Vie Erbosa / C. Memotti | 10 - Information Phase | 11.01.2021 14:12 | 4057 | | | No | No | | | | | euro |
| 377471 | | | Costr resid sanitaria assistenz 1� lotto 80 posti letto+30 centro diurno | | Default Value | | Running | euro | 21.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | | Viale A. De Gasperi | 10 - Information Phase | 11.01.2021 14:12 | 4056 | | | No | No | | | | | euro |
| 377470 | | | Costruzione supermercato Coop dell'Unione Amiatina | | Default Value | | Running | euro | 05.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58033 | CASTEL DEL PIANO | Technical facilities | Via Campo Grande | 10 - Information Phase | 11.01.2021 14:11 | 4055 | | | No | No | | | | | euro |
| 377469 | | | Real 25 moduli abitat in legno previa rimoz container+opere complementari | | Default Value | | Running | euro | 03.12.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57037 | PORTOFERRAIO | Residential houses | Base Logistica Valle Carene | 10 - Information Phase | 11.01.2021 14:11 | 4054 | | | No | No | | | | | euro |
| 377468 | | | Costr (demoricostr) edificio mulitp ad uso abitazione 23 unita' abitative | | Default Value | | Running | euro | 04.12.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via F. Turati 25 | 10 - Information Phase | 11.01.2021 14:11 | 4053 | | | No | No | | | | | euro |
| 377467 | | | Costruzione palestra istituto comprensivo M.L. King (1� lotto) riappalto | | Default Value | | Running | euro | 10.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56030 | CALCINAIA | | Piazza A. Moro Loc. Fornacette | 10 - Information Phase | 11.01.2021 14:11 | 4052 | | | No | No | | | | | euro |
| 377466 | | | Costr (demoricostr) complesso commerciale 900 mq direzionale 3000 mq | | Default Value | | Running | euro | 04.12.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56025 | PONTEDERA | Technical facilities | Via Tosco Romagnola Est 96 | 10 - Information Phase | 11.01.2021 14:11 | 4051 | | | No | No | | | | | euro |
| 377465 | | | Costruzione supermercato catena MD | | Default Value | | Running | euro | 12.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55100 | LUCCA | Technical facilities | Via Romana 3082 | 10 - Information Phase | 11.01.2021 14:11 | 4050 | | | No | No | | | | | euro |
| 377464 | | | Realizz imp di depurazione (lotto 1) ed opere di collettamento (lotto 2) | | Default Value | | Running | euro | 06.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55051 | BARGA | Technical facilities | Localita' Chitarrino | 10 - Information Phase | 11.01.2021 14:11 | 4049 | | | No | No | | | | | euro |
| 377463 | | | Realizzazione museo della collezione Mitoraj | | Default Value | | Running | euro | 15.12.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55045 | PIETRASANTA | | Via Oberdan | 10 - Information Phase | 11.01.2021 14:11 | 4048 | | | No | No | | | | | euro |
| 377462 | | | Costruzione edificio logistico 3000 mq | | Default Value | | Running | euro | 23.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52028 | TERRANUOVA BRACCIOLINI | Industry building | Loc. Valvigna | 10 - Information Phase | 11.01.2021 14:11 | 4047 | | | No | No | | | | | euro |
| 377461 | | | Compl opere civili ed impianti passante ferroviario e stazione AV Belfiore | | Default Value | | Running | euro | 17.12.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Via Circondaria | 10 - Information Phase | 11.01.2021 14:11 | 4046 | | | No | No | | | | | euro |
| 377460 | | | Costruzione complesso multifunz 160 appartam negozi palestra p.interrato | | Default Value | | Running | euro | 26.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Corso Italia / Via Solferino | 10 - Information Phase | 11.01.2021 14:11 | 4045 | | | No | No | | | | | euro |
| 377459 | | | Ampliam terza corsia autostrada A1 tra Km 306+986 e Km 318+511 lotto 2B | | Default Value | | Running | euro | 13.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | INCISA VALDARNO | 10 - Information Phase | 11.01.2021 14:11 | 4044 | | | No | No | | | | | euro |
| 377458 | | | Costruzione depuratore | | Default Value | | Running | euro | 06.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50026 | SAN CASCIANO IN VAL DI PESA | Technical facilities | Loc. Ponterotto | 10 - Information Phase | 11.01.2021 14:11 | 4043 | | | No | No | | | | | euro |
| 377457 | | | Costruzione nuovo stabilimento Fendi 13.000 MQ | | Default Value | | Running | euro | 12.11.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50012 | BAGNO A RIPOLI | Industry building | Via Di Tizzano | 10 - Information Phase | 11.01.2021 14:11 | 4042 | | | No | No | | | | | euro |
| 377456 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 21.10.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06083 | BASTIA UMBRA | Residential houses | Via C.Battisti | 10 - Information Phase | 11.01.2021 14:11 | 4041 | | | No | No | | | | | euro |
| 377455 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 21.10.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06083 | BASTIA UMBRA | Residential houses | Via Orvieto | 10 - Information Phase | 11.01.2021 14:11 | 4040 | | | No | No | | | | | euro |
| 377454 | | | Demoricostruz edif 3 piani f.t.6 unita' abitat 15 boxes interr Classe A3 | | Default Value | | Running | euro | 10.11.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | Residential houses | Via dell'Arringo | 10 - Information Phase | 11.01.2021 14:11 | 4039 | | | No | No | | | | | euro |
| 377453 | | | Ristrutturazione e nuova costruzione edificio ad uso abitazione | | Default Value | | Running | euro | 04.11.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | Residential houses | Piazza Tre Monumenti | 10 - Information Phase | 11.01.2021 14:11 | 4038 | | | No | No | | | | | euro |
| 377401-001 | | | UNIONBAU / COSTRUZIONE NUOVA CASA DI UNA ASSOCIAZIONE / NONA PONENTE (BZ) / HDB | | Default Value | | Running | euro | 11.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39050 | Nova Ponente | | * | 30 - Tender & Submission Phase | 11.01.2021 10:38 | | | | No | No | | | | 8.000,00 € | euro |
| 377401 | | | UNIONBAU / COSTRUZIONE NUOVA CASA DI UNA ASSOCIAZIONE / NONA PONENTE (BZ) | | Default Value | | Running | euro | 11.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39050 | Nova Ponente | | * | 10 - Information Phase | 11.01.2021 10:38 | | | | No | No | | | | 8.000,00 € | euro |
| 377349-001 | | | DETAN-S / MANGILI E ASSOCIATI / COMM 6891 SCALA SPOTORNO | | Default Value | | Running | euro | 09.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24064 | Grumello del Monte | | via Fontanone , n°15 | 30 - Tender & Submission Phase | 09.01.2021 17:02 | | | | No | No | | | | | euro |
| 377349 | | | MANGILI E ASSOCIATI / COMM 6891 SCALA SPOTORNO | | Default Value | | Running | euro | 09.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24064 | Grumello del Monte | | via Fontanone , n°15 | 30 - Tender & Submission Phase | 09.01.2021 17:01 | | | | No | No | | | | | euro |
| 377253-001 | | | TONGIORGI / RINFORZO DI UNA TETTOIA IN LEGNO LAMELLARE / AREZZO / DETAN | | Default Value | | Running | euro | 07.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 52100 | Arezzo | | * | 30 - Tender & Submission Phase | 07.01.2021 16:42 | | | | No | No | | | | 3.000,00 € | euro |
| 377253 | | | TONGIORGI / RINFORZO DI UNA TETTOIA IN LEGNO LAMELLARE / AREZZO | | Default Value | | Running | euro | 07.01.2021 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52100 | Arezzo | | * | 10 - Information Phase | 07.01.2021 16:42 | | | | No | No | | | | 3.000,00 € | euro |
| 376858-001 | | | GARA CASERMA CANTORE / SAN CANDIDO / hDB / HBT / HB | | Default Value | | Running | euro | 07.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39038 | San Candido | | -- | 30 - Tender & Submission Phase | 07.01.2021 09:26 | | | | No | No | | | | | euro |
| 376858 | | | GARA CASERMA CANTORE / SAN CANDIDO | | Default Value | | Running | euro | 02.01.2021 | | ITRE-TRENTINO ALTO ADIGE | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 39038 | San Candido | | -- | 10 - Information Phase | 02.01.2021 13:01 | | | | No | No | | | | | euro |
| 376844 | | | Riqualificazione ed efficientamento energetico istituto comprensivo | | Default Value | | Running | euro | 21.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46049 | VOLTA MANTOVANA | | Viale G.Marconi 18/A | 10 - Information Phase | 23.12.2020 16:01 | 4037 | | | No | No | | | | | euro |
| 376843 | | | Costruzione magazzino merci 12900 mq e palazzina uffici 1500 mq | | Default Value | | Running | euro | 10.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46043 | CASTIGLIONE DELLE STIVIERE | Industry building | Via dell'Impresa | 10 - Information Phase | 23.12.2020 16:01 | 4036 | | | No | No | | | | | euro |
| 376842 | | | Ampliamento Istituto scolastico A.Volta | | Default Value | | Running | euro | 09.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | PAVIA | | Via per Abbiategrasso 28 | 10 - Information Phase | 23.12.2020 16:01 | 4035 | | | No | No | | | | | euro |
| 376841 | | | Lavori di ampliamento centro nazionale di adroterapia oncologica 4000 mq | | Default Value | | Running | euro | 30.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | PAVIA | | Strada Campeggi 53 | 10 - Information Phase | 23.12.2020 16:01 | 4034 | | | No | No | | | | | euro |
| 376840 | | | Realizzaz complesso edilizio da destinare a servizi comunita' alloggio | | Default Value | | Running | euro | 27.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27032 | FERRERA ERBOGNONE | | Via G.Da Ferrara | 10 - Information Phase | 23.12.2020 16:01 | 4033 | | | No | No | | | | | euro |
| 376839 | | | Costruzione 2 edifici commerciali 2300 + 1350 mq e opere di urbanizzaz | | Default Value | | Running | euro | 02.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27029 | VIGEVANO | Technical facilities | Viale Industria 200 | 10 - Information Phase | 23.12.2020 16:01 | 4032 | | | No | No | | | | | euro |
| 376838 | | | Riqualificazione e adeguamento normativo scuola media S.Jacini | | Default Value | | Running | euro | 23.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26011 | CASALBUTTANO ED UNITI | | Via Marconi | 10 - Information Phase | 23.12.2020 16:01 | 4031 | | | No | No | | | | | euro |
| 376837 | | | Costruzione palazzina ad uso abitazione e box | | Default Value | | Running | euro | 04.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Vie L. Fiorentini / Sabbioneta | 10 - Information Phase | 23.12.2020 16:01 | 4030 | | | No | No | | | | | euro |
| 376836 | | | Costruzione edificio artigianale 2800 mq coperti e uffici | | Default Value | | Running | euro | 09.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Industry building | Via del Serpente 81 | 10 - Information Phase | 23.12.2020 16:01 | 4029 | | | No | No | | | | | euro |
| 376835 | | | Costruz residenza sanitaria assistenziale 120 p letto e centro alzheimer | | Default Value | | Running | euro | 27.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via Flero 29 | 10 - Information Phase | 23.12.2020 16:01 | 4028 | | | No | No | | | | | euro |
| 376834 | | | Ristrutt edificio per servizi universitari uffici e spazi per studenti | | Default Value | | Running | euro | 21.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Vie Porta Pile 17 B | 10 - Information Phase | 23.12.2020 16:00 | 4027 | | | No | No | | | | | euro |
| 376833 | | | Ristrutturazione complesso residenziale 9 unita' aabitative piscina parco | | Default Value | | Running | euro | 19.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25083 | GARDONE RIVIERA | Residential houses | Centro Abitato | 10 - Information Phase | 23.12.2020 16:00 | 4026 | | | No | No | | | | | euro |
| 376832 | | | Costruzione complesso industriale 5600 mq | | Default Value | | Running | euro | 22.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25040 | ESINE | Industry building | Via Manzoni 97 | 10 - Information Phase | 23.12.2020 16:00 | 4025 | | | No | No | | | | | euro |
| 376831 | | | Ristrutturazione ampliamento e adeguamento sismico ex polo scolastico | | Default Value | | Running | euro | 23.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25010 | ISORELLA | | Via Garibaldi | 10 - Information Phase | 23.12.2020 16:00 | 4024 | | | No | No | | | | | euro |
| 376830 | | | Riqualificazione ex complesso industriale | | Default Value | | Running | euro | 02.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via del Ponte Pietra 2 | 10 - Information Phase | 23.12.2020 16:00 | 4023 | | | No | No | | | | | euro |
| 376829 | | | Ristrutturazione edificio 8 unita' abitative e autorimesse interrate | | Default Value | | Running | euro | 30.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via San Martino Della Pigrizia 6 | 10 - Information Phase | 23.12.2020 16:00 | 4022 | | | No | No | | | | | euro |
| 376828 | | | Demoricostruzione palazzina uso abitazione e boxes 12 appartam Classe A3 | | Default Value | | Running | euro | 02.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Residential houses | Via Ariosto 3 | 10 - Information Phase | 23.12.2020 16:00 | 4021 | | | No | No | | | | | euro |
| 376827 | | | Costruzione 2 edifici ad uso abitazione (1� lotto) | | Default Value | | Running | euro | 17.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24044 | DALMINE | Residential houses | Via Guzzanica 71 | 10 - Information Phase | 23.12.2020 16:00 | 4020 | | | No | No | | | | | euro |
| 376826 | | | Costruzione residenza sanitaria assistemziale 80 posti letto | | Default Value | | Running | euro | 05.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24038 | SANT'OMOBONO TERME | | Via Pascoli | 10 - Information Phase | 23.12.2020 16:00 | 4019 | | | No | No | | | | | euro |
| 376825 | | | Costruzione supermercato catema Iperal | | Default Value | | Running | euro | 30.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24030 | CARVICO | Technical facilities | Via C.C. Girolamo | 10 - Information Phase | 23.12.2020 16:00 | 4018 | | | No | No | | | | | euro |
| 376824 | | | Ampliamento supermercato e riqualificazione piazzale per eventi | | Default Value | | Running | euro | 18.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24015 | SAN GIOVANNI BIANCO | Technical facilities | Piazzale degli Alpini | 10 - Information Phase | 23.12.2020 16:00 | 4017 | | | No | No | | | | | euro |
| 376823 | | | Ristrutturazione e ampliamento edificio scolastico | | Default Value | | Running | euro | 15.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24010 | DOSSENA | | Via Chiesa 14 | 10 - Information Phase | 23.12.2020 16:00 | 4016 | | | No | No | | | | | euro |
| 376822 | | | Costruzione supermercato 4300 mq | | Default Value | | Running | euro | 17.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23884 | CASTELLO DI BRIANZA | Technical facilities | Vie Lecco / Don G. Allamano | 10 - Information Phase | 23.12.2020 16:00 | 4015 | | | No | No | | | | | euro |
| 376821 | | | Ampliamento complesso industriale 15400 mq | | Default Value | | Running | euro | 20.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23861 | CESANA BRIANZA | Industry building | Via Del Brughetto 1 | 10 - Information Phase | 23.12.2020 16:00 | 4014 | | | No | No | | | | | euro |
| 376820 | | | Costruzione palestra a servizio dell'Istituto Comprensivo | | Default Value | | Running | euro | 12.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23807 | MERATE | | Via A.Manzoni | 10 - Information Phase | 23.12.2020 16:00 | 4013 | | | No | No | | | | | euro |
| 376819 | | | Costruzione palestra a servizio IPIA Pinchetti | | Default Value | | Running | euro | 19.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23037 | TIRANO | | Lungadda IV Novembre | 10 - Information Phase | 23.12.2020 16:00 | 4012 | | | No | No | | | | | euro |
| 376818 | | | Realizzazione area interscambio nuova fermata RFI | | Default Value | | Running | euro | 22.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Localita' Camerlata | 10 - Information Phase | 23.12.2020 16:00 | 4011 | | | No | No | | | | | euro |
| 376817 | | | Costruzione palazzetto dello sport 5.200 posti 2 palestre area ristoro | | Default Value | | Running | euro | 12.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22063 | CANTU' | | Corso Europa | 10 - Information Phase | 23.12.2020 16:00 | 4010 | | | No | No | | | | | euro |
| 376816 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 18.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22018 | PORLEZZA | Residential houses | Via Ceresio | 10 - Information Phase | 23.12.2020 16:00 | 4009 | | | No | No | | | | | euro |
| 376815 | | | Ristrutturazione ex Caserma Garibaldi per polo culturale | | Default Value | | Running | euro | 27.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | | Piazza Repubblica | 10 - Information Phase | 23.12.2020 16:00 | 4008 | | | No | No | | | | | euro |
| 376814 | | | Costruzione edificio ad uso abitazione 5 unita' abitative e box classe A | | Default Value | | Running | euro | 23.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | Residential houses | Via F. Crispi 1 | 10 - Information Phase | 23.12.2020 16:00 | 4007 | | | No | No | | | | | euro |
| 376813 | | | Costruzione polo commerciale cinema negozi primo lotto=demolizioni | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Corso Sempione / Via San Gottardo | 10 - Information Phase | 23.12.2020 16:00 | 4006 | | | No | No | | | | | euro |
| 376812 | | | Costruzione edificio 5 piani fuori terra 8 appartamenti e boxes | | Default Value | | Running | euro | 21.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | Residential houses | Via Settembrini | 10 - Information Phase | 23.12.2020 16:00 | 4005 | | | No | No | | | | | euro |
| 376811 | | | Costruzione 17 edifici e parco 1�lotto 4 edifici 100 unita' abitative tot | | Default Value | | Running | euro | 26.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Val D'Ossola 17 | 10 - Information Phase | 23.12.2020 16:00 | 4004 | | | No | No | | | | | euro |
| 376810 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via della Taccona 64 | 10 - Information Phase | 23.12.2020 16:00 | 4003 | | | No | No | | | | | euro |
| 376809 | | | Costruzione palazzina ad uso abitazione e boxes 7 appartam Classe A4 | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via A.Boito 90 | 10 - Information Phase | 23.12.2020 16:00 | 4002 | | | No | No | | | | | euro |
| 376808 | | | Costruzione edificio ad uso abitazione e boxes Classe A3 | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via G.C.Abba | 10 - Information Phase | 23.12.2020 16:00 | 4001 | | | No | No | | | | | euro |
| 376807 | | | Costruzione 2 edifici ad uso abitaz e boxes 33 appartamenti Classe A1 | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via della Taccona 30 | 10 - Information Phase | 23.12.2020 16:00 | 4000 | | | No | No | | | | | euro |
| 376806 | | | Costr edificio multipiano ad uso abitaz 26 app negozi e 2 piani int box | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Padre R. Giuliani 9 | 10 - Information Phase | 23.12.2020 16:00 | 3999 | | | No | No | | | | | euro |
| 376805 | | | Costruzione 4 palazzine 16 unita' abitative Classe A lotto 1A | | Default Value | | Running | euro | 15.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20847 | ALBIATE | Residential houses | Via Oriana Fallaci | 10 - Information Phase | 23.12.2020 16:00 | 3998 | | | No | No | | | | | euro |
| 376804 | | | Costruzione magazzino automatizzato e relativi spazi di gestione 12.431mq | | Default Value | | Running | euro | 10.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20832 | DESIO | Industry building | Via Filippo da Desio 60 | 10 - Information Phase | 23.12.2020 16:00 | 3997 | | | No | No | | | | | euro |
| 376803 | | | Costruzione 3 medie strutture di vendita primo lotto demoliz Ex Medaspan | | Default Value | | Running | euro | 18.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20821 | MEDA | Technical facilities | Via L.Cadorna | 10 - Information Phase | 23.12.2020 16:00 | 3996 | | | No | No | | | | | euro |
| 376802 | | | costruzione edificio multipiano 41 appartamenti e boxes | | Default Value | | Running | euro | 24.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20158 | MILANO | Residential houses | Via Don G.Verita' 11 | 10 - Information Phase | 23.12.2020 16:00 | 3995 | | | No | No | | | | | euro |
| 376801 | | | Costruzione edificio 9 piani f.terra 27 appartamenti e boxes | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20156 | MILANO | Residential houses | Viale C.Espinasse 93 | 10 - Information Phase | 23.12.2020 16:00 | 3994 | | | No | No | | | | | euro |
| 376800 | | | Costruz (demoricostruz) edificio 5 pft 41 unita' abitative classe A4 | | Default Value | | Running | euro | 17.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via A. Fioravanti 5 | 10 - Information Phase | 23.12.2020 16:00 | 3993 | | | No | No | | | | | euro |
| 376799 | | | Demoricostruzione edificio ad uso abitaz e boxes 27 appartam 1 ufficio | | Default Value | | Running | euro | 09.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | MILANO | Residential houses | Via P.Giannone 2 | 10 - Information Phase | 23.12.2020 16:00 | 3992 | | | No | No | | | | | euro |
| 376798 | | | Costruzione edificio ad uso abitazione e boxes 26 appartamenti Classe A4 | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20153 | MILANO | Residential houses | Via Frosinone 4 | 10 - Information Phase | 23.12.2020 16:00 | 3991 | | | No | No | | | | | euro |
| 376797 | | | Costruzione 2 edifici ad uso abitazione e boxes | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | MILANO | Residential houses | Viale Certosa 135 | 10 - Information Phase | 23.12.2020 16:00 | 3990 | | | No | No | | | | | euro |
| 376796 | | | Lavori di riqualificazione complesso ad uso uffici 40000 mq | | Default Value | | Running | euro | 26.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20149 | MILANO | Technical facilities | Via Monte Rosa 91 | 10 - Information Phase | 23.12.2020 16:00 | 3989 | | | No | No | | | | | euro |
| 376795 | | | Costruzione torre residenziale 19 piani per 33 unita' abitative e boxes | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20147 | MILANO | Residential houses | Via F.Gonin 11 | 10 - Information Phase | 23.12.2020 16:00 | 3988 | | | No | No | | | | | euro |
| 376794 | | | Demoricostruzione edificio 8 piani f.t. 18 unita' abitative e boxes | | Default Value | | Running | euro | 12.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20146 | MILANO | Residential houses | Via L.Tolstoi 46 | 10 - Information Phase | 23.12.2020 16:00 | 3987 | | | No | No | | | | | euro |
| 376793 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | MILANO | Residential houses | Viale C.Troya 19 | 10 - Information Phase | 23.12.2020 16:00 | 3986 | | | No | No | | | | | euro |
| 376792 | | | Demoricostruzione edificio 5 piani f.t. ad uso abitazione e boxes | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20141 | MILANO | Residential houses | Via B.Verro 62 | 10 - Information Phase | 23.12.2020 15:59 | 3985 | | | No | No | | | | | euro |
| 376791 | | | Recupero e nuova costruzione complesso ad uso abitazione 6.260 mq | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20135 | MILANO | Residential houses | Via Comelico 39 | 10 - Information Phase | 23.12.2020 15:59 | 3984 | | | No | No | | | | | euro |
| 376790 | | | Demoricostruzione e ristrutturaz edif ad uso abitaz e boxes 22 unita' tot | | Default Value | | Running | euro | 09.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20135 | MILANO | Residential houses | Via Vasari 3 | 10 - Information Phase | 23.12.2020 15:59 | 3983 | | | No | No | | | | | euro |
| 376789 | | | Costruzione nuovi edifici dipartimenti chimica elettronica bioingegneria | | Default Value | | Running | euro | 09.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20133 | MILANO | | Via Bassini 6 | 10 - Information Phase | 23.12.2020 15:59 | 3982 | | | No | No | | | | | euro |
| 376788 | | | Costruzione 3 edifici 110 appartamenti Classe A + 95 boxes interrati | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20129 | MILANO | Residential houses | Via Compagnoni 12 | 10 - Information Phase | 23.12.2020 15:59 | 3981 | | | No | No | | | | | euro |
| 376787 | | | Costruzione complesso multipiano ad uso abitazione e box | | Default Value | | Running | euro | 26.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20128 | MILANO | Residential houses | Via Teocrito 56 | 10 - Information Phase | 23.12.2020 15:59 | 3980 | | | No | No | | | | | euro |
| 376786 | | | Costruzione 4 edifici multipiano ad uso abitazione riappalto lavori | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20128 | MILANO | Residential houses | Via Antonio Meucci 47 | 10 - Information Phase | 23.12.2020 15:59 | 3979 | | | No | No | | | | | euro |
| 376785 | | | Costruz torre residenziale 8 piani fuori terra e 2 stecche residenziali | | Default Value | | Running | euro | 17.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20127 | MILANO | Residential houses | Via Valtorta 32 | 10 - Information Phase | 23.12.2020 15:59 | 3978 | | | No | No | | | | | euro |
| 376784 | | | Costruzione edificio ad uso abirtazione e boxes 30 appartamenti | | Default Value | | Running | euro | 24.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20126 | MILANO | Residential houses | Via Gino Pollini 10 | 10 - Information Phase | 23.12.2020 15:59 | 3977 | | | No | No | | | | | euro |
| 376783 | | | Costruzione palazzina ad uso abitazione e box | | Default Value | | Running | euro | 20.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20123 | MILANO | Residential houses | Via San Calocero 9 | 10 - Information Phase | 23.12.2020 15:59 | 3976 | | | No | No | | | | | euro |
| 376782 | | | Ristrutturazione complesso 5 piani fuori terra ad uso uffici 4000 mq | | Default Value | | Running | euro | 16.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | MILANO | Technical facilities | Via Bassano Porrone 6 | 10 - Information Phase | 23.12.2020 15:59 | 3975 | | | No | No | | | | | euro |
| 376781 | | | Riqualificazione complesso sportivo palazzo del ghiaccio | | Default Value | | Running | euro | 03.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Dei Ciclamini 23 | 10 - Information Phase | 23.12.2020 15:59 | 3974 | | | No | No | | | | | euro |
| 376780 | | | Realizz nuova piattaforma logistica ortofrutta riappalto lavori | | Default Value | | Running | euro | 30.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Industry building | Via C. Lombroso | 10 - Information Phase | 23.12.2020 15:59 | 3973 | | | No | No | | | | | euro |
| 376779 | | | Costr 3 edifici multip a destinaz direzionale e parcheggio int 27.600 mq | | Default Value | | Running | euro | 30.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Bisceglie Comparto T | 10 - Information Phase | 23.12.2020 15:59 | 3972 | | | No | No | | | | | euro |
| 376778 | | | Ristrutturazione complesso multipiano ad uso uffici 10.000 mq | | Default Value | | Running | euro | 27.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazza Fidia 1 | 10 - Information Phase | 23.12.2020 15:59 | 3971 | | | No | No | | | | | euro |
| 376777 | | | Ristrutturaz risanamento conservativo complesso multip uso uffici 12000mq | | Default Value | | Running | euro | 22.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via San Vigilio 1 | 10 - Information Phase | 23.12.2020 15:59 | 3970 | | | No | No | | | | | euro |
| 376776 | | | Ristrutturazione ed ampliamento IRCCS Policlinico | | Default Value | | Running | euro | 12.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20097 | SAN DONATO MILANESE | | Via Caduti Di Nassiriya | 10 - Information Phase | 23.12.2020 15:59 | 3969 | | | No | No | | | | | euro |
| 376775 | | | Realizzazione vasca di accumulo per acque miste | | Default Value | | Running | euro | 05.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20081 | ABBIATEGRASSO | Technical facilities | Capoluogo | 10 - Information Phase | 23.12.2020 15:59 | 3968 | | | No | No | | | | | euro |
| 376774 | | | Adeguamento e potenziamento impianto di depurazione | | Default Value | | Running | euro | 05.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20078 | SAN COLOMBANO AL LAMBRO | Technical facilities | Capoluogo | 10 - Information Phase | 23.12.2020 15:59 | 3967 | | | No | No | | | | | euro |
| 376773 | | | Adeguamento e razionalizzaz area acuti ospedale per risparmio energetico | | Default Value | | Running | euro | 12.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20070 | VIZZOLO PREDABISSI | | Via Pandina 1 | 10 - Information Phase | 23.12.2020 15:59 | 3966 | | | No | No | | | | | euro |
| 376772 | | | Costruzione residenza assistenziale 176 posti letto | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | ARESE | | Via Alfredo Papa | 10 - Information Phase | 23.12.2020 15:59 | 3965 | | | No | No | | | | | euro |
| 376771 | | | Costruzione palazzina ad uso abitazione e box | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | ARESE | Residential houses | Via E. Vismara | 10 - Information Phase | 23.12.2020 15:59 | 3964 | | | No | No | | | | | euro |
| 376770 | | | Costruzione palazzina ad uso abitazione 15 appartamenti | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Residential houses | Via U. Pellegrini | 10 - Information Phase | 23.12.2020 15:59 | 3963 | | | No | No | | | | | euro |
| 376769 | | | Costruzione edificio multipiano ad uso abitazione 34 appartamenti e box | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Residential houses | Via Cividale | 10 - Information Phase | 23.12.2020 15:59 | 3962 | | | No | No | | | | | euro |
| 376768 | | | Costruzione palazzina ad uso abitazione 10 unita' abitative | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Residential houses | Via G. Borsi 9 | 10 - Information Phase | 23.12.2020 15:59 | 3961 | | | No | No | | | | | euro |
| 376767 | | | Costruzione palazzina ad uso abitazione 11 appartamenti classe A4 | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Residential houses | Via Cardinal A. Ferrari 27 | 10 - Information Phase | 23.12.2020 15:59 | 3960 | | | No | No | | | | | euro |
| 376766 | | | Costruzione 2 palazzine ad uso abitazione 32 appartamenti totali e box | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Residential houses | Via Stelvio | 10 - Information Phase | 23.12.2020 15:59 | 3959 | | | No | No | | | | | euro |
| 376765 | | | Costruzione palazzina ad uso abitazione 8 appartamenti e box | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Residential houses | Via Calatafimi | 10 - Information Phase | 23.12.2020 15:59 | 3958 | | | No | No | | | | | euro |
| 376764 | | | Costruzione edificio ad uso abitazione 7 unita' abitative | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Residential houses | Via Virgilio 4 | 10 - Information Phase | 23.12.2020 15:59 | 3957 | | | No | No | | | | | euro |
| 376763 | | | Opere civili per la realizzazione nuova stazione elettrica 380 KV | | Default Value | | Running | euro | 04.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20013 | MAGENTA | Technical facilities | Via Espinasse | 10 - Information Phase | 23.12.2020 15:59 | 3956 | | | No | No | | | | | euro |
| 376762 | | | Costruzione supermercato Eurospin | | Default Value | | Running | euro | 10.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | SAN GIORGIO SU LEGNANO | Technical facilities | Vie Milano / Aldo Moro | 10 - Information Phase | 23.12.2020 15:59 | 3955 | | | No | No | | | | | euro |
| 376732-001 | | | DETAN-S / TORRE COSTACURTA - VICO / OLGINATE | | Default Value | | Running | euro | 23.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23854 | Olginate | Industry building | Via Adda 20 | 40 - Realisation Phase | 23.12.2020 07:54 | | | | No | No | | | | | euro |
| 376732 | | | TORRE COSTACURTA - VICO / OLGINATE | | Default Value | | Running | euro | 23.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23854 | Olginate | | Via Adda 20 | 30 - Tender & Submission Phase | 23.12.2020 07:53 | | | | No | No | | | | | euro |
| 376688 | | | IMPLEMENTAZIONE /HIT / SOCI ANIT | | Default Value | | Running | euro | 22.12.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | _ | _ | | _ | 10 - Information Phase | 22.12.2020 09:22 | | | | No | No | | | | | euro |
| 376525-001 | | | ICRAS / AMPLIAMENTO EDIFICIO COMMERCIALE; LAVORI DI RIORDINO DI PARTE DELLA VIABILITA' INTERNA E PARCHEGGI / DETAN / BRENNERO | | Default Value | | Running | euro | 18.12.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39041 | Brennero | | * | 30 - Tender & Submission Phase | 18.12.2020 09:27 | | | | No | No | | | | 8.000,00 € | euro |
| 376525 | | | ICRAS / AMPLIAMENTO EDIFICIO COMMERCIALE; LAVORI DI RIORDINO DI PARTE DELLA VIABILITA' INTERNA E PARCHEGGI / DETAN | | Default Value | | Running | euro | 18.12.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39041 | Brennero | | * | 10 - Information Phase | 18.12.2020 09:27 | | | | No | No | | | | 8.000,00 € | euro |
| 376489 | | | POLO LOGISTICO 300000MQ MALALBERGO / ALTEDO 15 MAGG NIENTE | | Default Value | | Running | euro | 17.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40051 | Altedo | | VIA CHIAVICONE | 10 - Information Phase | 17.12.2020 16:40 | | | | No | No | | | | | euro |
| 376488 | | | POLO LOGISTICO 75000MQ SAN PIETRO EX AIE / ALTEDO 15 MAGG NIENTE | | Default Value | | Running | euro | 17.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40051 | Altedo | | --- | 10 - Information Phase | 17.12.2020 16:37 | | | | No | No | | | | | euro |
| 376486 | | | ENG 2K / DB SCHENCKER/ VERONA INTERPORTO | | Default Value | | Running | euro | 17.12.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | INTERPORTO | 10 - Information Phase | 17.12.2020 16:13 | | | | No | No | | | | | euro |
| 376485 | | | NUOVO OSPEDALE BUFALINI / CESENA 2021 (STUDIO ALTIERI e F&M) | | Default Value | | Running | euro | 17.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47023 | CESENA | | --- | 10 - Information Phase | 17.12.2020 16:08 | | | | No | No | | | | | euro |
| 376484 | | | COMMERCIALE / FORLI | | Default Value | | Running | euro | 17.12.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47100 | FORLI' | | VIA VASUMINI | 10 - Information Phase | 17.12.2020 16:07 | | | | No | No | | | | | euro |
| 376483-001 | | | ADRIACOS / RSA / VIGONOVO / GIUNTI | | Default Value | | Running | euro | 03.02.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33074 | VIGONOVO DI FONTANAFREDDA | | -- | 40 - Realisation Phase | 03.02.2021 20:15 | | | | No | No | | | | | euro |
| 376483 | | | ADRIACOS / RSA / VIGONOVO | | Default Value | | Running | euro | 17.12.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33074 | VIGONOVO DI FONTANAFREDDA | | -- | 40 - Realisation Phase | 17.12.2020 16:06 | | | | No | No | | | | | euro |
| 376355-001 | | | GARA / DEMOLIZIONE PARZIALE CON RICOSTRUZIONE RESIDENCE VALLON / CORVARA / HDB | | Default Value | | Running | euro | 16.12.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39033 | Corvara in Badia | | ALTA BADIA | 10 - Information Phase | 16.12.2020 13:58 | | | | No | No | | | | 11.000,00 € | euro |
| 376355 | | | GARA / DEMOLIZIONE PARZIALE CON RICOSTRUZIONE RESIDENCE VALLON / CORVARA | | Default Value | | Running | euro | 16.12.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39033 | Corvara in Badia | | ALTA BADIA | 10 - Information Phase | 16.12.2020 13:58 | | | | No | No | | | | 11.000,00 € | euro |
| 376123 | | | GARA / Wohnhaus mit Gastbetrieb Stubenruss / SAN CANDIDO | | Default Value | | Running | euro | 14.12.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39038 | San Candido | | X | 10 - Information Phase | 14.12.2020 14:37 | | | | No | No | | | | | euro |
| 376051 | | | CAMPUS UNIVERSITA' DEGLI STUDI MILANO / MIND | | Default Value | | Running | euro | 14.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20157 | Milano | | Via Cristina Belgioioso | 10 - Information Phase | 14.12.2020 08:07 | | | | No | No | | | | | euro |
| 376018-001 | | | CANDELA/ESSELUNGA MANTOVA/CARICO SCARICO/HL | | Default Value | | Running | euro | 11.12.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 46100 | Mantova | | -- | 40 - Realisation Phase | 11.12.2020 17:26 | | | | No | No | | | | | euro |
| 376018 | | | CANDELA/ESSELUNGA MANTOVA/CARICO SCARICO | | Default Value | | Running | euro | 11.12.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 46100 | Mantova | | -- | 10 - Information Phase | 11.12.2020 17:24 | | | | No | No | | | | | euro |
| 375952-001 | | | IMPRESA CENCI COSTRUZIONE/RIVESTIMENTO ASCENSORE/FK4 HL | | Default Value | | Running | euro | 11.12.2020 | | ITOS-TOSCANA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | VIA Petrella 16 | 40 - Realisation Phase | 11.12.2020 09:40 | | | | No | No | | | | | euro |
| 375952 | | | IMPRESA CENCI COSTRUZIONE/RIVESTIMENTO ASCENSORE/FK4 | | Default Value | | Running | euro | 11.12.2020 | | ITOS-TOSCANA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | VIA Petrella 16 | 10 - Information Phase | 11.12.2020 09:38 | | | | No | No | | | | | euro |
| 375917-001 | | | INFRARAIL / LINEA FERROVIARIA MILANO – NAPOLI / NODO DI FIRENZE / PENETRAZIONE URBANA / HBT | | Default Value | | Running | euro | 10.12.2020 | | ITOS-TOSCANA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | X | 30 - Tender & Submission Phase | 10.12.2020 14:46 | | | | No | No | | | | | euro |
| 375917 | | | INFRARAIL / LINEA FERROVIARIA MILANO – NAPOLI / NODO DI FIRENZE / PENETRAZIONE URBANA | | Default Value | | Running | euro | 10.12.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | X | 10 - Information Phase | 10.12.2020 14:45 | | | | No | Yes | | | | | euro |
| 375865-001 | | | TORRE PILOTI / GENOVA / DETAN | | Default Value | | Running | euro | 10.12.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | | X | 30 - Tender & Submission Phase | 10.12.2020 08:57 | | | | No | No | | | | | euro |
| 375865 | | | TORRE PILOTI / GENOVA | | Default Value | | Running | euro | 10.12.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | X | 10 - Information Phase | 10.12.2020 08:56 | | | | No | No | | | | | euro |
| 375530 | | | GARA / STUDIES FOR METRO LINE 2 / TORINO | | Default Value | | Running | euro | 04.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 04.12.2020 15:44 | | | | No | No | | | | | euro |
| 375503-001 | | | DETAN-E / RITRUTTURAZONE MONTEROSA 91 / MILANO | | Default Value | | Running | euro | 04.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20149 | Milano | | Via Monterosa 91 | 40 - Realisation Phase | 04.12.2020 12:18 | | | | No | No | | | | | euro |
| 375503 | | | RITRUTTURAZONE MONTEROSA 91 / MILANO | | Default Value | | Running | euro | 04.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20149 | Milano | | Via Monterosa 91 | 40 - Realisation Phase | 04.12.2020 12:16 | | | | No | No | | | | | euro |
| 375383-001 | | | GARA / COSTRUZIONE NUOVO EDIFICIO PER IL SISTEMA A POMPA DI CALORE / BOLZANO / HTA / HBT / HDB | | Default Value | | Running | euro | 03.12.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 03.12.2020 09:57 | | | | No | No | | | | 3.000,00 € | euro |
| 375383 | | | GARA / COSTRUZIONE NUOVO EDIFICIO PER IL SISTEMA A POMPA DI CALORE / BOLZANO | | Default Value | | Running | euro | 03.12.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 03.12.2020 09:57 | | | | No | No | | | | 3.000,00 € | euro |
| 375382 | | | ICOP / NUOVA PIATTAFORMA LOGISTICA / TRIESTE | | Default Value | | Running | euro | 03.12.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | VIA SERVOLA | 10 - Information Phase | 03.12.2020 09:55 | | | | No | No | | | | | euro |
| 375322-001 | | | HDB / A2A TERMOVAORIZZATORE / SISTEMA DI ACCUMULO / VIA GOLTARA BERGAMO | | Default Value | | Running | euro | 02.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24127 | Bergamo | Technical facilities (Energy) | Via Luigi Goltara | 30 - Tender & Submission Phase | 02.12.2020 13:42 | | | | No | No | | | | | euro |
| 375322 | | | A2A TERMOVAORIZZATORE / SISTEMA DI ACCUMULO / VIA GOLTARA BERGAMO | | Default Value | | Running | euro | 02.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24127 | Bergamo | Technical facilities (Energy) | Via Luigi Goltara | 30 - Tender & Submission Phase | 02.12.2020 13:39 | | | | No | No | | | | | euro |
| 375296 | | | ICOP / PARCO DEL MARE / TRIESTE | | Default Value | | Running | euro | 02.12.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | PORTO | 10 - Information Phase | 02.12.2020 10:48 | | | | No | No | | | | | euro |
| 375249-001 | | | GARA / MALLEY GARE / LOSANNA / FPA | | Default Value | | Running | euro | 01.12.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | | X | 30 - Tender & Submission Phase | 01.12.2020 15:31 | | | | No | No | | | | | euro |
| 375249 | | | GARA / MALLEY GARE / LOSANNA | | Default Value | | Running | euro | 01.12.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 24124 | Bergamo | | X | 10 - Information Phase | 01.12.2020 15:30 | | | | No | No | | | | | euro |
| 374997-002 | | | GARA / CENTRO DI RICERCA E MEDICINA TRASLAZIONE / TORINO / FPA | | Default Value | | Running | euro | 21.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | * | 30 - Tender & Submission Phase | 21.12.2020 15:48 | | | | No | No | | | | | euro |
| 374997-001 | | | GARA / CENTRO DI RICERCA E MEDICINA TRASLAZIONE / TORINO / HDB | | Default Value | | Running | euro | 01.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | * | 30 - Tender & Submission Phase | 01.12.2020 09:33 | | | | No | No | | | | 500.000,00 € | euro |
| 374997 | | | GARA / CENTRO DI RICERCA E MEDICINA TRASLAZIONE / TORINO | | Default Value | | Running | euro | 01.12.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 01.12.2020 09:32 | | | | No | No | | | | 500.000,00 € | euro |
| 374657-002 | | | HTA / C20-06 ANTIRION OCEANO PACIFICO / UFFICI / ROMA | | Default Value | | Running | euro | 05.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 00144 | Roma | | Via dell'Oceano Pacifico | 40 - Realisation Phase | 05.10.2021 09:32 | | | | No | No | | | | | euro |
| 374657-001 | | | HDB / C20-06 ANTIRION OCEANO PACIFICO / UFFICI / ROMA | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 00144 | Roma | | Via dell'Oceano Pacifico | 40 - Realisation Phase | 25.11.2020 15:50 | | | | No | No | | | | | euro |
| 374657 | | | C20-06 ANTIRION OCEANO PACIFICO / UFFICI / ROMA | | Default Value | | Running | euro | 25.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 00144 | Roma | | Via dell'Oceano Pacifico | 40 - Realisation Phase | 25.11.2020 15:47 | | | | No | No | | | | | euro |
| 374552-001 | | | CAVALLARO & MORTORO / REALIZZAZIONE NUOVO GRUPPO OPERATIVO NELL'AEREOPORTO / FURBARA / GIUNTI | | Default Value | | Running | euro | 24.11.2020 | | ILAZ-LAZIO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 00050 | Cerveteri | | FRAZ. FURBARA | 30 - Tender & Submission Phase | 24.11.2020 16:16 | | | | No | No | | | | 6.000,00 € | euro |
| 374552 | | | CAVALLARO & MORTORO / REALIZZAZIONE NUOVO GRUPPO OPERATIVO NELL'AEREOPORTO / FURBARA | | Default Value | | Running | euro | 24.11.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00050 | Cerveteri | | FRAZ. FURBARA | 10 - Information Phase | 24.11.2020 16:16 | | | | No | No | | | | 6.000,00 € | euro |
| 374492-001 | | | NUOVO OSPEDALE S. CATALDO - TARANTO /GIUNTI | | Default Value | | Running | euro | 24.11.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 74100 | TARANTO | | Taranto | 30 - Tender & Submission Phase | 24.11.2020 10:05 | | | | No | No | | | | | euro |
| 374492 | | | NUOVO OSPEDALE S. CATALDO - TARANTO | | Default Value | | Running | euro | 12.11.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 74100 | TARANTO | | Taranto | 10 - Information Phase | 24.11.2020 10:02 | | | | No | No | | | | | euro |
| 374487-001 | | | HCC / PIATTAFORMA LOGISTICA ORTOFRUTTA / SO.GE.MI MILANO | | Default Value | | Running | euro | 24.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20137 | Milano | Industry building | Via Cesare Lombroso, 54 | 30 - Tender & Submission Phase | 24.11.2020 10:00 | | | | No | No | | | | | euro |
| 374487 | | | PIATTAFORMA LOGISTICA ORTOFRUTTA / SO.GE.MI MILANO | | Default Value | | Running | euro | 24.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20137 | Milano | Industry building | Via Cesare Lombroso, 54 | 30 - Tender & Submission Phase | 24.11.2020 09:56 | | | | No | No | | | | | euro |
| 374336-001 | | | GARA / ESPANSIONE ATTIVITA' / BOLZANO (ATZWANG) / HDB | | Default Value | | Running | euro | 20.11.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 20.11.2020 15:03 | | | | No | No | | | | 20.000,00 € | euro |
| 374336 | | | GARA / ESPANSIONE ATTIVITA' / BOLZANO (ATZWANG) | | Default Value | | Running | euro | 20.11.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 20.11.2020 15:02 | | | | No | No | | | | 20.000,00 € | euro |
| 374113-001 | | | HK5 / UNIFAMILIARE / VIA TOSCANINI CERRO MAGGIORE | | Default Value | | Running | euro | 18.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20023 | Cerro Maggiore | Residential houses | via Toscanini | 40 - Realisation Phase | 18.11.2020 15:27 | | | | No | No | | | | | euro |
| 374113 | | | UNIFAMILIARE / VIA TOSCANINI CERRO MAGGIORE | | Default Value | | Running | euro | 18.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20023 | Cerro Maggiore | | via Toscanini | 40 - Realisation Phase | 18.11.2020 15:25 | | | | No | No | | | | | euro |
| 374090-001 | | | MAK COSTRUZIONI / AMPLIAMENTO DELLA SCUOLA DI FOIANA CON BIBLIOTECA / HIT | | Default Value | | Running | euro | 18.11.2020 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 39011 | Lana | | X | 30 - Tender & Submission Phase | 18.11.2020 13:33 | | | | No | No | | | | | euro |
| 374090 | | | MAK COSTRUZIONI / AMPLIAMENTO DELLA SCUOLA DI FOIANA CON BIBLIOTECA | | Default Value | | Running | euro | 18.11.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39011 | Lana | | X | 10 - Information Phase | 18.11.2020 13:33 | | | | No | No | | | | | euro |
| 373741 | | | FEDRIGOLI / NUOVI EDIFICI POLICLINICO / PONTE SAN PIETRO | | Default Value | | Running | euro | 13.11.2020 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 24036 | Ponte San Pietro | | -- | 10 - Information Phase | 13.11.2020 11:25 | | | | No | No | | | | | euro |
| 373630 | | | Costruzione RSA 120 posti e R.A.A. 20 posti letto | | Default Value | | Running | euro | 18.09.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 13100 | VERCELLI | | Corso Magenta 43 | 10 - Information Phase | 12.11.2020 10:07 | 3954 | | | No | No | | | | | euro |
| 373593-001 | | | HDB / VILLA MARIA / RSA / CARATE BRIANZA | | Default Value | | Running | euro | 11.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20841 | Carate Brianza | | Piazzale della Madonnina 1 | 40 - Realisation Phase | 11.11.2020 17:18 | | | | No | No | | | | | euro |
| 373593 | | | VILLA MARIA / RSA / CARATE BRIANZA | | Default Value | | Running | euro | 11.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20841 | Carate Brianza | | Piazzale della Madonnina 1 | 40 - Realisation Phase | 11.11.2020 17:16 | | | | No | No | | | | | euro |
| 373536 | | | CARP / RESIDENZIALE BLU HOME / JESOLO | | Default Value | | Running | euro | 11.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30016 | Jesolo | | -- | 10 - Information Phase | 11.11.2020 10:49 | | | | No | No | | | | | euro |
| 373535 | | | BARALDO / RESIDENZIALE / MONSELICE | | Default Value | | Running | euro | 11.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35043 | Monselice | | VIA CARUBBIO | 10 - Information Phase | 11.11.2020 10:39 | | | | No | No | | | | | euro |
| 373532 | | | BOSCO COSTR / RESIDENCE MONTIRONE / ABANO | | Default Value | | Running | euro | 11.11.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35031 | Abano Terme | | -- | 10 - Information Phase | 11.11.2020 10:35 | | | | No | No | | | | | euro |
| 373484-001 | | | KOEHL / DEMOLIZIONE E RICOSTRUZIONE EDIFICIO / HDB / HIT / HSD / BOLZANO | | Default Value | | Running | euro | 10.11.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Laubengasse Nr. 8 | 30 - Tender & Submission Phase | 10.11.2020 15:58 | | | | No | No | | | | 3.000,00 € | euro |
| 373484 | | | KOEHL / DEMOLIZIONE E RICOSTRUZIONE EDIFICIO / HDB / HIT / HSD | | Default Value | | Running | euro | 10.11.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Laubengasse Nr. 8 | 10 - Information Phase | 10.11.2020 15:58 | | | | No | No | | | | 3.000,00 € | euro |
| 373403-001 | | | HDB / 1282-AFI / EDIFICIO PIAZZA FIDA 1 MILANO | | Default Value | | Running | euro | 10.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20159 | Milano | Office building | Piazza Fida 1 | 30 - Tender & Submission Phase | 10.11.2020 07:30 | | | | No | No | | | | | euro |
| 373403 | | | 1282-AFI / EDIFICIO PIAZZA FIDA 1 MILANO | | Default Value | | Running | euro | 10.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20159 | Milano | Office building | Piazza Fida 1 | 30 - Tender & Submission Phase | 10.11.2020 07:27 | | | | No | No | | | | | euro |
| 373296 | | | Lavori di efficientamento energetico di 40 alloggi | | Default Value | | Running | euro | 25.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | Residential houses | Vie Sarrabus / Trexenta | 10 - Information Phase | 06.11.2020 16:24 | 3953 | | | No | No | | | | | euro |
| 373295 | | | Costruzione deposito di smistamento merci 6000 mq | | Default Value | | Running | euro | 02.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Industry building | Zona Industriale | 10 - Information Phase | 06.11.2020 16:24 | 3952 | | | No | No | | | | | euro |
| 373294 | | | Manutenzione straordinaria ed efficientamento energetico scuola primaria | | Default Value | | Running | euro | 27.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | MONSERRATO | | Via San Gavino | 10 - Information Phase | 06.11.2020 16:24 | 3951 | | | No | No | | | | | euro |
| 373293 | | | Complet interventi di adeg funz e e messa in sicurezza scuola elementare | | Default Value | | Running | euro | 17.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09047 | SELARGIUS | | Via Parigi | 10 - Information Phase | 06.11.2020 16:24 | 3950 | | | No | No | | | | | euro |
| 373292 | | | Ristrutt restauro e consolidamento statico chiesa di San Giorgio | | Default Value | | Running | euro | 17.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | VILLAPUTZU | Technical facilities | Piazza Chiesa 4 | 10 - Information Phase | 06.11.2020 16:24 | 3949 | | | No | No | | | | | euro |
| 373291 | | | Ristrutturazione riqualificaz ed adeguam funzionale cittadella sportiva | | Default Value | | Running | euro | 02.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | SETTIMO SAN PIETRO | | Via I� Maggio | 10 - Information Phase | 06.11.2020 16:24 | 3948 | | | No | No | | | | | euro |
| 373290 | | | "Completamento del campo sportivo ""Tiro a Volo""" | | Default Value | | Running | euro | 07.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09020 | VILLANOVAFRANCA | | Loc Pranu Scalitta | 10 - Information Phase | 06.11.2020 16:24 | 3947 | | | No | No | | | | | euro |
| 373289 | | | Lavori di ultimazione casa di riposo Margherita Di Savoia | | Default Value | | Running | euro | 25.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09016 | IGLESIAS | | Corso c. Colombo 80 | 10 - Information Phase | 06.11.2020 16:24 | 3946 | | | No | No | | | | | euro |
| 373288 | | | Sistemaz pavimentaz/arredi ambiti portuali alla radice molo di sottoflutto | | Default Value | | Running | euro | 17.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09014 | CARLOFORTE | Technical facilities | Porto | 10 - Information Phase | 06.11.2020 16:24 | 3945 | | | No | No | | | | | euro |
| 373287 | | | Lavori di manutenzione del campo sportivo di Frutti D'Oro | | Default Value | | Running | euro | 23.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | | Via Albatros Loc Ftutti D'Oro | 10 - Information Phase | 06.11.2020 16:24 | 3944 | | | No | No | | | | | euro |
| 373286 | | | Lavori di riqualificazione della Piazza Liori ed aree limitrofe | | Default Value | | Running | euro | 28.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | | Piazza Liori | 10 - Information Phase | 06.11.2020 16:24 | 3943 | | | No | No | | | | | euro |
| 373285 | | | Real pista ciclabile ed opere connesse x colleg alla viabilita' esistente | | Default Value | | Running | euro | 25.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | Technical facilities | SP 91 Loc. Forru Coccu / Rio S.Lucia | 10 - Information Phase | 06.11.2020 16:24 | 3942 | | | No | No | | | | | euro |
| 373284 | | | Ristrutturazione ex ospedale per casa della salute: lotto impianti | | Default Value | | Running | euro | 24.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | | Via Demurtas | 10 - Information Phase | 06.11.2020 16:24 | 3941 | | | No | No | | | | | euro |
| 373283 | | | Lavori di manutenzione straordinaria campo da calcio Lixius | | Default Value | | Running | euro | 27.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08045 | LANUSEI | | Localita' Lixius | 10 - Information Phase | 06.11.2020 16:24 | 3940 | | | No | No | | | | | euro |
| 373282 | | | Realizzazione centro visite multimediale a Cala Gonone | | Default Value | | Running | euro | 07.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08022 | DORGALI | | Viale Bue Marino | 10 - Information Phase | 06.11.2020 16:24 | 3939 | | | No | No | | | | | euro |
| 373281 | | | Messa a norma sicurezza e completamento piscina comunale | | Default Value | | Running | euro | 18.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | IRGOLI | | Via A. De Gasperi Loc Arjolas | 10 - Information Phase | 06.11.2020 16:24 | 3938 | | | No | No | | | | | euro |
| 373280 | | | Lavori di riqualificazione e manutenzione straordinaria impianto sportivo | | Default Value | | Running | euro | 30.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Viale Adua | 10 - Information Phase | 06.11.2020 16:24 | 3937 | | | No | No | | | | | euro |
| 373279 | | | Adeg norme di sicurezza e agibilita' convitto annesso Ist Tecnico Agrario | | Default Value | | Running | euro | 24.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Bellini | 10 - Information Phase | 06.11.2020 16:24 | 3936 | | | No | No | | | | | euro |
| 373278 | | | Risanam riqualificaz adeguamento locali x nuovo day hospital oncologico | | Default Value | | Running | euro | 10.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Viale Italia 39 | 10 - Information Phase | 06.11.2020 16:24 | 3935 | | | No | No | | | | | euro |
| 373277 | | | Riqualificazione pista di atletica e completamento polo sportivo | | Default Value | | Running | euro | 02.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07044 | ITTIRI | | Via A. Manca 1 | 10 - Information Phase | 06.11.2020 16:24 | 3934 | | | No | No | | | | | euro |
| 373276 | | | Ottimizzaz e razionalizzaz sistema adduzione sistema Nurra compl lotto 2 | | Default Value | | Running | euro | 07.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07040 | URI | Technical facilities | OLMEDO | 10 - Information Phase | 06.11.2020 16:24 | 3933 | | | No | No | | | | | euro |
| 373275 | | | Ottimizzaz e razionalizzaz sistema adduzione sistema Nurra compl lotto 4 | | Default Value | | Running | euro | 07.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07040 | URI | Technical facilities | olmedo | 10 - Information Phase | 06.11.2020 16:24 | 3932 | | | No | No | | | | | euro |
| 373274 | | | Ottimizzaz e razionalizzaz sistema adduzione sistema Nurrra compl lotto 3 | | Default Value | | Running | euro | 07.10.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07040 | URI | Technical facilities | OLMEDO | 10 - Information Phase | 06.11.2020 16:24 | 3931 | | | No | No | | | | | euro |
| 373273 | | | Lavori di efficientamento energetico centro polivalente | | Default Value | | Running | euro | 27.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07040 | OLMEDO | | Largo Colombo | 10 - Information Phase | 06.11.2020 16:24 | 3930 | | | No | No | | | | | euro |
| 373272 | | | Lavori per l'intervento compendio di Rinaggiu (1� lotto funzionale) | | Default Value | | Running | euro | 23.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07029 | TEMPIO PAUSANIA | Technical facilities | Compendio di Rinaggiu | 10 - Information Phase | 06.11.2020 16:24 | 3929 | | | No | No | | | | | euro |
| 373271 | | | Costruzione supermercato 1700 mq 3 villette bifamiliari e OOUU a scomputo | | Default Value | | Running | euro | 30.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Piazza Pasana / S.S. 127 | 10 - Information Phase | 06.11.2020 16:23 | 3928 | | | No | No | | | | | euro |
| 373270 | | | Lavori di ripristino SP 38 bis dal km. 1,250 al km. 4,600 riappalto lavori | | Default Value | | Running | euro | 11.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Localita' Monte Pino | 10 - Information Phase | 06.11.2020 16:23 | 3927 | | | No | No | | | | | euro |
| 373269 | | | Lavori di rifacimento del ponte sul rio San Nicola | | Default Value | | Running | euro | 04.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Via S. Petta | 10 - Information Phase | 06.11.2020 16:23 | 3926 | | | No | No | | | | | euro |
| 373268 | | | lavori di ampliamento cimitero comunale (lotto 1) | | Default Value | | Running | euro | 02.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | GOLFO ARANCI | Technical facilities | Capoluogo | 10 - Information Phase | 06.11.2020 16:23 | 3925 | | | No | No | | | | | euro |
| 373267 | | | Lavori di ristrutturazione sede municipale | | Default Value | | Running | euro | 20.08.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | BUDDUSO' | | Piazza Fumu 1 | 10 - Information Phase | 06.11.2020 16:23 | 3924 | | | No | No | | | | | euro |
| 373266 | | | Adeguamento alle norme di sicurezza della casa comunale | | Default Value | | Running | euro | 25.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07014 | OZIERI | | Via Veneto | 10 - Information Phase | 06.11.2020 16:23 | 3923 | | | No | No | | | | | euro |
| 373265 | | | Recupero manutenz straordinaria ed adeg normativo 6 alloggi palazzina B | | Default Value | | Running | euro | 24.09.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07014 | OZIERI | Residential houses | Via Dei Ferrovieri | 10 - Information Phase | 06.11.2020 16:23 | 3922 | | | No | No | | | | | euro |
| 373258 | | | CARPENTEDIL / Costruzione edificio ad uso abitazione e boxes 12 appartamenti 25/3 TETTO >>>>PRESENTAZIONE | | Default Value | | Running | euro | 07.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47838 | RICCIONE | Residential houses | Viale Ceccarini 140 | 10 - Information Phase | 06.11.2020 15:00 | 3921 | | | No | No | | | | | euro |
| 373256 | | | ??? / Costruzione punto vendita Globo 2500 mq | | Default Value | | Running | euro | 27.08.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Technical facilities | Viale Virgilio 9 | 10 - Information Phase | 06.11.2020 15:00 | 3919 | | | No | No | | | | | euro |
| 373255 | | | CMB DIEGO / Costruz 2 edifici edilizia residenz convenzionata comparto Vaciglio B2-A | | Default Value | | Running | euro | 19.08.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Residential houses | Strada Morane | 10 - Information Phase | 06.11.2020 15:00 | 3918 | | | No | No | | | | | euro |
| 373254 | | | FBI COSTR / Costruzione due edifici ad uso abitazione 20 unita' Classe A 26/3 TETTO >> PRESENTAZIONE | | Default Value | | Running | euro | 27.08.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Residential houses | Via Elio Bernardi 14 | 10 - Information Phase | 06.11.2020 15:00 | 3917 | | | No | No | | | | | euro |
| 373252 | | | PINI / Costruzione complesso residenziale ville e appartamenti 20 unita' tot | | Default Value | | Running | euro | 08.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Residential houses | Via Campania 28 Loc.Canali | 10 - Information Phase | 06.11.2020 15:00 | 3915 | | | No | No | | | | | euro |
| 373250 | | | EMILIANA SCAVI / Costruzione 5 palazzine per 25 unita' abitative totali | | Default Value | | Running | euro | 08.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Residential houses | Strada Formigina 505 | 10 - Information Phase | 06.11.2020 15:00 | 3913 | | | No | No | | | | | euro |
| 373249 | | | ITI / Realizzazione Parco dello Sport primo stralcio=piscina 4 vasche | | Default Value | | Running | euro | 20.08.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41053 | MARANELLO | | Via V.Wolf | 10 - Information Phase | 06.11.2020 15:00 | 3912 | | | No | No | | | | | euro |
| 373248 | | | CATERINO / Costruzione edificio multipiano ad uso abitazione 34 app e box lotto 1 26/3 1 TETTO + 1 NUOVO ??? PRESENTAZIONE | | Default Value | | Running | euro | 07.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Residential houses | Via G. Rivani 47 | 10 - Information Phase | 06.11.2020 15:00 | 3911 | | | No | No | | | | | euro |
| 373247 | | | BELLETTI & BARONI M / Costruzione tre palazzine ad uso abitazione 48 appartam tot e parco / 25/3 TUTTO FERMO SOLO CARTELLO | | Default Value | | Running | euro | 07.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Residential houses | Vie Marecchiese / Rossa | 10 - Information Phase | 06.11.2020 15:00 | 3910 | | | No | No | | | | | euro |
| 373246 | | | CONSORZIO CSM / Consolidam riqualificaz ponte stradale sul fiume Reno II e ultimo lotto | | Default Value | | Running | euro | 15.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Technical facilities | Via Emilia Ponente | 10 - Information Phase | 06.11.2020 15:00 | 3909 | | | No | No | | | | | euro |
| 373245 | | | COLOMBO / Costruzione nuovo edificio direzionale (CERIANI) | | Default Value | | Running | euro | 08.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Technical facilities | Via della Beverara 23 | 10 - Information Phase | 06.11.2020 15:00 | 3908 | | | No | No | | | | | euro |
| 373244 | | | ZUCCHINI / Costruzione 1 edif a torre+1 edif in linea per 60 unita' abitative tot 26/3 DEMOLITO | | Default Value | | Running | euro | 08.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Residential houses | Vie Corticella 91 / di Saliceto | 10 - Information Phase | 06.11.2020 15:00 | 3907 | | | No | No | | | | | euro |
| 373243 | | | ING FERRARI / campus universitario di formazione manageriale 06/10/21 INIZIATO SENTIRE VIGGIANO | | Default Value | | Running | euro | 24.09.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Via Degli Scalini 18 | 10 - Information Phase | 06.11.2020 15:00 | 3906 | | | No | No | | | | | euro |
| 373242 | | | ??? Costruzione complesso ad uso abitazione e boxes 16/12 DEMOLITO NIENTE CANTIERE | | Default Value | | Running | euro | 08.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40068 | SAN LAZZARO DI SAVENA | Residential houses | Vie Fonde' / dell'Industria | 10 - Information Phase | 06.11.2020 15:00 | 3905 | | | No | No | | | | | euro |
| 373230 | | | ITEC / Costruz ipermercato alimentare 3500 mq 450 posti auto riappalto lavori | | Default Value | | Running | euro | 09.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Technical facilities | Viale Rosa Luxemburg / Croce | 10 - Information Phase | 06.11.2020 14:06 | 3903 | | | No | No | | | | | euro |
| 373229 | | | SANTONI GROUP (QUERZOLI) / Costruzione polo logistico Aspiag-Despar 57.000 mq 26/3 1° LOTTO FATTO 2° INIZIO CANTIERE | | Default Value | | Running | euro | 07.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40024 | CASTEL SAN PIETRO TERME | Technical facilities | Via H.Ford | 10 - Information Phase | 06.11.2020 14:06 | 3902 | | | No | No | | | | | euro |
| 373228 | | | BARALDINI SPA e COSPE M / Lavori di interramento linea ferroviaria 1� stralcio 2� lotto 18/3 PREP CANTIERE | | Default Value | | Running | euro | 07.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 44100 | FERRARA | Technical facilities | Vie Bologna / Boldrini | 10 - Information Phase | 06.11.2020 14:06 | 3901 | | | No | No | | | | | euro |
| 373227 | | | MANELLI / Recupero e riqualificaz edif per ricerca e innovazione Tenopolo lotto A | | Default Value | | Running | euro | 12.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Technical facilities | Via Stalingrado ex Manifattuta T. | 10 - Information Phase | 06.11.2020 14:06 | 3900 | | | No | No | | | | | euro |
| 373226 | | | SECIS SRL / Realizz nuovo sottopasso ed opere provvisorie progetto RE.MO.VE. | | Default Value | | Running | euro | 04.09.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Stazione Porto Marghera | 10 - Information Phase | 06.11.2020 13:54 | 3899 | | | No | No | | | | | euro |
| 373225 | | | RICCESI ENNIO / Costruzione parcheggio interrato e a raso | | Default Value | | Running | euro | 14.10.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | Technical facilities | Viale Dell' Agricoltura | 10 - Information Phase | 06.11.2020 13:54 | 3898 | | | No | No | | | | | euro |
| 373224 | | | ANDREOLA / Completamento e ampliamento impianto di depurazione secondo lotto | | Default Value | | Running | euro | 26.08.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Technical facilities | Localita' Ca'Nordio | 10 - Information Phase | 06.11.2020 13:54 | 3897 | | | No | No | | | | | euro |
| 373223 | | | SETTEN / Ampliam valorizz piscina coperta riqualif e gestione project financing | | Default Value | | Running | euro | 02.10.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35042 | ESTE | Technical facilities | Via Dello Stadio | 10 - Information Phase | 06.11.2020 13:54 | 3896 | | | No | No | | | | | euro |
| 373222 | | | GRANDI OPERE / Costruzione ipermercato 12000 mq e 2 MSV / ALI | | Default Value | | Running | euro | 14.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35031 | ABANO TERME | Technical facilities | Via Romana | 10 - Information Phase | 06.11.2020 13:54 | 3895 | | | No | No | | | | | euro |
| 373115-001 | | | CMSA / MUSEO DELL'INDUSTRIA E DEL LAVORO EUGENIO BATTISTI / BRESCIA / HBS | | Default Value | | Running | euro | 05.11.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 25100 | BRESCIA | | VIA QUINTO STEFANA | 30 - Tender & Submission Phase | 05.11.2020 13:54 | | | | No | No | | | | | euro |
| 373115 | | | CMSA / MUSEO DELL'INDUSTRIA E DEL LAVORO EUGENIO BATTISTI / BRESCIA | | Default Value | | Running | euro | 05.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | VIA QUINTO STEFANA | 10 - Information Phase | 05.11.2020 13:54 | | | | No | No | | | | | euro |
| 372740 | | | Costruzione albergo 286 camere 600 posti letto | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Mestre Via Ca' Macello 14 | 10 - Information Phase | 02.11.2020 10:47 | 3894 | | | No | No | | | | | euro |
| 372739 | | | CONTRACOS / PERCASSI / Costruzione polo logistico 120000 mq | | Default Value | | Running | euro | 14.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 37050 | OPPEANO | Industry building | Via Serenissima | 10 - Information Phase | 02.11.2020 10:47 | 3893 | | | No | No | | | | | euro |
| 372738 | | | Realizzazione linea ferroviaria alta velocita' primo lotto funzionale | | Default Value | | Running | euro | 19.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | Technical facilities | VICENZA | 10 - Information Phase | 02.11.2020 10:47 | 3892 | | | No | No | | | | | euro |
| 372737 | | | Costruzione nuova scuola dell'infanzia | | Default Value | | Running | euro | 23.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 33035 | MARTIGNACCO | Residential houses | Via del Mulino 37 Loc.Nogaredo di Prato | 10 - Information Phase | 02.11.2020 10:47 | 3891 | | | No | No | | | | | euro |
| 372736 | | | Costruzione 4 edifici ad uso abitazione per 16 alloggi ERP | | Default Value | | Running | euro | 15.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 33051 | AQUILEIA | Residential houses | Via Gramsci | 10 - Information Phase | 02.11.2020 10:47 | 3890 | | | No | No | | | | | euro |
| 372735 | | | Riqualificazione complesso direzionale 40000 mq | | Default Value | | Running | euro | 02.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Pirelli 35 | 10 - Information Phase | 02.11.2020 10:47 | 3889 | | | No | No | | | | | euro |
| 372734 | | | Restauro conservativo comples ad uso hotel *****120 camere SPA ristorante | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Porta Romana 10 | 10 - Information Phase | 02.11.2020 10:47 | 3888 | | | No | No | | | | | euro |
| 372733 | | | Costruzione edificio multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 19.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 0 | MILANO | Residential houses | Via Filippino Lippi 33 | 10 - Information Phase | 02.11.2020 10:47 | 3887 | | | No | No | | | | | euro |
| 372732 | | | Costr complesso multipiano 12 pft ad uso abitazione e box 75 appartamenti | | Default Value | | Running | euro | 25.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Lodovico Pogliaghi 5 | 10 - Information Phase | 02.11.2020 10:47 | 3886 | | | No | No | | | | | euro |
| 372731 | | | Lavori di realizzazione comando polizia locale parcheggio parco | | Default Value | | Running | euro | 11.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Vie Colleoni / Gattamelata | 10 - Information Phase | 02.11.2020 10:47 | 3885 | | | No | No | | | | | euro |
| 372730 | | | ENG 2K / Costruzione polo logistico | | Default Value | | Running | euro | 11.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27010 | TORREVECCHIA PIA | Industry building | S.S. 412 KM. 14,270 | 10 - Information Phase | 02.11.2020 10:47 | 3884 | | | No | No | | | | | euro |
| 372729 | | | Riqualificazione ex scuderie De Montel per complesso termale | | Default Value | | Running | euro | 14.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Achille | 10 - Information Phase | 02.11.2020 10:47 | 3883 | | | No | No | | | | | euro |
| 372728 | | | Riqualificazione edificio ad uso commerciale direzionale 12000 mq | | Default Value | | Running | euro | 19.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via della Spiga 26 | 10 - Information Phase | 02.11.2020 10:47 | 3882 | | | No | No | | | | | euro |
| 372727 | | | Costruzione complesso multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 19.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Adamello 10 | 10 - Information Phase | 02.11.2020 10:47 | 3881 | | | No | No | | | | | euro |
| 372726 | | | Costruzione complesso ad uso abitazione 60 unita' abitative | | Default Value | | Running | euro | 09.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Vie Ponte Pietra / G. Cesare | 10 - Information Phase | 02.11.2020 10:47 | 3880 | | | No | No | | | | | euro |
| 372725 | | | Costruz torre residenziale 14 pft 56 appartamenti edilizia convenzionata | | Default Value | | Running | euro | 15.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | Residential houses | Via Falcone e Borsellino | 10 - Information Phase | 02.11.2020 10:46 | 3879 | | | No | No | | | | | euro |
| 372724 | | | Costruzione polo geriatrico riabilitativo 200 posti letto | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26815 | MASSALENGO | | Via Padre Marco | 10 - Information Phase | 02.11.2020 10:46 | 3878 | | | No | No | | | | | euro |
| 372723 | | | Costruzione 2 edifici ad uso abitazione 43 appartamenti totali | | Default Value | | Running | euro | 11.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via F. OlgiatI | 10 - Information Phase | 02.11.2020 10:46 | 3877 | | | No | No | | | | | euro |
| 372722 | | | Costruzione scuola secondaria di primo grado | | Default Value | | Running | euro | 01.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Adriano 60 | 10 - Information Phase | 02.11.2020 10:46 | 3876 | | | No | No | | | | | euro |
| 372721 | | | Costruzione 2 edifici multip ad uso abitazione 27+11 appartamenti e boxes | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Fontana 20 | 10 - Information Phase | 02.11.2020 10:46 | 3875 | | | No | No | | | | | euro |
| 372720 | | | Restauro e risanamento conservativo edif uso abitaz e spazi commerciali | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Bigli 1/3 | 10 - Information Phase | 02.11.2020 10:46 | 3874 | | | No | No | | | | | euro |
| 372719 | | | Costruzione RSA 120 posti anziani non autosufficienti + CDI 20 posti | | Default Value | | Running | euro | 27.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via Romiglia | 10 - Information Phase | 02.11.2020 10:46 | 3873 | | | No | No | | | | | euro |
| 372718 | | | Costruzione 2 edifici multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Lepontina 4 / Valtellina 38 | 10 - Information Phase | 02.11.2020 10:46 | 3872 | | | No | No | | | | | euro |
| 372717 | | | Demoricostruzione complesso ad uso abitazione e boxes | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via L. di Breme 26 | 10 - Information Phase | 02.11.2020 10:46 | 3871 | | | No | No | | | | | euro |
| 372716 | | | Costruzione complesso residenziale 40 unita' abitative Classe A4 | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Residential houses | Via T.Tasso 4 | 10 - Information Phase | 02.11.2020 10:46 | 3870 | | | No | No | | | | | euro |
| 372715 | | | Costruzione nuova scuola primaria | | Default Value | | Running | euro | 07.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26016 | SPINO D'ADDA | | Via Ragazzi del 99 | 10 - Information Phase | 02.11.2020 10:46 | 3869 | | | No | No | | | | | euro |
| 372714 | | | Costruzione polo ambulatoriale | | Default Value | | Running | euro | 07.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21053 | CASTELLANZA | | Via G.Bettinelli | 10 - Information Phase | 02.11.2020 10:46 | 3868 | | | No | No | | | | | euro |
| 372713 | | | Costruzione 20 ville a schiera | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46043 | CASTIGLIONE DELLE STIVIERE | Residential houses | Via Lonato | 10 - Information Phase | 02.11.2020 10:46 | 3867 | | | No | No | | | | | euro |
| 372712 | | | Costruzione 25 ville 9292 mq SLP | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24057 | MARTINENGO | Residential houses | Via Milano | 10 - Information Phase | 02.11.2020 10:46 | 3866 | | | No | No | | | | | euro |
| 372711 | | | Rimozione interferenze e demolizione manufatti area insediam Campus UNIMI | | Default Value | | Running | euro | 27.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via C.Belgioioso 171 | 10 - Information Phase | 02.11.2020 10:46 | 3865 | | | No | No | | | | | euro |
| 372710 | | | Costruzione complesso commerciale direzionale residenziale | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | Residential houses | Via C. Carcano 4 | 10 - Information Phase | 02.11.2020 10:46 | 3864 | | | No | No | | | | | euro |
| 372709 | | | Costruzione Residenza Sanitaria Assistenziale | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20085 | LOCATE DI TRIULZI | | Strada Comunale Cascina dell'Olmo | 10 - Information Phase | 02.11.2020 10:46 | 3863 | | | No | No | | | | | euro |
| 372708 | | | Costruzione centro commerciale supermercato alimentare e negozi | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20064 | GORGONZOLA | Technical facilities | Vie Trieste / Piacenza | 10 - Information Phase | 02.11.2020 10:46 | 3862 | | | No | No | | | | | euro |
| 372707 | | | Costruzione tre edifici multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 19.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Residential houses | Via della Concordia 3 | 10 - Information Phase | 02.11.2020 10:46 | 3861 | | | No | No | | | | | euro |
| 372706 | | | Costruzione 2 edifici 6 piani fuori terra per 19 appartam tot Classe A4 | | Default Value | | Running | euro | 14.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via delle Grazzine 29 | 10 - Information Phase | 02.11.2020 10:46 | 3860 | | | No | No | | | | | euro |
| 372705 | | | Costruzione villete e appartamenti | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via San Colombano 13 | 10 - Information Phase | 02.11.2020 10:46 | 3859 | | | No | No | | | | | euro |
| 372704 | | | Costruzione complesso residenz ville bifamiliari e appartam 18 unita' tot | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24020 | TORRE BOLDONE | Residential houses | Via Martinella | 10 - Information Phase | 02.11.2020 10:46 | 3858 | | | No | No | | | | | euro |
| 372703 | | | Costruzione edificio multipiano ad uso abitazione e box | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G. B. Vico 14 | 10 - Information Phase | 02.11.2020 10:46 | 3857 | | | No | No | | | | | euro |
| 372702 | | | Costruzione supermercato | | Default Value | | Running | euro | 20.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | PIEVE EMANUELE | Technical facilities | S.P.n.28 / Via E.Berlinguer | 10 - Information Phase | 02.11.2020 10:46 | 3856 | | | No | No | | | | | euro |
| 372701 | | | Costruzione edificio ad uso abitazione e boxes Alasse A3 | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via G.C.Abba | 10 - Information Phase | 02.11.2020 10:46 | 3855 | | | No | No | | | | | euro |
| 372700 | | | Ristrutt e riqualif edificio 5 piani fuori terra ad uso uffici 2400 mq | | Default Value | | Running | euro | 11.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Del Lauro 1 | 10 - Information Phase | 02.11.2020 10:46 | 3854 | | | No | No | | | | | euro |
| 372699 | | | Riconversione ex cinema Maestoso in wellness center e SPA | | Default Value | | Running | euro | 26.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Lodi 39 | 10 - Information Phase | 02.11.2020 10:46 | 3853 | | | No | No | | | | | euro |
| 372698 | | | Costruzione edificio ad uso abitazione 8 unita' abitative e box | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Viale V. Emanuele 31 | 10 - Information Phase | 02.11.2020 10:46 | 3852 | | | No | No | | | | | euro |
| 372697 | | | Costruzione supermercato | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Via P.Paoli 47 | 10 - Information Phase | 02.11.2020 10:46 | 3851 | | | No | No | | | | | euro |
| 372696 | | | Costruzione supermercato Famila 1500 mq | | Default Value | | Running | euro | 09.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Vie Montello / Palestro 22 | 10 - Information Phase | 02.11.2020 10:46 | 3850 | | | No | No | | | | | euro |
| 372695 | | | Costruzione supermercato | | Default Value | | Running | euro | 07.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20823 | LENTATE SUL SEVESO | Technical facilities | Via Nazionale dei Giovi | 10 - Information Phase | 02.11.2020 10:46 | 3849 | | | No | No | | | | | euro |
| 372694 | | | Costruzione palazzina ad uso abitazione 12 appartamenti e boxes | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20835 | MUGGIO' | Residential houses | Via C.Menotti | 10 - Information Phase | 02.11.2020 10:46 | 3848 | | | No | No | | | | | euro |
| 372693 | | | Costruzione supermercato | | Default Value | | Running | euro | 08.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27028 | SAN MARTINO SICCOMARIO | Technical facilities | S.P. n.35 dei Giovi | 10 - Information Phase | 02.11.2020 10:46 | 3847 | | | No | No | | | | | euro |
| 372692 | | | Costruzione supermercato Lidl 2000 mq | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25049 | ISEO | Technical facilities | Viale Europa 35 | 10 - Information Phase | 02.11.2020 10:46 | 3846 | | | No | No | | | | | euro |
| 372691 | | | Costruzione edificio multipiano ad uso abitazione | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Residential houses | Vie Monte Grappa / Baslini | 10 - Information Phase | 02.11.2020 10:46 | 3845 | | | No | No | | | | | euro |
| 372690 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Alberto Riva Villasanta 11 | 10 - Information Phase | 02.11.2020 10:46 | 3844 | | | No | No | | | | | euro |
| 372689 | | | Ampliamento complesso scolastico appalto integrato | | Default Value | | Running | euro | 19.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | | Via Adda | 10 - Information Phase | 02.11.2020 10:46 | 3843 | | | No | No | | | | | euro |
| 372688 | | | Costruzione supermercato | | Default Value | | Running | euro | 24.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20843 | VERANO BRIANZA | Technical facilities | Vie Sauro/Monza | 10 - Information Phase | 02.11.2020 10:46 | 3842 | | | No | No | | | | | euro |
| 372687 | | | Costruzione palazzina ad uso abitaz e boxes 12 unita' abitative | | Default Value | | Running | euro | 30.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20863 | CONCOREZZO | Residential houses | Via Piave 9 | 10 - Information Phase | 02.11.2020 10:45 | 3841 | | | No | No | | | | | euro |
| 372686 | | | Ristruttur edificio 5 piani fuori terra ad uso abitazione 20 appartamenti | | Default Value | | Running | euro | 02.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Marghera 2 | 10 - Information Phase | 02.11.2020 10:45 | 3840 | | | No | No | | | | | euro |
| 372685 | | | Costruzione nuova scuola primaria Anna Frank | | Default Value | | Running | euro | 20.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22029 | UGGIATE TREVANO | | Via Roma | 10 - Information Phase | 02.11.2020 10:45 | 3839 | | | No | No | | | | | euro |
| 372684 | | | Ristrutturaz edificio 5 piani f.t. uso direzionale commerciale 1500mq tot | | Default Value | | Running | euro | 28.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazzetta Pattari 5/7 | 10 - Information Phase | 02.11.2020 10:45 | 3838 | | | No | No | | | | | euro |
| 372683 | | | Realizzazione vasca V1 antiallagamento Quartiere di Longuelo | | Default Value | | Running | euro | 19.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Valle d'Astino | 10 - Information Phase | 02.11.2020 10:45 | 3837 | | | No | No | | | | | euro |
| 372682 | | | Costruzione fabbricato commerciale media struttura vendita 1500 mq | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Vie Nicolini 5/Milano 84 | 10 - Information Phase | 02.11.2020 10:45 | 3836 | | | No | No | | | | | euro |
| 372681 | | | Costruzione edificio industriale | | Default Value | | Running | euro | 30.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20064 | GORGONZOLA | Industry building | Via Carlo Cattaneo | 10 - Information Phase | 02.11.2020 10:45 | 3835 | | | No | No | | | | | euro |
| 372680 | | | Costruzione nuovo punto vendita | | Default Value | | Running | euro | 07.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46030 | SAN GIORGIO DI MANTOVA | Technical facilities | Via XXV Aprile | 10 - Information Phase | 02.11.2020 10:45 | 3834 | | | No | No | | | | | euro |
| 372679 | | | Costruzione supermercato | | Default Value | | Running | euro | 17.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22063 | CANTU' | Technical facilities | Vie Milano / San Giuseppe | 10 - Information Phase | 02.11.2020 10:45 | 3833 | | | No | No | | | | | euro |
| 372678 | | | Costruzione edificio ad uso abitazione e ristorante | | Default Value | | Running | euro | 01.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Viale Pasubio 2 | 10 - Information Phase | 02.11.2020 10:45 | 3832 | | | No | No | | | | | euro |
| 372677 | | | Costruzione palazzina ad uso abitazione e boxes 6 unita' abitative | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20064 | GORGONZOLA | Residential houses | Via G.Giusti | 10 - Information Phase | 02.11.2020 10:45 | 3831 | | | No | No | | | | | euro |
| 372676 | | | Costruzione 5 ville singole | | Default Value | | Running | euro | 14.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Pialorsi | 10 - Information Phase | 02.11.2020 10:45 | 3830 | | | No | No | | | | | euro |
| 372675 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 14.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25015 | DESENZANO DEL GARDA | Residential houses | Via P.Calcinardi | 10 - Information Phase | 02.11.2020 10:45 | 3829 | | | No | No | | | | | euro |
| 372674 | | | Costruzione edificio multipiano 6 piani f.t.7 unita' abitative totali | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Via G.Sirtori 9 | 10 - Information Phase | 02.11.2020 10:45 | 3828 | | | No | No | | | | | euro |
| 372673 | | | Costruzione edificio commerciale e opere di urbanizzazione | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22063 | CANTU' | Technical facilities | Vie Como / Bersagliere | 10 - Information Phase | 02.11.2020 10:45 | 3827 | | | No | No | | | | | euro |
| 372672 | | | Costruzione edificio commerciale e opere di urbanizzazione | | Default Value | | Running | euro | 09.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Technical facilities | Vie Milano / Europa | 10 - Information Phase | 02.11.2020 10:45 | 3826 | | | No | No | | | | | euro |
| 372671 | | | Ponte ciclopedonale sul torrente Mallero collegam Parco Bartesaghi Adda | | Default Value | | Running | euro | 03.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23100 | SONDRIO | Technical facilities | Torrente Mallero | 10 - Information Phase | 02.11.2020 10:45 | 3825 | | | No | No | | | | | euro |
| 372670 | | | Costruzione edificio quadrifamiliare lotto 8 complesso CIS10 | | Default Value | | Running | euro | 27.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25036 | PALAZZOLO SULL'OGLIO | Residential houses | Via S.Pertini | 10 - Information Phase | 02.11.2020 10:45 | 3824 | | | No | No | | | | | euro |
| 372669 | | | Costruzione palazzina residenziale | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via A. Bolis 8 | 10 - Information Phase | 02.11.2020 10:45 | 3823 | | | No | No | | | | | euro |
| 372668 | | | Costruzione (demoricostruzione) edificio ad uso abitazione | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Bianzana 61 | 10 - Information Phase | 02.11.2020 10:45 | 3822 | | | No | No | | | | | euro |
| 372667 | | | Costruzione edificio ad uso abitazione 3 unita' abitative e box | | Default Value | | Running | euro | 10.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24068 | SERIATE | Residential houses | Via Curtatone | 10 - Information Phase | 02.11.2020 10:45 | 3821 | | | No | No | | | | | euro |
| 372575-001 | | | CANGELOSI / RELIZZAZIONE NUOVA COPERTURA IN LEGNO CON TRE ARCHI / MESSINA / DETAN | | Default Value | | Running | euro | 30.10.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 98100 | MESSINA | | * | 30 - Tender & Submission Phase | 30.10.2020 11:16 | | | | No | No | | | | 5.000,00 € | euro |
| 372575 | | | CANGELOSI / RELIZZAZIONE NUOVA COPERTURA IN LEGNO CON TRE ARCHI / MESSINA | | Default Value | | Running | euro | 30.10.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 98100 | MESSINA | | * | 10 - Information Phase | 30.10.2020 11:16 | | | | No | No | | | | 5.000,00 € | euro |
| 372509-001 | | | GARA / COSTRUZIONE NUOVO HOTEL / BRESSANONE / HDB / HSD / HTT / HTPL | | Default Value | | Running | euro | 29.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39042 | Bressanone | | * | 30 - Tender & Submission Phase | 29.10.2020 14:30 | | | | No | No | | | | | euro |
| 372509 | | | GARA / COSTRUZIONE NUOVO HOTE / BRESSANONE | | Default Value | | Running | euro | 29.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39042 | Bressanone | | * | 10 - Information Phase | 29.10.2020 14:30 | | | | No | No | | | | | euro |
| 372321-002 | | | HDB / NUOVA SCUOLA / EUROMILANO SPA / CASCINA MERLATA | | Default Value | | Running | euro | 28.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Educational facility | Via Emanuele Jona | 30 - Tender & Submission Phase | 28.10.2020 18:27 | | | | No | No | | | | | euro |
| 372321-001 | | | HIT / NUOVA SCUOLA / EUROMILANO SPA / CASCINA MERLATA | | Default Value | | Running | euro | 28.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Educational facility | Via Emanuele Jona | 30 - Tender & Submission Phase | 28.10.2020 06:47 | | | | No | No | | | | | euro |
| 372321 | | | NUOVA SCUOLA / EUROMILANO SPA / CASCINA MERLATA | | Default Value | | Running | euro | 28.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | Milano | Educational facility | Via Emanuele Jona | 20 - Planning Phase | 28.10.2020 06:45 | | | | No | No | | | | | euro |
| 372302 | | | Costr edificio artigianale composto da 3 unita' immobiliari lotto R PDL 31 | | Default Value | | Running | euro | 30.09.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | Industry building | Via Dei Mugnai Loc Tobbiana | 10 - Information Phase | 27.10.2020 14:41 | 3820 | | | No | No | | | | | euro |
| 372301 | | | Costruzione Residenza Sanitaria Assistenziale 240 posti letto | | Default Value | | Running | euro | 20.08.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57023 | CECINA | | Vie Pasubio/Parmigiani ex Massalombarda | 10 - Information Phase | 27.10.2020 14:41 | 3819 | | | No | No | | | | | euro |
| 372300 | | | Costruzione distretto socio sanitario | | Default Value | | Running | euro | 28.08.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56038 | PONSACCO | | Via Rospicciano | 10 - Information Phase | 27.10.2020 14:41 | 3818 | | | No | No | | | | | euro |
| 372299 | | | Costruzione sede scuola dell'infanzia e primaria (1� e 2� sralcio) | | Default Value | | Running | euro | 23.09.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56030 | CALCINAIA | | Via S. Ubaldesca | 10 - Information Phase | 27.10.2020 14:41 | 3817 | | | No | No | | | | | euro |
| 372298 | | | Progettazione esecutiva e realizzazione parcheggio multipiano ex Ape | | Default Value | | Running | euro | 01.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56025 | PONTEDERA | Technical facilities | Via R. Piaggio | 10 - Information Phase | 27.10.2020 14:41 | 3816 | | | No | No | | | | | euro |
| 372297 | | | Costruzione punto vendita societa' Globo | | Default Value | | Running | euro | 20.08.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55100 | LUCCA | Technical facilities | Viale G.Puccini Localita' Sant'Anna | 10 - Information Phase | 27.10.2020 14:41 | 3815 | | | No | No | | | | | euro |
| 372296 | | | Costruzione palestra 1� lotto 2� stralcio opere edili | | Default Value | | Running | euro | 01.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55032 | CASTELNUOVO DI GARFAGNANA | | Via Fabrizi | 10 - Information Phase | 27.10.2020 14:41 | 3814 | | | No | No | | | | | euro |
| 372295 | | | Costruzione ristorante | | Default Value | | Running | euro | 09.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52028 | TERRANUOVA BRACCIOLINI | Technical facilities | Via Poggilupi | 10 - Information Phase | 27.10.2020 14:41 | 3813 | | | No | No | | | | | euro |
| 372294 | | | Costruz stabilimento industr sistemi ricarica veicoli elettrici 15000 mq | | Default Value | | Running | euro | 17.08.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52027 | SAN GIOVANNI VALDARNO | Industry building | Z.I. Sant'Andrea | 10 - Information Phase | 27.10.2020 14:41 | 3812 | | | No | No | | | | | euro |
| 372293 | | | Costruzione scuola primaria Francesco Mochi a Levanella | | Default Value | | Running | euro | 11.09.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52025 | MONTEVARCHI | | Via I� Maggio / Ex SR 69 | 10 - Information Phase | 27.10.2020 14:41 | 3811 | | | No | No | | | | | euro |
| 372292 | | | Costruzione nuova scuola materna | | Default Value | | Running | euro | 08.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52011 | BIBBIENA | | Frazione Soci | 10 - Information Phase | 27.10.2020 14:40 | 3810 | | | No | No | | | | | euro |
| 372291 | | | Realizz blocco ambulatoriale per visite oncologiche p.t. San Luca Vecchio | | Default Value | | Running | euro | 28.08.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Largo Brambilla 3 | 10 - Information Phase | 27.10.2020 14:40 | 3809 | | | No | No | | | | | euro |
| 372290 | | | Costruzione stabilimento industriale | | Default Value | | Running | euro | 02.09.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50028 | TAVARNELLE VAL DI PESA | Industry building | Loc Sambuca | 10 - Information Phase | 27.10.2020 14:40 | 3808 | | | No | No | | | | | euro |
| 372289 | | | Costruzione supermarcato Lidl | | Default Value | | Running | euro | 15.10.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06049 | SPOLETO | Technical facilities | Viale Martiri Della Resistenza 61 | 10 - Information Phase | 27.10.2020 14:40 | 3807 | | | No | No | | | | | euro |
| 372288 | | | Ristrutturazione e nuova costruzione edificio ad uso residenziale | | Default Value | | Running | euro | 01.09.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | Residential houses | Viale F.Turati 56 | 10 - Information Phase | 27.10.2020 14:40 | 3806 | | | No | No | | | | | euro |
| 372287 | | | Costruzione 6 ville unifamiliari Classe Energetica A4 | | Default Value | | Running | euro | 01.09.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | Residential houses | Vie Piedimonte / Palmucci | 10 - Information Phase | 27.10.2020 14:40 | 3805 | | | No | No | | | | | euro |
| 372171 | | | Real centro raccolta RSU ed assimilati imp trasporto pneumatico rifiuti | | Default Value | | Running | euro | 15.10.2020 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 74100 | TARANTO | Technical facilities | Via Golfo | 10 - Information Phase | 26.10.2020 16:29 | 3804 | | | No | No | | | | | euro |
| 372170 | | | Costruzione 2 residenze sanitarie assistenziali appalto in concessione | | Default Value | | Running | euro | 20.08.2020 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 70100 | BARI | | Via Randaccio Via Vaccarella | 10 - Information Phase | 26.10.2020 16:29 | 3803 | | | No | No | | | | | euro |
| 372167 | | | Costruzione nuovo punto vendita 3000 mq | | Default Value | | Running | euro | 19.08.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 60100 | ANCONA | Technical facilities | Vie Zingaretti / Albertini | 10 - Information Phase | 26.10.2020 16:20 | 3802 | | | No | No | | | | | euro |
| 372166 | | | Costruzione nuova sede scuola media Lorenzini | | Default Value | | Running | euro | 30.09.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 60035 | JESI | | Via Schweitzer | 10 - Information Phase | 26.10.2020 16:20 | 3801 | | | No | No | | | | | euro |
| 372165 | | | Costruzione nuova scuola media | | Default Value | | Running | euro | 03.09.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 60013 | CORINALDO | | Viale della Murata | 10 - Information Phase | 26.10.2020 16:20 | 3800 | | | No | No | | | | | euro |
| 372164 | | | Costruzione polo scolastico primo lotto | | Default Value | | Running | euro | 23.09.2020 | | IABR-ABRUZZO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 66050 | MONTEODORISIO | | Localita' Sant'Anna | 10 - Information Phase | 26.10.2020 16:15 | 3799 | | | No | No | | | | | euro |
| 372163 | | | Lavori di ricostruzione ospedale 12544 mq | | Default Value | | Running | euro | 01.10.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 02012 | AMATRICE | | S.R. 260 | 10 - Information Phase | 26.10.2020 16:06 | 3798 | | | No | No | | | | | euro |
| 372162 | | | "Costruzione scuola elementare programma urbanistico ""Cecchignola Ovest""" | | Default Value | | Running | euro | 14.10.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | | Via Della Cecchignola | 10 - Information Phase | 26.10.2020 16:06 | 3797 | | | No | No | | | | | euro |
| 372161 | | | Costr centro commerciale 19500 mq tot supermercato Conad e viabilita' pubbl | | Default Value | | Running | euro | 11.09.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00040 | POMEZIA | Technical facilities | Via Pontina Vecchia 40 | 10 - Information Phase | 26.10.2020 16:06 | 3796 | | | No | No | | | | | euro |
| 371808-001 | | | HIT / PASSERELLA CICLOPEDONALE / SONDRIO / MAZZOLENI | | Default Value | | Running | euro | 21.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23100 | Sondrio | | via Lungomallero | 30 - Tender & Submission Phase | 21.10.2020 09:39 | | | | No | No | | | | | euro |
| 371808 | | | PASSERELLA CICLOPEDONALE / SONDRIO / MAZZOLENI | | Default Value | | Running | euro | 21.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23100 | Sondrio | | via Lungomallero | 30 - Tender & Submission Phase | 21.10.2020 09:36 | | | | No | No | | | | | euro |
| 371681 | | | TOWER SANTACATERINA / 3 EDIFICI / BERGAMO | | Default Value | | Running | euro | 19.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24124 | Bergamo | Residential houses | Via Suardi 40 | 10 - Information Phase | 19.10.2020 13:32 | | | | No | No | | | | | euro |
| 371633-002 | | | HDB / IMMOBILE SPARIM / BUSTO ARSIZIO / EX SEDE ENEL | | Default Value | | Running | euro | 02.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21052 | Busto Arsizio (VA) | Residential houses | Via Ugo Foscolo 6 | 40 - Realisation Phase | 02.11.2020 17:09 | | | | No | No | | | | | euro |
| 371633-001 | | | HSC / IMMOBILE SPARIM / BUSTO ARSIZIO / | | Default Value | | Running | euro | 19.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21052 | Busto Arsizio (VA) | Residential houses | Via Ugo Foscolo 6 | 40 - Realisation Phase | 19.10.2020 09:58 | | | | No | Yes | | | | | euro |
| 371633 | | | IMMOBILE SPARIM / BUSTO ARSIZIO / | | Default Value | | Running | euro | 19.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | Busto Arsizio (VA) | Residential houses | Via Ugo Foscolo 6 | 40 - Realisation Phase | 19.10.2020 09:53 | | | | No | No | | | | | euro |
| 371607-001 | | | GARA / HOTEL MOUNTAIN & SOUL / RAMSAU / HIT / HDB | | Default Value | | Running | euro | 16.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39032 | Campo Tures | Residential houses | X | 30 - Tender & Submission Phase | 16.10.2020 14:18 | | | | No | No | | | | | euro |
| 371607 | | | GARA / HOTEL MOUNTAIN & SOUL / RAMSAU | | Default Value | | Running | euro | 16.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39032 | Campo Tures | Residential houses | X | 10 - Information Phase | 16.10.2020 14:18 | | | | No | No | | | | | euro |
| 371441-001 | | | TERREAL/ ABITAZIONE TREBASALEGHE PADOVA /FK4 | | Default Value | | Running | euro | 14.10.2020 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 35010 | Trebaseleghe | | - | 30 - Tender & Submission Phase | 14.10.2020 21:35 | | | | No | No | | | | | euro |
| 371441 | | | TERREAL/ ABITAZIONE TREBASALEGHE PADOVA | | Default Value | | Running | euro | 14.10.2020 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 35010 | Trebaseleghe | | - | 10 - Information Phase | 14.10.2020 21:35 | | | | No | No | | | | | euro |
| 371141-001 | | | GEDI GRUPPO/ AMBULATORIO COTIGNOLA /HIT | | Default Value | | Running | euro | 12.10.2020 | | IPUG-PUGLIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | - | COTIGNOLA | | - | 30 - Tender & Submission Phase | 12.10.2020 10:46 | | | | No | No | | | | | euro |
| 371141 | | | GEDI GRUPPO/ AMBULATORIO COTIGNOLA | | Default Value | | Running | euro | 12.10.2020 | | IPUG-PUGLIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | - | COTIGNOLA | | - | 10 - Information Phase | 12.10.2020 10:44 | | | | No | No | | | | | euro |
| 371122-001 | | | LIBARDONI / EDIFICIO RESIDENZIALE TRENTO / HIT | | Default Value | | Running | euro | 12.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 38100 | TRENTO | | Viale Bolognini | 30 - Tender & Submission Phase | 12.10.2020 09:09 | | | | No | No | | | | | euro |
| 371122 | | | LIBARDONI / EDIFICIO RESIDENZIALE TRENTO | | Default Value | | Running | euro | 12.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | | Viale Bolognini | 20 - Planning Phase | 12.10.2020 09:08 | | | | No | No | | | | | euro |
| 371093-001 | | | DETAN / ADEGUAMENTO SISMICO 2 CAPOCORDA / BRACCO IMAGIN / CERIANO LAGHETTO | | Default Value | | Running | euro | 12.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20816 | Ceriano Laghetto | | via per Ceriani 2 | 40 - Realisation Phase | 12.10.2020 07:15 | | | | No | No | | | | | euro |
| 371093 | | | ADEGUAMENTO SISMICO 2 CAPOCORDA / BRACCO IMAGIN / CERIANO LAGHETTO | | Default Value | | Running | euro | 12.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20816 | Ceriano Laghetto | | via per Ceriani 2 | 20 - Planning Phase | 12.10.2020 07:13 | | | | No | No | | | | | euro |
| 371091 | | | POLO LOGISTICO CONAD NORD OVEST / MODENA | | Default Value | | Running | euro | 11.10.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | | VIA POLONIA | 10 - Information Phase | 11.10.2020 09:25 | | | | No | No | | | | | euro |
| 371082-001 | | | MANELLI / METRO "BRIN/CANEOPARI e BRIGNOLE/MARTINEX" / GENOVA | | Default Value | | Running | euro | 09.10.2020 | | ILIG-LIGURIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | | METRO BRIN / BRIGNOLE | 10 - Information Phase | 09.10.2020 16:55 | | | | No | No | | | | | euro |
| 371082 | | | MANELLI / METRO "BRIN/CANEOPARI e BRIGNOLE/MARTINEX" / GENOVA | | Default Value | | Running | euro | 09.10.2020 | | ILIG-LIGURIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | METRO BRIN / BRIGNOLE | 10 - Information Phase | 09.10.2020 16:55 | | | | No | No | | | | | euro |
| 371077-001 | | | MANELLI / POLO SCOLASTICO / INVERUNO | | Default Value | | Running | euro | 09.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20010 | Inveruno | | VIA IV NOVEMBRE | 10 - Information Phase | 09.10.2020 16:46 | | | | No | No | | | | | euro |
| 371077 | | | MANELLI / POLO SCOLASTICO / INVERUNO | | Default Value | | Running | euro | 09.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | Inveruno | | VIA IV NOVEMBRE | 10 - Information Phase | 09.10.2020 16:45 | | | | No | No | | | | | euro |
| 371076 | | | MANELLI / LABORATORI CIMEC (EX MANIFATTURA TABACCHI) / ROVERETO | | Default Value | | Running | euro | 09.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 26010 | Rovereto | | EX MANIFATTURA TABACCHI | 10 - Information Phase | 09.10.2020 16:43 | | | | No | No | | | | | euro |
| 371057 | | | AKNO BUSINNES PARK (2022??) / LIVRAGA | | Default Value | | Running | euro | 09.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26814 | Livraga | | -- | 10 - Information Phase | 09.10.2020 12:08 | | | | No | No | | | | | euro |
| 370939 | | | GRANDI IMPRESE VENETO EMILIA FRIULI | | Default Value | | Running | euro | 08.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | -- | 10 - Information Phase | 08.10.2020 10:02 | | | | No | No | | | | | euro |
| 370823-001 | | | GARA / RIQUALIFICA FABBRICATO VIAGGIATORI FFSS ROMA-TERMINI / BLOCCO B / DETAN | | Default Value | | Running | euro | 06.10.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00185 | Roma | Infrastructural facilities (Railway) | MARSALA | 30 - Tender & Submission Phase | 06.10.2020 17:16 | | | | No | No | | | | | euro |
| 370823 | | | GARA / RIQUALIFICA FABBRICATO VIAGGIATORI FFSS ROMA-TERMINI / BLOCCO B | | Default Value | | Running | euro | 06.10.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00185 | Roma | Infrastructural facilities (Railway) | MARSALA | 10 - Information Phase | 06.10.2020 17:15 | | | | No | No | | | | | euro |
| 370811-001 | | | GARA / ERWEITERUNG HOTEL VILLA WEINGARTENV / HDB | | Default Value | | Running | euro | 06.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 92021 | Caldare | | UNTERWINKEL, 24 | 30 - Tender & Submission Phase | 06.10.2020 14:45 | | | | No | No | | | | | euro |
| 370811 | | | GARA / ERWEITERUNG HOTEL VILLA WEINGARTEN | | Default Value | | Running | euro | 06.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 92021 | Caldare | | UNTERWINKEL, 24 | 10 - Information Phase | 06.10.2020 14:44 | | | | No | No | | | | | euro |
| 370805-001 | | | HDB / HUMANITAS MATER DOMINI / CASTELLANZA | | Default Value | | Running | euro | 06.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21053 | Castellanza | Medical facility | Via Gerenzano 2 | 40 - Realisation Phase | 06.10.2020 14:09 | | | | No | No | | | | | euro |
| 370805 | | | HUMANITAS MATER DOMINI / CASTELLANZA | | Default Value | | Running | euro | 06.10.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21053 | Castellanza | Medical facility | Via Gerenzano 2 | 40 - Realisation Phase | 06.10.2020 14:08 | | | | No | Yes | | | | | euro |
| 370767-001 | | | LOVISOTTO / TARVISIUM / TREVISO / HDB e HIT | | Default Value | | Running | euro | 06.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 31100 | TREVISO (TV) | | VIA BATTISTI | 40 - Realisation Phase | 06.10.2020 10:18 | | | | No | No | | | | | euro |
| 370767 | | | LOVISOTTO / TARVISIUM / TREVISO | | Default Value | | Running | euro | 06.10.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO (TV) | | VIA BATTISTI | 10 - Information Phase | 06.10.2020 10:17 | | | | No | No | | | | | euro |
| 370575-001 | | | AERRE CERAMICHE / NUOVO TERMILAN MOLO DI BEVERELLO / NAPOLI / UHA / HB | | Default Value | | Running | euro | 05.10.2020 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 80100 | NAPOLI | | * | 30 - Tender & Submission Phase | 05.10.2020 16:36 | | | | No | No | | | | 42.000,00 € | euro |
| 370575 | | | AERRE CERAMICHE / NUOVO TERMILAN MOLO DI BEVERELLO / NAPOLI | | Default Value | | Running | euro | 05.10.2020 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 80100 | NAPOLI | | * | 10 - Information Phase | 05.10.2020 16:36 | | | | No | No | | | | 42.000,00 € | euro |
| 370554 | | | ITINERA SPA / STRADA GROSSETO-SIENA / SIENA | | Default Value | | Running | euro | 05.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 53100 | Siena | | * | 10 - Information Phase | 05.10.2020 15:13 | | | | No | No | | | | | euro |
| 370472-001 | | | BLF CONSULTING / VILLA LE QUERCE / FIRENZE / HDB | | Default Value | | Running | euro | 05.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | * | 10 - Information Phase | 05.10.2020 09:23 | | | | No | No | | | | 5.000,00 € | euro |
| 370472 | | | BLF CONSULTING / VILLA LE QUERCE / FIRENZE | | Default Value | | Running | euro | 05.10.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | * | 10 - Information Phase | 05.10.2020 08:37 | | | | No | No | | | | 5.000,00 € | euro |
| 370290-001 | | | EIB - NEW BUILDING PROJECT / HTA | | Default Value | | Running | euro | 30.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Luxembourg | 01000 | LUXEMBOURG | Office building | -- | 10 - Information Phase | 30.09.2020 15:49 | | | | No | No | | | | | euro |
| 370290 | | | EIB - NEW BUILDING PROJECT | | Default Value | | Running | euro | 30.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Luxembourg | 01000 | LUXEMBOURG | Office building | -- | 10 - Information Phase | 30.09.2020 15:45 | | | | No | No | | | | | euro |
| 370058-001 | | | RAGGI COSTRUZIONI E RESTAURI / NUOVA CANTINA E RIQUALIFICAZIONE DI UN CAPANNONE ESISTENTE / HBT | | Default Value | | Running | euro | 29.09.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 57100 | LIVORNO | | LOC. MIGLIARINI | 10 - Information Phase | 29.09.2020 09:47 | | | | No | No | | | | | euro |
| 370058 | | | RAGGI COSTRUZIONI E RESTAURI / NUOVA CANTINA E RIQUALIFICAZIONE DI UN CAPANNONE ESISTENTE | | Default Value | | Running | euro | 28.09.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57100 | LIVORNO | | LOC. MIGLIARINI | 10 - Information Phase | 28.09.2020 16:00 | | | | No | No | | | | | euro |
| 369973 | | | GARA / OSPEDALE POLICLINICO SAN MARTINO / GENOVA | | Default Value | | Running | euro | 28.09.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | Largo rosanna benzi, 10 | 10 - Information Phase | 28.09.2020 09:22 | | | | No | No | | | | | euro |
| 369931-001 | | | DETAN-S / TETTOIA CAMPO SPORTIVO / SAN GIORGIO DI MANTOVA | | Default Value | | Running | euro | 26.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 46030 | San Giorgio di Mantova | Sports facility | Via Togliatti 27 | 20 - Planning Phase | 26.09.2020 07:47 | | | | No | No | | | | | euro |
| 369931 | | | TETTOIA CAMPO SPORTIVO / SAN GIORGIO DI MANTOVA | | Default Value | | Running | euro | 26.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46030 | San Giorgio di Mantova | Sports facility | Via Togliatti 27 | 20 - Planning Phase | 26.09.2020 07:45 | | | | No | No | | | | | euro |
| 369925-001 | | | CIMOLAI / LOMBARDIA / DETAN | | Default Value | | Running | euro | 25.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | -- | 20 - Planning Phase | 25.09.2020 15:30 | | | | No | No | | | | | euro |
| 369925 | | | CIMOLAI / LOMBARDIA | | Default Value | | Running | euro | 25.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | -- | 10 - Information Phase | 25.09.2020 15:29 | | | | No | No | | | | | euro |
| 369864-001 | | | HIT / COMPLESSO RESIDENZIALE CASCINA GRANDE OPERA / DEVERO | | Default Value | | Running | euro | 25.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Opera | Residential houses | Via Cascina Grande | 40 - Realisation Phase | 25.09.2020 07:21 | | | | No | No | | | | | euro |
| 369864 | | | COMPLESSO RESIDENZIALE CASCINA GRANDE OPERA / DEVERO | | Default Value | | Running | euro | 25.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | Opera | Residential houses | Via Cascina Grande | 40 - Realisation Phase | 25.09.2020 07:19 | | | | No | No | | | | | euro |
| 369860 | | | CITTADELLA SANITARIA LOTTO 3 / TREVISO | | Default Value | | Running | euro | 24.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO (TV) | Medical facility | Cittadella della salute | 10 - Information Phase | 24.09.2020 22:42 | | | | No | No | | | | | euro |
| 369858-001 | | | CARRON / CITTADELLA SANITARIA LOTTO 2 / TREVISO / MBT | | Default Value | | Running | euro | 24.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 31100 | TREVISO (TV) | | Cittadella sella Salute | 40 - Realisation Phase | 24.09.2020 22:40 | | | | No | No | | | | | euro |
| 369858 | | | CARRON / CITTADELLA SANITARIA LOTTO 2 / TREVISO | | Default Value | | Running | euro | 24.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO (TV) | | Cittadella sella Salute | 10 - Information Phase | 24.09.2020 22:39 | | | | No | No | | | | | euro |
| 369852-001 | | | HIT / COMPLESSO VIA VIGEVANO 29 MILANO / INSQUADRA | | Default Value | | Running | euro | 24.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20144 | Milano | Residential houses | via Vigevano 29 | 30 - Tender & Submission Phase | 24.09.2020 17:05 | | | | No | No | | | | | euro |
| 369852 | | | COMPLESSO VIA VIGEVANO 29 MILANO / INSQUADRA | | Default Value | | Running | euro | 24.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | Milano | Residential houses | via Vigevano 29 | 20 - Planning Phase | 24.09.2020 17:03 | | | | No | No | | | | | euro |
| 369676-001 | | | GARA / PROGETTO DI UNITA' ABITATIVE E GAREGES PER UN EDIFICIO / CATANIA / HDB | | Default Value | | Running | euro | 23.09.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 95100 | CATANIA | | * | 40 - Realisation Phase | 23.09.2020 11:00 | | | | No | No | | | | 25.000,00 € | euro |
| 369676 | | | RCC INGEGNERIA / PROGETTO DI UNITA' ABITATIVE E GAREGES PER UN EDIFICIO / CATANIA | | Default Value | | Running | euro | 23.09.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 95100 | CATANIA | | * | 10 - Information Phase | 23.09.2020 10:59 | | | | No | No | | | | 25.000,00 € | euro |
| 369551 | | | GIUNTI/ PROGETTAZIONE ADEGUAMENTO NORME ANTINCENDIO CAMPUS E. QUAGLIARELLO /BARI/ STUDIO CARELLA | | Default Value | | Running | euro | 21.09.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 70010 | Capurso | Educational facility | CAPURSO | 10 - Information Phase | 21.09.2020 15:59 | | | | No | No | | | | | euro |
| 369420-001 | | | SARACINO / AMPLIAMENTO SCUOLA ELEMENTARE / MACONESI / HIT / HBT / HBS | | Default Value | | Running | euro | 18.09.2020 | | ILIG-LIGURIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 16047 | Moconesi | | MACAGGI, 13 | 40 - Realisation Phase | 18.09.2020 09:04 | | | | No | No | | | | | euro |
| 369420 | | | SARACINO / AMPLIAMENTO SCUOLA ELEMENTARE / MACONESI | | Default Value | | Running | euro | 18.09.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16047 | Moconesi | | MACAGGI, 13 | 10 - Information Phase | 18.09.2020 09:03 | | | | No | No | | | | | euro |
| 369321-001 | | | BAUELEMENT / AMPLIAMENTO QUALITATIVO E QUANTITATIVO HOTEL ICARO E COSTRUZIONE DI UN PARCHEGGIO INTERRATO / BOLZANO / HDB | | Default Value | | Running | euro | 17.09.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 12050 | Castelrotto | | VIA LEONARDO DA VINCI | 30 - Tender & Submission Phase | 17.09.2020 09:06 | | | | No | No | | | | 3.500,00 € | euro |
| 369321 | | | BAUELEMENT / AMPLIAMENTO QUALITATIVO E QUANTITATIVO HOTEL ICARO E COSTRUZIONE DI UN PARCHEGGIO INTERRATO / BOLZANO | | Default Value | | Running | euro | 17.09.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 12050 | Castelrotto | | VIA LEONARDO DA VINCI | 10 - Information Phase | 17.09.2020 09:05 | | | | No | No | | | | 3.500,00 € | euro |
| 369223-001 | | | DETAN S / NUOVA COSTRUZIONE / CORSO DI PORTA VITTORIA MILANO | | Default Value | | Running | euro | 16.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20122 | Milano | Residential houses | corso di porta vittoria | 30 - Tender & Submission Phase | 16.09.2020 07:17 | | | | No | No | | | | | euro |
| 369223 | | | NUOVA COSTRUZIONE / CORSO DI PORTA VITTORIA MILANO | | Default Value | | Running | euro | 16.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | Milano | Residential houses | corso di porta vittoria | 30 - Tender & Submission Phase | 16.09.2020 07:14 | | | | No | No | | | | | euro |
| 368937-001 | | | PLATTNER / NUOVA AUTORIMESSA DI 4 PIANI INTERRATI / BOLZANO / HDB | | Default Value | | Running | euro | 11.09.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 11.09.2020 11:25 | | | | No | No | | | | 30.000,00 € | euro |
| 368937 | | | PLATTNER / NUOVA AUTORIMESSA DI 4 PIANI INTERRATI / BOLZANO | | Default Value | | Running | euro | 11.09.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 11.09.2020 11:25 | | | | No | No | | | | 30.000,00 € | euro |
| 368784-002 | | | GARA/NUOVO POLO SCOLASTICO PORGO PINTURA/MORROVALLE/MACERATA/GIUNTI | | Default Value | | Running | euro | 09.09.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 62010 | Morrovalle | | BORGO PINTURA | 30 - Tender & Submission Phase | 09.09.2020 17:24 | | | | No | No | | | | | euro |
| 368784-001 | | | GARA/NUOVO POLO SCOLASTICO PORGO PINTURA/MORROVALLE/MACERATA/HSS | | Default Value | | Running | euro | 09.09.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 62010 | Morrovalle | | BORGO PINTURA | 30 - Tender & Submission Phase | 09.09.2020 17:17 | | | | No | No | | | | | euro |
| 368784 | | | GARA/NUOVO POLO SCOLASTICO PORGO PINTURA/MORROVALLE/MACERATA | | Default Value | | Running | euro | 09.09.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62010 | Morrovalle | | BORGO PINTURA | 10 - Information Phase | 09.09.2020 17:15 | | | | No | No | | | | | euro |
| 368775-001 | | | GARA / NUOVO POLO SCOLASTICO BORGO PINTURA / MORROVALLE / HSS | | Default Value | | Running | euro | 09.09.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 62010 | Morrovalle | Educational facility | X | 30 - Tender & Submission Phase | 09.09.2020 14:45 | | | | No | No | | | | | euro |
| 368775 | | | GARA / NUOVO POLO SCOLASTICO BORGO PINTURA | | Default Value | | Running | euro | 09.09.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62010 | Morrovalle | Educational facility | X | 30 - Tender & Submission Phase | 09.09.2020 14:43 | | | | No | No | | | | | euro |
| 368713-001 | | | FEDRIGOLI / OSPEDALE SACCO / HDB | | Default Value | | Running | euro | 09.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20157 | Milano | | VIA GRASSI | 40 - Realisation Phase | 09.09.2020 10:25 | | | | No | No | | | | | euro |
| 368713 | | | FEDRIGOLI / OSPEDALE SACCO | | Default Value | | Running | euro | 09.09.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 20157 | Milano | | VIA GRASSI | 10 - Information Phase | 09.09.2020 10:23 | | | | No | No | | | | | euro |
| 368403-001 | | | HIT / EX BORLETTI / VIA CECCHI 18 MILANO | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20146 | Milano | Residential houses | Via Cecchi 18 | 40 - Realisation Phase | 04.09.2020 08:48 | | | | No | No | | | | | euro |
| 368403 | | | EX BORLETTI / VIA CECCHI 18 MILANO | | Default Value | | Running | euro | 04.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20146 | Milano | Residential houses | Via Cecchi 18 | 40 - Realisation Phase | 04.09.2020 08:46 | | | | No | No | | | | | euro |
| 368222-001 | | | GARA / MIGLIORAMENTO STATICO-SISMICO DEL PALAZZO DEL GOVERNO / LA SPEZIA / DETAN S460 | | Default Value | | Running | euro | 01.09.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 19100 | LA SPEZIA | | * | 30 - Tender & Submission Phase | 01.09.2020 16:52 | | | | No | No | | | | 20.000,00 € | euro |
| 368222 | | | GARA / MIGLIORAMENTO STATITO-SISMICO DEL PALAZZO DEL GOVERNO / LA SPEZIA | | Default Value | | Running | euro | 01.09.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 19100 | LA SPEZIA | | * | 10 - Information Phase | 01.09.2020 16:52 | | | | No | No | | | | 20.000,00 € | euro |
| 368141 | | | PLATTNER/CASA POMPIERI A SINIGO | | Default Value | | Running | euro | 01.09.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 39012 | Sinigo | | - | 40 - Realisation Phase | 01.09.2020 08:52 | | | | No | No | | | | | euro |
| 368119-001 | | | HBT / PALAZZO NAVIGLIO / VIA L. POGLIAGHI 5 MILANO | | Default Value | | Running | euro | 31.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20146 | Milano | Residential houses | Via L. Pogliaghi 5 | 30 - Tender & Submission Phase | 31.08.2020 17:44 | | | | No | No | | | | | euro |
| 368119 | | | PALAZZO NAVIGLIO / VIA L. POGLIAGHI 5 MILANO | | Default Value | | Running | euro | 31.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20146 | Milano | Residential houses | Via L. Pogliaghi 5 | 30 - Tender & Submission Phase | 31.08.2020 17:38 | | | | No | No | | | | | euro |
| 368115-001 | | | UNIONBAU / ZIMA-WOHNANLANGE / VAHRN / HDB / HIT | | Default Value | | Running | euro | 31.08.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39040 | Varna | | * | 30 - Tender & Submission Phase | 31.08.2020 16:39 | | | | No | No | | | | 19.000,00 € | euro |
| 368115 | | | UNIONBAU / ZIMA-WOHNANLANGE / VAHRN | | Default Value | | Running | euro | 31.08.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39040 | Varna | | * | 10 - Information Phase | 31.08.2020 16:39 | | | | No | No | | | | 19.000,00 € | euro |
| 368102-001 | | | HIT / Y TOWERS / Overhoeks AMSTERDAM / RIZZANI DE ECCHER | | Default Value | | Running | euro | 31.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Netherlands | 1013 EW | Amsterdam | Office building | Overhoeks | 40 - Realisation Phase | 31.08.2020 16:05 | | | | No | No | | | | | euro |
| 368102 | | | Y TOWERS / Overhoeks AMSTERDAM / RIZZANI DE ECCHER | | Default Value | | Running | euro | 31.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Netherlands | 1013 EW | Amsterdam | Office building | Overhoeks | 40 - Realisation Phase | 31.08.2020 16:02 | | | | No | No | | | | | euro |
| 368023 | | | GARA / FORTEZZA-VERONA RAILWAY LINE / FORTEZZA | | Default Value | | Running | euro | 31.08.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39045 | Fortezza | | * | 10 - Information Phase | 31.08.2020 09:18 | | | | No | No | | | | | euro |
| 368020 | | | GARA / THE JOSEFSBERG RAILWAY TUNNEL / BOLZANO | | Default Value | | Running | euro | 31.08.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 31.08.2020 09:14 | | | | No | No | | | | | euro |
| 367992-001 | | | HIT / UNIFAMILIARE POLONI-LEONI / COLOGNO AL SERIO | | Default Value | | Running | euro | 30.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24055 | Cologno al Serio | Residential houses | Via Papa Giovanni XXIII | 20 - Planning Phase | 30.08.2020 11:23 | | | | No | No | | | | | euro |
| 367992 | | | UNIFAMILIARE POLONI-LEONI / COLOGNO AL SERIO | | Default Value | | Running | euro | 30.08.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24055 | Cologno al Serio | Residential houses | Via Papa Giovanni XXIII | 20 - Planning Phase | 30.08.2020 11:22 | | | | No | No | | | | | euro |
| 367899-001 | | | GARA / FILIALE LIDL / AVOLA / GIUNTO | | Default Value | | Running | euro | 27.08.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 96012 | Avola | | * | 30 - Tender & Submission Phase | 27.08.2020 16:25 | | | | No | No | | | | 5.900,00 € | euro |
| 367899 | | | GARA / FILIALE LIDL / AVOLA | | Default Value | | Running | euro | 27.08.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 96012 | Avola | | * | 10 - Information Phase | 27.08.2020 16:24 | | | | No | No | | | | 5.900,00 € | euro |
| 367882-001 | | | GARA / NUOVO MATERNO INFANTILE DELL'OSPEDALE DI REGGIO EMILIA / REGGIO EMILIA / HSD | | Default Value | | Running | euro | 27.08.2020 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 42100 | REGGIO EMILIA | | X | 30 - Tender & Submission Phase | 27.08.2020 14:59 | | | | No | No | | | | | euro |
| 367882 | | | GARA / NUOVO MATERNO INFANTILE DELL'OSPEDALE DI REGGIO EMILIA / REGGIO EMILIA | | Default Value | | Running | euro | 27.08.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | | X | 10 - Information Phase | 27.08.2020 14:59 | | | | No | No | | | | | euro |
| 367877-001 | | | GARA / EX EXCELSIOR / MADONNA DI CAMPIGLIO / HDB | | Default Value | | Running | euro | 27.08.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 38086 | Madonna di Campiglio | | * | 30 - Tender & Submission Phase | 27.08.2020 14:52 | | | | No | No | | | | 7.000,00 € | euro |
| 367877 | | | GARA / EX EXCELSIOR / MADONNA DI CAMPIGLIO | | Default Value | | Running | euro | 27.08.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38086 | Madonna di Campiglio | | * | 10 - Information Phase | 27.08.2020 14:52 | | | | No | No | | | | 7.000,00 € | euro |
| 367396-001 | | | GARA /COSTRUZIONE NUOVO OSPEDALE DI AMATRICE/ AMATRICE-RIETI /GIUNTI | | Default Value | | Running | euro | 26.08.2020 | 05.08.2020 | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 02010 | Amatrice | Medical facility | AMATRICE | 30 - Tender & Submission Phase | 26.08.2020 12:52 | | | | No | No | | | | 40.000,00 € | euro |
| 367396 | | | GARA /COSTRUZIONE NUOVO OSPEDALE DI AMATRICE/ AMATRICE-RIETI | | Default Value | | Running | euro | 26.08.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 02010 | Amatrice | Medical facility | AMATRICE | 10 - Information Phase | 26.08.2020 12:51 | | | | No | No | | | | 40.000,00 € | euro |
| 365806 | | | Costruzione 24 ville Classe A4 | | Default Value | | Running | euro | 17.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 28100 | NOVARA | Residential houses | Vie delle Americhe / Rosette | 10 - Information Phase | 03.08.2020 11:51 | 3781 | | | No | No | | | | | euro |
| 365805 | | | Riqualif e manut pad 8 x riunificazione clinica psichiatrica e S.P.D.C. | | Default Value | | Running | euro | 22.07.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | Largo Benzi 10 | 10 - Information Phase | 03.08.2020 11:51 | 3780 | | | No | No | | | | | euro |
| 365804 | | | Viabilita' in sponda sinistra torrente Polcevera | | Default Value | | Running | euro | 17.07.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | Technical facilities | Strada G. Rossa e Via Perlasca | 10 - Information Phase | 03.08.2020 11:51 | 3779 | | | No | No | | | | | euro |
| 365803 | | | Costruzione (demoricostruzione) scuola secondaria di 1� grado Jona | | Default Value | | Running | euro | 03.07.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 14100 | ASTI | | Corso Genova 24 | 10 - Information Phase | 03.08.2020 11:51 | 3778 | | | No | No | | | | | euro |
| 365802 | | | Restauro conservativo Casa di Betania per nuova sede Confndustria | | Default Value | | Running | euro | 03.07.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 12100 | CUNEO | Technical facilities | Via V. Bersezio 9 | 10 - Information Phase | 03.08.2020 11:51 | 3777 | | | No | No | | | | | euro |
| 365801 | | | Ristr complesso per RSA 400 p.letto+parte commerciale e residenz 24000 mq | | Default Value | | Running | euro | 17.07.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | Corso Racconigi 49 | 10 - Information Phase | 03.08.2020 11:51 | 3776 | | | No | No | | | | | euro |
| 365800 | | | Restauro conservativo immobile per residenza studenti 350 p.letto 16000 mq | | Default Value | | Running | euro | 17.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | Residential houses | Via Belfiore 23 | 10 - Information Phase | 03.08.2020 11:51 | 3775 | | | No | No | | | | | euro |
| 365799 | | | Costruzione supermercato 700 mq | | Default Value | | Running | euro | 17.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | Technical facilities | Via F.Millio 10 | 10 - Information Phase | 03.08.2020 11:51 | 3774 | | | No | No | | | | | euro |
| 365798 | | | Ristrutturazione edificio per nuovo supermercato 2500 mq primo lotto | | Default Value | | Running | euro | 17.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | Technical facilities | Corso Bramante 15/17 Ex Fiat | 10 - Information Phase | 03.08.2020 11:51 | 3773 | | | No | No | | | | | euro |
| 365797 | | | Costruzione Residenza Sanitaria Assistenziale 200 posti letto | | Default Value | | Running | euro | 17.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | Via S.M.Mazzarello 102 | 10 - Information Phase | 03.08.2020 11:51 | 3772 | | | No | No | | | | | euro |
| 365796 | | | Ristrutturazione ed ampliamento edificio per supermercato e OO UU | | Default Value | | Running | euro | 26.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10094 | GIAVENO | Technical facilities | Via Selvaggio | 10 - Information Phase | 03.08.2020 11:51 | 3771 | | | No | No | | | | | euro |
| 365795 | | | Costruzione supermercato 900 mq | | Default Value | | Running | euro | 17.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10092 | BEINASCO | Technical facilities | Via Torino | 10 - Information Phase | 03.08.2020 11:51 | 3770 | | | No | No | | | | | euro |
| 365794 | | | Costruzione supermercato ed opere di urbanizzaz a scomputo=parcheggio | | Default Value | | Running | euro | 18.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10077 | SAN MAURIZIO CANAVESE | Technical facilities | Cso Italia/Via Fatebenefratelli | 10 - Information Phase | 03.08.2020 11:51 | 3769 | | | No | No | | | | | euro |
| 365793 | | | Lavori di ampliamento villaggio turistico Club Mediterranee | | Default Value | | Running | euro | 18.06.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10060 | PRAGELATO | Technical facilities | Via Rohrbach Loc. Plan | 10 - Information Phase | 03.08.2020 11:51 | 3768 | | | No | No | | | | | euro |
| 365764 | | | Costruzione supermercato catena MD e opere di urbanizzaz=imp sportivo | | Default Value | | Running | euro | 08.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27029 | VIGEVANO | Technical facilities | Corso Argentina / Via Podgora | 10 - Information Phase | 03.08.2020 09:06 | 3767 | | | No | No | | | | | euro |
| 365763 | | | Ristrutturazione edificio per nuova caserma dei Carabinieri | | Default Value | | Running | euro | 03.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26812 | BORGHETTO LODIGIANO | | Via IV Novembre | 10 - Information Phase | 03.08.2020 09:06 | 3766 | | | No | No | | | | | euro |
| 365762 | | | Costruzione edificio produttivo in ampliamento all'esistente 4000 mq | | Default Value | | Running | euro | 26.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Industry building | Via N. Sauro 12 | 10 - Information Phase | 03.08.2020 09:06 | 3765 | | | No | No | | | | | euro |
| 365761 | | | Costruzione (demoricostruzione) supermercato 1500 mq | | Default Value | | Running | euro | 17.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26017 | TRESCORE CREMASCO | Technical facilities | Viale A. De Gasperi 2 | 10 - Information Phase | 03.08.2020 09:06 | 3764 | | | No | No | | | | | euro |
| 365760 | | | Ristrutturazione ed ampliamento casa di riposo | | Default Value | | Running | euro | 18.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25087 | SALO' | | Via Zane 10 | 10 - Information Phase | 03.08.2020 09:06 | 3763 | | | No | No | | | | | euro |
| 365759 | | | Realizzazione nuovo polo scolastico | | Default Value | | Running | euro | 24.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25054 | MARONE | | Via Borgo Nuovo | 10 - Information Phase | 03.08.2020 09:06 | 3762 | | | No | No | | | | | euro |
| 365758 | | | Realizzazione nuova scuola primaria Edmondo De Amicis | | Default Value | | Running | euro | 18.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25045 | CASTEGNATO | | Area ex Ribola | 10 - Information Phase | 03.08.2020 09:06 | 3761 | | | No | No | | | | | euro |
| 365757 | | | Costruzione 2 edifici commerciali 1^fase opere di urbanizzazione | | Default Value | | Running | euro | 17.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Vie S.G. Bosco / Mugazzone | 10 - Information Phase | 03.08.2020 09:06 | 3760 | | | No | No | | | | | euro |
| 365756 | | | Lavori di ristrutturazione tribuna dello stadio denominato UBI (2� lotto) | | Default Value | | Running | euro | 26.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | | Viale G. Cesare 18 | 10 - Information Phase | 03.08.2020 09:06 | 3759 | | | No | No | | | | | euro |
| 365755 | | | Costruzione supermercato Lidl 1290 mq | | Default Value | | Running | euro | 25.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Vie Gusmini 8 / Corridoni 72 | 10 - Information Phase | 03.08.2020 09:06 | 3758 | | | No | No | | | | | euro |
| 365754 | | | Costruzione polo logistico MD spa 92000 mq palazzina uffici 2200 mq | | Default Value | | Running | euro | 17.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24058 | CORTENUOVA | Industry building | Via S. Giorgio Loc. S.M. Del Sasso | 10 - Information Phase | 03.08.2020 09:06 | 3757 | | | No | No | | | | | euro |
| 365753 | | | Ristrutturazione complesso industriale per nuova sede aziendale 7000 mq | | Default Value | | Running | euro | 18.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24052 | AZZANO SAN PAOLO | Industry building | Via Emilia | 10 - Information Phase | 03.08.2020 09:06 | 3756 | | | No | No | | | | | euro |
| 365752 | | | Costruzione polo logistico 58.600 mq | | Default Value | | Running | euro | 16.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | CIVIDATE AL PIANO | Industry building | S.P.n.98 / Cascina Cascinone | 10 - Information Phase | 03.08.2020 09:06 | 3755 | | | No | No | | | | | euro |
| 365751 | | | Costruzione edificio industriale 6000 mq | | Default Value | | Running | euro | 26.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24040 | LEVATE | Industry building | Via San Carlo Borromeo | 10 - Information Phase | 03.08.2020 09:06 | 3754 | | | No | No | | | | | euro |
| 365750 | | | Costruzione edificio multipiano ad uso abitazione 24 Appartamenti | | Default Value | | Running | euro | 17.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO | Residential houses | Via Risorgimento 16 | 10 - Information Phase | 03.08.2020 09:06 | 3753 | | | No | No | | | | | euro |
| 365748 | | | Costruzione edificio 10 unita' abitative e boxes | | Default Value | | Running | euro | 30.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | Residential houses | Via N.Castellini 87 | 10 - Information Phase | 03.08.2020 09:06 | 3751 | | | No | No | | | | | euro |
| 365747 | | | Costruzione palazzina ad uso abitaz 6 appartamenti e boxes | | Default Value | | Running | euro | 15.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Residential houses | Viale Diaz 30 | 10 - Information Phase | 03.08.2020 09:06 | 3750 | | | No | No | | | | | euro |
| 365746 | | | Costruzione edificio multipiano 9 unita' abitative e boxes | | Default Value | | Running | euro | 30.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Residential houses | Via N.Sauro 10 | 10 - Information Phase | 03.08.2020 09:06 | 3749 | | | No | No | | | | | euro |
| 365745 | | | Costruzione 2 edifici multipiano ad uso abitaz e supermercato | | Default Value | | Running | euro | 20.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Residential houses | Vie Monte Grappa / Marconi | 10 - Information Phase | 03.08.2020 09:06 | 3748 | | | No | No | | | | | euro |
| 365744 | | | Costruzione sette ville a schiera e palazzina con appartamenti | | Default Value | | Running | euro | 30.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21040 | VEDANO OLONA | Residential houses | Via Adua | 10 - Information Phase | 03.08.2020 09:06 | 3747 | | | No | No | | | | | euro |
| 365743 | | | Costruzione nuova sede concessionaria automobili | | Default Value | | Running | euro | 10.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | Technical facilities | Vie Milano / Pompei | 10 - Information Phase | 03.08.2020 09:06 | 3746 | | | No | No | | | | | euro |
| 365742 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Gondar | 10 - Information Phase | 03.08.2020 09:06 | 3745 | | | No | No | | | | | euro |
| 365741 | | | Costruzione due edifici multipiano 34 appartamenti totali | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via F.D.Guerrazzi 23 | 10 - Information Phase | 03.08.2020 09:06 | 3744 | | | No | No | | | | | euro |
| 365740 | | | Costruzione edificio ad uso abitazione 5 unita' abitative Classe A3 | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20871 | VIMERCATE | Residential houses | Via Dante Alighieri 1 | 10 - Information Phase | 03.08.2020 09:06 | 3743 | | | No | No | | | | | euro |
| 365739 | | | Costruz palazzina 2 piani fuori terra 12 appartamenti classe energetica A4 | | Default Value | | Running | euro | 19.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20864 | AGRATE BRIANZA | Residential houses | Via G. Rossini | 10 - Information Phase | 03.08.2020 09:06 | 3742 | | | No | No | | | | | euro |
| 365738 | | | Costruzione edificio multipiano 30 appartamenti e boxes | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20861 | BRUGHERIO | Residential houses | Via J. e R. Kennedy | 10 - Information Phase | 03.08.2020 09:06 | 3741 | | | No | No | | | | | euro |
| 365737 | | | Costruzione edificio 3 piani f.t. 14 appartamenti e boxes | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20861 | BRUGHERIO | Residential houses | Via G.Garibaldi 10 | 10 - Information Phase | 03.08.2020 09:06 | 3740 | | | No | No | | | | | euro |
| 365736 | | | Ampliamento Casa di Riposo | | Default Value | | Running | euro | 20.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20841 | CARATE BRIANZA | | Piazzale della Madonnina 1 | 10 - Information Phase | 03.08.2020 09:06 | 3739 | | | No | No | | | | | euro |
| 365735 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20835 | MUGGIO' | Residential houses | Via San Carlo | 10 - Information Phase | 03.08.2020 09:06 | 3738 | | | No | No | | | | | euro |
| 365734 | | | Costruzione nuovo insediamento produttivo | | Default Value | | Running | euro | 01.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20833 | GIUSSANO | Industry building | Vie Vigano' / Novedrate | 10 - Information Phase | 03.08.2020 09:05 | 3737 | | | No | No | | | | | euro |
| 365733 | | | Costruzione 2 RSA 120+120 p letto centro diurno palestra farmacia | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20812 | LIMBIATE | | Vie Trieste / Gargano | 10 - Information Phase | 03.08.2020 09:05 | 3736 | | | No | No | | | | | euro |
| 365732 | | | Costruzione edificio 22 unita' abitative | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20812 | LIMBIATE | Residential houses | Via dei Mille | 10 - Information Phase | 03.08.2020 09:05 | 3735 | | | No | No | | | | | euro |
| 365731 | | | Costruzione complesso ad uso abitazione 5000 mq 3 piani int 97 box | | Default Value | | Running | euro | 23.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Rovello 14 | 10 - Information Phase | 03.08.2020 09:05 | 3734 | | | No | No | | | | | euro |
| 365730 | | | Costruzione supermercato | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale Sarca 100 | 10 - Information Phase | 03.08.2020 09:05 | 3733 | | | No | No | | | | | euro |
| 365729 | | | Demoricostruzione complesso ad uso abitaz=60 appartamenti e boxes | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via L.G.Faravelli 14 | 10 - Information Phase | 03.08.2020 09:05 | 3732 | | | No | No | | | | | euro |
| 365728 | | | Costruzione edificio multipiano ad uso abitaz=30 appartamenti e boxes | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Gulli 9 | 10 - Information Phase | 03.08.2020 09:05 | 3731 | | | No | No | | | | | euro |
| 365727 | | | Demoricostruzione RSA 120 posti letto + centro diurno | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via P.A.Paravia 5 | 10 - Information Phase | 03.08.2020 09:05 | 3730 | | | No | No | | | | | euro |
| 365726 | | | Costruzione palazzina ad uso abitazione 5 unita' abitative | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Severoli 11 | 10 - Information Phase | 03.08.2020 09:05 | 3729 | | | No | No | | | | | euro |
| 365725 | | | Nuova fermata Tibaldi tratta Pta Romana/S Cristoforo linea MI-Mortara | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale C.Bazzi 12 | 10 - Information Phase | 03.08.2020 09:05 | 3728 | | | No | No | | | | | euro |
| 365724 | | | Costruzione edificio multipiano ad uso abitaz 55 unita' abitative | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Presolana 6 | 10 - Information Phase | 03.08.2020 09:05 | 3727 | | | No | No | | | | | euro |
| 365723 | | | Costruzione edificio ad uso abitaz e boxes Riappalto lavori | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Vanvitelli 6 | 10 - Information Phase | 03.08.2020 09:05 | 3726 | | | No | No | | | | | euro |
| 365722 | | | Recupero cascina Boldinasco 45 alloggi co-housing spazi lavorativi comuni | | Default Value | | Running | euro | 20.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via F.De Lemene 59 | 10 - Information Phase | 03.08.2020 09:05 | 3725 | | | No | No | | | | | euro |
| 365721 | | | Realizz nuova piattaforma logistica ortofrutta comprensorio agroalimentare | | Default Value | | Running | euro | 25.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Industry building | Via C.Lombroso | 10 - Information Phase | 03.08.2020 09:05 | 3724 | | | No | No | | | | | euro |
| 365720 | | | Costruzione edificio multip ad uso abitaz 30 appart 25 boxes interrati | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via San Martino 15 | 10 - Information Phase | 03.08.2020 09:05 | 3723 | | | No | No | | | | | euro |
| 365719 | | | Costruzione due edifici multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 23.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Palladio 18 | 10 - Information Phase | 03.08.2020 09:05 | 3722 | | | No | No | | | | | euro |
| 365718 | | | Ristrutturazione complesso industriale per laboratori uffici (1� lotto) | | Default Value | | Running | euro | 19.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Varesina 204 | 10 - Information Phase | 03.08.2020 09:05 | 3721 | | | No | No | | | | | euro |
| 365717 | | | Costruzione (demoricostruzione) 2 edifici ad uso abitazione e box | | Default Value | | Running | euro | 19.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Savona 134 | 10 - Information Phase | 03.08.2020 09:05 | 3720 | | | No | No | | | | | euro |
| 365716 | | | Costruzione complesso residenziale 10000 mq negozi parco 6200 mq | | Default Value | | Running | euro | 19.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Biella 9 / S. Martini 3 | 10 - Information Phase | 03.08.2020 09:05 | 3719 | | | No | No | | | | | euro |
| 365715 | | | Costruziome palazzina ad uso residenziale di prestigio | | Default Value | | Running | euro | 19.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Corso Porta Ticinese 32 | 10 - Information Phase | 03.08.2020 09:05 | 3718 | | | No | No | | | | | euro |
| 365714 | | | Costruzione complesso multipiano 98 appartamenti | | Default Value | | Running | euro | 18.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Garofalo 39 / Paisiello 11 | 10 - Information Phase | 03.08.2020 09:05 | 3717 | | | No | No | | | | | euro |
| 365713 | | | Realizz parcheggio multip interrato e parcheggio a raso PII De Gasperi Est | | Default Value | | Running | euro | 20.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20097 | SAN DONATO MILANESE | Technical facilities | Via De Gasperi | 10 - Information Phase | 03.08.2020 09:05 | 3716 | | | No | No | | | | | euro |
| 365712 | | | Ampliamento centro direzionale 22000 mq | | Default Value | | Running | euro | 23.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | Via San Bovio | 10 - Information Phase | 03.08.2020 09:05 | 3715 | | | No | No | | | | | euro |
| 365711 | | | Costruzione edificio 8 appartamenti e boxes | | Default Value | | Running | euro | 30.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Via Montebello 24 | 10 - Information Phase | 03.08.2020 09:05 | 3714 | | | No | No | | | | | euro |
| 365710 | | | Costruzione impianto trattamento rifiuti organici | | Default Value | | Running | euro | 25.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Industry building | Via Novara 250 | 10 - Information Phase | 03.08.2020 09:05 | 3713 | | | No | No | | | | | euro |
| 365709 | | | Costruzione nuova sede concessionaria automobili | | Default Value | | Running | euro | 30.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | SOLARO | Technical facilities | Via G.Donizetti | 10 - Information Phase | 03.08.2020 09:05 | 3712 | | | No | No | | | | | euro |
| 365708 | | | Ristrutturazione sovrappasso Buonarroti | | Default Value | | Running | euro | 16.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20017 | RHO | Technical facilities | Via Buonarroti | 10 - Information Phase | 03.08.2020 09:05 | 3711 | | | No | No | | | | | euro |
| 365707 | | | Costruzione edificio multipiano ad uso abitazione=nuovo lotto | | Default Value | | Running | euro | 18.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | CORNAREDO | Residential houses | Via G.Deledda 16 | 10 - Information Phase | 03.08.2020 09:05 | 3710 | | | No | Yes | | | | | euro |
| 365620-001 | | | GARA / INDUSTRIALE MAN BUS & TRUCK / NOGAROLE ROCCA / HBS | | Default Value | | Running | euro | 30.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37060 | Nogarole Rocca | | VIA DE GASPERI | 30 - Tender & Submission Phase | 30.07.2020 16:07 | | | | No | No | | | | | euro |
| 365620 | | | GARA / INDUSTRIALE MAN BUS & TRUCK / NOGAROLE ROCCA 17/12 REVISIONE PROGETTO | | Default Value | | Running | euro | 30.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37060 | Nogarole Rocca | | VIA DE GASPERI | 30 - Tender & Submission Phase | 30.07.2020 15:38 | | | | No | No | | | | | euro |
| 365571 | | | SETTEN / SCUOLA PRIMARIA / MARCON | | Default Value | | Running | euro | 30.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30020 | Marcon | | -- | 30 - Tender & Submission Phase | 30.07.2020 10:02 | | | | No | No | | | | | euro |
| 365570 | | | Costruz scuola elementare programma urbanistico E1 Anagnina comparto S4 | | Default Value | | Running | euro | 22.07.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | | Via Tuscolana | 10 - Information Phase | 30.07.2020 09:43 | 3709 | | | No | No | | | | | euro |
| 365569 | | | Costruz asilo nido programma urbanistico E1 Anagnina comparto S3 | | Default Value | | Running | euro | 22.07.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | | Via Tuscolana | 10 - Information Phase | 30.07.2020 09:43 | 3708 | | | No | No | | | | | euro |
| 365568 | | | Completam parcheggio pubblico multip P2 e adiacente Lotto C cunicolo pp.ss | | Default Value | | Running | euro | 23.06.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | Technical facilities | Localita' EUR | 10 - Information Phase | 30.07.2020 09:43 | 3707 | | | No | No | | | | | euro |
| 365567 | | | Demoricostruzione scuola dell'infanzia Martinelli | | Default Value | | Running | euro | 09.07.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 63811 | SANT'ELPIDIO A MARE | | Via Marconi | 10 - Information Phase | 30.07.2020 09:35 | 3706 | | | No | No | | | | | euro |
| 365566 | | | Costruzione centro polifunzionale | | Default Value | | Running | euro | 24.06.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 63044 | COMUNANZA | | Centro abitato | 10 - Information Phase | 30.07.2020 09:35 | 3705 | | | No | No | | | | | euro |
| 365565 | | | Costruzione nuovo municipio | | Default Value | | Running | euro | 18.06.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 61022 | VALLEFOGLIA | | Piazza Pio La Torre | 10 - Information Phase | 30.07.2020 09:35 | 3704 | | | No | No | | | | | euro |
| 365563 | | | Realizzazione nuovo plesso scolastico e adeguamento sismico palestra | | Default Value | | Running | euro | 22.07.2020 | | IABR-ABRUZZO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 67058 | SAN BENEDETTO DEI MARSI | | Via San Cipriano | 10 - Information Phase | 30.07.2020 09:28 | 3703 | | | No | No | | | | | euro |
| 365562 | | | Ristrutturazione scuola primaria Lola di Stefano | | Default Value | | Running | euro | 02.07.2020 | | IABR-ABRUZZO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 67039 | SULMONA | | Viale Roosvelt 11 | 10 - Information Phase | 30.07.2020 09:28 | 3702 | | | No | No | | | | | euro |
| 365561 | | | Realizzazione nuovo polo scolastico | | Default Value | | Running | euro | 15.07.2020 | | IABR-ABRUZZO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 67030 | PACENTRO | | Localita' Aia Mosca | 10 - Information Phase | 30.07.2020 09:28 | 3701 | | | No | No | | | | | euro |
| 365559 | | | Ampliamento sede comunale da adibire ad uffici comunali | | Default Value | | Running | euro | 15.07.2020 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 70056 | MOLFETTA | Technical facilities | Loc Lama Scotella | 10 - Information Phase | 30.07.2020 09:21 | 3700 | | | No | No | | | | | euro |
| 365518-001 | | | FAGNONI/CASA COMIGNAGO/FK4 | | Default Value | | Running | euro | 29.07.2020 | | IPIE-PIEMONTE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 28060 | Comignago | | - | 30 - Tender & Submission Phase | 29.07.2020 13:39 | | | | No | No | | | | | euro |
| 365518 | | | FAGNONI/CASA COMIGNAGO | | Default Value | | Running | euro | 29.07.2020 | | IPIE-PIEMONTE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 28060 | Comignago | | - | 10 - Information Phase | 29.07.2020 13:38 | | | | No | No | | | | | euro |
| 365413 | | | DE MARCHI / Cosruzione sede operativa ed amministrativa di S.I.VE. | | Default Value | | Running | euro | 17.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37045 | LEGNAGO | Technical facilities | Vie Ponzina / Modigliani | 10 - Information Phase | 28.07.2020 09:08 | 3699 | | | No | No | | | | | euro |
| 365412 | | | ATHESTE / Lavori di ristrutturazione ed ampliamento prono soccorso | | Default Value | | Running | euro | 17.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32021 | AGORDO | | Via Fontana 36 | 10 - Information Phase | 28.07.2020 09:07 | 3698 | | | No | No | | | | | euro |
| 365411 | | | PAMEF APPALTI / Lavori di complet del 10� piano del monoblocco presidio ospedaliero | | Default Value | | Running | euro | 18.06.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31033 | CASTELFRANCO VENETO | | Via Dei Carpani 167 | 10 - Information Phase | 28.07.2020 09:07 | 3697 | | | No | No | | | | | euro |
| 365410 | | | VIEDILCOS / Costruzione (demoricostruzione) edificio ad uso alberghiero | | Default Value | | Running | euro | 15.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Loc Malamocco 33 | 10 - Information Phase | 28.07.2020 09:07 | 3696 | | | No | No | | | | | euro |
| 365408 | | | ??? Ampliamento centro medico 800 mq ambulatori uffici sala operatoria | | Default Value | | Running | euro | 15.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31050 | VILLORBA | | Viale Repubblica 10/B | 10 - Information Phase | 28.07.2020 09:07 | 3694 | | | No | No | | | | | euro |
| 365407 | | | ??? Costruzione supermercato 2650 mq ed opere di urbanizzazione | | Default Value | | Running | euro | 26.06.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37012 | BUSSOLENGO | Technical facilities | Viale Foro Boario 28 | 10 - Information Phase | 28.07.2020 09:07 | 3693 | | | No | No | | | | | euro |
| 365406 | | | ??? Costruzione supermercato ed opere urbanizzazione a scomputo | | Default Value | | Running | euro | 03.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31015 | CONEGLIANO | Technical facilities | Via Maggiore G. Piovesana 65 | 10 - Information Phase | 28.07.2020 09:07 | 3692 | | | No | No | | | | | euro |
| 365405 | | | BORDIGNON / Costruzione nuova sede aziendale magazzini uffici 5200 mq totali | | Default Value | | Running | euro | 17.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31035 | CROCETTA DEL MONTELLO | Technical facilities | Via Piave 20 | 10 - Information Phase | 28.07.2020 09:07 | 3691 | | | No | No | | | | | euro |
| 365404 | | | ICEP / Costr centro servizi anziani 90 posti letto anziazni non autosuff e OO UU | | Default Value | | Running | euro | 17.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31036 | ISTRANA | | Via N. Sauro | 10 - Information Phase | 28.07.2020 09:07 | 3690 | | | No | No | | | | | euro |
| 365402 | | | ??? Costruz (demoricostruz) complesso a destinazione commerciale direzionale | | Default Value | | Running | euro | 10.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Marghera Via Dell'Elettricita' 14 | 10 - Information Phase | 28.07.2020 09:07 | 3688 | | | No | No | | | | | euro |
| 365401 | | | ERRICO / Recupero ex Ospizio Ca' Di Dio x hotel 5 * 66 camere 2 ristoranti SPA | | Default Value | | Running | euro | 17.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Riva Degli Schiavoni | 10 - Information Phase | 28.07.2020 09:07 | 3687 | | | No | No | | | | | euro |
| 365400 | | | ??? Ristr edifici x centro ricerca uffici sala conferenze 150 posti 10000 mq | | Default Value | | Running | euro | 19.06.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Industry building | Viale Dell'Industria 34 | 10 - Information Phase | 28.07.2020 09:07 | 3686 | | | No | No | | | | | euro |
| 365373 | | | LA CORTE COSTRUZIONI / Costruzione 8 villette a schiera | | Default Value | | Running | euro | 17.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Residential houses | Via Gina Romani | 10 - Information Phase | 27.07.2020 15:59 | 3685 | | | No | No | | | | | euro |
| 365372 | | | SOGEI / Costruzione edificio 9 appartamenti piastra commerciale e uffici 26/3 TETTO >>> PRESENTAZIONE | | Default Value | | Running | euro | 14.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40026 | IMOLA | Residential houses | Vie Ortignola / Di Vittorio | 10 - Information Phase | 27.07.2020 15:59 | 3684 | | | No | No | | | | | euro |
| 365371 | | | BAROCCO / Costruzione palazzina ad uso abitazione 12 appartamenti e box | | Default Value | | Running | euro | 17.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29100 | PIACENZA | Residential houses | Via B. Bagarotti | 10 - Information Phase | 27.07.2020 15:59 | 3683 | | | No | No | | | | | euro |
| 365370 | | | CITTA DUE / Costruzione edificio ad uso abitazione lotto E | | Default Value | | Running | euro | 17.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Residential houses | Via G. Impastato | 10 - Information Phase | 27.07.2020 15:59 | 3682 | | | No | No | | | | | euro |
| 365369 | | | MPD / Costruzione 4 ville bifamiliari + edificio quadrifamiliare bioedilizia | | Default Value | | Running | euro | 17.06.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47023 | CESENA | Residential houses | Via Dismano | 10 - Information Phase | 27.07.2020 15:59 | 3681 | | | No | No | | | | | euro |
| 365368 | | | SANTA CATERINA / Costruzione palazzina ad uso abitaz 12 unita' abitative e boxes | | Default Value | | Running | euro | 06.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Residential houses | Vie Aliprandi / Fabriani | 10 - Information Phase | 27.07.2020 15:59 | 3680 | | | No | No | | | | | euro |
| 365367 | | | ITI / Realizzazione nuova Casa della Salute Riappalto lavori | | Default Value | | Running | euro | 24.06.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41012 | CARPI | | Piazza S.Allende / A.Baracchi | 10 - Information Phase | 27.07.2020 15:59 | 3679 | | | No | No | | | | | euro |
| 365366 | | | QUARTAROLI / Costruz edificio multipiano ad uso abitazione 18 app. classe energetica A4 | | Default Value | | Running | euro | 19.06.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | Residential houses | Via G. Calestani 2/7 | 10 - Information Phase | 27.07.2020 15:59 | 3678 | | | No | No | | | | | euro |
| 365365 | | | COOP MURATORI / Costruzione 2 edifici 12 + 12 alloggi casaclina Classe energetica A4 | | Default Value | | Running | euro | 15.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Residential houses | Viale Piersanti Mattarella | 10 - Information Phase | 27.07.2020 15:59 | 3677 | | | No | No | | | | | euro |
| 365363 | | | ???? ABITCOOP / Costruzione 5 palazzine per 25 unita' abitative totali | | Default Value | | Running | euro | 14.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | Residential houses | Strada Formigina 505 | 10 - Information Phase | 27.07.2020 15:59 | 3675 | | | No | No | | | | | euro |
| 365361 | | | ENG2K / Ampliamento parco logistico lotto V | | Default Value | | Running | euro | 19.06.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29015 | CASTEL SAN GIOVANNI | Industry building | S.P. 412 R | 10 - Information Phase | 27.07.2020 15:59 | 3673 | | | No | No | | | | | euro |
| 365360 | | | ??? ABITCOOP / Costruz palazzine ad uso abitaz 108 appartamenti tot e opere urbanizzaz | | Default Value | | Running | euro | 14.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41042 | FIORANO MODENESE | Residential houses | Via Motta 23 | 10 - Information Phase | 27.07.2020 15:59 | 3672 | | | No | No | | | | | euro |
| 365359 | | | CMB INTEGRA /Riordino e riqualificazione strutture area pediatrica (1� stralcio funz.) 16/12 CANTIERE | | Default Value | | Running | euro | 10.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | Via P. Albertoni 15 | 10 - Information Phase | 27.07.2020 15:59 | 3671 | | | No | No | | | | | euro |
| 365358 | | | CON.CO.PAR SCARL / Costruzione edifici 260 alloggi social housing parco supermercato | | Default Value | | Running | euro | 06.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29100 | PIACENZA | Residential houses | Via Montebello Ex Manifattura | 10 - Information Phase | 27.07.2020 15:59 | 3670 | | | No | No | | | | | euro |
| 365357 | | | CONS STABILE GRANDI LAVORI RCM FINCOSIT F&M IMG / Costruzione nuovo Hub portuale / 25/3 NON ACCESSIBILE | | Default Value | | Running | euro | 17.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | Technical facilities | Porto | 10 - Information Phase | 27.07.2020 15:59 | 3669 | | | No | No | | | | | euro |
| 365352-001 | | | MAGNETTI / PLURIPIANO / HCC | | Default Value | | Running | euro | 27.07.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24030 | Carvico | | X | 40 - Realisation Phase | 27.07.2020 15:49 | | | | No | No | | | | | euro |
| 365352 | | | MAGNETTI / PLURIPIANO | | Default Value | | Running | euro | 27.07.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 24030 | Carvico | | X | 10 - Information Phase | 27.07.2020 15:48 | | | | No | No | | | | | euro |
| 365324-001 | | | TERREAL/CHIESA PIZZO VIBO VALENTIA/WINDPOST | | Default Value | | Running | euro | 27.07.2020 | | ICAL-CALABRIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 89900 | Vibo Valentia | | _ | 20 - Planning Phase | 27.07.2020 12:38 | | | | No | No | | | | | euro |
| 365324 | | | TERREAL/CHIESA PIZZO VIBO VALENTIA | | Default Value | | Running | euro | 27.07.2020 | | ICAL-CALABRIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 89900 | Vibo Valentia | | _ | 10 - Information Phase | 27.07.2020 12:37 | | | | No | No | | | | | euro |
| 365309-001 | | | NEOLIT/ SPAZI VITA ANZIANI GIOVANI/MERANO/FPA | | Default Value | | Running | euro | 27.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 39010 | Merano | | - | 20 - Planning Phase | 27.07.2020 11:24 | | | | No | No | | | | | euro |
| 365309 | | | NEOLIT/ SPAZI VITA ANZIANI GIOVANI/MERANO | | Default Value | | Running | euro | 27.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 39010 | Merano | | - | 10 - Information Phase | 27.07.2020 11:23 | | | | No | No | | | | | euro |
| 365217 | | | OFF PEDROLLO / BMW / VOLARGNE | | Default Value | | Running | euro | 23.07.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37020 | Volargne | | VIA NAPOLEONE | 40 - Realisation Phase | 23.07.2020 15:13 | | | | No | No | | | | | euro |
| 365064-001 | | | HBS / NUOVA LINEA DI TERMOVALORIZZAZIONE-LINEA 3 PARONA | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 27020 | Parona | Technical facilities (Mechanical engeneering) | Via Casc 2c | 40 - Realisation Phase | 22.07.2020 07:10 | | | | No | No | | | | | euro |
| 365064 | | | NUOVA LINEA DI TERMOVALORIZZAZIONE-LINEA 3 PARONA | | Default Value | | Running | euro | 22.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27020 | Parona | Technical facilities (Mechanical engeneering) | Via Casc 2c | 40 - Realisation Phase | 22.07.2020 07:07 | | | | No | No | | | | | euro |
| 364845-001 | | | IMPLEMENTAZIONE/ HIT / EMILIA-VENETO | | Default Value | | Running | euro | 17.07.2020 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | - | 10 - Information Phase | 17.07.2020 10:34 | | | | No | No | | | | | euro |
| 364845 | | | IMPLEMENTAZIONE/ HIT / EMILIA-VENETO | | Default Value | | Running | euro | 17.07.2020 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | - | 10 - Information Phase | 17.07.2020 10:34 | | | | No | No | | | | | euro |
| 364720-002 | | | HTA-CE 40/22P / SYMBIOSIS LOTTO NORD / MILANO / CMB | | Default Value | | Running | euro | 09.11.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20139 | Milano | Office building | Viale Oltres | 40 - Realisation Phase | 09.11.2020 08:01 | | | | No | No | | | | | euro |
| 364720-001 | | | HBS / SYMBIOSIS LOTTO NORD / MILANO / CMB | | Default Value | | Running | euro | 15.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20139 | Milano | Office building | Viale Oltres | 40 - Realisation Phase | 15.07.2020 14:31 | | | | No | No | | | | | euro |
| 364720 | | | SYMBIOSIS LOTTO NORD / MILANO / CMB | | Default Value | | Running | euro | 15.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20139 | Milano | Office building | Viale Oltres | 30 - Tender & Submission Phase | 15.07.2020 14:28 | | | | No | No | | | | | euro |
| 364709-001 | | | MAK COSTRUZIONI / DOBBIACO (BZ)/ ISI SCALE | | Default Value | | Running | euro | 15.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 39034 | Dobbiaco | | - | 20 - Planning Phase | 15.07.2020 13:55 | | | | No | No | | | | | euro |
| 364709 | | | MAK COSTRUZIONI / DOBBIACO (BZ) | | Default Value | | Running | euro | 15.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 39034 | Dobbiaco | | - | 10 - Information Phase | 15.07.2020 13:53 | | | | No | No | | | | | euro |
| 364623-001 | | | GARA / COSTRUZIONE DI NUOVO CONDOMINIO / MILANO / HDB / HB / HBT / GWS | | Default Value | | Running | euro | 14.07.2020 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | VIA GAROFALO | 10 - Information Phase | 14.07.2020 12:12 | | | | No | No | | | | | euro |
| 364623 | | | GARA / COSTRUZIONE DI NUOVO CONDOMINIO / MILANO | | Default Value | | Running | euro | 14.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | VIA GAROFALO | 10 - Information Phase | 14.07.2020 12:12 | | | | No | No | | | | | euro |
| 364584-001 | | | UNIONBAU / IMPIANTO PER LO SPORT SU GHIACCIO / BRUNICO / HIT | | Default Value | | Running | euro | 14.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 39031 | Brunico | Sports facility | X | 30 - Tender & Submission Phase | 14.07.2020 08:24 | | | | No | No | | | | | euro |
| 364584 | | | UNIONBAU / IMPIANTO PER LO SPORT SU GHIACCIO / BRUNICO | | Default Value | | Running | euro | 14.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39031 | Brunico | Sports facility | X | 10 - Information Phase | 14.07.2020 08:24 | | | | No | No | | | | | euro |
| 364452-001 | | | HIT / UNIFAMILIARE / BUSNELLI / CARIMATE | | Default Value | | Running | euro | 10.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 22060 | Carimate | Residential houses | VIA CALVI | 40 - Realisation Phase | 10.07.2020 13:18 | | | | No | No | | | | | euro |
| 364452 | | | UNIFAMILIARE / BUSNELLI / CARIMATE | | Default Value | | Running | euro | 10.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22060 | Carimate | Residential houses | VIA CALVI | 30 - Tender & Submission Phase | 10.07.2020 13:15 | | | | No | No | | | | | euro |
| 364319-001 | | | CANDELA/TSH TORINO RESIDENZE STUDENTI /FK4 | | Default Value | | Running | euro | 09.07.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | - | 10 - Information Phase | 09.07.2020 10:22 | | | | No | No | | | | | euro |
| 364319 | | | CANDELA/TSH TORINO RESIDENZE STUDENTI | | Default Value | | Running | euro | 09.07.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | - | 10 - Information Phase | 09.07.2020 10:21 | | | | No | No | | | | | euro |
| 364290-001 | | | HDB / IMMOBILIARE VALEFRA / CINISELLO BALSAMO | | Default Value | | Running | euro | 08.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20092 | Cinisello Balsamo | Residential houses | Via Monte Nevoso | 30 - Tender & Submission Phase | 08.07.2020 17:46 | | | | No | No | | | | | euro |
| 364290 | | | IMMOBILIARE VALEFRA / CINISELLO BALSAMO | | Default Value | | Running | euro | 08.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20092 | Cinisello Balsamo | Residential houses | Via Monte Nevoso | 30 - Tender & Submission Phase | 08.07.2020 17:43 | | | | No | No | | | | | euro |
| 364283-002 | | | GARA / PROGETTO DI RISTRUTTURAZIONE E AMPLIAMENTO OSPEDALE LOTTO 5A / BRUNICO | | Default Value | | Running | euro | 16.10.2020 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | BRUNICO | 30 - Tender & Submission Phase | 16.10.2020 13:45 | | | | No | No | | | | | euro |
| 364283-001 | | | GARA / PROGETTO DI RISTRUTTURAZIONE E AMPLIAMENTO OSPEDALE / BRUNICO / HDB / HIT / HBT | | Default Value | | Running | euro | 08.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | BRUNICO | 30 - Tender & Submission Phase | 08.07.2020 16:42 | | | | No | No | | | | | euro |
| 364283 | | | GARA / PROGETTO DI RISTRUTTURAZIONE E AMPLIAMENTO OSPEDALE / BRUNICO | | Default Value | | Running | euro | 08.07.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | BRUNICO | 10 - Information Phase | 08.07.2020 16:42 | | | | No | No | | | | | euro |
| 364242-001 | | | RESIDENZIALE / NOVI DI MODENA / HDB | | Default Value | | Running | euro | 08.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 41016 | Novi di Modena | | VIA DE AMICIS | 10 - Information Phase | 08.07.2020 11:54 | | | | No | No | | | | | euro |
| 364242 | | | RESIDENZIALE / NOVI DI MODENA | | Default Value | | Running | euro | 08.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41016 | Novi di Modena | | VIA DE AMICIS | 10 - Information Phase | 08.07.2020 11:49 | | | | No | No | | | | | euro |
| 364137-001 | | | HDB / HEIDENHAIN ITALIANA / NUOVO HEADQUARTERS milano | | Default Value | | Running | euro | 07.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20128 | Milano | Office building | Via De Notaris 51 | 30 - Tender & Submission Phase | 07.07.2020 13:25 | | | | No | No | | | | | euro |
| 364137 | | | HEIDENHAIN ITALIANA / NUOVO HEADQUARTERS milano | | Default Value | | Running | euro | 07.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20128 | Milano | Office building | Via De Notaris 51 | 30 - Tender & Submission Phase | 07.07.2020 13:21 | | | | No | No | | | | | euro |
| 363962-001 | | | COGEIS / CENTRO COMMERCIALE / TORINO / HDB | | Default Value | | Running | euro | 03.07.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | VIA GUIDORENI | 40 - Realisation Phase | 03.07.2020 12:28 | | | | No | No | | | | 20.000,00 € | euro |
| 363962 | | | COGEIS / CENTRO COMMERCIALE / TORINO | | Default Value | | Running | euro | 03.07.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | VIA GUIDORENI | 10 - Information Phase | 03.07.2020 12:28 | | | | No | No | | | | 20.000,00 € | euro |
| 363697 | | | IMPLEMETAZIONE ISEDIO PAVIMENTISTI VENETO EMILIA LOMBARDIA | | Default Value | | Running | euro | 01.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | --- | 10 - Information Phase | 01.07.2020 12:14 | | | | No | No | | | | | euro |
| 363614-001 | | | VIADOTTO SUL LAGO TURANO- Interventi sull’impalcato viario / HBS | | Default Value | | Running | euro | 30.06.2020 | 24.06.2020 | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 02020 | Castel di Tora | Infrastructural facility | S.P. 14 | 40 - Realisation Phase | 30.06.2020 13:56 | | | | No | No | | | | | euro |
| 363614 | | | VIADOTTO SUL LAGO TURANO- Interventi sull’impalcato viario | | Default Value | | Running | euro | 24.06.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 02020 | Castel di Tora | | S.P. 14 | 10 - Information Phase | 30.06.2020 13:55 | | | | No | No | | | | | euro |
| 363482-001 | | | CANDELA / CITY LIFE /FK4 | | Default Value | | Running | euro | 29.06.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | - | 20 - Planning Phase | 29.06.2020 11:59 | | | | No | No | | | | | euro |
| 363482 | | | CANDELA / CITY LIFE | | Default Value | | Running | euro | 29.06.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | - | 10 - Information Phase | 29.06.2020 11:58 | | | | No | No | | | | | euro |
| 363421-002 | | | HBT / PROGETTO GAROFALO / VIA GAROFALO 37 MILANO | | Default Value | | Running | euro | 02.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20133 | Milano | Residential houses | via Garofalo 37 | 30 - Tender & Submission Phase | 02.07.2020 15:02 | | | | No | No | | | | | euro |
| 363421-001 | | | HDB / PROGETTO GAROFALO / VIA GAROFALO 37 MILANO | | Default Value | | Running | euro | 29.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20133 | Milano | Residential houses | via Garofalo 37 | 30 - Tender & Submission Phase | 29.06.2020 08:26 | | | | No | No | | | | | euro |
| 363421 | | | PROGETTO GAROFALO / VIA GAROFALO 37 MILANO | | Default Value | | Running | euro | 29.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20133 | Milano | Residential houses | via Garofalo 37 | 30 - Tender & Submission Phase | 29.06.2020 08:24 | | | | No | No | | | | | euro |
| 363192-001 | | | EDIL 84 / REALIZZAZIONE DI UNA PALAZZINA COSTITUITA DA 30 APPARTAMENTI IN REGIME DI HOUSING SOCIALE / PISTOIA / HDB | | Default Value | | Running | euro | 24.06.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 51100 | Pistoia (PT) | | VIA MOLINA DI GORA | 30 - Tender & Submission Phase | 24.06.2020 16:35 | | | | No | No | | | | 21.000,00 € | euro |
| 363192 | | | EDIL 84 / REALIZZAZIONE DI UNA PALAZZINA COSTITUITA DA 30 APPARTAMENTI IN REGIME DI HOUSING SOCIALE / PISTOIA | | Default Value | | Running | euro | 24.06.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 51100 | Pistoia (PT) | | VIA MOLINA DI GORA | 10 - Information Phase | 24.06.2020 16:35 | | | | No | No | | | | 21.000,00 € | euro |
| 362934 | | | GARC / Costruzione insediamento commerciale | | Default Value | | Running | euro | 22.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41042 | FIORANO MODENESE | Technical facilities | Vie Giardino/Viazza II tronco | 10 - Information Phase | 22.06.2020 14:16 | 3667 | | | No | No | | | | | euro |
| 362930 | | | SARCOS / Costr 2 medie strutture vendita non alimentare 2100+800 mq e residenziale | | Default Value | | Running | euro | 12.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29100 | PIACENZA | Technical facilities | Via R.Goitre | 10 - Information Phase | 22.06.2020 14:16 | 3663 | | | No | No | | | | | euro |
| 362929 | | | SUBISSATI / Costruzione scuola primaria / 25/3 ANCORA DA DEMOLIRE | | Default Value | | Running | euro | 13.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47838 | RICCIONE | | Via Catullo | 10 - Information Phase | 22.06.2020 14:16 | 3662 | | | No | No | | | | | euro |
| 362927 | | | ??? / Costruzione capannone per impianto trattamento ossa di origine zootecnica | | Default Value | | Running | euro | 07.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41014 | CASTELVETRO DI MODENA | Industry building | Via per Spilamberto 30/C | 10 - Information Phase | 22.06.2020 14:15 | 3660 | | | No | No | | | | | euro |
| 362926 | | | SCARAMUZZA / Costruzione supermercato 2800 mq e negozi 700 mq | | Default Value | | Running | euro | 19.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 29017 | FIORENZUOLA D'ARDA | Technical facilities | Vie Emilia Ovest / Frioli | 10 - Information Phase | 22.06.2020 14:15 | 3659 | | | No | No | | | | | euro |
| 362922 | | | CMB (EX 330877) DIEGO / Costruzione residenza studentesca edificio multip 513 posti letto 26/3 FONDAZIONI | | Default Value | | Running | euro | 19.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Residential houses | Via Serlio Ex Fervet | 10 - Information Phase | 22.06.2020 14:15 | 3654 | | | No | No | | | | | euro |
| 362921 | | | TECHBAU / Costruzione 2 edifici logistici con uffici 21400 mq DC24 + 9450 mq DC23 | | Default Value | | Running | euro | 28.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40010 | BENTIVOGLIO | Industry building | Interporto | 10 - Information Phase | 22.06.2020 14:15 | 3653 | | | No | No | | | | | euro |
| 362880 | | | TONON / Costruzione ipermercato 4800mq UMI 1 e opere di urbanizzaz secondaria | | Default Value | | Running | euro | 27.05.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Via Caravaggio 25 | 10 - Information Phase | 22.06.2020 12:13 | 3640 | | | No | No | | | | | euro |
| 362879 | | | ENG2K / Ampliamento polo logistico | | Default Value | | Running | euro | 04.06.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35040 | VESCOVANA | Industry building | Viale Europa | 10 - Information Phase | 22.06.2020 12:13 | 3639 | | | No | No | | | | | euro |
| 362878 | | | BUILDING VI / Estensione rete acquedotto area Monselicense Estense Montagnanese | | Default Value | | Running | euro | 03.05.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35043 | MONSELICE | Technical facilities | ESTE | 10 - Information Phase | 22.06.2020 12:13 | 3638 | | | No | No | | | | | euro |
| 362877 | | | PIZZAROTTI / Costruzione casa circondariale 300 posti | | Default Value | | Running | euro | 27.05.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33078 | SAN VITO AL TAGLIAMENTO | | Via Oberdan | 10 - Information Phase | 22.06.2020 12:06 | 3637 | | | No | No | | | | | euro |
| 362827-001 | | | HIT / VILLE BIFAMILIARI AREA AT4 / VIA CEPPE COMERIO | | Default Value | | Running | euro | 22.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21025 | Comerio | Residential houses | via ceppe | 30 - Tender & Submission Phase | 22.06.2020 10:06 | | | | No | No | | | | | euro |
| 362827 | | | VILLE BIFAMILIARI AREA AT4 / VIA CEPPE COMERIO | | Default Value | | Running | euro | 22.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21025 | Comerio | Residential houses | via ceppe | 30 - Tender & Submission Phase | 22.06.2020 10:04 | | | | No | No | | | | | euro |
| 362570 | | | Costruzione passerella ciclo-pedonale sul fiume Serio | | Default Value | | Running | euro | 28.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24020 | GORLE | Technical facilities | SCANSOROSCIATE / PEDRENGO | 10 - Information Phase | 18.06.2020 14:44 | 3636 | | | No | No | | | | | euro |
| 362569 | | | Ristrutturazione palazzina ad uso abitazione | | Default Value | | Running | euro | 10.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via G.Galilei 126 | 10 - Information Phase | 18.06.2020 14:44 | 3635 | | | No | No | | | | | euro |
| 362568 | | | Costruzione villa bifamiliare | | Default Value | | Running | euro | 21.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25032 | CHIARI | Residential houses | Via Cav.Repubblica Italiana 16 | 10 - Information Phase | 18.06.2020 14:44 | 3634 | | | No | No | | | | | euro |
| 362567 | | | Costruzione edificio ad uso abitazione | | Default Value | | Running | euro | 27.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25015 | DESENZANO DEL GARDA | Residential houses | Via G. Zadei | 10 - Information Phase | 18.06.2020 14:44 | 3633 | | | No | No | | | | | euro |
| 362566 | | | Costruzione 4 ville Classe Energetica A4 | | Default Value | | Running | euro | 27.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | CASTREZZATO | Residential houses | Vie I.Silone / Cinna | 10 - Information Phase | 18.06.2020 14:44 | 3632 | | | No | No | | | | | euro |
| 362565 | | | Costruzione palestra ad uso scolastico ed extrascolastico | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23019 | TRAONA | | Via Valeriana | 10 - Information Phase | 18.06.2020 14:44 | 3631 | | | No | No | | | | | euro |
| 362564 | | | Ristrutturazione e ampliamento supermercato | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24058 | ROMANO DI LOMBARDIA | Technical facilities | Via del Commercio | 10 - Information Phase | 18.06.2020 14:44 | 3630 | | | No | No | | | | | euro |
| 362563 | | | Costruzione nuova scuola dell'infanzia San Carlo e locali polifunzionali | | Default Value | | Running | euro | 09.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24060 | SPINONE AL LAGO | | Via alla Fonte | 10 - Information Phase | 18.06.2020 14:44 | 3629 | | | No | No | | | | | euro |
| 362562 | | | Ristrutturazione edificio ad uso residenziale | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Via A.Diaz 60 | 10 - Information Phase | 18.06.2020 14:44 | 3628 | | | No | No | | | | | euro |
| 362561 | | | Recupero edificio 8 unita' abitative con tipologia loft | | Default Value | | Running | euro | 27.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Alzaia Naviglio Grande 190 | 10 - Information Phase | 18.06.2020 14:44 | 3627 | | | No | No | | | | | euro |
| 362560 | | | Costruzione parcheggio in struttura presso Centro Commerciale | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24035 | CURNO | Technical facilities | Via Fermi 1 | 10 - Information Phase | 18.06.2020 14:44 | 3626 | | | No | No | | | | | euro |
| 362559 | | | Ristrutturazione edificio ad uso abitazione e negozi | | Default Value | | Running | euro | 03.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Piazza Caprera | 10 - Information Phase | 18.06.2020 14:44 | 3625 | | | No | No | | | | | euro |
| 362558 | | | Costruzione nuovi fabbricati ad uso agricolo | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20066 | MELZO | Industry building | Cascina Colombina | 10 - Information Phase | 18.06.2020 14:44 | 3624 | | | No | No | | | | | euro |
| 362557 | | | Bonifica area comunale | | Default Value | | Running | euro | 19.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Giambellino 129 | 10 - Information Phase | 18.06.2020 14:44 | 3623 | | | No | No | | | | | euro |
| 362556 | | | Costruzione edificio commerciale | | Default Value | | Running | euro | 28.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46030 | SAN GIORGIO DI MANTOVA | Technical facilities | S.P.n.10 / Via XXV Aprile | 10 - Information Phase | 18.06.2020 14:44 | 3622 | | | No | No | | | | | euro |
| 362555 | | | Costruzione nuova scuola per l'infanzia e asilo nido | | Default Value | | Running | euro | 15.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | ADRO | | Via Nigoline | 10 - Information Phase | 18.06.2020 14:44 | 3621 | | | No | No | | | | | euro |
| 362554 | | | Costruzione 2 ville trifamiliari classe energetica A2 | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via O.Montini 9 | 10 - Information Phase | 18.06.2020 14:44 | 3620 | | | No | No | | | | | euro |
| 362553 | | | Costruzione supermercato 1260 mq ed opere di urbanizzazione | | Default Value | | Running | euro | 08.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Technical facilities | Via San Francesco | 10 - Information Phase | 18.06.2020 14:44 | 3619 | | | No | No | | | | | euro |
| 362552 | | | Costruzione ville a schiera e opere di urbanizzazione | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25045 | CASTEGNATO | Residential houses | Via Galilei | 10 - Information Phase | 18.06.2020 14:44 | 3618 | | | No | No | | | | | euro |
| 362551 | | | Costruzione palazzina ad uso abitazione | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Scipio Slapater 14 | 10 - Information Phase | 18.06.2020 14:44 | 3617 | | | No | No | | | | | euro |
| 362550 | | | Costruzione 2 palazzine ed uso abitazione 5+5 appartamenti Classe A3 | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Residential houses | Vie del Picco / Cavalli | 10 - Information Phase | 18.06.2020 14:44 | 3616 | | | No | No | | | | | euro |
| 362549 | | | Costruzione edificio ad uso abitazione 10 unita' abitative | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via G.Savoldo 4 | 10 - Information Phase | 18.06.2020 14:44 | 3615 | | | No | No | | | | | euro |
| 362548 | | | Costruzione due palazzine 5 + 5 appartamenti | | Default Value | | Running | euro | 27.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25064 | GUSSAGO | Residential houses | Via Caporalino 46 | 10 - Information Phase | 18.06.2020 14:44 | 3614 | | | No | No | | | | | euro |
| 362547 | | | Costruzione palazzina multipiano ad uso abitazione 10 appartam classe A3 | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Largo Molinetto | 10 - Information Phase | 18.06.2020 14:44 | 3613 | | | No | No | | | | | euro |
| 362546 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Menabrea 7 | 10 - Information Phase | 18.06.2020 14:44 | 3612 | | | No | No | | | | | euro |
| 362545 | | | Ristrutturazione edificio ex filtropresse e allestimento laboratorio | | Default Value | | Running | euro | 10.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Technical facilities | Localita' San Rocco | 10 - Information Phase | 18.06.2020 14:44 | 3611 | | | No | No | | | | | euro |
| 362544 | | | Costruzione supermercato 1450 mq e opere urbanizzazione | | Default Value | | Running | euro | 09.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27026 | GARLASCO | Technical facilities | Vie Dorno / L. Da Vinci | 10 - Information Phase | 18.06.2020 14:44 | 3610 | | | No | No | | | | | euro |
| 362543 | | | Costruzione edifici residenziali Lotto A2 | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via O.Montini | 10 - Information Phase | 18.06.2020 14:44 | 3609 | | | No | No | | | | | euro |
| 362542 | | | Costruzione edificio multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Gallarana | 10 - Information Phase | 18.06.2020 14:44 | 3608 | | | No | No | | | | | euro |
| 362541 | | | Costruzione edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 08.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20062 | CASSANO D'ADDA | Residential houses | Vicolo del Frati | 10 - Information Phase | 18.06.2020 14:44 | 3607 | | | No | No | | | | | euro |
| 362540 | | | Ristrutturazione edificio multipiano ad uso abitazione | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Pola 4 | 10 - Information Phase | 18.06.2020 14:44 | 3606 | | | No | No | | | | | euro |
| 362539 | | | Costruzione edificio multipiano 18 appartamenti Classe A3 | | Default Value | | Running | euro | 19.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | PAVIA | Residential houses | Viale Savoldi | 10 - Information Phase | 18.06.2020 14:44 | 3605 | | | No | No | | | | | euro |
| 362538 | | | Costruzione edificio ad uso abitazione 17 appartamenti e boxes | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G.B.Prandina 4 | 10 - Information Phase | 18.06.2020 14:43 | 3604 | | | No | No | | | | | euro |
| 362537 | | | Ristrutturazione e ricostruzione scuola primaria | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24018 | VILLA D'ALME' | | Piazza Carboni | 10 - Information Phase | 18.06.2020 14:43 | 3603 | | | No | No | | | | | euro |
| 362536 | | | Ampliam stabilim produzione alimenti x animali magazzino 6650mq coperti | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26011 | CASALBUTTANO ED UNITI | Industry building | Via M.Soldi | 10 - Information Phase | 18.06.2020 14:43 | 3602 | | | No | No | | | | | euro |
| 362535 | | | Costruzione 2 palazzine ad uso abitazione negozi ed uffici | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Vie L.Bissolati / L.Bianchini | 10 - Information Phase | 18.06.2020 14:43 | 3601 | | | No | No | | | | | euro |
| 362534 | | | Costruzione supermercato Italmark | | Default Value | | Running | euro | 24.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25049 | ISEO | Technical facilities | Via Roma Localita' Covelo | 10 - Information Phase | 18.06.2020 14:43 | 3600 | | | No | No | | | | | euro |
| 362533 | | | Costruzione edifici B1 e B2 ed uso abitazione | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Leone XIII 8 | 10 - Information Phase | 18.06.2020 14:43 | 3599 | | | No | No | | | | | euro |
| 362532 | | | Ristrutturazione edificio multipiano ad uso abitazione | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Corso Porta Vittoria 51 | 10 - Information Phase | 18.06.2020 14:43 | 3598 | | | No | No | | | | | euro |
| 362531 | | | Demoricostruzione edificio ad uso abitazione 20 appartamenti | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G.Pastorelli 13 | 10 - Information Phase | 18.06.2020 14:43 | 3597 | | | No | No | | | | | euro |
| 362530 | | | Costruzione supermercato generi alimentari e ristorante 500 mq | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Via Foro Boario 4 | 10 - Information Phase | 18.06.2020 14:43 | 3596 | | | No | No | | | | | euro |
| 362529 | | | Costruzione edificio ad uso abitazione 21 appartamenti Classe A4 | | Default Value | | Running | euro | 20.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Costanza 11 | 10 - Information Phase | 18.06.2020 14:43 | 3595 | | | No | No | | | | | euro |
| 362528 | | | Recupero complesso multip residenze 4150mq uffici 580mq commercio 1300mq | | Default Value | | Running | euro | 27.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Vie Camozzi 70 / Maffei 3 | 10 - Information Phase | 18.06.2020 14:43 | 3594 | | | No | No | | | | | euro |
| 362527 | | | Costruzione edificio commerciale formato da 2 unita' 1232+867 mq | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20093 | COLOGNO MONZESE | Technical facilities | Vie per Imbersago / Foscolo | 10 - Information Phase | 18.06.2020 14:43 | 3593 | | | No | No | | | | | euro |
| 362526 | | | Demoricostruzione edificio 3 piani f.t. 27 appartamenti e boxes | | Default Value | | Running | euro | 10.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Via G.Matteotti 98 | 10 - Information Phase | 18.06.2020 14:43 | 3592 | | | No | No | | | | | euro |
| 362525 | | | ENG 2K / Costruzione magazzino logistico 8000 mq | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25045 | CASTEGNATO | Industry building | Zona Industriale | 10 - Information Phase | 18.06.2020 14:43 | 3591 | | | No | No | | | | | euro |
| 362524 | | | Risanamento conservativo edificio per abitazioni di prestigio | | Default Value | | Running | euro | 09.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Timavo 12 | 10 - Information Phase | 18.06.2020 14:43 | 3590 | | | No | No | | | | | euro |
| 362523 | | | Costruzione edificio ad uso abitaz 34 appartamenti e 27 boxes | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Salaino 14 | 10 - Information Phase | 18.06.2020 14:43 | 3589 | | | No | No | | | | | euro |
| 362522 | | | Ampliam complesso industriale palazzina uffici 1700mq produzione 3100mq | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24035 | CURNO | Industry building | Via Fermi 16 | 10 - Information Phase | 18.06.2020 14:43 | 3588 | | | No | No | | | | | euro |
| 362521 | | | Demoricostruzione 2 edifici multipiano ad uso abitazione e boxes | | Default Value | | Running | euro | 03.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Valtellina 38 | 10 - Information Phase | 18.06.2020 14:43 | 3587 | | | No | No | | | | | euro |
| 362520 | | | Ristrutturazione 3 edifici ad uso uffici | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via San Giovanni sul Muro 9 | 10 - Information Phase | 18.06.2020 14:43 | 3586 | | | No | No | | | | | euro |
| 362519 | | | Opere strutt risoluzione interferenze sottoservizi/viabili prolungam tram | | Default Value | | Running | euro | 19.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Anassagora Quartiere Adriano | 10 - Information Phase | 18.06.2020 14:43 | 3585 | | | No | No | | | | | euro |
| 362518-003 | | | ITI / Costruzione parcheggio multipiano interrato PII De Gasperi Est / GIUNTI | | Default Value | | Running | euro | 07.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20097 | SAN DONATO MILANESE | Technical facilities | Via Vannucchi | 40 - Realisation Phase | 07.07.2021 10:33 | 3584 | | | No | No | | | | | euro |
| 362518-002 | | | ITI / Costruzione parcheggio multipiano interrato PII De Gasperi Est /HSC | | Default Value | | Running | euro | 07.07.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20097 | SAN DONATO MILANESE | Technical facilities | Via Vannucchi | 40 - Realisation Phase | 07.07.2021 10:33 | 3584 | | | No | No | | | | | euro |
| 362518-001 | | | ITI / Costruzione parcheggio multipiano interrato PII De Gasperi Est / HDB | | Default Value | | Running | euro | 21.06.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20097 | SAN DONATO MILANESE | Technical facilities | Via Vannucchi | 40 - Realisation Phase | 21.06.2021 12:03 | 3584 | | | No | No | | | | | euro |
| 362518 | | | Costruzione parcheggio multipiano interrato PII De Gasperi Est | | Default Value | | Running | euro | 04.06.2020 | | IEMI-EMILIA ROMAGNA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20097 | SAN DONATO MILANESE | Technical facilities | Via Vannucchi | 40 - Realisation Phase | 18.06.2020 14:43 | 3584 | | | No | No | | | | | euro |
| 362517 | | | Ampliamento grande struttura vendita ex Fornace e adeguamento rete viaria | | Default Value | | Running | euro | 23.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21049 | TRADATE | Technical facilities | Via Fornace Cortellezzi | 10 - Information Phase | 18.06.2020 14:43 | 3583 | | | No | No | | | | | euro |
| 362516 | | | Demoricostruzione 3 edifici multip ad uso abitazione 74 appartam e boxes | | Default Value | | Running | euro | 27.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G.B.Piranesi 38 | 10 - Information Phase | 18.06.2020 14:43 | 3582 | | | No | No | | | | | euro |
| 362515 | | | Costruzione complesso industriale | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25040 | ESINE | Industry building | Via A.Manzoni 97 | 10 - Information Phase | 18.06.2020 14:43 | 3581 | | | No | No | | | | | euro |
| 362514 | | | Costruzione 3 edifici multipiano 103 appartamenti 96 boxes Classe A1 | | Default Value | | Running | euro | 04.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Bisceglie | 10 - Information Phase | 18.06.2020 14:43 | 3580 | | | No | No | | | | | euro |
| 362513 | | | Costruzione 3 edifici multipiano ad uso abitazione 100 appartamenti | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie L.Pastro 18 / Vignati 15 | 10 - Information Phase | 18.06.2020 14:43 | 3579 | | | No | No | | | | | euro |
| 362512 | | | Costruzione polo per la macinazione del grano | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Industry building | Vie Riglio / Roncobasso | 10 - Information Phase | 18.06.2020 14:43 | 3578 | | | No | No | | | | | euro |
| 362511 | | | Costruzione complesso residenziale wellness area 3 piani interr boxes | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Piazza Irnerio 18 Ex Borletti | 10 - Information Phase | 18.06.2020 14:43 | 3577 | | | No | No | | | | | euro |
| 362510 | | | Costruzione centro logistico 27300 mq per societa' PE.TRA srl | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24041 | BREMBATE | Industry building | Via Orobie | 10 - Information Phase | 18.06.2020 14:43 | 3576 | | | No | No | | | | | euro |
| 362509 | | | Costruzione complesso multipiano residenza studenti 35000mq 700 p.letto | | Default Value | | Running | euro | 07.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Frigia 19 | 10 - Information Phase | 18.06.2020 14:43 | 3575 | | | No | No | | | | | euro |
| 362508 | | | Costruzione edificio commerciale presso Centro Fiordaliso 10000 mq | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20089 | ROZZANO | Technical facilities | Via Curiel | 10 - Information Phase | 18.06.2020 14:43 | 3574 | | | No | No | | | | | euro |
| 362507 | | | Costruzione edificio multipiano ad uso direzionale 14000 mq | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via V.Pisani 22 | 10 - Information Phase | 18.06.2020 14:43 | 3573 | | | No | No | | | | | euro |
| 362506 | | | Costruzione residenza studentesca 640 posti letto 17650 mq | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Giovenale 15 / Col Moschin 14 | 10 - Information Phase | 18.06.2020 14:43 | 3572 | | | No | No | | | | | euro |
| 362505 | | | TECHBAU / Costruzione polo logistico 2 edifici 45800+18000 mq | | Default Value | | Running | euro | 28.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46030 | SAN GIORGIO DI MANTOVA | Industry building | Vie Castiona / S.P.n.10 | 10 - Information Phase | 18.06.2020 14:43 | 3571 | | | No | No | | | | | euro |
| 362504 | | | Costruzione edifici multipiano uso abitazione 103 appartamenti Lotto 2 | | Default Value | | Running | euro | 20.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via A.Spinola | 10 - Information Phase | 18.06.2020 14:43 | 3570 | | | No | No | | | | | euro |
| 362503 | | | Costruz complesso multipiano direzionale fase 2 Quartiere Symbiosis | | Default Value | | Running | euro | 12.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Adamello | 10 - Information Phase | 18.06.2020 14:43 | 3569 | | | No | No | | | | | euro |
| 362502 | | | Costruzione sede Campus universitario scientifico Mind project-financing | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via C.Belgioioso Area Expo | 10 - Information Phase | 18.06.2020 14:43 | 3568 | | | No | No | | | | | euro |
| 362501 | | | Nuovo quartiere multifunzionale Lotto R1 542 appartamenti uffici retail | | Default Value | | Running | euro | 24.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Bisceglie/Calchi Taeggi | 10 - Information Phase | 18.06.2020 14:43 | 3567 | | | No | No | | | | | euro |
| 362412-001 | | | HIT / 3 EDIFICI A1 / HABITAT BISCEGLE COOP / VIA BISCEGLIE MILANO | | Default Value | | Running | euro | 17.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20152 | Milano | Residential houses | Via Bisceglie | 40 - Realisation Phase | 17.06.2020 18:09 | | | | No | No | | | | | euro |
| 362412 | | | 3 EDIFICI A1 / HABITAT BISCEGLE COOP / VIA BISCEGLIE MILANO | | Default Value | | Running | euro | 17.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20152 | Milano | | Via Bisceglie | 40 - Realisation Phase | 17.06.2020 18:07 | | | | No | No | | | | | euro |
| 362406 | | | Costruzione supermercato Coop e opere di urbanizzazione | | Default Value | | Running | euro | 03.05.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58017 | PITIGLIANO | Technical facilities | S.R.n.74/Via Brodolini | 10 - Information Phase | 17.06.2020 16:00 | 3566 | | | No | No | | | | | euro |
| 362405 | | | Costruzione Residenza Sanitaria Assistenziale 240 posti letto | | Default Value | | Running | euro | 09.06.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57023 | CECINA | | Vie Pasubio/Parmigiani ex Massalombarda | 10 - Information Phase | 17.06.2020 16:00 | 3565 | | | No | No | | | | | euro |
| 362404 | | | Realizzazione nuovo palazzetto dello sport primo lotto | | Default Value | | Running | euro | 13.05.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56032 | BUTI | | Via Eroi dello Spazio | 10 - Information Phase | 17.06.2020 16:00 | 3564 | | | No | No | | | | | euro |
| 362403 | | | Realizzazione palestra presso Istituto M.L.King primo lotto | | Default Value | | Running | euro | 13.05.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56030 | CALCINAIA | | Via A.Garemi 3 | 10 - Information Phase | 17.06.2020 16:00 | 3563 | | | No | No | | | | | euro |
| 362402 | | | Costruzione edificio commerciale 1200mq e uffici 450mq | | Default Value | | Running | euro | 07.05.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55049 | VIAREGGIO | Technical facilities | Via Pisana | 10 - Information Phase | 17.06.2020 16:00 | 3562 | | | No | No | | | | | euro |
| 362401 | | | Costruzione nuova scuola (1� lotto) | | Default Value | | Running | euro | 22.05.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55022 | BAGNI DI LUCCA | | Localita' Scesta | 10 - Information Phase | 17.06.2020 15:59 | 3561 | | | No | No | | | | | euro |
| 362400 | | | Costruzione scuola primaria | | Default Value | | Running | euro | 04.06.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52044 | CORTONA | Technical facilities | Localita' Camuccia | 10 - Information Phase | 17.06.2020 15:59 | 3560 | | | No | No | | | | | euro |
| 362399 | | | Recupero cascina Favard per nuova sede amministrativa 750 mq | | Default Value | | Running | euro | 09.06.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50012 | BAGNO A RIPOLI | | Vie Pian di Ripoli/Villa Cedri | 10 - Information Phase | 17.06.2020 15:59 | 3559 | | | No | No | | | | | euro |
| 362398 | | | Realizzazione cittadella dello sport e della salute primo stralcio | | Default Value | | Running | euro | 29.05.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06100 | PERUGIA | | Via G.Bambagioni | 10 - Information Phase | 17.06.2020 15:59 | 3558 | | | No | No | | | | | euro |
| 362397 | | | Realizzazione istituto comprensivo Bastia 2 | | Default Value | | Running | euro | 09.06.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06083 | BASTIA UMBRA | | Via XXV Aprile Localita' Sant'Angelo | 10 - Information Phase | 17.06.2020 15:59 | 3557 | | | No | No | | | | | euro |
| 362396 | | | Costruzione 2 edifici commerciali 4510 mq totali | | Default Value | | Running | euro | 15.05.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06059 | TODI | Technical facilities | Via M.delle Foibe Localita' Ponte Rio | 10 - Information Phase | 17.06.2020 15:59 | 3556 | | | No | No | | | | | euro |
| 362395 | | | Costruzione nuova scuola dell'infanzia denominata Il Castello | | Default Value | | Running | euro | 11.06.2020 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06056 | MASSA MARTANA | | Loc. Colpetrazzo | 10 - Information Phase | 17.06.2020 15:59 | 3555 | | | No | No | | | | | euro |
| 362232-001 | | | CANDELA/ ED. LUSSEMBURGO/ hk5 | | Default Value | | Running | euro | 16.06.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | - | - | | - | 20 - Planning Phase | 16.06.2020 11:57 | | | | No | No | | | | | euro |
| 362232 | | | CANDELA/ ED. LUSSEMBURGO | | Default Value | | Running | euro | 16.06.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | - | - | | - | 10 - Information Phase | 16.06.2020 11:56 | | | | No | No | | | | | euro |
| 362213-001 | | | TERREAL/ ED. CASSINO FROSINONE/HW | | Default Value | | Running | euro | 16.06.2020 | | ILAZ-LAZIO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 03043 | Cassino | | - | 20 - Planning Phase | 16.06.2020 10:21 | | | | No | No | | | | | euro |
| 362213 | | | TERREAL/ ED. CASSINO FROSINONE | | Default Value | | Running | euro | 16.06.2020 | | ILAZ-LAZIO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 03043 | Cassino | | - | 20 - Planning Phase | 16.06.2020 10:20 | | | | No | No | | | | | euro |
| 361899-002 | | | FERMAGETTO / IMPRESE LOMBARDIA | | Default Value | | Running | euro | 12.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | Industry building | piazza città di lombardia 1 | 20 - Planning Phase | 12.07.2020 15:11 | | | | No | No | | | | | euro |
| 361899-001 | | | ISEDIO ARMOURJOINT / IMPRESE LOMBARDIA | | Default Value | | Running | euro | 11.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | Industry building | piazza città di lombardia 1 | 20 - Planning Phase | 11.06.2020 07:07 | | | | No | No | | | | | euro |
| 361899 | | | IMPRESE LOMBARDIA | | Default Value | | Running | euro | 11.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | Industry building | piazza città di lombardia 1 | 20 - Planning Phase | 11.06.2020 07:02 | | | | No | No | | | | | euro |
| 361154-001 | | | SERIO PREFABBRICATI / EUROCOMMERCIZL PROPRIETIES / CURNO / HCC | | Default Value | | Running | euro | 02.06.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 24035 | Curno | | X | 40 - Realisation Phase | 02.06.2020 11:52 | | | | No | No | | | | | euro |
| 361154 | | | SERIO PREFABBRICATI / EUROCOMMERCIZL PROPRIETIES / CURNO | | Default Value | | Running | euro | 02.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24035 | Curno | | X | 10 - Information Phase | 02.06.2020 11:51 | | | | No | No | | | | | euro |
| 360989 | | | CANTIERI TUROLLA/ED. VIGEVANO | | Default Value | | Running | euro | 29.05.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 27029 | Vigevano | | - | 30 - Tender & Submission Phase | 29.05.2020 11:09 | | | | No | No | | | | | euro |
| 360969-001 | | | DUE EDIFICI RESIDENZIALI / VIA ALDINI ERITREA MILANO / HDB | | Default Value | | Running | euro | 29.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20157 | Milano | Residential houses | Via Aldini - Eritrea | 30 - Tender & Submission Phase | 29.05.2020 09:46 | | | | No | No | | | | | euro |
| 360969 | | | DUE EDIFICI RESIDENZIALI / VIA ALDINI ERITREA MILANO / | | Default Value | | Running | euro | 29.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20157 | Milano | | Via Aldini - Eritrea | 30 - Tender & Submission Phase | 29.05.2020 09:39 | | | | No | No | | | | | euro |
| 360828-001 | | | HIT / RESIDENZIALE 7 PIANI / VIA PECORI GIRALDI MILANO / | | Default Value | | Running | euro | 27.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20139 | Milano | Residential houses | via guglielmo pecori giraldi | 30 - Tender & Submission Phase | 27.05.2020 13:26 | | | | No | No | | | | | euro |
| 360828 | | | RESIDENZIALE 7 PIANI / VIA PECORI GIRALDI MILANO | | Default Value | | Running | euro | 27.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20139 | Milano | Residential houses | via guglielmo pecori giraldi | 30 - Tender & Submission Phase | 27.05.2020 13:23 | | | | No | No | | | | | euro |
| 360520-001 | | | GARA / MANNA RESORT / BOLZANO / HDB / HIT | | Default Value | | Running | euro | 22.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 22.05.2020 09:50 | | | | No | No | | | | 11.000,00 € | euro |
| 360520 | | | GARA / MANNA RESORT | | Default Value | | Running | euro | 22.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 22.05.2020 09:50 | | | | No | No | | | | 11.000,00 € | euro |
| 360510-001 | | | NEOLIT/CANTIERE TERMENO/FPA | | Default Value | | Running | euro | 22.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 39040 | Termeno sulla strada del vino | | - | 40 - Realisation Phase | 22.05.2020 09:22 | | | | No | No | | | | | euro |
| 360510 | | | NEOLIT/CANTIERE TERMENO | | Default Value | | Running | euro | 22.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 39040 | Termeno sulla strada del vino | | - | 10 - Information Phase | 22.05.2020 09:21 | | | | No | No | | | | | euro |
| 360508-001 | | | UNION BAU/CANTIERE TERMENO/FPA | | Default Value | | Running | euro | 22.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 39040 | Termeno sulla strada del vino | | - | 20 - Planning Phase | 22.05.2020 09:20 | | | | No | No | | | | | euro |
| 360508 | | | UNION BAU/CANTIERE TERMENO | | Default Value | | Running | euro | 22.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 39040 | Termeno sulla strada del vino | | - | 10 - Information Phase | 22.05.2020 09:19 | | | | No | No | | | | | euro |
| 360499-001 | | | RESIDENZIALE VIA ASPROMONTE 30 LECCO / HIT | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23900 | LECCO (LC) | Residential houses | Via Aspromonte 30 | 30 - Tender & Submission Phase | 22.05.2020 06:57 | | | | No | No | | | | | euro |
| 360499 | | | RESIDENZIALE VIA ASPROMONTE 30 LECCO | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO (LC) | Residential houses | Via Aspromonte 30 | 30 - Tender & Submission Phase | 22.05.2020 06:56 | | | | No | No | | | | | euro |
| 360488-001 | | | IMMOBILIARE URBINO / VIA CANGER CREMA / CASTELLI / DETAN | | Default Value | | Running | euro | 21.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 26013 | Crema | Residential houses | via Canger | 40 - Realisation Phase | 21.05.2020 13:18 | | | | No | No | | | | | euro |
| 360488 | | | IMMOBILIARE URBINO / VIA CANGER CREMA / CASTELLI | | Default Value | | Running | euro | 21.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | Crema | | via Canger | 40 - Realisation Phase | 21.05.2020 13:16 | | | | No | No | | | | | euro |
| 360383-001 | | | REPARTO ONCOLOGIA / OSPEDALE MANERBIO / HDB | | Default Value | | Running | euro | 20.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 25025 | Manerbio | Medical facility | Via Lungomella 2 | 30 - Tender & Submission Phase | 20.05.2020 11:01 | | | | No | No | | | | | euro |
| 360383 | | | REPARTO ONCOLOGIA / OSPEDALE MANERBIO | | Default Value | | Running | euro | 20.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25025 | Manerbio | Medical facility | Via Lungomella 2 | 30 - Tender & Submission Phase | 20.05.2020 10:58 | | | | No | No | | | | | euro |
| 360370 | | | Costruzione 2 edifici Multipiano 32 appartamenti tot negozi e box | | Default Value | | Running | euro | 20.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | Residential houses | Via Niccoli | 10 - Information Phase | 20.05.2020 09:34 | 3554 | | | No | No | | | | | euro |
| 360369 | | | Costruzione edificio residenziale Comparto 1 UMI 1.4 | | Default Value | | Running | euro | 13.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Arno | 10 - Information Phase | 20.05.2020 09:34 | 3553 | | | No | No | | | | | euro |
| 360368 | | | Costruzione deposito logistico Amazon 8000 mq | | Default Value | | Running | euro | 31.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Industry building | Via Umberto Forti | 10 - Information Phase | 20.05.2020 09:34 | 3552 | | | No | No | | | | | euro |
| 360367 | | | Costruzione scuola dell'infanzia Riappalto Lavori | | Default Value | | Running | euro | 22.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56033 | CAPANNOLI | | Via P. Togliatti 17 | 10 - Information Phase | 20.05.2020 09:34 | 3551 | | | No | No | | | | | euro |
| 360366 | | | Costruzione supermercato 1450 mq | | Default Value | | Running | euro | 09.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55054 | MASSAROSA | Technical facilities | Via G. Duccini 105 | 10 - Information Phase | 20.05.2020 09:34 | 3550 | | | No | No | | | | | euro |
| 360365 | | | Ristrutt e ampliam Hotel Bristol **** 62 camere ristorante piscina | | Default Value | | Running | euro | 20.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55049 | VIAREGGIO | Technical facilities | Viale D. Manin 14 | 10 - Information Phase | 20.05.2020 09:34 | 3549 | | | No | No | | | | | euro |
| 360364 | | | Costruzione (demoric) complesso residenziale 36 unita' abitative | | Default Value | | Running | euro | 13.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Via Giano Della Bella 20 | 10 - Information Phase | 20.05.2020 09:34 | 3548 | | | No | No | | | | | euro |
| 360363 | | | Realizz sala polivalente edif L5 scuola allievi Marescialli Maritano | | Default Value | | Running | euro | 12.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Localita' Castello | 10 - Information Phase | 20.05.2020 09:34 | 3547 | | | No | No | | | | | euro |
| 360362 | | | Recupero e nuova costruzione edifici ville e appart 40 unita' totale | | Default Value | | Running | euro | 07.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Via G. D'Annunzio 221 | 10 - Information Phase | 20.05.2020 09:34 | 3546 | | | No | No | | | | | euro |
| 360361 | | | Ampliamento Istituto Alberghiero Saffi realizz nuovo edificio in legno | | Default Value | | Running | euro | 22.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Via Del Mezzetta 15 | 10 - Information Phase | 20.05.2020 09:34 | 3545 | | | No | No | | | | | euro |
| 360360 | | | Messa in sicurezza ed adeguamento Palazzo di Giustizia | | Default Value | | Running | euro | 15.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Viale A. Guidoni 61 | 10 - Information Phase | 20.05.2020 09:34 | 3544 | | | No | No | | | | | euro |
| 360359 | | | Costruzione edificio commerciale per grande struttura di vendita | | Default Value | | Running | euro | 05.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50053 | EMPOLI | Technical facilities | Vie Tosco Romagnola / Dalla Piccola | 10 - Information Phase | 20.05.2020 09:34 | 3543 | | | No | No | | | | | euro |
| 360358 | | | Costruzione nuova sede logistica | | Default Value | | Running | euro | 30.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50026 | SAN CASCIANO IN VAL DI PESA | Industry building | Localita' Sibille | 10 - Information Phase | 20.05.2020 09:34 | 3542 | | | No | No | | | | | euro |
| 360357 | | | Costruz sede Liceo Enriques Agnoletti c/o Polo Scientifico Universita' | | Default Value | | Running | euro | 19.02.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50019 | SESTO FIORENTINO | | Viale Delle Idee | 10 - Information Phase | 20.05.2020 09:34 | 3541 | | | No | No | | | | | euro |
| 360314 | | | Riqualificazione energetica edifici 11 15 15/a del centro servizi | | Default Value | | Running | euro | 07.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Z.I. Macchiareddu | 10 - Information Phase | 19.05.2020 16:13 | 3540 | | | No | No | | | | | euro |
| 360313 | | | Ristrutt adeguam normativo edif x uffici Agenzia Dogane e Monopoli | | Default Value | | Running | euro | 29.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Via Caprera 15 Ex AAMS | 10 - Information Phase | 19.05.2020 16:13 | 3539 | | | No | No | | | | | euro |
| 360312 | | | Manutenz straordinaria palestra comunale e realizz area parcheggio | | Default Value | | Running | euro | 19.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09098 | TERRALBA | | Via De Amicis | 10 - Information Phase | 19.05.2020 16:13 | 3538 | | | No | No | | | | | euro |
| 360311 | | | Realizzazione piscina coperta comunale primo lotto esecutivo | | Default Value | | Running | euro | 24.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09070 | ZERFALIU | | Localita' Sa Paui | 10 - Information Phase | 19.05.2020 16:13 | 3537 | | | No | No | | | | | euro |
| 360310 | | | Riqualificazione energetica e retrofitting scuola materna | | Default Value | | Running | euro | 08.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09047 | SELARGIUS | | Via Bellini | 10 - Information Phase | 19.05.2020 16:13 | 3536 | | | No | No | | | | | euro |
| 360309 | | | Realizz e gestione funzionale impianto polivalente nell'area sportiva | | Default Value | | Running | euro | 12.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | SETTIMO SAN PIETRO | | S.P. 15 | 10 - Information Phase | 19.05.2020 16:13 | 3535 | | | No | No | | | | | euro |
| 360308 | | | Lavori manutenz straordinaria palestra c/o scuola elementare e media | | Default Value | | Running | euro | 07.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | GUAMAGGIORE | | Via IV Novembre | 10 - Information Phase | 19.05.2020 16:13 | 3534 | | | No | No | | | | | euro |
| 360307 | | | Costruzione nuovo Ospedale progettaz esecutiva ed esecuz lavori | | Default Value | | Running | euro | 30.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09037 | SAN GAVINO MONREALE | | Via Roma | 10 - Information Phase | 19.05.2020 16:13 | 3533 | | | No | No | | | | | euro |
| 360306 | | | Ristrutturazione caseggiato ex ferrovia per sede unione dei comuni | | Default Value | | Running | euro | 16.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09037 | SAN GAVINO MONREALE | | Piazza C. Battisti | 10 - Information Phase | 19.05.2020 16:13 | 3532 | | | No | No | | | | | euro |
| 360305 | | | Recupero edificio x 12 alloggi ERP area Le Casermette primo lotto | | Default Value | | Running | euro | 20.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09016 | IGLESIAS | Residential houses | Via Buozzi Quartiere Col Di Lana | 10 - Information Phase | 19.05.2020 16:13 | 3531 | | | No | No | | | | | euro |
| 360304 | | | Sistem idraulica Rio San Girolamo Masone Ollastu ricostr opere pubbliche | | Default Value | | Running | euro | 05.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | Technical facilities | Loc. Poggio Pini ed altre frazioni | 10 - Information Phase | 19.05.2020 16:13 | 3530 | | | No | No | | | | | euro |
| 360303 | | | Intervento valorizzaz centro storico secondo lotto secondo stralcio | | Default Value | | Running | euro | 17.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | Technical facilities | Corso A. Gramsci | 10 - Information Phase | 19.05.2020 16:13 | 3529 | | | No | No | | | | | euro |
| 360302 | | | Lavori di completamento banchina piazzali arredi e servizi | | Default Value | | Running | euro | 23.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09011 | CALASETTA | Technical facilities | Porto Turistico | 10 - Information Phase | 19.05.2020 16:13 | 3528 | | | No | No | | | | | euro |
| 360301 | | | Costruzione (demoric) edificio alloggi a canone sociale secondo lotto | | Default Value | | Running | euro | 23.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | PORTOSCUSO | Residential houses | Via Giulio Cesare | 10 - Information Phase | 19.05.2020 16:13 | 3527 | | | No | No | | | | | euro |
| 360300 | | | Ristrutturazione edificio fondo Unrra sede Polizia Stradale | | Default Value | | Running | euro | 29.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | | Via Ugolino 4 | 10 - Information Phase | 19.05.2020 16:13 | 3526 | | | No | No | | | | | euro |
| 360299 | | | Manutenz sede centrale+succursale Liceo Scienze Umane e Musicale | | Default Value | | Running | euro | 17.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | | Vie Deffenu / Ugo Foscolo | 10 - Information Phase | 19.05.2020 16:13 | 3525 | | | No | No | | | | | euro |
| 360298 | | | Costruzione nuovo museo Man Riappalto Lavori | | Default Value | | Running | euro | 08.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | Technical facilities | Piazza Satta | 10 - Information Phase | 19.05.2020 16:13 | 3524 | | | No | No | | | | | euro |
| 360297 | | | Lavori di efficientamento energetico palazzo comunale | | Default Value | | Running | euro | 29.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08040 | BAUNEI | | Via San Nicolo' 2 | 10 - Information Phase | 19.05.2020 16:13 | 3523 | | | No | No | | | | | euro |
| 360296 | | | Riqualif funzionale e messa in sicurezza IPSASR Flli Costa Azara | | Default Value | | Running | euro | 17.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08038 | SORGONO | | Corso IV Novembre 114 | 10 - Information Phase | 19.05.2020 16:13 | 3522 | | | No | No | | | | | euro |
| 360295 | | | Lavori di completamento Chiesa Spirito Santo opere esterne | | Default Value | | Running | euro | 06.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07046 | PORTO TORRES | Technical facilities | Via IV Novembre | 10 - Information Phase | 19.05.2020 16:13 | 3521 | | | No | No | | | | | euro |
| 360294 | | | Lavori di riqualificazione complesso scolastico Grazia Deledda | | Default Value | | Running | euro | 07.02.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Via Tarragona 16 | 10 - Information Phase | 19.05.2020 16:13 | 3520 | | | No | No | | | | | euro |
| 360293 | | | Lavori di efficientamento energetico casa comunale | | Default Value | | Running | euro | 22.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07040 | CODRONGIANOS | | Via Roma 5 | 10 - Information Phase | 19.05.2020 16:13 | 3519 | | | No | No | | | | | euro |
| 360292 | | | Lavori di riqualificazione energetica casa comunale | | Default Value | | Running | euro | 17.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07030 | BADESI | | Via Risorgimento 15 | 10 - Information Phase | 19.05.2020 16:13 | 3518 | | | No | No | | | | | euro |
| 360291 | | | Lavori di completamento mercato civico | | Default Value | | Running | euro | 09.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07024 | LA MADDALENA | Technical facilities | Piazza Garibaldi | 10 - Information Phase | 19.05.2020 16:13 | 3517 | | | No | No | | | | | euro |
| 360290 | | | Ristrutt edifici ex Enaip per nuova sede istituzionale primo lotto | | Default Value | | Running | euro | 17.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07014 | OZIERI | Technical facilities | Localita' Chilivani e Piano Perfugas | 10 - Information Phase | 19.05.2020 16:13 | 3516 | | | No | No | | | | | euro |
| 360289 | | | Riqualificazione complesso scolastico Istituto Comprensivo | | Default Value | | Running | euro | 16.01.2020 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07011 | BONO | | Via Tirso | 10 - Information Phase | 19.05.2020 16:13 | 3515 | | | No | No | | | | | euro |
| 360168-001 | | | DETAN / ADEGUAMENTO SISMICO / BRESSANA PV | | Default Value | | Running | euro | 18.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 27042 | Bressana Bottarone | Residential houses | via Agostino Depretis 96 | 30 - Tender & Submission Phase | 18.05.2020 17:50 | | | | No | No | | | | | euro |
| 360168 | | | ADEGUAMENTO SISMICO / BRESSANA PV | | Default Value | | Running | euro | 18.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27042 | Bressana Bottarone | Residential houses | via Agostino Depretis 96 | 30 - Tender & Submission Phase | 18.05.2020 17:49 | | | | No | No | | | | | euro |
| 360163-001 | | | EDITEL / CABINA PRIMARIA / ROZZANO / HDB | | Default Value | | Running | euro | 18.05.2020 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 20089 | Rozzano | | VIA VESUVIO | 40 - Realisation Phase | 18.05.2020 16:16 | | | | No | No | | | | 4.000,00 € | euro |
| 360163 | | | EDITEL / CABINA PRIMARIA / ROZZANO | | Default Value | | Running | euro | 18.05.2020 | | ILOM-LOMBARDIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 20089 | Rozzano | | VIA VESUVIO | 10 - Information Phase | 18.05.2020 16:15 | | | | No | No | | | | 4.000,00 € | euro |
| 359804-001 | | | ESSELUNGA MANTOVA/FK4 | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 46100 | Mantova | | - | 40 - Realisation Phase | 14.05.2020 10:39 | | | | No | No | | | | | euro |
| 359804 | | | ESSELUNGA MANTOVA | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 46100 | Mantova | | - | 30 - Tender & Submission Phase | 14.05.2020 10:38 | | | | No | No | | | | | euro |
| 359803 | | | GARA / RISTRUTTURAZIONE E AMPLIAMENTO EDIFICIO CIVILE / RODDINO / HSC-B | | Default Value | | Running | euro | 14.05.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 12050 | Roddino | | X | 10 - Information Phase | 14.05.2020 10:38 | | | | No | No | | | | | euro |
| 359797-001 | | | ESSELUNGA VIA BRAMANTE TORINO/FK4 | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | VIA BRAMANTE | 30 - Tender & Submission Phase | 14.05.2020 10:31 | | | | No | No | | | | | euro |
| 359797 | | | ESSELUNGA VIA BRAMANTE TORINO | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | VIA BRAMANTE | 20 - Planning Phase | 14.05.2020 10:30 | | | | No | No | | | | | euro |
| 359780-002 | | | HIT / CASCINA MERLATA LOTTO R5.3 / MILANO / DEVERO | | Default Value | | Running | euro | 27.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Residential houses | via pasolini | 40 - Realisation Phase | 27.10.2021 07:17 | | | | No | No | | | | | euro |
| 359780-001 | | | HDB / CASCINA MERLATA LOTTO R5.3 / MILANO / NESSI & MAIOCCHI PERCASSI | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Residential houses | via pasolini | 40 - Realisation Phase | 14.05.2020 09:25 | | | | No | No | | | | | euro |
| 359780 | | | CASCINA MERLATA LOTTO R5.3 / MILANO | | Default Value | | Running | euro | 14.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | Milano | Residential houses | via pasolini | 40 - Realisation Phase | 14.05.2020 09:18 | | | | No | No | | | | | euro |
| 359703-001 | | | IMPRESA TUROLLA/EDIFICI VIGEVANO/FK4 | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 27029 | Vigevano | | cORSO gARIBALDI | 40 - Realisation Phase | 22.05.2020 09:14 | | | | No | No | | | | | euro |
| 359703 | | | IMPRESA TUROLLA/EDIFICI VIGEVANO | | Default Value | | Running | euro | 13.05.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 27029 | Vigevano | | cORSO gARIBALDI | 10 - Information Phase | 13.05.2020 11:58 | | | | No | No | | | | | euro |
| 359677-001 | | | TECHBAU / KRYALOS SGR / ROLO / HBT | | Default Value | | Running | euro | 13.05.2020 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 42047 | Rolo | | X | 30 - Tender & Submission Phase | 13.05.2020 10:19 | | | | No | No | | | | | euro |
| 359633 | | | TERMAL / EX CASERMA MINGHETTI / BOLOGNA | | Default Value | | Running | euro | 12.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | VI ACASTELFIDARDO 9 | 10 - Information Phase | 12.05.2020 16:22 | | | | No | No | | | | | euro |
| 359406-003 | | | HIPPODRHOME MILANO / RESIDENZIALE 22 PIANI / HBT | | Default Value | | Running | euro | 20.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Residential houses | via Ippodrono 8 | 30 - Tender & Submission Phase | 20.05.2020 14:12 | | | | No | No | | | | | euro |
| 359406-002 | | | HBS / HIPPODRHOME MILANO / RESIDENZIALE 22 PIANI | | Default Value | | Running | euro | 09.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | | via Trenno 12 | 30 - Tender & Submission Phase | 09.05.2020 11:37 | | | | No | No | | | | | euro |
| 359406-001 | | | HDB / HIPPODRHOME MILANO / RESIDENZIALE 22 PIANI | | Default Value | | Running | euro | 09.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Residential houses | via Ippodromo 8 | 40 - Realisation Phase | 09.05.2020 11:33 | | | | No | No | | | | | euro |
| 359406 | | | HIPPODRHOME MILANO / RESIDENZIALE 22 PIANI | | Default Value | | Running | euro | 09.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | Milano | | via Ippodrono 8 | 30 - Tender & Submission Phase | 09.05.2020 11:32 | | | | No | No | | | | | euro |
| 359358-001 | | | TERZER / TERME / ISCHGL / HIT / HDB / HSB / HTA / HBT | | Default Value | | Running | euro | 08.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 08.05.2020 10:31 | | | | No | No | | | | | euro |
| 359358 | | | TERZEL / TERME / ISCHGL | | Default Value | | Running | euro | 08.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 08.05.2020 10:30 | | | | No | No | | | | | euro |
| 359141-001 | | | GARA / AMPLIAMENTO CAPANNONE G FITSCHER GMBH / HBT / HSD | | Default Value | | Running | euro | 06.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39014 | Postal | | X | 30 - Tender & Submission Phase | 06.05.2020 10:54 | | | | No | No | | | | | euro |
| 359141 | | | GARA / AMPLIAMENTO CAPANNONE G PFITSCHER GMBH / HBT / HSD | | Default Value | | Running | euro | 06.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39014 | Postal | | X | 10 - Information Phase | 06.05.2020 10:54 | | | | No | No | | | | | euro |
| 359100-002 | | | BOCCOLE DEMU FIX / PREFABBRICATORI LOMBARDIA | | Default Value | | Running | euro | 22.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | | piazza città di lombardia 1 | 20 - Planning Phase | 22.05.2020 10:05 | | | | No | No | | | | | euro |
| 359100-001 | | | STAR CONNECTOR / THERMOMASS / PREFABBRICATORI LOMBARDIA | | Default Value | | Running | euro | 06.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | | piazza città di lombardia 1 | 20 - Planning Phase | 06.05.2020 07:11 | | | | No | No | | | | | euro |
| 359100 | | | PREFABBRICATORI LOMBARDIA | | Default Value | | Running | euro | 06.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | | piazza città di lombardia 1 | 20 - Planning Phase | 06.05.2020 07:10 | | | | No | No | | | | | euro |
| 359086-002 | | | NUOVA COSTRUZIONE VIGILI DEL FUOCO / BANDA MUSICALE / SOCCORSO ALPINO / TERMENO / BRA / FPA | | Default Value | | Running | euro | 24.02.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39040 | Termeno sulla strada del vino | | X | 40 - Realisation Phase | 24.02.2021 11:26 | | | | No | No | | | | | euro |
| 359086-001 | | | NUOVA COSTRUZIONE VIGILI DEL FUOCO / BANDA MUSICALE / SOCCORSO ALPINO / TERMENO / HDB | | Default Value | | Running | euro | 05.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 39040 | Termeno sulla strada del vino | | X | 30 - Tender & Submission Phase | 05.05.2020 16:08 | | | | No | No | | | | | euro |
| 359086 | | | NUOVA COSTRUZIONE VIGILI DEL FUOCO / BANDA MUSICALE / SOCCORSO ALPINO / TERMENO | | Default Value | | Running | euro | 05.05.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39040 | Termeno sulla strada del vino | | X | 30 - Tender & Submission Phase | 05.05.2020 16:07 | | | | No | No | | | | | euro |
| 359019-001 | | | IMPLEMENTAZIONE THERMOMASS / PIEMONTE / LIGURIA / VALLE D'AOSTA | | Default Value | | Running | euro | 05.05.2020 | | IPIE-PIEMONTE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | X | 10 - Information Phase | 05.05.2020 11:07 | | | | No | No | | | | | euro |
| 359019 | | | IMPLEMENTAZIONE THERMOMASS / PIEMONTE / LIGURIA / VALLE D'AOSTA | | Default Value | | Running | euro | 05.05.2020 | | IPIE-PIEMONTE | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | X | 10 - Information Phase | 05.05.2020 11:07 | | | | No | No | | | | | euro |
| 359017-001 | | | IMPLEMENTAZIONE THERMOMASS / LOMBARDIA | | Default Value | | Running | euro | 05.05.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | X | 10 - Information Phase | 05.05.2020 11:06 | | | | No | No | | | | | euro |
| 359017 | | | IMPLEMENTAZIONE THERMOMASS / LOMBARDIA | | Default Value | | Running | euro | 05.05.2020 | | ILOM-LOMBARDIA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | X | 10 - Information Phase | 05.05.2020 11:06 | | | | No | No | | | | | euro |
| 359014-001 | | | IMPLEMENTAZIONE THERMOMASS / VENETO / EMILIA / FRIULI VENEZIA GIULIA | | Default Value | | Running | euro | 05.05.2020 | | IVEN-VENETO | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | X | 20 - Planning Phase | 05.05.2020 11:03 | | | | No | No | | | | | euro |
| 359014 | | | IMPLEMENTAZIONE THERMOMASS / VENETO / EMILIA / FRIULI VENEZIA GIULIA | | Default Value | | Running | euro | 05.05.2020 | | IVEN-VENETO | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | X | 10 - Information Phase | 05.05.2020 11:02 | | | | No | No | | | | | euro |
| 358913-001 | | | ABETE FEDERICA/COSTRUZIONE NUOVA VILLETTA/ RIOLO TERME/FK4 | | Default Value | | Running | euro | 04.05.2020 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 48025 | Riolo Terme | | - | 30 - Tender & Submission Phase | 04.05.2020 11:15 | | | | No | No | | | | | euro |
| 358913 | | | ABETE FEDERICA/COSTRUZIONE NUOVA VILLETTA/ RIOLO TERME | | Default Value | | Running | euro | 04.05.2020 | | IEMI-EMILIA ROMAGNA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 48025 | Riolo Terme | | - | 20 - Planning Phase | 04.05.2020 11:13 | | | | No | No | | | | | euro |
| 358904-001 | | | IMPRESA EDILE MASON GIORDANO/ COSTRUZIONE NUOVA VILLETTA/ PIEROBON CAMPO SAN PIERO/FK4 | | Default Value | | Running | euro | 04.05.2020 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 35012 | Camposampiero | | - | 20 - Planning Phase | 04.05.2020 11:04 | | | | No | No | | | | | euro |
| 358904 | | | IMPRESA EDILE MASON GIORDANO/ COSTRUZIONE NUOVA VILLETTA/ PIEROBON CAMPO SAN PIERO | | Default Value | | Running | euro | 04.05.2020 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 35012 | Camposampiero | | - | 20 - Planning Phase | 04.05.2020 11:02 | | | | No | No | | | | | euro |
| 358901-001 | | | GARA / EDIFICIO COMMERCIALE / BOLOGNA VIA STALINGRADO / HBS | | Default Value | | Running | euro | 04.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | VIA STALINGRADO | 30 - Tender & Submission Phase | 04.05.2020 11:04 | | | | No | No | | | | | euro |
| 358901 | | | GARA / EDIFICIO COMMERCIALE / BOLOGNA VIA STALINGRADO | | Default Value | | Running | euro | 04.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | VIA STALINGRADO | 10 - Information Phase | 04.05.2020 10:58 | | | | No | No | | | | | euro |
| 358888-001 | | | GARA / CASA CORRADI / REGGIO EMILIA / HK4 | | Default Value | | Running | euro | 04.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 42120 | REGGIO EMILIA | | --- | 30 - Tender & Submission Phase | 04.05.2020 10:49 | | | | No | No | | | | | euro |
| 358888 | | | GARA / CASA CORRADI / REGGIO EMILIA | | Default Value | | Running | euro | 04.05.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42120 | REGGIO EMILIA | | --- | 10 - Information Phase | 04.05.2020 10:46 | | | | No | No | | | | | euro |
| 358488-001 | | | METRO TORINO/ Lotto 1+Lotto2 /profili HTA 38/17 | | Default Value | | Running | euro | 02.11.2021 | | IPIE-PIEMONTE | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | Infrastructural facilities (Metro) | * | 40 - Realisation Phase | 02.11.2021 10:46 | | | | No | No | | | | | euro |
| 358488 | | | METRO TORINO/ Lotto 1+Lotto2 | | Default Value | | Running | euro | 27.04.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 27.04.2020 09:12 | | | | No | No | | | | | euro |
| 358487 | | | GARA / WATER TUNNEL | | Default Value | | Running | euro | 27.04.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | * | BISAGNO | | * | 10 - Information Phase | 27.04.2020 09:09 | | | | No | No | | | | | euro |
| 358474-001 | | | HDB / SPARK TWO DIREZIONALE / SANTA GIULIA MILANO | | Default Value | | Running | euro | 27.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20138 | Milano | Office building | VIA LUIGI RUSSOLO | 40 - Realisation Phase | 27.04.2020 07:00 | | | | No | No | | | | | euro |
| 358474 | | | SPARK TWO DIREZIONALE / SANTA GIULIA MILANO | | Default Value | | Running | euro | 27.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20138 | Milano | Office building | VIA LUIGI RUSSOLO | 40 - Realisation Phase | 27.04.2020 06:57 | | | | No | No | | | | | euro |
| 358187-001 | | | HIT / PALAZZINA I CILIEGI / MA.DI COSTRUZIONI / MOTTA VISCONTI | | Default Value | | Running | euro | 22.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20086 | Motta Visconti | Residential houses | VIA VALIE 12 | 30 - Tender & Submission Phase | 22.04.2020 07:14 | | | | No | No | | | | | euro |
| 358187 | | | PALAZZINA I CILIEGI / MA.DI COSTRUZIONI / MOTTA VISCONTI | | Default Value | | Running | euro | 22.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20086 | Motta Visconti | Residential houses | VIA VALIE 12 | 20 - Planning Phase | 22.04.2020 07:07 | | | | No | No | | | | | euro |
| 358185-002 | | | AAP140 / HUPAC INTERMODAL / LOGISTICA PIACENZA | | Default Value | | Running | euro | 22.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 29100 | PIACENZA | | VIA DA DEFINIRE | 30 - Tender & Submission Phase | 22.04.2020 07:39 | | | | No | No | | | | | euro |
| 358185-001 | | | HSC / HUPAC INTERMODAL / LOGISTICA PIACENZA | | Default Value | | Running | euro | 22.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 29100 | PIACENZA | Industry building | VIA DA DEFINIRE | 30 - Tender & Submission Phase | 22.04.2020 07:01 | | | | No | No | | | | | euro |
| 358185 | | | HUPAC INTERMODAL / LOGISTICA PIACENZA | | Default Value | | Running | euro | 22.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 29100 | PIACENZA | | VIA DA DEFINIRE | 30 - Tender & Submission Phase | 22.04.2020 06:58 | | | | No | No | | | | | euro |
| 357942-001 | | | HTA/IMPIANTO FANGHI ARVEDI CREMONA | | Default Value | | Running | euro | 20.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 26100 | Cremona | Industry building | VIA ACQUAVIVA 3-18 | 40 - Realisation Phase | 20.04.2020 07:35 | | | | No | Yes | | | | | euro |
| 357942 | | | IMPIANTO FANGHI ARVEDI CREMONA | | Default Value | | Running | euro | 20.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | Cremona | Industry building | VIA ACQUAVIVA 3-18 | 30 - Tender & Submission Phase | 20.04.2020 07:33 | | | | No | Yes | | | | | euro |
| 357934-001 | | | HDB / NUOVO MAGAZZINO ELCAM MEDICAL CARPI | | Default Value | | Running | euro | 20.04.2020 | | IEMI-EMILIA ROMAGNA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 41012 | Carpi (MO) | Industry building | CIAVALLE D'AOSTA 2 | 30 - Tender & Submission Phase | 20.04.2020 07:09 | | | | No | No | | | | | euro |
| 357934 | | | NUOVO MAGAZZINO ELCAM MEDICAL CARPI | | Default Value | | Running | euro | 20.04.2020 | | IEMI-EMILIA ROMAGNA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 41012 | Carpi (MO) | | CIAVALLE D'AOSTA 2 | 30 - Tender & Submission Phase | 20.04.2020 07:05 | | | | No | No | | | | | euro |
| 357915-001 | | | HTA/ACCIAIERIA ARVEDI CREMONA | | Default Value | | Running | euro | 17.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 26100 | Cremona | Industry building | VIA ACQUAVIVA 18 | 40 - Realisation Phase | 17.04.2020 13:52 | | | | No | No | | | | | euro |
| 357915 | | | ACCIAIERIA ARVEDI CREMONA | | Default Value | | Running | euro | 17.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | Cremona | Industry building | VIA ACQUAVIVA 18 | 40 - Realisation Phase | 17.04.2020 13:50 | | | | No | No | | | | | euro |
| 357688-001 | | | GARA / VILLA MAYA / ALBISANO / HIT / HDB | | Default Value | | Running | euro | 15.04.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | * | albisano | | * | 30 - Tender & Submission Phase | 15.04.2020 11:55 | | | | No | No | | | | | euro |
| 357688 | | | GARA / VILLA MAYA / ALBISANO | | Default Value | | Running | euro | 15.04.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | * | albisano | | * | 10 - Information Phase | 15.04.2020 11:55 | | | | No | No | | | | | euro |
| 357551-001 | | | GIUNTI / AEL HOTEL PLANIBEL LA THUILE | | Default Value | | Running | euro | 14.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 11016 | La Thuile | | FRAZ. ENTREVERS 158 | 30 - Tender & Submission Phase | 14.04.2020 08:44 | | | | No | No | | | | | euro |
| 357551 | | | AEL HOTEL PLANIBEL LA THUILE | | Default Value | | Running | euro | 14.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 11016 | La Thuile | | FRAZ. ENTREVERS 158 | 30 - Tender & Submission Phase | 14.04.2020 08:42 | | | | No | No | | | | | euro |
| 357520-002 | | | GIUNTI / NUOVO STUDENTATO VIA FRIGIA 19 MILANO | | Default Value | | Running | euro | 14.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20126 | Milano | Residential houses | VIA FRIGIA | 40 - Realisation Phase | 14.04.2020 07:13 | | | | No | No | | | | | euro |
| 357520-001 | | | HDB / NUOVO STUDENTATO VIA FRIGIA 19 MILANO | | Default Value | | Running | euro | 14.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20126 | Milano | Residential houses | VIA FRIGIA | 40 - Realisation Phase | 14.04.2020 07:10 | | | | No | No | | | | | euro |
| 357520 | | | NUOVO STUDENTATO VIA FRIGIA 19 MILANO | | Default Value | | Running | euro | 14.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20126 | Milano | | VIA FRIGIA | 40 - Realisation Phase | 14.04.2020 07:09 | | | | No | No | | | | | euro |
| 357397-001 | | | GARA / DEMOLIZIONE E RICOSTRUZIONE DI UN EDIFICIO / NOVA PONENTE / HDB / HIT | | Default Value | | Running | euro | 09.04.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39050 | Nova Ponente | | * | 10 - Information Phase | 09.04.2020 09:38 | | | | No | No | | | | 9.000,00 € | euro |
| 357397 | | | GARA / DEMOLIZIONE E RICOSTRUZIONE DI UN EDIFICIO / NOVA PONENTE | | Default Value | | Running | euro | 09.04.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39050 | Nova Ponente | | * | 10 - Information Phase | 09.04.2020 09:38 | | | | No | No | | | | 9.000,00 € | euro |
| 357297-001 | | | SCR / COSTRUZIONE DI UN EDIFICIO PER UFFICI / TORINO / GIUNTI | | Default Value | | Running | euro | 08.04.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 08.04.2020 10:37 | | | | No | No | | | | 60.000,00 € | euro |
| 357297 | | | SCR / COSTRUZIONE DI UN EDIFICIO PER UFFICI / TORINO | | Default Value | | Running | euro | 08.04.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 08.04.2020 10:37 | | | | No | No | | | | 60.000,00 € | euro |
| 357266-003 | | | HBT-SK / TRILOGY TOWERS MILANO / VIA GALLARATE 3 MILANO | | Default Value | | Running | euro | 13.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Residential houses | VIA GALLARATE 3 | 40 - Realisation Phase | 13.10.2021 07:23 | | | | No | No | | | | | euro |
| 357266-002 | | | GIUNTI / TRILOGY TOWERS MILANO / VIA GALLARATE 3 MILANO | | Default Value | | Running | euro | 18.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Residential houses | VIA GALLARATE 3 | 40 - Realisation Phase | 18.02.2021 11:19 | | | | No | No | | | | | euro |
| 357266-001 | | | HDB / TRILOGY TOWERS MILANO / VIA GALLARATE 3 MILANO | | Default Value | | Running | euro | 08.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20151 | Milano | Residential houses | VIA GALLARATE 3 | 40 - Realisation Phase | 08.04.2020 07:32 | | | | No | No | | | | | euro |
| 357266 | | | TRILOGY TOWERS MILANO / VIA GALLARATE 3 MILANO | | Default Value | | Running | euro | 08.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | Milano | Residential houses | VIA GALLARATE 3 | 30 - Tender & Submission Phase | 08.04.2020 07:30 | | | | No | No | | | | | euro |
| 357236-001 | | | NUOVO CENTRO LOGISTICO AMAZON / PISA / TUBI CORRUGATI | | Default Value | | Running | euro | 07.04.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 56100 | PISA | Industry building | X | 30 - Tender & Submission Phase | 07.04.2020 13:45 | | | | No | No | | | | | euro |
| 357236 | | | NUOVO CENTRO LOGISTICO AMAZON / PISA | | Default Value | | Running | euro | 07.04.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Industry building | X | 10 - Information Phase | 07.04.2020 13:44 | | | | No | No | | | | | euro |
| 357146-007 | | | HBS-SK / CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 24.11.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 24.11.2021 18:28 | | | | No | No | | | | | euro |
| 357146-006 | | | DETAN S / CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 30.10.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 30.10.2021 06:58 | | | | No | No | | | | | euro |
| 357146-005 | | | HSD-CRET 2 / CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 29.09.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 29.09.2021 10:28 | | | | No | No | | | | | euro |
| 357146-004 | | | HBT-SK / CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 28.12.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 28.12.2020 09:32 | | | | No | No | | | | | euro |
| 357146-003 | | | DEMU 1988 SK / CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 17.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 17.09.2020 09:27 | | | | No | No | | | | | euro |
| 357146-002 | | | HDB / CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 02.07.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 02.07.2020 07:13 | | | | No | No | | | | 100.000,00 € | euro |
| 357146-001 | | | HSD CRET / CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 30.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 30.06.2020 15:39 | | | | No | No | | | | | euro |
| 357146 | | | CHORUS LIFE / VIA C. SERASSI BERGAMO | | Default Value | | Running | euro | 06.04.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24124 | Bergamo | Sports facility | CARLO SERASSI | 40 - Realisation Phase | 06.04.2020 16:35 | | | | No | No | | | | 100.000,00 € | euro |
| 356748-001 | | | OSPEDALE GARIBALDI / CATANIA / HDB | | Default Value | | Running | euro | 31.03.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 95032 | Catania | | X | 30 - Tender & Submission Phase | 31.03.2020 15:39 | | | | No | No | | | | | euro |
| 356748 | | | OSPEDALE GARIBALDI / CATANIA | | Default Value | | Running | euro | 31.03.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 95032 | Catania | | X | 10 - Information Phase | 31.03.2020 15:39 | | | | No | No | | | | | euro |
| 356739-003 | | | HTA / SEI MILANO / MILANO | | Default Value | | Running | euro | 26.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | X | 40 - Realisation Phase | 26.02.2021 12:16 | | | | No | No | | | | | euro |
| 356739-002 | | | SEI MILANO / MILANO / HDB | | Default Value | | Running | euro | 31.03.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | X | 40 - Realisation Phase | 31.03.2020 14:31 | | | | No | No | | | | | euro |
| 356739-001 | | | SEI MILANO / MILANO / HSD | | Default Value | | Running | euro | 31.03.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | X | 40 - Realisation Phase | 31.03.2020 14:31 | | | | No | No | | | | | euro |
| 356739 | | | SEI MILANO / MILANO | | Default Value | | Running | euro | 31.03.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | X | 40 - Realisation Phase | 31.03.2020 14:29 | | | | No | No | | | | | euro |
| 355407-001 | | | GARA / AEREOPORTO / CATANIA / GIUNTI | | Default Value | | Running | euro | 25.03.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 95100 | CATANIA | | * | 10 - Information Phase | 25.03.2020 15:58 | | | | No | No | | | | | euro |
| 355407 | | | GARA / AEREOPORTO / CATANIA | | Default Value | | Running | euro | 25.03.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 95100 | CATANIA | | * | 10 - Information Phase | 25.03.2020 15:58 | | | | No | No | | | | | euro |
| 355377-001 | | | GARA COSTRUZIONE DI ALLOGGI AREA EX POLIGONO MONUMENTALE CASERMA CECCHIGNOLA / ROMA / HDB | | Default Value | | Running | euro | 25.03.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00143 | Roma | Residential houses | Della Cecchignola | 30 - Tender & Submission Phase | 25.03.2020 11:26 | | | | No | No | | | | | euro |
| 355377 | | | GARA COSTRUZIONE DI ALLOGGI AREA EX POLIGONO MONUMENTALE CASERMA CECCHIGNOLA/ROMA | | Default Value | | Running | euro | 25.03.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00143 | Roma | Residential houses | Della Cecchignola | 10 - Information Phase | 25.03.2020 11:21 | | | | No | No | | | | | euro |
| 354733-001 | | | ITINERARIO NAPOLI-BARI / RADDOPPIO TRATTA CANCELLO BENEVENTO / 1° LOTTO FUNZIONALE CANCELLO-FRASSO TELESINO / BENTONITICO | | Default Value | | Running | euro | 17.03.2020 | | ICAM-CAMPANIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 81024 | Maddaloni | | X | 30 - Tender & Submission Phase | 17.03.2020 08:56 | | | | No | No | | | | | euro |
| 354733 | | | ITINERARIO NAPOLI-BARI / RADDOPPIO TRATTA CANCELLO BENEVENTO / 1° LOTTO FUNZIONALE CANCELLO-FRASSO TELESINO | | Default Value | | Running | euro | 17.03.2020 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 81024 | Maddaloni | | X | 10 - Information Phase | 17.03.2020 08:55 | | | | No | No | | | | 62.500,00 € | euro |
| 354452 | | | Interramento linea ferrov e stazione costr nuova fermata Andria Nord | | Default Value | | Running | euro | 13.02.2020 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 76123 | ANDRIA | Technical facilities | Centro Urbano | 10 - Information Phase | 11.03.2020 16:52 | 3514 | | | No | No | | | | | euro |
| 354448 | | | Costruzione Ospedale Dei Sibillini 60 posti letto + 20 posti letto RSA | | Default Value | | Running | euro | 17.01.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 63857 | AMANDOLA | | S.P. 237 | 10 - Information Phase | 11.03.2020 16:28 | 3513 | | | No | No | | | | | euro |
| 354447 | | | Riqualificazione centro fiere per polo innovazione e agrifood | | Default Value | | Running | euro | 31.01.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62100 | MACERATA | Technical facilities | Via A. De Gasperi Loc. Villa Potenza | 10 - Information Phase | 11.03.2020 16:28 | 3512 | | | No | No | | | | | euro |
| 354444 | | | Costruzione (demoric) nuova sede municipale | | Default Value | | Running | euro | 13.02.2020 | | IMOL-MOLISE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 86077 | POZZILLI | | Via Roma 34 | 10 - Information Phase | 11.03.2020 16:21 | 3511 | | | No | No | | | | | euro |
| 354442 | | | Costruzione scuola secondaria di primo grado Tommaso Da Celano | | Default Value | | Running | euro | 29.01.2020 | | IABR-ABRUZZO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 67043 | CELANO | | Via Della Torre | 10 - Information Phase | 11.03.2020 16:15 | 3510 | | | No | No | | | | | euro |
| 354438-002 | | | Nuova palazzina alloggi pers. volontario Esercito-Caserma Saloni-sistemi ritenuta facciate | | Default Value | | Running | euro | 07.09.2021 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 01100 | VITERBO | | Via Cassia Cimina 4 | 40 - Realisation Phase | 07.09.2021 17:19 | 3509 | | | No | No | | | | | euro |
| 354438-001 | | | Nuova palazzina alloggi pers. volontario Esercito-Caserma Saloni-HIT | | Default Value | | Running | euro | 25.02.2021 | | ILAZ-LAZIO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 01100 | VITERBO | | Via Cassia Cimina 4 | 40 - Realisation Phase | 25.02.2021 08:45 | 3509 | | | No | No | | | | | euro |
| 354438 | | | Nuova palazzina alloggi pers. volontario Esercito-Caserma Saloni | | Default Value | | Running | euro | 10.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 01100 | VITERBO | | Via Cassia Cimina 4 | 10 - Information Phase | 11.03.2020 15:56 | 3509 | | | No | No | | | | | euro |
| 354276 | | | SCG IMPIANTI / Costruzione scuola elementare e palestra c/o nuovo polo scolastico 24/11 SCAVI (CONTATTATO ENZO) | | Default Value | | Running | euro | 06.02.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40013 | CASTEL MAGGIORE | | Via Emanuela Loi | 10 - Information Phase | 10.03.2020 11:38 | 3504 | | | No | No | | | | | euro |
| 354275 | | | ENG2K / Ampliamento centro logistico Lotto 14.3 | | Default Value | | Running | euro | 24.01.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40010 | BENTIVOGLIO | Industry building | Interporto Bologna | 10 - Information Phase | 10.03.2020 11:38 | 3503 | | | No | No | | | | | euro |
| 354272 | | | TREVI M / Consolid tratto Canale Candiano banchina antistatne stabil Marcegaglia 26/3 NON ACCESSIBILE | | Default Value | | Running | euro | 05.02.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | Technical facilities | Canale Candiano Porto | 10 - Information Phase | 10.03.2020 11:38 | 3500 | | | No | No | | | | | euro |
| 354271 | | | RCM COSTR ?? / Ampliam stabilimento capannone 16000 mq magazzino prodotti finiti 25/3 NON ACCESSIBILE | | Default Value | | Running | euro | 16.01.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | Industry building | Via Baiona 141 | 10 - Information Phase | 10.03.2020 11:38 | 3499 | | | No | No | | | | | euro |
| 354270 | | | GSE ??? / Costruzione stabilimento e palazzina uffici 40000 mq totale | | Default Value | | Running | euro | 14.02.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Industry building | Via Emore Tirelli | 10 - Information Phase | 10.03.2020 11:38 | 3498 | | | No | No | | | | | euro |
| 354262 | | | ??? Costruzione edificio multip 8 pft ad uso turistico ricettivo | | Default Value | | Running | euro | 09.01.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Marghera Via Colombara 46 | 10 - Information Phase | 10.03.2020 11:09 | 3494 | | | No | No | | | | | euro |
| 354260 | | | GARBO / Costruzione complesso residenziale villette e appartamenti classe A4 | | Default Value | | Running | euro | 24.01.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Residential houses | Via A. Cappellini | 10 - Information Phase | 10.03.2020 11:09 | 3492 | | | No | No | | | | | euro |
| 354259 | | | CERVET / Costruzione 52 unita' abitative per studenti e servizi annessi | | Default Value | | Running | euro | 19.02.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Residential houses | Via Torino Ex Actv | 10 - Information Phase | 10.03.2020 11:09 | 3491 | | | No | No | | | | | euro |
| 354258 | | | SACAIM / Manut riuso rifunz Palazzo ex Casino' Lido Mostra Cinema Centro Congressi | | Default Value | | Running | euro | 29.01.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Piazzale Casino' Lungomare Marconi 4 | 10 - Information Phase | 10.03.2020 11:09 | 3490 | | | No | No | | | | | euro |
| 354257 | | | CLEA ??? / Restauro risanam ristrutt ex manifattura tabacchi x uffici giudiziari | | Default Value | | Running | euro | 14.02.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Piazzale Roma | 10 - Information Phase | 10.03.2020 11:09 | 3489 | | | No | No | | | | | euro |
| 354256 | | | GARA / SIT / Ristruttur e ampliam sede aziendale uffici centro ricerca sala confer | | Default Value | | Running | euro | 14.02.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Technical facilities | Viale Dell'Industria 31 | 10 - Information Phase | 10.03.2020 11:09 | 3488 | | | No | No | | | | | euro |
| 354255 | | | ?????Centro commerciale 70 negozi hotel ***** congressi benessere | | Default Value | | Running | euro | 31.01.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30016 | IESOLO | Technical facilities | Via Roma dx | 10 - Information Phase | 10.03.2020 11:09 | 3487 | | | No | No | | | | | euro |
| 354252 | | | EDILCIDO / Recupero funzionale ex macello per museo storia naturale secondo lotto | | Default Value | | Running | euro | 09.01.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | UDINE | Technical facilities | Via Sabbadini | 30 - Tender & Submission Phase | 10.03.2020 11:01 | 3485 | | | No | No | | | | | euro |
| 354236 | | | Ristrutt ampliam complesso industriale lavoraz sottoprodotti macellaz | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46019 | VIADANA | Industry building | Via Ottoponti Bragagnina 48 | 10 - Information Phase | 10.03.2020 09:53 | 3482 | | | No | No | | | | | euro |
| 354235 | | | Costruzione 2 edifici multip 30 appartamenti classe A2 | | Default Value | | Running | euro | 07.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26900 | LODI | Residential houses | Viale Papa Giovanni XXIII 22 | 10 - Information Phase | 10.03.2020 09:53 | 3481 | | | No | No | | | | | euro |
| 354234 | | | Costruzione magazzino per documenti bancari 50400 mq primo lotto | | Default Value | | Running | euro | 14.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26814 | LIVRAGA | Industry building | Via Delle Industrie | 10 - Information Phase | 10.03.2020 09:53 | 3480 | | | No | No | | | | | euro |
| 354233 | | | Recupero e nuova costruz area commerc 5 MSV superm Lidl Fast Food | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Vie Castelleone / Seminario | 10 - Information Phase | 10.03.2020 09:53 | 3479 | | | No | No | | | | | euro |
| 354232 | | | Costruzione supermercato Eurospin 887 mq + commerciale 310 mq | | Default Value | | Running | euro | 10.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Technical facilities | Viale Europa 5 Ex Fiat | 10 - Information Phase | 10.03.2020 09:53 | 3478 | | | No | No | | | | | euro |
| 354231 | | | Costruzione nuovo Teatro Ideal 2 sale 312+172 posti Riappalto Lavori | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Via Milano 140 | 10 - Information Phase | 10.03.2020 09:53 | 3477 | | | No | No | | | | | euro |
| 354230 | | | Costruzione palazzina ad uso abitazione Lotto A1 | | Default Value | | Running | euro | 14.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via O. Montini | 10 - Information Phase | 10.03.2020 09:53 | 3476 | | | No | No | | | | | euro |
| 354229 | | | Costruzione 2 ville trifamiliari classe energetica A2 | | Default Value | | Running | euro | 29.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via O. Montini 9 | 10 - Information Phase | 10.03.2020 09:53 | 3475 | | | No | No | | | | | euro |
| 354228 | | | Realizzazione impianto depurazione acque reflue civili | | Default Value | | Running | euro | 14.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25062 | CONCESIO | Technical facilities | Via Giovanni Falcone | 10 - Information Phase | 10.03.2020 09:53 | 3474 | | | No | No | | | | | euro |
| 354227 | | | Costruzione polo oncologico 3 piani 2500 mq | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25025 | MANERBIO | | Lungomella Valsecchi | 10 - Information Phase | 10.03.2020 09:53 | 3473 | | | No | No | | | | | euro |
| 354226 | | | Costruzione edifici B1 e B2 ad uso abitazione | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Papa Leone XIII 8 | 10 - Information Phase | 10.03.2020 09:53 | 3472 | | | No | No | | | | | euro |
| 354225 | | | Costruzione parcheggio interrato pertinenziale 54 posti auto | | Default Value | | Running | euro | 06.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via Porta Dipinta | 10 - Information Phase | 10.03.2020 09:53 | 3471 | | | No | No | | | | | euro |
| 354224 | | | Ampliamento aerostazione Lotto 1B nuovo edificio 3 pontili imbarco | | Default Value | | Running | euro | 07.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | ORIO AL SERIO | Technical facilities | Aeroporto Il Caravaggio | 10 - Information Phase | 10.03.2020 09:53 | 3470 | | | No | No | | | | | euro |
| 354223 | | | Costruzione casa di riposo edificio 3 piani 16 camere doppie 3 singole | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | | Piazzale Ospedale 5 | 10 - Information Phase | 10.03.2020 09:53 | 3469 | | | No | No | | | | | euro |
| 354222 | | | Recupero edificio ex foresteria per nuova sede 4000 mq | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24044 | DALMINE | Technical facilities | Piazzale L. Da Vinci 3 | 10 - Information Phase | 10.03.2020 09:53 | 3468 | | | No | No | | | | | euro |
| 354221 | | | Costruzione autosilo interrato 2 piani 255 posti auto | | Default Value | | Running | euro | 30.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23017 | MORBEGNO | Technical facilities | Via Rita Levi Montalcini | 10 - Information Phase | 10.03.2020 09:53 | 3467 | | | No | No | | | | | euro |
| 354220 | | | Realizzazione nuova scuola primaria Istituto Compensivo | | Default Value | | Running | euro | 29.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22018 | PORLEZZA | | Via Osteno | 10 - Information Phase | 10.03.2020 09:53 | 3466 | | | No | No | | | | | euro |
| 354219 | | | Costruzione palazzina 6 piani ft 10 unita' abitative classe A2 | | Default Value | | Running | euro | 10.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21013 | GALLARATE | Residential houses | Via Palestro 12 | 10 - Information Phase | 10.03.2020 09:53 | 3465 | | | No | No | | | | | euro |
| 354218 | | | Costruzione edificio ad uso abitazione 30 appartamenti classe A | | Default Value | | Running | euro | 05.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Viale U. Foscolo 13 | 10 - Information Phase | 10.03.2020 09:53 | 3464 | | | No | No | | | | | euro |
| 354217 | | | Costruzione edificio multip ad uso abitazione 25 appartamenti e box | | Default Value | | Running | euro | 05.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Val Seriana 6 | 10 - Information Phase | 10.03.2020 09:53 | 3463 | | | No | No | | | | | euro |
| 354216 | | | Costruzione complesso ad uso abitazione 30 unita' abitative classe A3 | | Default Value | | Running | euro | 05.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Piave 13 | 10 - Information Phase | 10.03.2020 09:53 | 3462 | | | No | No | | | | | euro |
| 354215 | | | Costruzione 2 RSA 120+120 p letto centro diurno palestra farmacia | | Default Value | | Running | euro | 14.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20812 | LIMBIATE | | Vie Trieste / Gargano | 10 - Information Phase | 10.03.2020 09:53 | 3461 | | | No | No | | | | | euro |
| 354214 | | | Costruzione edificio multip uso abitazione 10 appartamenti classe A4 | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Principe Eugenio 13 | 10 - Information Phase | 10.03.2020 09:53 | 3460 | | | No | No | | | | | euro |
| 354213 | | | Ristrutturaz e risanamento conservativo complesso multip uso uffici | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via San Vigilio 1 | 10 - Information Phase | 10.03.2020 09:53 | 3459 | | | No | No | | | | | euro |
| 354212 | | | Costruz residenza studentesca 640 posti letto primo lotto scavi fondaz | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie Giovenale 15 / Col Moschin 14 | 10 - Information Phase | 10.03.2020 09:53 | 3458 | | | No | No | | | | | euro |
| 354211 | | | Costruzione edificio multip 15 pft ad uso abitazione classe energ A4 | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Serlio 7 | 10 - Information Phase | 10.03.2020 09:53 | 3457 | | | No | No | | | | | euro |
| 354210 | | | Costruzione edificio multip 46 appartamenti e box | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Piazza Aspromonte 13/15 | 10 - Information Phase | 10.03.2020 09:53 | 3456 | | | No | No | | | | | euro |
| 354209 | | | Costruzione edificio multip 30 appartamenti e box | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Stamira D'Ancona 40 | 10 - Information Phase | 10.03.2020 09:53 | 3455 | | | No | No | | | | | euro |
| 354208 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 19.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Asiago 72 | 10 - Information Phase | 10.03.2020 09:53 | 3454 | | | No | No | | | | | euro |
| 354207 | | | Costruzione (demoric) edificio multip ad uso abitazione e box | | Default Value | | Running | euro | 13.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Valtellina 16 | 10 - Information Phase | 10.03.2020 09:53 | 3453 | | | No | No | | | | | euro |
| 354206 | | | Costruzione 2 torri residenziali 123 appartamenti | | Default Value | | Running | euro | 06.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Privata R. Ruggeti 20 | 10 - Information Phase | 10.03.2020 09:53 | 3452 | | | No | No | | | | | euro |
| 354205 | | | Costruzione palazzina ad uso abitazione 12 appartamenti e box | | Default Value | | Running | euro | 22.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Vigevano 29 | 10 - Information Phase | 10.03.2020 09:53 | 3451 | | | No | No | | | | | euro |
| 354204 | | | Costruzione complesso multipiano 105 appartamenti e box | | Default Value | | Running | euro | 22.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Piazza G. Occhialini 19 | 10 - Information Phase | 10.03.2020 09:53 | 3450 | | | No | No | | | | | euro |
| 354203 | | | Lavori completamento complesso multip ad uso direzionale 40000 mq | | Default Value | | Running | euro | 22.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Sile 8 | 10 - Information Phase | 10.03.2020 09:53 | 3449 | | | No | No | | | | | euro |
| 354202 | | | Costruzione complesso alberghiero 194 camere | | Default Value | | Running | euro | 22.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Zecca Vecchia 3 | 10 - Information Phase | 10.03.2020 09:53 | 3448 | | | No | No | | | | | euro |
| 354201 | | | Costruzione 3 edifici 1 al rustico multip ad uso abitazione e box | | Default Value | | Running | euro | 15.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via P.P. Pasolini Cascina Merlata R9 | 10 - Information Phase | 10.03.2020 09:53 | 3447 | | | No | No | | | | | euro |
| 354200 | | | Riqualific edifici direzionali 56000 mq certificaz Leed Gold primo lotto | | Default Value | | Running | euro | 10.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie U. Bassi 4 / G. Pepe | 10 - Information Phase | 10.03.2020 09:53 | 3446 | | | No | No | | | | | euro |
| 354199-001 | | | Costruzione Citta' Della Salute e Ricerca / GIUNTI | | Default Value | | Running | euro | 04.05.2021 | | ILOM-LOMBARDIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 20099 | SESTO SAN GIOVANNI | | Viale Italia 572 Ex Falck | 30 - Tender & Submission Phase | 04.05.2021 16:48 | 3445 | | | No | No | | | | | euro |
| 354199 | | | Costruzione Citta' Della Salute e Ricerca concessione progett realizzaz | | Default Value | | Running | euro | 13.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20099 | SESTO SAN GIOVANNI | | Viale Italia 572 Ex Falck | 10 - Information Phase | 10.03.2020 09:53 | 3445 | | | No | No | | | | | euro |
| 354198 | | | Costruz 3 edifici a destinaz residenziale 12000 mq commerciale 4000 mq | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | VIMODRONE | Residential houses | Via Pio La Torre 14 | 10 - Information Phase | 10.03.2020 09:53 | 3444 | | | No | No | | | | | euro |
| 354197 | | | Costruzione nuovo impianto natatorio appalto in concessione | | Default Value | | Running | euro | 13.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20081 | ABBIATEGRASSO | | Via Alla Conca 13 | 10 - Information Phase | 10.03.2020 09:53 | 3443 | | | No | No | | | | | euro |
| 354196 | | | GSE / Costruzione edificio logistico 27000 mq primo lotto OO UU � 400.000,00 | | Default Value | | Running | euro | 10.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20067 | PAULLO | Industry building | Strada Vecchia Paullese | 10 - Information Phase | 10.03.2020 09:53 | 3442 | | | No | No | | | | | euro |
| 354195 | | | Costruzione nuova sede aziendale 17000 mq | | Default Value | | Running | euro | 10.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | ARLUNO | Technical facilities | Via Certosa Zona Industriale | 10 - Information Phase | 10.03.2020 09:52 | 3441 | | | No | No | | | | | euro |
| 354177-001 | | | MACOS/ TECHPARK BRUNICO/FACCIATA LASTRE CA/DT BODY ANCHOR | | Default Value | | Running | euro | 10.03.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 39042 | BRUNICO | | _ | 10 - Information Phase | 10.03.2020 08:42 | | | | No | No | | | | | euro |
| 354177 | | | MACOS/ TECHPARK BRUNICO/FACCIATA LASTRE CA | | Default Value | | Running | euro | 10.03.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 39042 | BRUNICO | | _ | 10 - Information Phase | 10.03.2020 08:41 | | | | No | No | | | | | euro |
| 354159-001 | | | GARA/ COSTRUZIONE CAMPANILE / FIRENZE / DETAN | | Default Value | | Running | euro | 09.03.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | * | 40 - Realisation Phase | 09.03.2020 16:21 | | | | No | No | | | | 10.000,00 € | euro |
| 354159 | | | GARA/ COSTRUZIONE CAMPANILE / FIRENZE | | Default Value | | Running | euro | 09.03.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | * | 10 - Information Phase | 09.03.2020 16:21 | | | | No | No | | | | 10.000,00 € | euro |
| 354003-001 | | | A.M / REALIZZAZIONE DEI LAVORI DI ADEGUAMENTO FUNZIONALE CASERMA CARABINIERI / NICHELINO / DETAN | | Default Value | | Running | euro | 06.03.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10042 | Nichelino | | * | 10 - Information Phase | 06.03.2020 10:51 | | | | No | No | | | | 8.000,00 € | euro |
| 354003 | | | A.M / REALIZZAZIONE DEI LAVORI DI ADEGUAMENTO FUNZIONALE CASERMA CARABINIERI / NICHELINO | | Default Value | | Running | euro | 06.03.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10042 | Nichelino | | * | 10 - Information Phase | 06.03.2020 10:51 | | | | No | No | | | | 8.000,00 € | euro |
| 353954-001 | | | R.C.M. / RIQUALIFICAZIONE URBANA E SICUREZZA DELLE PERIFERIE DELLE CITTA' METROPOLITANE / GENOVA / DETAN | | Default Value | | Running | euro | 05.03.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | | * | 10 - Information Phase | 05.03.2020 15:21 | | | | No | No | | | | 10.000,00 € | euro |
| 353954 | | | R.C.M. / RIQUALIFICAZIONE URBANA E SICUREZZA DELLE PERIFERIE DELLE CITTA' METROPOLITANE / GENOVA | | Default Value | | Running | euro | 05.03.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | * | 10 - Information Phase | 05.03.2020 15:21 | | | | No | No | | | | 10.000,00 € | euro |
| 353875-001 | | | CONSORZIO EDILMACO / TUNNEL / COL D ITENDA / CORDOLO BENTONITICO | | Default Value | | Running | euro | 04.03.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | * | * | | * | 40 - Realisation Phase | 04.03.2020 14:18 | | | | No | No | | | | | euro |
| 353875 | | | CONSORZIO EDILMACO / TUNNEL / COL D ITENDA | | Default Value | | Running | euro | 04.03.2020 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | * | * | | * | 10 - Information Phase | 04.03.2020 14:17 | | | | No | No | | | | | euro |
| 353868-001 | | | UNIVERSITA' PAPARDO' / MESSINA / GIUNTI | | Default Value | | Running | euro | 04.03.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 98100 | MESSINA | | * | 10 - Information Phase | 04.03.2020 12:25 | | | | No | No | | | | 120.000,00 € | euro |
| 353868 | | | UNIVERSITA' PAPARDO' / MESSINA | | Default Value | | Running | euro | 04.03.2020 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 98100 | MESSINA | | * | 10 - Information Phase | 04.03.2020 12:25 | | | | No | No | | | | 120.000,00 € | euro |
| 353809-001 | | | HIT / 4 UNITA' ABITATIVE / VOLTA MANTOVANO / VECCHIO COSTRUZIONI | | Default Value | | Running | euro | 03.03.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 46049 | Volta Mantovana | Residential houses | via Dora Baltea | 40 - Realisation Phase | 03.03.2020 16:55 | | | | No | No | | | | | euro |
| 353809 | | | 4 UNITA' ABITATIVE / VOLTA MANTOVANO / VECCHIO COSTRUZIONI | | Default Value | | Running | euro | 03.03.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46049 | Volta Mantovana | Residential houses | via Dora Baltea | 40 - Realisation Phase | 03.03.2020 16:54 | | | | No | No | | | | | euro |
| 353300-001 | | | CMB / WALTHER PARK / BOLZANO / HDB / HIT / HSD | | Default Value | | Running | euro | 24.02.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 40 - Realisation Phase | 24.02.2020 13:55 | | | | No | No | | | | | euro |
| 353300 | | | CMB / WALTHER PARK / BOLZANO | | Default Value | | Running | euro | 24.02.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 24.02.2020 13:55 | | | | No | No | | | | | euro |
| 353287-001 | | | HBS / PROGETTO PARK VENEZIA / CREW | | Default Value | | Running | euro | 24.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 30100 | VENEZIA | Infrastructural facility | VIA DELL'INDUSTRIA | 10 - Information Phase | 24.02.2020 11:49 | | | | No | No | | | | | euro |
| 353287 | | | PROGETTO PARK VENEZIA / CREW | | Default Value | | Running | euro | 24.02.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Infrastructural facility | VIA DELL'INDUSTRIA | 10 - Information Phase | 24.02.2020 11:46 | | | | No | No | | | | | euro |
| 353209 | | | Adeguamento funzionale sede ITI Carlo Contini | | Default Value | | Running | euro | 04.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | | Via Gennargentu 31 | 10 - Information Phase | 21.02.2020 14:47 | 3440 | | | No | No | | | | | euro |
| 353208 | | | Adeguamento funzionale sede Istituto Lorenzo Mossa | | Default Value | | Running | euro | 04.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | | Via E. Carboni 10 | 10 - Information Phase | 21.02.2020 14:47 | 3439 | | | No | No | | | | | euro |
| 353207 | | | Costruzione edificio multip 45 unita' abitative e servizi annessi | | Default Value | | Running | euro | 27.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | Residential houses | Via Lepanto | 10 - Information Phase | 21.02.2020 14:47 | 3438 | | | No | No | | | | | euro |
| 353206 | | | Realizz asse stradale di collegamento con SP 8 e 11 e Policlinico Univ | | Default Value | | Running | euro | 02.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | MONSERRATO | Technical facilities | S.P. 8 e 11 | 10 - Information Phase | 21.02.2020 14:47 | 3437 | | | No | No | | | | | euro |
| 353205 | | | Costruzione asilo nido a servizio universita' | | Default Value | | Running | euro | 13.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Via Trentino | 10 - Information Phase | 21.02.2020 14:47 | 3436 | | | No | No | | | | | euro |
| 353204 | | | Lavori di revamping linee A e B del termovalorizzatore | | Default Value | | Running | euro | 21.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Industry building | Localita' Macchiareddu | 10 - Information Phase | 21.02.2020 14:47 | 3435 | | | No | No | | | | | euro |
| 353203 | | | Realizzazione corridoi ciclabili Poetto Corridoio 5 | | Default Value | | Running | euro | 23.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Localita'Poetto | 10 - Information Phase | 21.02.2020 14:47 | 3434 | | | No | No | | | | | euro |
| 353202 | | | Riqual scuole primarie e secondarie primo grado e spazi scuola infanzia | | Default Value | | Running | euro | 25.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09095 | MOGORO | | MASULLAS | 10 - Information Phase | 21.02.2020 14:47 | 3433 | | | No | No | | | | | euro |
| 353201 | | | Recupero Chiesa Parrocchiale San Giorgio e Santa Caterina | | Default Value | | Running | euro | 13.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | VILLAPUTZU | Technical facilities | Piazza Chiesa | 10 - Information Phase | 21.02.2020 14:47 | 3431 | | | No | No | | | | | euro |
| 353200 | | | Lavori di riqualificazione scuola primaria secondo lotto | | Default Value | | Running | euro | 06.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09032 | ASSEMINI | | Via Di Vittorio | 10 - Information Phase | 21.02.2020 14:47 | 3430 | | | No | No | | | | | euro |
| 353199 | | | Lavori di riqualificazione scuola primaria | | Default Value | | Running | euro | 23.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09032 | ASSEMINI | | Via Asproni | 10 - Information Phase | 21.02.2020 14:47 | 3429 | | | No | No | | | | | euro |
| 353198 | | | Ristrutt edificio da adibire a Caserma Carabinieri primo lotto funzion | | Default Value | | Running | euro | 27.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09020 | VILLANOVAFRANCA | | Via G. Galilei | 10 - Information Phase | 21.02.2020 14:47 | 3428 | | | No | No | | | | | euro |
| 353197 | | | Realizz sentiero ciclopedonale colleg centro abitato con porto turistico | | Default Value | | Running | euro | 21.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09019 | TEULADA | Technical facilities | Localita' diverse | 10 - Information Phase | 21.02.2020 14:47 | 3427 | | | No | No | | | | | euro |
| 353196 | | | Costruzione asilo nido | | Default Value | | Running | euro | 30.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | VILLASPECIOSA | | Via Kennedy | 10 - Information Phase | 21.02.2020 14:47 | 3426 | | | No | No | | | | | euro |
| 353195 | | | Lavori di completamento impianto sportivo polivalente | | Default Value | | Running | euro | 29.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | PULA | | Via XXV Aprile | 10 - Information Phase | 21.02.2020 14:47 | 3425 | | | No | No | | | | | euro |
| 353194 | | | Lavori di realizzazione del campo da calcio in erba sintetica | | Default Value | | Running | euro | 10.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | TORPE' | | Via Campo Sportivo snc | 10 - Information Phase | 21.02.2020 14:47 | 3424 | | | No | No | | | | | euro |
| 353193 | | | Adeguametno funzionale sede Liceo Pischedda | | Default Value | | Running | euro | 27.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08013 | BOSA | | Via Alghero | 10 - Information Phase | 21.02.2020 14:47 | 3423 | | | No | No | | | | | euro |
| 353192 | | | Lavori di allestimento aula congressi | | Default Value | | Running | euro | 25.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Viale Italia | 10 - Information Phase | 21.02.2020 14:47 | 3422 | | | No | No | | | | | euro |
| 353191 | | | Costruzione oratorio Localita' Bancali | | Default Value | | Running | euro | 18.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | Technical facilities | S.P. Sassari Argentiera | 10 - Information Phase | 21.02.2020 14:47 | 3421 | | | No | No | | | | | euro |
| 353190 | | | Manut struttur impiant e messa a norma scuola primaria ed infanzia | | Default Value | | Running | euro | 29.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Cilea 5 | 10 - Information Phase | 21.02.2020 14:47 | 3420 | | | No | No | | | | | euro |
| 353189 | | | Bonifica area destinata a centro intermodale passeggeri primo stralcio | | Default Value | | Running | euro | 29.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | Technical facilities | Via XXV Aprile | 10 - Information Phase | 21.02.2020 14:47 | 3419 | | | No | No | | | | | euro |
| 353188 | | | Prolung Antemurale di Ponente e resecazione Banchina Alti Fondali | | Default Value | | Running | euro | 04.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07046 | PORTO TORRES | Technical facilities | Porto Civico | 10 - Information Phase | 21.02.2020 14:47 | 3418 | | | No | No | | | | | euro |
| 353187 | | | Realizzazione tribuna campo sportivo Rocca Ruja primo stralcio | | Default Value | | Running | euro | 21.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07040 | STINTINO | | Localita' Rocca Ruja | 10 - Information Phase | 21.02.2020 14:47 | 3417 | | | No | No | | | | | euro |
| 353186 | | | Manut straordin efficientam energetico potenz spazi scuola Azuni | | Default Value | | Running | euro | 19.09.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07037 | SORSO | | Via Azuni 1 | 10 - Information Phase | 21.02.2020 14:47 | 3416 | | | No | No | | | | | euro |
| 353185 | | | Manutenzione straordinaria scuola secondaria di primo grado | | Default Value | | Running | euro | 29.08.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07032 | NULVI | | Via Sassari 1 | 10 - Information Phase | 21.02.2020 14:47 | 3415 | | | No | No | | | | | euro |
| 353043-001 | | | PREFABBRICATI PRE SAL/UNIPOL/STRUTT. PER GRC | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | - | 10 - Information Phase | 20.02.2020 10:02 | | | | No | No | | | | | euro |
| 353043 | | | PREFABBRICATI PRE SAL/UNIPOL | | Default Value | | Running | euro | 20.02.2020 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | - | 10 - Information Phase | 20.02.2020 10:01 | | | | No | No | | | | | euro |
| 353041-001 | | | GRUPPO MARCHE/DISTR. SANITARIO TARANTO/HL | | Default Value | | Running | euro | 20.02.2020 | | IPUG-PUGLIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 74015 | Martina Franca | | - | 20 - Planning Phase | 20.02.2020 09:54 | | | | No | No | | | | | euro |
| 353041 | | | GRUPPO MARCHE/DISTR. SANITARIO TARANTO | | Default Value | | Running | euro | 20.02.2020 | | IPUG-PUGLIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 74015 | Martina Franca | | - | 10 - Information Phase | 20.02.2020 09:53 | | | | No | No | | | | | euro |
| 353037-001 | | | TERREAL/CENTRO DIR VERONA/HL | | Default Value | | Running | euro | 20.02.2020 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | - | 10 - Information Phase | 20.02.2020 09:45 | | | | No | No | | | | | euro |
| 353037 | | | TERREAL/CENTRO DIR VERONA | | Default Value | | Running | euro | 20.02.2020 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | - | 10 - Information Phase | 20.02.2020 09:44 | | | | No | No | | | | | euro |
| 352916-001 | | | CARRON BAU/TECH PARK BOLZANO/HIT | | Default Value | | Running | euro | 18.02.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | - | 10 - Information Phase | 18.02.2020 16:10 | | | | No | No | | | | | euro |
| 352916 | | | CARRON BAU/TECH PARK BOLZANO | | Default Value | | Running | euro | 18.02.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | - | 10 - Information Phase | 18.02.2020 16:09 | | | | No | No | | | | | euro |
| 352914-001 | | | UNIONBAU/CAMPO TURES/HIT | | Default Value | | Running | euro | 18.02.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | - | 40 - Realisation Phase | 18.02.2020 16:02 | | | | No | No | | | | | euro |
| 352914 | | | UNIONBAU/CAMPO TURES/HIT | | Default Value | | Running | euro | 18.02.2020 | | ITRE-TRENTINO ALTO ADIGE | Anna Magri | | | | No | Project | Halfen System Account | Italy | - | - | | - | 10 - Information Phase | 18.02.2020 16:01 | | | | No | No | | | | | euro |
| 352757-002 | | | TERREAL/CENTRO DIR. VERONA/HL | | Default Value | | Running | euro | 09.09.2020 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | _ | 30 - Tender & Submission Phase | 09.09.2020 09:03 | | | | No | No | | | | | euro |
| 352757-001 | | | TERREAL/CENTRO DIR. VERONA/FK4 | | Default Value | | Running | euro | 17.02.2020 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | _ | 30 - Tender & Submission Phase | 17.02.2020 11:20 | | | | No | No | | | | | euro |
| 352757 | | | TERREAL/CENTRO DIR. VERONA | | Default Value | | Running | euro | 17.02.2020 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | _ | 30 - Tender & Submission Phase | 17.02.2020 11:17 | | | | No | No | | | | | euro |
| 352152-001 | | | PALAZZO STRINGHER / UDINE / DETAN | | Default Value | | Running | euro | 07.02.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 33100 | Udine | | VIALE CADORE | 30 - Tender & Submission Phase | 07.02.2020 11:34 | | | | No | No | | | | | euro |
| 352152 | | | PALAZZO STRINGHER / UDINE | | Default Value | | Running | euro | 07.02.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | Udine | | VIALE CADORE | 30 - Tender & Submission Phase | 07.02.2020 11:31 | | | | No | No | | | | | euro |
| 351794-001 | | | GARA/AMPLIAMENTO OUTLET/VALMONTONE/ HDB | | Default Value | | Running | euro | 03.02.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00038 | Valmontone | Shopping center | Della Pace | 10 - Information Phase | 03.02.2020 17:26 | | | | No | No | | | | | euro |
| 351794 | | | GARA/AMPLIAMENTO OUTLET/VALMONTONE | | Default Value | | Running | euro | 31.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00038 | Valmontone | Shopping center | Della Pace | 10 - Information Phase | 03.02.2020 17:26 | | | | No | No | | | | | euro |
| 351484-001 | | | HDB / POLO TRASFORMAZIONE CEREALI / CREMONA | | Default Value | | Running | euro | 29.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 26100 | Cremona | Industry building | via Riglio | 40 - Realisation Phase | 29.01.2020 13:32 | | | | No | No | | | | | euro |
| 351484 | | | POLO TRASFORMAZIONE CEREALI / CREMONA | | Default Value | | Running | euro | 29.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | Cremona | Industry building | via Riglio | 40 - Realisation Phase | 29.01.2020 13:30 | | | | No | No | | | | | euro |
| 351404 | | | Riqualificazione urbana area est interventi area Foro Boario | | Default Value | | Running | euro | 29.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | Technical facilities | Piazza G. L. Pintus | 10 - Information Phase | 28.01.2020 16:41 | 3414 | | | No | No | | | | | euro |
| 351403 | | | Realizz porticciolo piccola pesca realizz moli foranei dragaggi protez | | Default Value | | Running | euro | 21.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Localita' Sant'Elia | 10 - Information Phase | 28.01.2020 16:41 | 3413 | | | No | No | | | | | euro |
| 351402 | | | Riqualif Viale S Avendrace e viabilita' trasversale x conness parco arch | | Default Value | | Running | euro | 17.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Viale S. Avendrace | 10 - Information Phase | 28.01.2020 16:41 | 3412 | | | No | No | | | | | euro |
| 351401 | | | Riconfiguraz tracciato x realizz parco urbano attrezzato Via San Paolo | | Default Value | | Running | euro | 17.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Via Campo Scipione | 10 - Information Phase | 28.01.2020 16:41 | 3411 | | | No | No | | | | | euro |
| 351400 | | | Opere di adeguamento nel parcheggio per autovetture su due livelli ft | | Default Value | | Running | euro | 17.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Via Cesare Battisti | 10 - Information Phase | 28.01.2020 16:41 | 3410 | | | No | No | | | | | euro |
| 351399 | | | Riqual Viale S Avendrace e Via Po x connessione area ex mattatoio | | Default Value | | Running | euro | 17.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Viale S. Avendrace / Via Po | 10 - Information Phase | 28.01.2020 16:41 | 3409 | | | No | No | | | | | euro |
| 351398 | | | Sistem aree esterne risanam locali accessori scuola primaria Carta | | Default Value | | Running | euro | 17.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09098 | TERRALBA | | Via Roma | 10 - Information Phase | 28.01.2020 16:41 | 3408 | | | No | No | | | | | euro |
| 351397 | | | Lavori di efficientamento casa comunale | | Default Value | | Running | euro | 05.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09078 | SCANO DI MONTIFERRO | | Piazza Montrigu De Reos 1 | 10 - Information Phase | 28.01.2020 16:41 | 3407 | | | No | No | | | | | euro |
| 351396 | | | Messa sicurezza manut straordinaria Santuario Beata Vergine Assunta | | Default Value | | Running | euro | 07.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | GUASILA | Technical facilities | Via Teologo Melas 2 | 10 - Information Phase | 28.01.2020 16:41 | 3406 | | | No | No | | | | | euro |
| 351395 | | | Lavori di manutenzione locali ex pretura | | Default Value | | Running | euro | 06.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09038 | SERRAMANNA | | Via Matteotti | 10 - Information Phase | 28.01.2020 16:41 | 3405 | | | No | No | | | | | euro |
| 351394 | | | Complet recupero ristrutt Villa Gandolfo x centro servizi secondo lotto | | Default Value | | Running | euro | 21.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09014 | CARLOFORTE | | Localita' Spalmadoreddu | 10 - Information Phase | 28.01.2020 16:41 | 3404 | | | No | No | | | | | euro |
| 351393 | | | Lavori efficientamento e riqualificazione energetica ex tribunale | | Default Value | | Running | euro | 05.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09013 | CARBONIA | | Via XVIII Dicembre | 10 - Information Phase | 28.01.2020 16:41 | 3403 | | | No | No | | | | | euro |
| 351392 | | | Lavori di recupero e valorizzazione del centro storico IV lotto | | Default Value | | Running | euro | 06.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | Technical facilities | Piazza Chiesa Sant'Efisio | 10 - Information Phase | 28.01.2020 16:41 | 3402 | | | No | No | | | | | euro |
| 351391 | | | Completamento Lotti 1 e 3 nuova Strada Statale 195 Sulcitana | | Default Value | | Running | euro | 05.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | Technical facilities | SARROCH | 10 - Information Phase | 28.01.2020 16:41 | 3401 | | | No | No | | | | | euro |
| 351390 | | | Realizzazione sala operativa COC presso municipio | | Default Value | | Running | euro | 27.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | | Via Cagliari | 10 - Information Phase | 28.01.2020 16:41 | 3400 | | | No | No | | | | | euro |
| 351389 | | | Complet centro sportivo polivalente sovracomunale Riappalto Lavori | | Default Value | | Running | euro | 08.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | | Via F. Serafini Loc. Su Suergiu | 10 - Information Phase | 28.01.2020 16:41 | 3399 | | | No | No | | | | | euro |
| 351388 | | | Costruzione nuova scuola dell'infanzia | | Default Value | | Running | euro | 27.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | VILLASPECIOSA | | Via Gaetano Zizi | 10 - Information Phase | 28.01.2020 16:41 | 3398 | | | No | No | | | | | euro |
| 351387 | | | Ristrutt ex provveditorato studi x centro accoglienza studenti pendolari | | Default Value | | Running | euro | 05.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | Residential houses | Via Veneto | 10 - Information Phase | 28.01.2020 16:41 | 3397 | | | No | No | | | | | euro |
| 351386 | | | Riqualific messa sicurezza razionalizz energetica palazzo comunale | | Default Value | | Running | euro | 25.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08100 | NUORO | | Via Dante 44 | 10 - Information Phase | 28.01.2020 16:41 | 3396 | | | No | No | | | | | euro |
| 351385 | | | Lavori di completamento comparto di Casa Podda | | Default Value | | Running | euro | 04.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08030 | SADALI | | Centro Storico | 10 - Information Phase | 28.01.2020 16:41 | 3395 | | | No | No | | | | | euro |
| 351384 | | | Riqualif energetica edifici comunali che ospitano uffici del comune | | Default Value | | Running | euro | 06.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08022 | DORGALI | Technical facilities | Corso Umberto 37 | 10 - Information Phase | 28.01.2020 16:41 | 3394 | | | No | No | | | | | euro |
| 351383 | | | Costruzione edificio da adibire a nido d'infanzia | | Default Value | | Running | euro | 11.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | BUDONI | | Via Kennedy | 10 - Information Phase | 28.01.2020 16:41 | 3393 | | | No | No | | | | | euro |
| 351382 | | | Costruzione edificio di culto | | Default Value | | Running | euro | 15.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08015 | MACOMER | Technical facilities | Localita' Bonutrau | 10 - Information Phase | 28.01.2020 16:41 | 3392 | | | No | No | | | | | euro |
| 351381 | | | Realizzaz azienda veterinaria La Crucca polo agrario veterinario | | Default Value | | Running | euro | 04.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Localita' La Crucca | 10 - Information Phase | 28.01.2020 16:41 | 3391 | | | No | No | | | | | euro |
| 351380 | | | Riqualif centro sportivo polifunzionale Palasport Palaserradimigni | | Default Value | | Running | euro | 28.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Piazza A. Segni | 10 - Information Phase | 28.01.2020 16:41 | 3390 | | | No | No | | | | | euro |
| 351379 | | | Riqual energetica adeg complesso sportivo Torres Tennis primo stralcio | | Default Value | | Running | euro | 28.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Romita | 10 - Information Phase | 28.01.2020 16:41 | 3389 | | | No | No | | | | | euro |
| 351378 | | | Riqualificazione centro polisportivo Carbonazzi | | Default Value | | Running | euro | 28.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Milano | 10 - Information Phase | 28.01.2020 16:41 | 3388 | | | No | No | | | | | euro |
| 351377 | | | Costruzione Polo Umanistico a basso impatto ambientale | | Default Value | | Running | euro | 27.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Vie Roma / Zanfarino / Diaz | 10 - Information Phase | 28.01.2020 16:41 | 3387 | | | No | No | | | | | euro |
| 351376 | | | Ristrutt edificio Monserrato Polo Agrario Veterinario potenz Veterinaria | | Default Value | | Running | euro | 27.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Vienna | 10 - Information Phase | 28.01.2020 16:41 | 3386 | | | No | No | | | | | euro |
| 351375 | | | Costruzione nuova sede Dip Chimica e Farmacia complesso Monserrato | | Default Value | | Running | euro | 27.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Vienna | 10 - Information Phase | 28.01.2020 16:41 | 3385 | | | No | No | | | | | euro |
| 351374 | | | Realizz opere edili � 804.000 e impiant sala emodinamica cardiologia | | Default Value | | Running | euro | 13.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via E. De Nicola 1 | 10 - Information Phase | 28.01.2020 16:41 | 3384 | | | No | No | | | | | euro |
| 351373 | | | Ristrutt sede Dipartimento Economia riqualif area ex Orto Botanico | | Default Value | | Running | euro | 08.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Muroni 25 | 10 - Information Phase | 28.01.2020 16:41 | 3383 | | | No | No | | | | | euro |
| 351372 | | | Ristrutt palazzi amministraz centrale P Universita' Ex Estanco Zirulia | | Default Value | | Running | euro | 08.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Piazza Universita' | 10 - Information Phase | 28.01.2020 16:41 | 3382 | | | No | No | | | | | euro |
| 351371 | | | Completam banchinamenti interni ed opere difesa del porto primo lotto | | Default Value | | Running | euro | 28.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07040 | STINTINO | Technical facilities | Porto | 10 - Information Phase | 28.01.2020 16:41 | 3381 | | | No | No | | | | | euro |
| 351370 | | | Ristrutturazione ex oratorio di Santa Croce | | Default Value | | Running | euro | 13.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07027 | OSCHIRI | | Via Umberto I 7/B | 10 - Information Phase | 28.01.2020 16:40 | 3380 | | | No | No | | | | | euro |
| 351369 | | | Lavori riqualificazione ed adeguamento funzionale casa di riposo | | Default Value | | Running | euro | 08.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07027 | OSCHIRI | | Via Cavour 13 | 10 - Information Phase | 28.01.2020 16:40 | 3379 | | | No | No | | | | | euro |
| 351368 | | | Prolungam pista volo 23 nuova viabilita' di accesso e opere connesse | | Default Value | | Running | euro | 17.10.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Aeroporto Costa Smeralda | 10 - Information Phase | 28.01.2020 16:40 | 3378 | | | No | No | | | | | euro |
| 351367 | | | Lavori rifunzional edifici ex Opera Pia x attivita' teatrali convegni | | Default Value | | Running | euro | 04.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07024 | LA MADDALENA | Technical facilities | Vie Roma / L. Da Vinci | 10 - Information Phase | 28.01.2020 16:40 | 3377 | | | No | No | | | | | euro |
| 351366 | | | Valorizzazione percorsi Basilica | | Default Value | | Running | euro | 18.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | LUOGOSANTO | | Piazza Duomo 1 | 10 - Information Phase | 28.01.2020 16:40 | 3376 | | | No | No | | | | | euro |
| 351365 | | | Costruzione oratorio interparrocchiale | | Default Value | | Running | euro | 22.11.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07014 | OZIERI | Technical facilities | Localita' San Nicola | 10 - Information Phase | 28.01.2020 16:40 | 3375 | | | No | No | | | | | euro |
| 351364 | | | Costruzione strada di scorrimento e circonvallazione secondo lotto | | Default Value | | Running | euro | 04.12.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07013 | MORES | Technical facilities | Localita' diverse | 10 - Information Phase | 28.01.2020 16:40 | 3374 | | | No | No | | | | | euro |
| 351236-001 | | | COMPLETAMENTO STRUTTURA HOSPICE/ROMA/GIUNTI | | Default Value | | Running | euro | 27.01.2020 | 21.01.2020 | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00165 | Roma | Medical facility | Bogliasco | 40 - Realisation Phase | 27.01.2020 16:42 | | | | No | No | | | | | euro |
| 351236 | | | COMPLETAMENTO STRUTTURA HOSPICE/ROMA | | Default Value | | Running | euro | 27.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00165 | Roma | Medical facility | Bogliasco | 10 - Information Phase | 27.01.2020 16:32 | | | | No | No | | | | | euro |
| 351226-001 | | | GARA / REALIZZAZIONE STRUTTURA ALBERGHIERA ALPIANA RESORT / TORRI DEL BENACO / HDB | | Default Value | | Running | euro | 27.01.2020 | | IVEN-VENETO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 37010 | Torri del Benaco | | * | 10 - Information Phase | 27.01.2020 14:34 | | | | No | No | | | | | euro |
| 351226 | | | GARA / REALIZZAZIONE STRUTTURA ALBERGHIERA ALPIANA RESORT / TORRI DEL BENACO | | Default Value | | Running | euro | 27.01.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37010 | Torri del Benaco | | * | 10 - Information Phase | 27.01.2020 14:34 | | | | No | No | | | | | euro |
| 351162 | | | GLF / Ampliamento Ospedale terzo e quarto lotto Progettaz e Realizzazione 18/6 SCAVI | | Default Value | | Running | euro | 18.12.2019 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33100 | UDINE | | Piazzale Santa Maria Misericordia 15 | 10 - Information Phase | 27.01.2020 10:29 | 3370 | | | No | No | | | | | euro |
| 351161 | | | COMAR / Costruz centro commerciale con wellness ristorazione giardino pensile 18/6 ANCORA DA DEMOLIRE | | Default Value | | Running | euro | 12.12.2019 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | Technical facilities | Viale Dell'Ippodromo Ex Fiera | 10 - Information Phase | 27.01.2020 10:29 | 3369 | | | No | No | | | | | euro |
| 351155 | | | CONPAT SCARL / Costruzione scuola media Gozzadini | | Default Value | | Running | euro | 16.10.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40055 | CASTENASO | | Via Dello Sport | 10 - Information Phase | 27.01.2020 10:14 | 3330 | | | No | No | | | | | euro |
| 351150 | | | MEDIL (GEOM FURLAN) ) / Realizz nuovo insediam universitario Studentato 2 x 149 posti alloggio SENTIRSI FINE NOVEMBRE 21 | | Default Value | | Running | euro | 20.11.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Residential houses | Via Terracini Ex Lazzaretto Bertalia | 10 - Information Phase | 27.01.2020 10:14 | 3225 | | | No | No | | | | | euro |
| 351114 | | | ITALFEM ??? / Costruzione piscina pubblica coperta con palestra | | Default Value | | Running | euro | 24.10.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | | Via Delle Macchine 55 | 10 - Information Phase | 24.01.2020 15:52 | 3223 | | | No | No | | | | | euro |
| 351111 | | | ITI / Ristrutt ampliam complesso Medicina Veterinaria c/o Complesso Agripolis | | Default Value | | Running | euro | 06.12.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35020 | LEGNARO | | Viale Dell'Universita' 16 | 10 - Information Phase | 24.01.2020 15:52 | 3220 | | | No | No | | | | | euro |
| 351109 | | | GHIOTTI / Ampliamento casa di cura 4 piani 2000 mq | | Default Value | | Running | euro | 08.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 45030 | OCCHIOBELLO | | Via Gorizia 2 | 10 - Information Phase | 24.01.2020 15:52 | 3218 | | | No | No | | | | | euro |
| 351105 | | | FRANCO COSTRUZIONI / Ristrutturazione edificio ad uso commerciale 6000 mq | | Default Value | | Running | euro | 05.12.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Technical facilities | Piazza Garibaldi / Via Cavour | 10 - Information Phase | 24.01.2020 15:52 | 3214 | | | No | No | | | | | euro |
| 351104 | | | INCOS ITALIA / Costruzione 2 edifici commerciali 3A e 3B 21/2 NIENTE | | Default Value | | Running | euro | 22.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36100 | VICENZA | Technical facilities | Via G. Solda' | 10 - Information Phase | 24.01.2020 15:52 | 3213 | | | No | No | | | | | euro |
| 351100 | | | CAPPAROTTO / Opere laminazione piene Fiume Agno Gua' adeguam bacini demaniali | | Default Value | | Running | euro | 29.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36070 | TRISSINO | Technical facilities | ARZIGNANO | 10 - Information Phase | 24.01.2020 15:52 | 3209 | | | No | No | | | | | euro |
| 351098 | | | I.TEC / Costruzione nuova sede aziendale per laboratori ed uffici | | Default Value | | Running | euro | 19.12.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Mestre | 10 - Information Phase | 24.01.2020 15:52 | 3207 | | | No | No | | | | | euro |
| 351082 | | | RESIDENZIALE VIA MARABOTTO / BOLOGNA | | Default Value | | Running | euro | 24.01.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Residential houses | VIA MARABOTTO | 10 - Information Phase | 24.01.2020 14:36 | | | | No | No | | | | | euro |
| 351079-002 | | | HDB / RESIDENZIALE VIA BASSI / BOLOGNA | | Default Value | | Running | euro | 16.09.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | | VIA L BASSI | 40 - Realisation Phase | 16.09.2020 07:32 | | | | No | No | | | | | euro |
| 351079 | | | RESIDENZIALE VIA BASSI / BOLOGNA | | Default Value | | Running | euro | 24.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 40100 | BOLOGNA | | VIA L BASSI | 40 - Realisation Phase | 24.01.2020 14:20 | | | | No | No | | | | | euro |
| 350983-001 | | | GARA / NOI TECHPARK ALTO ADIGE / BRUNICO / HDB / HBT / HIT | | Default Value | | Running | euro | 23.01.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39042 | BRUNICO | | * | 30 - Tender & Submission Phase | 23.01.2020 14:38 | | | | No | No | | | | 29.000,00 € | euro |
| 350983 | | | GARA / NOI TECHPARK ALTO ADIGE / BRUNICO | | Default Value | | Running | euro | 23.01.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39042 | BRUNICO | | * | 10 - Information Phase | 23.01.2020 14:38 | | | | No | No | | | | 29.000,00 € | euro |
| 350942-001 | | | PAVIMENTAL / AUTOSTRADA A1 / AMPLIAMENTO TERZA CORSIA BARBERINO DI MUGELLO / KKT | | Default Value | | Running | euro | 23.01.2020 | | ITOS-TOSCANA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 50031 | Barberino di Mugello | | X | 40 - Realisation Phase | 23.01.2020 10:21 | | | | No | No | | | | | euro |
| 350942 | | | PAVIMENTAL / AUTOSTRADA A1 / AMPLIAMENTO TERZA CORSIA BARBERINO DI MUGELLO | | Default Value | | Running | euro | 23.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50031 | Barberino di Mugello | | X | 10 - Information Phase | 23.01.2020 10:20 | | | | No | No | | | | | euro |
| 350739-001 | | | DETAN / DIREZIONALE / VIA SAN GIOVANNI SUL MURO MILANO | | Default Value | | Running | euro | 21.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20121 | Milano | Office building | via san giovanni sul muro | 10 - Information Phase | 21.01.2020 16:11 | | | | No | No | | | | | euro |
| 350739 | | | DIREZIONALE / VIA SAN GIOVANNI SUL MURO MILANO | | Default Value | | Running | euro | 21.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | Milano | Office building | via san giovanni sul muro | 10 - Information Phase | 21.01.2020 16:10 | | | | No | No | | | | | euro |
| 350624 | | | Costruzione palazzina 4 unita' abitative Lotto 3 + bifamiliare Lotto 19 | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46043 | CASTIGLIONE DELLE STIVIERE | Residential houses | Via R. Leoncavallo | 10 - Information Phase | 20.01.2020 14:25 | 3204 | | | No | No | | | | | euro |
| 350623 | | | AKNO / Costruzione edificio logistico 35000 mq coperti | | Default Value | | Running | euro | 18.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27043 | BRONI | Industry building | Via Dell'Artigianato | 10 - Information Phase | 20.01.2020 14:25 | 3203 | | | No | No | | | | | euro |
| 350622 | | | Costruzione supermercato Conad 1800 mq | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27029 | VIGEVANO | Technical facilities | Via Buozzi Ex Enel | 10 - Information Phase | 20.01.2020 14:25 | 3202 | | | No | No | | | | | euro |
| 350621 | | | Costruzione 2 ville bifamiliari | | Default Value | | Running | euro | 16.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27029 | VIGEVANO | Residential houses | Strada Vignazza 18 | 10 - Information Phase | 20.01.2020 14:25 | 3201 | | | No | No | | | | | euro |
| 350620 | | | ENG 2K / VAILOG Costruzione fabbricato ad uso logistico | | Default Value | | Running | euro | 18.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27015 | LANDRIANO | Industry building | Via S.P. 412 | 10 - Information Phase | 20.01.2020 14:25 | 3200 | | | No | No | | | | | euro |
| 350619 | | | Costruzione scuola elementare con annesso palazzetto dello sport | | Default Value | | Running | euro | 11.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26866 | CASTIRAGA VIDARDO | | Vie Verdi / Rossini | 10 - Information Phase | 20.01.2020 14:25 | 3199 | | | No | No | | | | | euro |
| 350618 | | | Adeguamento e potenziamento impianto di depurazione | | Default Value | | Running | euro | 19.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26823 | CASTIGLIONE D'ADDA | Technical facilities | Capoluogo | 10 - Information Phase | 20.01.2020 14:25 | 3198 | | | No | No | | | | | euro |
| 350617 | | | Costruzione media struttura di vendita catena Aldi 2500 mq Lotto 1 | | Default Value | | Running | euro | 12.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Vie Cascina Corte / Postumia | 10 - Information Phase | 20.01.2020 14:25 | 3197 | | | No | No | | | | | euro |
| 350616 | | | Ristrutturazione succursale IIS Einaudi | | Default Value | | Running | euro | 24.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | | Vie Manzoni / Borghetto | 10 - Information Phase | 20.01.2020 14:25 | 3196 | | | No | No | | | | | euro |
| 350615 | | | Costruzione (demoric) scuola primaria Marazzi | | Default Value | | Running | euro | 27.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26020 | PALAZZO PIGNANO | | Via M. Polo Loc. Scannabue | 10 - Information Phase | 20.01.2020 14:25 | 3195 | | | No | No | | | | | euro |
| 350614 | | | Costruzione villette a schiera | | Default Value | | Running | euro | 13.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26013 | CREMA | Residential houses | Via Don P. Mazzolari | 10 - Information Phase | 20.01.2020 14:25 | 3194 | | | No | No | | | | | euro |
| 350613 | | | Costruzione supermercato 1400 mq | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Via Zara 16 | 10 - Information Phase | 20.01.2020 14:25 | 3193 | | | No | No | | | | | euro |
| 350612 | | | Costruzione edificio ad uso abitazione | | Default Value | | Running | euro | 06.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Del Carso | 10 - Information Phase | 20.01.2020 14:25 | 3192 | | | No | No | | | | | euro |
| 350611 | | | Costruzione residenza sanitaria assistenziale 120 posti letto | | Default Value | | Running | euro | 06.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via Bose | 10 - Information Phase | 20.01.2020 14:25 | 3191 | | | No | No | | | | | euro |
| 350610 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 06.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Della Palazzina | 10 - Information Phase | 20.01.2020 14:25 | 3190 | | | No | No | | | | | euro |
| 350609 | | | Costruzione 3 villette classe energetica A1 | | Default Value | | Running | euro | 06.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Bramante | 10 - Information Phase | 20.01.2020 14:25 | 3189 | | | No | No | | | | | euro |
| 350608 | | | Realizzazione nuova scuola primaria | | Default Value | | Running | euro | 08.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25080 | MAZZANO | | Localita' Ciliverghe | 10 - Information Phase | 20.01.2020 14:25 | 3188 | | | No | No | | | | | euro |
| 350607 | | | Costruzione 2 edifici ad uso abitazione 12 unita' abitative totale | | Default Value | | Running | euro | 23.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25050 | TEMU' | Residential houses | Via Tollarini | 10 - Information Phase | 20.01.2020 14:25 | 3187 | | | No | No | | | | | euro |
| 350606 | | | Realizzazione Porsche Experience Center Autodromo Franciacorta | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | CASTREZZATO | Technical facilities | Via A. De Gasperi | 10 - Information Phase | 20.01.2020 14:25 | 3186 | | | No | No | | | | | euro |
| 350605 | | | TECHBAU / Costruzione polo logistico cerrtificazione Leed Gold | | Default Value | | Running | euro | 06.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | CASTREZZATO | Industry building | Via San Giuseppe S.P. 62 | 10 - Information Phase | 20.01.2020 14:25 | 3185 | | | No | No | | | | | euro |
| 350604 | | | Riqualificazione complesso scolastico scuola infanzia San Capitanio | | Default Value | | Running | euro | 20.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25028 | VEROLANUOVA | | Via Dante 35 | 10 - Information Phase | 20.01.2020 14:25 | 3184 | | | No | No | | | | | euro |
| 350603 | | | Realizz nuovi collettori fognari x dismissione terminali non depurati | | Default Value | | Running | euro | 25.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25020 | OFFLAGA | Technical facilities | Zone diverse | 10 - Information Phase | 20.01.2020 14:25 | 3183 | | | No | No | | | | | euro |
| 350602 | | | Realizz hangar manutenzione linee volo 1 e 2 palazzina comando etc | | Default Value | | Running | euro | 22.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25016 | GHEDI | Industry building | Aeroporto Militare | 10 - Information Phase | 20.01.2020 14:25 | 3182 | | | No | No | | | | | euro |
| 350601 | | | Costruzione complesso residenziale | | Default Value | | Running | euro | 20.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25015 | DESENZANO DEL GARDA | Residential houses | Via Commissario G. Palatucci | 10 - Information Phase | 20.01.2020 14:25 | 3181 | | | No | No | | | | | euro |
| 350600 | | | Costruzione palestra annessa alla scuola primaria | | Default Value | | Running | euro | 27.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25010 | MONTIRONE | | Via Scuole | 10 - Information Phase | 20.01.2020 14:25 | 3180 | | | No | No | | | | | euro |
| 350599 | | | Costruzione edificio produttivo con palazzina uffici | | Default Value | | Running | euro | 20.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24064 | GRUMELLO DEL MONTE | Industry building | Via Della Molinara | 10 - Information Phase | 20.01.2020 14:25 | 3179 | | | No | No | | | | | euro |
| 350598 | | | Realizzazione centro civico didattico primo stralcio funzionale | | Default Value | | Running | euro | 16.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24060 | BOLGARE | | Via Leopardi | 10 - Information Phase | 20.01.2020 14:25 | 3178 | | | No | No | | | | | euro |
| 350597 | | | Ampliamento scuola primaria | | Default Value | | Running | euro | 16.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | GRASSOBBIO | | Via Fornacette | 10 - Information Phase | 20.01.2020 14:25 | 3177 | | | No | No | | | | | euro |
| 350596 | | | Costruzione casa di riposo edificio 3 piani 16 camere doppie 3 singole | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | | Piazzale Ospedale 5 | 10 - Information Phase | 20.01.2020 14:25 | 3176 | | | No | No | | | | | euro |
| 350595 | | | Costruzione 6 medie strutture di vendita primo lotto OO UU | | Default Value | | Running | euro | 23.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24044 | DALMINE | Technical facilities | Vie Provinciale / Guzzanica | 10 - Information Phase | 20.01.2020 14:25 | 3175 | | | No | No | | | | | euro |
| 350594 | | | Costruzione 2 villette a schiera | | Default Value | | Running | euro | 14.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24043 | CARAVAGGIO | Residential houses | Via Vittime Dell'Annamaria Albenga 21 | 10 - Information Phase | 20.01.2020 14:25 | 3174 | | | No | No | | | | | euro |
| 350593 | | | Ampliamento centro commerciale cinema multisala palestra area food | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24040 | STEZZANO | Technical facilities | Via Guzzanica 62/64 | 10 - Information Phase | 20.01.2020 14:25 | 3173 | | | No | No | | | | | euro |
| 350592 | | | Ampliamento complesso industriale edificio produttivo 4225 mq | | Default Value | | Running | euro | 14.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24023 | CLUSONE | Industry building | Viale Europa 47 | 10 - Information Phase | 20.01.2020 14:25 | 3172 | | | No | No | | | | | euro |
| 350591 | | | Costruzione nuova scuola dell'infanzia | | Default Value | | Running | euro | 13.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24022 | ALZANO LOMBARDO | | Parco Ex Villa Paglia | 10 - Information Phase | 20.01.2020 14:25 | 3171 | | | No | No | | | | | euro |
| 350590 | | | Efficientam energetico ristrutturaz e nuova palestra scuola media | | Default Value | | Running | euro | 14.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24021 | ALBINO | | Loc. Desenzano e Comenduno | 10 - Information Phase | 20.01.2020 14:25 | 3170 | | | No | No | | | | | euro |
| 350589 | | | Ristrutt ampliam complesso industriale per nuova sede Omet srl | | Default Value | | Running | euro | 29.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23847 | MOLTENO | Technical facilities | Via G. Puccini 15 | 10 - Information Phase | 20.01.2020 14:25 | 3169 | | | No | No | | | | | euro |
| 350588 | | | Costruzione edificio alberghiero 3 piani 18 camere | | Default Value | | Running | euro | 25.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23030 | LIVIGNO | Technical facilities | Via Saroch 33 | 10 - Information Phase | 20.01.2020 14:25 | 3168 | | | No | No | | | | | euro |
| 350587 | | | Costruzione edificio ad uso commerciale | | Default Value | | Running | euro | 13.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23012 | CASTIONE ANDEVENNO | Technical facilities | Via Nazionale | 10 - Information Phase | 20.01.2020 14:25 | 3167 | | | No | No | | | | | euro |
| 350586 | | | Complet opere difesa esondazioni lago comparto Piazza Cavour Lungolago | | Default Value | | Running | euro | 13.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Lungolago | 10 - Information Phase | 20.01.2020 14:25 | 3166 | | | No | No | | | | | euro |
| 350585 | | | Costruzione supermercato 1500 mq e OO UU | | Default Value | | Running | euro | 12.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Via Cecilio 38 | 10 - Information Phase | 20.01.2020 14:25 | 3165 | | | No | No | | | | | euro |
| 350584 | | | Ampliamento complesso produttivo | | Default Value | | Running | euro | 28.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Industry building | Via Cecilio 15 | 10 - Information Phase | 20.01.2020 14:25 | 3164 | | | No | No | | | | | euro |
| 350583 | | | Completamento edificio per 33 alloggi box e 3 unita' | | Default Value | | Running | euro | 08.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Vie Di Vittorio / Cecilio | 10 - Information Phase | 20.01.2020 14:25 | 3163 | | | No | No | | | | | euro |
| 350582 | | | Costruzione villa unifamiliare + villa bifamiliare | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22029 | UGGIATE TREVANO | Residential houses | Via 4 Novembre | 10 - Information Phase | 20.01.2020 14:25 | 3162 | | | No | No | | | | | euro |
| 350581 | | | Costruzione 5 unita' abitative a schiera | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22029 | UGGIATE TREVANO | Residential houses | Via Roma | 10 - Information Phase | 20.01.2020 14:25 | 3161 | | | No | No | | | | | euro |
| 350580 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22029 | UGGIATE TREVANO | Residential houses | Via Roma | 10 - Information Phase | 20.01.2020 14:25 | 3160 | | | No | No | | | | | euro |
| 350579 | | | Realizz nuovo day center 2 x attivita' diurna demol padiglioni esistenti | | Default Value | | Running | euro | 13.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | | Viale Borri Ospedale Circolo | 10 - Information Phase | 20.01.2020 14:25 | 3159 | | | No | No | | | | | euro |
| 350578 | | | Costruzione parcheggio multipiano 4 piani 317 posti auto | | Default Value | | Running | euro | 17.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Vie Del Ponte / N. Bixio 32 | 10 - Information Phase | 20.01.2020 14:25 | 3158 | | | No | No | | | | | euro |
| 350577 | | | Costruzione parco commerciale 4 MSV multisala ristorante OO UU | | Default Value | | Running | euro | 13.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Corso Sempione 194 Ex Mizar | 10 - Information Phase | 20.01.2020 14:25 | 3157 | | | No | No | | | | | euro |
| 350576 | | | Costruzione nuova sede 2000 mq | | Default Value | | Running | euro | 07.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Vie A. Da Brescia / Dei Sassi | 10 - Information Phase | 20.01.2020 14:25 | 3156 | | | No | No | | | | | euro |
| 350575 | | | Costruzione edificio ad uso abitazione 15 unita' abitative | | Default Value | | Running | euro | 31.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Residential houses | Via R. Pilo | 10 - Information Phase | 20.01.2020 14:25 | 3155 | | | No | No | | | | | euro |
| 350574 | | | Costruzione edificio 3 piani fuori terra 15 unita' abitative classe A4 | | Default Value | | Running | euro | 31.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Residential houses | Via R. Pilo 31 | 10 - Information Phase | 20.01.2020 14:25 | 3154 | | | No | No | | | | | euro |
| 350573 | | | Costruzione palazzina ad uso abitazione | | Default Value | | Running | euro | 16.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21047 | SARONNO | Residential houses | Via L. Caronni 11/27 | 10 - Information Phase | 20.01.2020 14:25 | 3153 | | | No | No | | | | | euro |
| 350572 | | | Costruzione complesso residenziale per 20 unita' abitative | | Default Value | | Running | euro | 19.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via F. Filzi 4 | 10 - Information Phase | 20.01.2020 14:25 | 3152 | | | No | No | | | | | euro |
| 350571 | | | Costruzione palazzina ad uso abitazione e box | | Default Value | | Running | euro | 16.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Q. Sella 27 | 10 - Information Phase | 20.01.2020 14:25 | 3151 | | | No | No | | | | | euro |
| 350570 | | | Costruzione (demoric) 4 unita' abitative a schiera | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20862 | ARCORE | Residential houses | Via L. Perosi 18 | 10 - Information Phase | 20.01.2020 14:25 | 3150 | | | No | No | | | | | euro |
| 350569 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Vie Solferino / Volturno | 10 - Information Phase | 20.01.2020 14:25 | 3149 | | | No | No | | | | | euro |
| 350568 | | | Realizzazione nuova palestra polifunzionale palazzetto | | Default Value | | Running | euro | 18.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | | Via Di Vittorio / Viale Martiri Liberta' | 10 - Information Phase | 20.01.2020 14:25 | 3148 | | | No | No | | | | | euro |
| 350567 | | | Costruzione palazzina ad uso abitazione Lotto 4 | | Default Value | | Running | euro | 23.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20847 | ALBIATE | Residential houses | Via N. Sauro | 10 - Information Phase | 20.01.2020 14:25 | 3147 | | | No | No | | | | | euro |
| 350566 | | | Costruzione supermercato primo lotto demolizione ex Core | | Default Value | | Running | euro | 17.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20843 | VERANO BRIANZA | Technical facilities | Vie N. Sauro / Monza | 10 - Information Phase | 20.01.2020 14:25 | 3146 | | | No | No | | | | | euro |
| 350565 | | | Costruzione palazzina 5 unita' abitative classe A | | Default Value | | Running | euro | 04.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20841 | CARATE BRIANZA | Residential houses | Viale Brianza | 10 - Information Phase | 20.01.2020 14:25 | 3145 | | | No | No | | | | | euro |
| 350564 | | | Costruzione edificio commerciale 2100 mq ristorante 1000 mq e OO UU | | Default Value | | Running | euro | 04.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Technical facilities | Vie Milano / Allo Stadio | 10 - Information Phase | 20.01.2020 14:25 | 3144 | | | No | No | | | | | euro |
| 350563 | | | Costruzione complesso residenziale per 31 unita' abitative classe A | | Default Value | | Running | euro | 19.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Bruzzesi 36/40 | 10 - Information Phase | 20.01.2020 14:25 | 3143 | | | No | No | | | | | euro |
| 350562 | | | Ristrutturaz ex complesso industriale per spazio eventi 7200 mq | | Default Value | | Running | euro | 19.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Moncucco 35 | 10 - Information Phase | 20.01.2020 14:25 | 3142 | | | No | No | | | | | euro |
| 350561 | | | Ampliamento con sopralzo edificio sanitario | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via G. Dezza 48 | 10 - Information Phase | 20.01.2020 14:25 | 3141 | | | No | No | | | | | euro |
| 350560 | | | Costruzione 4 edifici multip ad uso abitazione | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Antonio Meucci 47 | 10 - Information Phase | 20.01.2020 14:25 | 3140 | | | No | No | | | | | euro |
| 350559 | | | Costruzione edificio ad uso abitazione 26 unita' abitative e box | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Viale Monza 273 | 10 - Information Phase | 20.01.2020 14:25 | 3139 | | | No | No | | | | | euro |
| 350558 | | | Costruzione complesso multip ad uso abitaz 48 appart classe A1 e box | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via A. Kramer 26 | 10 - Information Phase | 20.01.2020 14:25 | 3138 | | | No | No | | | | | euro |
| 350557 | | | Restauro complesso ad uso alberghiero | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale Sarca 338 | 10 - Information Phase | 20.01.2020 14:25 | 3137 | | | No | No | | | | | euro |
| 350556 | | | Costruzione edificio ad uso abitazione | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Stilicone 33 | 10 - Information Phase | 20.01.2020 14:25 | 3136 | | | No | No | | | | | euro |
| 350555 | | | Costruzione edificio multip ad uso abitazione 22 alloggi Lotto 1 | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Vittorio De Sica | 10 - Information Phase | 20.01.2020 14:25 | 3135 | | | No | No | | | | | euro |
| 350554 | | | Costruzione edificio commerciale | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Bisceglie 102 | 10 - Information Phase | 20.01.2020 14:25 | 3134 | | | No | No | | | | | euro |
| 350553 | | | Ristrutturazione complesso residenziale | | Default Value | | Running | euro | 13.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Giuffre' 8 / Villani 3 | 10 - Information Phase | 20.01.2020 14:25 | 3133 | | | No | No | | | | | euro |
| 350552 | | | Adeguamento funzionale sede ITIS | | Default Value | | Running | euro | 04.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 09091 | ALES | | Via Amsicora 90 | 10 - Information Phase | 20.01.2020 14:25 | 3132 | | | No | No | | | | | euro |
| 350551 | | | Costruz edifici multip uso abitaz 103 appart Lotto 2 prima fase scavi | | Default Value | | Running | euro | 21.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via A. Spinola | 10 - Information Phase | 20.01.2020 14:25 | 3130 | | | No | No | | | | | euro |
| 350550 | | | Costruzione edificio ad uso abitazione 28 alloggi 35 box | | Default Value | | Running | euro | 20.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via M. Pichi 12 | 10 - Information Phase | 20.01.2020 14:25 | 3129 | | | No | No | | | | | euro |
| 350549 | | | Ristrutturazione edifici per alloggi ERP fabbricati 1 e 2 | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via O. Salomone 28 | 10 - Information Phase | 20.01.2020 14:25 | 3128 | | | No | No | | | | | euro |
| 350548 | | | Restauro edificio multipiano ad uso uffici | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazza Del Liberty 4 | 10 - Information Phase | 20.01.2020 14:25 | 3127 | | | No | No | | | | | euro |
| 350547 | | | Costruz residenza sanitaria assistenziale 120 p letto+28 appart protetti | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Viali F. Testi / Esperia | 10 - Information Phase | 20.01.2020 14:25 | 3126 | | | No | No | | | | | euro |
| 350546 | | | Costruzione (demoric) RSA 120 posti letto + centro diurno | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via P. A. Paravia 5 | 10 - Information Phase | 20.01.2020 14:25 | 3125 | | | No | No | | | | | euro |
| 350545 | | | Riqualificazione edificio ad uso uffici 1850 mq | | Default Value | | Running | euro | 08.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Broletto 5 | 10 - Information Phase | 20.01.2020 14:25 | 3124 | | | No | No | | | | | euro |
| 350544 | | | Costruzione torre residenziale 23 piani 105 appartamenti e 149 box | | Default Value | | Running | euro | 08.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Stresa 22/24 | 10 - Information Phase | 20.01.2020 14:25 | 3123 | | | No | No | | | | | euro |
| 350543 | | | Recupero e restauro edificio per nuova sede | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Caradosso 16 | 10 - Information Phase | 20.01.2020 14:25 | 3122 | | | No | No | | | | | euro |
| 350542 | | | Costruz edificio multip uso alberghiero 185 camere sale conf piscina | | Default Value | | Running | euro | 24.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via B. Colleoni 14 | 10 - Information Phase | 20.01.2020 14:25 | 3121 | | | No | No | | | | | euro |
| 350541 | | | Completamento edificio ad uso depositi self service | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Industry building | Via Bisceglie 89/91 | 10 - Information Phase | 20.01.2020 14:25 | 3120 | | | No | No | | | | | euro |
| 350540 | | | Costruzione edifici a torre ad uso abitazione 350 unita' abitative | | Default Value | | Running | euro | 13.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20092 | CINISELLO BALSAMO | Residential houses | Via G. Matteotti | 10 - Information Phase | 20.01.2020 14:25 | 3119 | | | No | No | | | | | euro |
| 350539 | | | Lavori di potenziamento SP 103 tratta A1 A2 primo lotto primo stralcio | | Default Value | | Running | euro | 13.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | S.P. 103 Antica Cassano | 10 - Information Phase | 20.01.2020 14:25 | 3118 | | | No | No | | | | | euro |
| 350538 | | | Costruzione supermercato 1550 mq e OO UU a scomputo | | Default Value | | Running | euro | 29.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | Vie Redecesio / F.V. Giulia | 10 - Information Phase | 20.01.2020 14:25 | 3117 | | | No | No | | | | | euro |
| 350537 | | | Ampliamento complesso industriale | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | TREZZANO SUL NAVIGLIO | Industry building | Via F. Gioia 1 | 10 - Information Phase | 20.01.2020 14:25 | 3116 | | | No | No | | | | | euro |
| 350536 | | | Costruz scuola elementare secondo lotto palestra auditorium 300 posti | | Default Value | | Running | euro | 31.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20077 | CERRO AL LAMBRO | | Localita' Riozzo | 10 - Information Phase | 20.01.2020 14:25 | 3115 | | | No | No | | | | | euro |
| 350535 | | | Ristrutturazione centro sportivo comunale Project Financing | | Default Value | | Running | euro | 21.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20063 | CERNUSCO SUL NAVIGLIO | | Via Buonarroti | 10 - Information Phase | 20.01.2020 14:25 | 3114 | | | No | No | | | | | euro |
| 350534 | | | Costruzione palazzina 10 unita' abitative classe A | | Default Value | | Running | euro | 28.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20025 | LEGNANO | Residential houses | Vie Stoppani / Plinio | 10 - Information Phase | 20.01.2020 14:25 | 3113 | | | No | No | | | | | euro |
| 350533 | | | Costruzione supermercato Eurospin 1257 mq | | Default Value | | Running | euro | 19.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | ROBECCHETTO CON INDUNO | Technical facilities | S.S. 341 Per Turbigo | 10 - Information Phase | 20.01.2020 14:25 | 3112 | | | No | No | | | | | euro |
| 350532 | | | Razionalizzazione area chirugica ed area materno infantile | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20013 | MAGENTA | | Via Al Donatore Di Sangue | 10 - Information Phase | 20.01.2020 14:24 | 3111 | | | No | No | | | | | euro |
| 350531 | | | GSE / Costruzione polo logistico FM Logistic 48200 mq e uffici 1200 mq | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | MESERO | Industry building | Via E. Mattei | 10 - Information Phase | 20.01.2020 14:24 | 3110 | | | No | No | | | | | euro |
| 350415 | | | Costruzione scuola Betti | | Default Value | | Running | euro | 13.11.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62032 | CAMERINO | | Loc. Madonna Delle Carceri | 10 - Information Phase | 16.01.2020 16:17 | 3109 | | | No | No | | | | | euro |
| 350414 | | | Realizzazione nuova scuola primaria | | Default Value | | Running | euro | 14.11.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 62018 | POTENZA PICENA | | Viali Piemonte / Lombardia | 10 - Information Phase | 16.01.2020 16:17 | 3108 | | | No | No | | | | | euro |
| 350413 | | | Ricostruzione scuola secondaria primo grado secondo e terzo stralcio | | Default Value | | Running | euro | 16.10.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 60035 | JESI | | Via Schweitzer | 10 - Information Phase | 16.01.2020 16:17 | 3107 | | | No | No | | | | | euro |
| 350412 | | | Costruzione campus scolastico IV stralcio palestra | | Default Value | | Running | euro | 28.11.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 60030 | MAIOLATI SPONTINI | | Localita' Moie | 10 - Information Phase | 16.01.2020 16:17 | 3106 | | | No | No | | | | | euro |
| 350411 | | | Costruzione nuova scuola media primo lotto | | Default Value | | Running | euro | 25.10.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 60022 | CASTELFIDARDO | | Via A. Meucci | 10 - Information Phase | 16.01.2020 16:17 | 3105 | | | No | No | | | | | euro |
| 350406 | | | Costruzione e gestione parcheggio multipiano Project Financing | | Default Value | | Running | euro | 31.10.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 04024 | GAETA | Technical facilities | Localita' Spaltoni | 10 - Information Phase | 16.01.2020 16:08 | 3104 | | | No | No | | | | | euro |
| 350405 | | | Costruz centro polifunzion con sala teatro auditorium bar presidio CRI | | Default Value | | Running | euro | 06.11.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 02012 | AMATRICE | | Viale Saturnino Muzii | 10 - Information Phase | 16.01.2020 16:08 | 3103 | | | No | No | | | | | euro |
| 350404 | | | Costruzione parcheggio interrato 85 box 203 posti auto a rotazione | | Default Value | | Running | euro | 07.11.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | Technical facilities | Via Della Giuliana / Largo Trionfale | 10 - Information Phase | 16.01.2020 16:08 | 3102 | | | No | No | | | | | euro |
| 350403 | | | Riqualificazione torri direzionali | | Default Value | | Running | euro | 18.10.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00100 | ROMA | Technical facilities | Viale Europa 242 | 10 - Information Phase | 16.01.2020 16:08 | 3101 | | | No | No | | | | | euro |
| 350259-001 | | | COSTRUZIONE IMMOBILE UNI LUISS/ ROMA/HDB | | Default Value | | Running | euro | 15.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00197 | Roma | Educational facility | Viale Romania, 32 | 40 - Realisation Phase | 15.01.2020 11:25 | | | | No | No | | | | 8.000,00 € | euro |
| 350259 | | | COSTRUZIONE IMMOBILE UNI LUISS/ ROMA | | Default Value | | Running | euro | 15.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00197 | Roma | Educational facility | Viale Romania, 32 | 10 - Information Phase | 15.01.2020 11:24 | | | | No | No | | | | 8.000,00 € | euro |
| 350181-001 | | | GARA / ESTENSIONE TERMINAL 1 AEROPORTO FIUMICINO / ROMA / HTA | | Default Value | | Running | euro | 14.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00054 | Fiumicino aeroporto | Infrastructural facility | Via dell'Aerporto di Fiumicino | 30 - Tender & Submission Phase | 14.01.2020 14:58 | | | | No | No | | | | 14.000,00 € | euro |
| 350181 | | | GARA / ESTENSIONE TERMINAL 1 AEROPORTO FIUMICINO / ROMA | | Default Value | | Running | euro | 14.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00054 | Fiumicino aeroporto | Infrastructural facility | Via dell'Aerporto di Fiumicino | 10 - Information Phase | 14.01.2020 14:57 | | | | No | No | | | | 14.000,00 € | euro |
| 350005 | | | Costruzione 2 palestre c/o polo scolastico di San Paolo | | Default Value | | Running | euro | 11.12.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 59100 | PRATO | | Via Galcianese | 10 - Information Phase | 13.01.2020 09:51 | 3100 | | | No | No | | | | | euro |
| 350004 | | | Costruz scuola elementare Fucini a seguito alluvione dell'11-12/11/2012 | | Default Value | | Running | euro | 31.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58015 | ORBETELLO | | Via Sicilia Loc. Albinia | 10 - Information Phase | 13.01.2020 09:51 | 3099 | | | No | No | | | | | euro |
| 350003 | | | Costruzione edificio commerciale supermercato Conad | | Default Value | | Running | euro | 30.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57039 | RIO NELL'ELBA | Technical facilities | Via Principe Amedeo | 10 - Information Phase | 13.01.2020 09:50 | 3098 | | | No | No | | | | | euro |
| 350002 | | | Riqualificazione ex Fornace per realizzazione RSA 70 posti letto | | Default Value | | Running | euro | 08.11.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57028 | SUVERETO | | Localita' Forni | 10 - Information Phase | 13.01.2020 09:50 | 3097 | | | No | No | | | | | euro |
| 350000 | | | Costruzione centro logistico catena alimentare del freddo secondo lotto | | Default Value | | Running | euro | 29.11.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57014 | COLLESALVETTI | Industry building | Interporto Vespucci | 10 - Information Phase | 13.01.2020 09:50 | 3095 | | | No | No | | | | | euro |
| 349999 | | | Restauro conservativo ed adeguamento funzionale di Casa Pacinotti | | Default Value | | Running | euro | 22.11.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | | Via Santa Maria 24 | 10 - Information Phase | 13.01.2020 09:50 | 3094 | | | No | No | | | | | euro |
| 349998 | | | Costruzione Polo Ospedaliero Universitario Nuovo Santa Chiara | | Default Value | | Running | euro | 08.11.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | | Via Paradisa Loc. Cisanello | 10 - Information Phase | 13.01.2020 09:50 | 3093 | | | No | No | | | | | euro |
| 349997 | | | Ristrutt completam complesso ad uso commerciale 12 MSV 13000 mq | | Default Value | | Running | euro | 20.11.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56021 | CASCINA | Technical facilities | Via Nugolaio | 10 - Information Phase | 13.01.2020 09:50 | 3092 | | | No | No | | | | | euro |
| 349996 | | | Ristrutt 3 edifici ERP e riqualif area e decoro urbano Intervento n.6 | | Default Value | | Running | euro | 28.11.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55100 | LUCCA | Residential houses | Piazza L. Ariosto | 10 - Information Phase | 13.01.2020 09:50 | 3091 | | | No | No | | | | | euro |
| 349995 | | | Costruzione supermercato Lidl | | Default Value | | Running | euro | 18.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55100 | LUCCA | Technical facilities | Via Di Tiglio 305 | 10 - Information Phase | 13.01.2020 09:50 | 3090 | | | No | No | | | | | euro |
| 349994 | | | Realizzazione nuova sede Distaccamento Vigili Del Fuoco | | Default Value | | Running | euro | 15.11.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 55049 | VIAREGGIO | | Capoluogo | 10 - Information Phase | 13.01.2020 09:50 | 3089 | | | No | No | | | | | euro |
| 349969-001 | | | NUOVA QUESTURA \ANDRIA \ GIUNTI | | Default Value | | Running | euro | 12.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 76123 | Andria | Office building | ANDRIA | 30 - Tender & Submission Phase | 12.01.2020 12:44 | | | | No | No | | | | 17.000,00 € | euro |
| 349969 | | | NUOVA QUESTURA \ANDRIA | | Default Value | | Running | euro | 12.01.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 76123 | Andria | Office building | ANDRIA | 10 - Information Phase | 12.01.2020 12:40 | | | | No | No | | | | 17.000,00 € | euro |
| 349967-001 | | | GARA \ NUOVO IDL \ SAN CASCIANO-FIRENZE \ HBT+HDB+WATERSTOP | | Default Value | | Running | euro | 12.01.2020 | | ITOS-TOSCANA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 50020 | San Casciano in Val di Pesa | Infrastructural facility | LOC. PONTEROTTO | 10 - Information Phase | 12.01.2020 12:31 | | | | No | No | | | | 13.000,00 € | euro |
| 349967 | | | GARA \ NUOVO IDL \ SAN CASCIANO-FIRENZE | | Default Value | | Running | euro | 12.01.2020 | | ITOS-TOSCANA | Amedeo Geraldi | | | | No | Parent Project | Halfen System Account | Italy | 50020 | San Casciano in Val di Pesa | Infrastructural facility | LOC. PONTEROTTO | 10 - Information Phase | 12.01.2020 12:30 | | | | No | No | | | | 13.000,00 € | euro |
| 349910-001 | | | AMPLIAMENTO IX GRUPPO COMANDO AEROPORTO MILIATARE GROSSETO / GROSSETO / HIT | | Default Value | | Running | euro | 10.01.2020 | | ITOS-TOSCANA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 58100 | Grosseto | Infrastructural facility | X | 30 - Tender & Submission Phase | 10.01.2020 15:09 | | | | No | No | | | | | euro |
| 349910 | | | AMPLIAMENTO IX GRUPPO COMANDO AEROPORTO MILIATARE GROSSETO / GROSSETO | | Default Value | | Running | euro | 10.01.2020 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58100 | Grosseto | Infrastructural facility | X | 10 - Information Phase | 10.01.2020 09:46 | | | | No | No | | | | | euro |
| 349766-001 | | | GUERRINI PREFABBRICATI / HITACHI / SANTIA' / HCC | | Default Value | | Running | euro | 08.01.2020 | | IPIE-PIEMONTE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 13048 | Santhià | | X | 40 - Realisation Phase | 08.01.2020 11:39 | | | | No | No | | | | 60.000,00 € | euro |
| 349766 | | | GUERRINI PREFABBRICATI / HITACHI / SANTIA' | | Default Value | | Running | euro | 08.01.2020 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 13048 | Santhià | | X | 10 - Information Phase | 08.01.2020 11:39 | | | | No | No | | | | 60.000,00 € | euro |
| 349380-001 | | | GIUGGIA / RIQUALIFICA DELLA PAVIMENTAZIONE ULTIMO PIANO PARCHEGGIO AEREOPORTO CASELLE / TORINO / GIUNTO | | Default Value | | Running | euro | 19.12.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | Strada San Maurizio | 10 - Information Phase | 19.12.2019 10:08 | | | | No | No | | | | 37.000,00 € | euro |
| 349380 | | | GIUGGIA / RIQUALIFICA DELLA PAVIMENTAZIONE ULTIMO PIANO PARCHEGGIO AEREOPORTO CASELLE / TORINO | | Default Value | | Running | euro | 19.12.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | Strada San Maurizio | 10 - Information Phase | 19.12.2019 10:07 | | | | No | No | | | | 37.000,00 € | euro |
| 349359 | | | PREFABBRICATI PUGLIESI/PANNELLI/SPA | | Default Value | | Running | euro | 18.12.2019 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | - | - | | - | 40 - Realisation Phase | 18.12.2019 16:48 | | | | No | No | | | | | euro |
| 349356 | | | CO.GEDIL/VENDITA MD/PANNELLI | | Default Value | | Running | euro | 18.12.2019 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 73010 | Lecce | | _ | 10 - Information Phase | 18.12.2019 16:29 | | | | No | No | | | | | euro |
| 349355 | | | NUOVO COMPLESSO PARROCCHIALE / CASSINO / GIUNTI | | Default Value | | Running | euro | 18.12.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 03043 | Cassino | Educational facility | Garigliano | 10 - Information Phase | 18.12.2019 16:28 | | | | No | No | | | | | euro |
| 349354 | | | ISA/AEROPORTO FIUMICINO | | Default Value | | Running | euro | 18.12.2019 | | ILAZ-LAZIO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 00054 | Fiumicino aeroporto | | Via dell'aeroporto | 10 - Information Phase | 18.12.2019 16:21 | | | | No | No | | | | | euro |
| 349352-002 | | | ISA/AEROPORTO FIUMICINO/ DETAN | | Default Value | | Running | euro | 06.11.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00054 | Fiumicino | | VIA DELL'AEROPORTO | 10 - Information Phase | 06.11.2020 16:33 | | | | No | No | | | | | euro |
| 349352-001 | | | ISA/AEROPORTO FIUMICINO/ FACCIATA PIETRA/SUK DT | | Default Value | | Running | euro | 18.12.2019 | | ILAZ-LAZIO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 00054 | Fiumicino | | VIA DELL'AEROPORTO | 20 - Planning Phase | 18.12.2019 16:16 | | | | No | No | | | | | euro |
| 349352 | | | ISA/AEROPORTO FIUMICINO/ FACCIATA PIETRA | | Default Value | | Running | euro | 18.12.2019 | | ILAZ-LAZIO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 00054 | Fiumicino | | VIA DELL'AEROPORTO | 10 - Information Phase | 18.12.2019 16:13 | | | | No | No | | | | | euro |
| 349345-001 | | | UNION BAU / COSTRUZIONE NUOVI ALLOGGI E 25 POSTI AUTO / HIT | | Default Value | | Running | euro | 18.12.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39038 | San Candido | | * | 10 - Information Phase | 18.12.2019 15:03 | | | | No | No | | | | 7.500,00 € | euro |
| 349345 | | | UNION BAU / COSTRUZIONE NUOVI ALLOGGI E 25 POSTI AUTO | | Default Value | | Running | euro | 18.12.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39038 | San Candido | | * | 10 - Information Phase | 18.12.2019 15:03 | | | | No | No | | | | 7.500,00 € | euro |
| 348867-001 | | | HIT / CIVILE ABITAZIONE 5 PIANI / EDILVALMALENCO / SONDRIO | | Default Value | | Running | euro | 10.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23100 | Sondrio | Residential houses | VIA DELLO STADIO | 40 - Realisation Phase | 10.12.2019 17:52 | | | | No | No | | | | | euro |
| 348867 | | | CIVILE ABITAZIONE 5 PIANI / EDILVALMALENCO / SONDRIO | | Default Value | | Running | euro | 10.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23100 | Sondrio | Residential houses | VIA DELLO STADIO | 40 - Realisation Phase | 10.12.2019 17:50 | | | | No | No | | | | | euro |
| 348830-001 | | | CLARA COSTRUZIONI / COSTRUZIONE DI UN MAGAZZINO COMMERCIALE / BOLZANO / HDB | | Default Value | | Running | euro | 10.12.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | VIA BADIA | 10 - Information Phase | 10.12.2019 11:41 | | | | No | No | | | | 35.000,00 € | euro |
| 348830 | | | CLARA COSTRUZIONI / COSTRUZIONE DI UN MAGAZZINO COMMERCIALE / BOLZANO | | Default Value | | Running | euro | 10.12.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | VIA BADIA | 10 - Information Phase | 10.12.2019 11:40 | | | | No | No | | | | 35.000,00 € | euro |
| 348818-001 | | | TERREAL/ NASTRIFICIO BONICATTI/ FK4 | | Default Value | | Running | euro | 10.12.2019 | | IPIE-PIEMONTE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 10099 | SAN MAURO T.SE (TO) | | Via Torino 275 | 30 - Tender & Submission Phase | 10.12.2019 10:44 | | | | No | No | | | | | euro |
| 348818 | | | TERREAL/ NASTRIFICIO BONICATTI | | Default Value | | Running | euro | 10.12.2019 | | IPIE-PIEMONTE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 10099 | SAN MAURO T.SE (TO) | | Via Torino 275 | 30 - Tender & Submission Phase | 10.12.2019 10:44 | | | | No | No | | | | | euro |
| 348815-001 | | | CICERO COSTRUZIONI/ CHIESA S MINIATO/ WP3 | | Default Value | | Running | euro | 10.12.2019 | | ITOS-TOSCANA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | _ | _ | | _ | 10 - Information Phase | 10.12.2019 10:36 | | | | No | No | | | | | euro |
| 348815 | | | CICERO COSTRUZIONI/ CHIESA S MINIATO/ WP3 | | Default Value | | Running | euro | 10.12.2019 | | ITOS-TOSCANA | Anna Magri | | | | No | Project | Halfen System Account | Italy | _ | _ | | _ | 10 - Information Phase | 10.12.2019 10:36 | | | | No | No | | | | | euro |
| 348348-001 | | | ADEGUAMENTO SISMICO LICEO LEONARDO DA VINCI / FIRENZE / HUC / HSCC | | Default Value | | Running | euro | 03.12.2019 | | ITOS-TOSCANA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | X | 30 - Tender & Submission Phase | 03.12.2019 11:35 | | | | No | No | | | | | euro |
| 348348 | | | ADEGUAMENTO SISMICO LICEO LEONARDO DA VINCI / FIRENZE | | Default Value | | Running | euro | 03.12.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | X | 10 - Information Phase | 03.12.2019 11:34 | | | | No | No | | | | | euro |
| 348214-001 | | | ALBERGO / CAORLE / HDB | | Default Value | | Running | euro | 29.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 30020 | Caorle | | --- | 40 - Realisation Phase | 29.11.2019 15:28 | | | | No | No | | | | | euro |
| 348214 | | | ALBERGO / CAORLE | | Default Value | | Running | euro | 29.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30020 | Caorle | | --- | 10 - Information Phase | 29.11.2019 15:21 | | | | No | No | | | | | euro |
| 348043-001 | | | CNA / BOLZANO / HBS | | Default Value | | Running | euro | 27.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | -- | 30 - Tender & Submission Phase | 27.11.2019 15:50 | | | | No | No | | | | | euro |
| 348043 | | | CNA / BOLZANO | | Default Value | | Running | euro | 27.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | -- | 10 - Information Phase | 27.11.2019 15:47 | | | | No | No | | | | | euro |
| 347924-001 | | | S.I.C.I / PALAZZO DI GIUSTIZIA / REGGIO CALABRIA / GIUNTI | | Default Value | | Running | euro | 26.11.2019 | | ICAL-CALABRIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 89900 | Vibo Valentia | | * | 10 - Information Phase | 26.11.2019 11:43 | | | | No | No | | | | 6.500,00 € | euro |
| 347924 | | | S.I.C.I / PALAZZO DI GIUSTIZIA / REGGIO CALABRIA | | Default Value | | Running | euro | 26.11.2019 | | ICAL-CALABRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 89900 | Vibo Valentia | | * | 10 - Information Phase | 26.11.2019 11:43 | | | | No | No | | | | 6.500,00 € | euro |
| 347870-001 | | | HIT / RESIDENZA DEL SOLE / VIA CONTE G. BELLI GRASSOBBIO / COLOMBELLI | | Default Value | | Running | euro | 26.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24050 | Grassobbio (BG) | | Via Conte Gianpaolo Belli | 10 - Information Phase | 26.11.2019 06:53 | | | | No | No | | | | | euro |
| 347870 | | | RESIDENZA DEL SOLE / VIA CONTE G. BELLI GRASSOBBIO / COLOMBELLI | | Default Value | | Running | euro | 26.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | Grassobbio (BG) | | Via Conte Gianpaolo Belli | 10 - Information Phase | 26.11.2019 06:52 | | | | No | No | | | | | euro |
| 347568 | | | LABOR SpA/AMPLIAMENTO CASA DI CURA VILLA SERENA/JESI/GIUNTI | | Default Value | | Running | euro | 03.10.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 60035 | Jesi | Medical facility | Colle Onorato, 2 | 10 - Information Phase | 21.11.2019 09:12 | | | | No | No | | | | 15.000,00 € | euro |
| 347431-001 | | | PRIMOS/EDIFICI LOGISTICI PER SERVIZI TECNO NAUTICI - RETRO DARSENA PORTO DI TARANTO/HIT | | Default Value | | Running | euro | 19.11.2019 | 19.11.2019 | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 74100 | TARANTO | Office building | PORTO COMMERCIALE-MOLO SAN CATALDO | 10 - Information Phase | 19.11.2019 17:52 | | | | No | No | | | | 3.000,00 € | euro |
| 347431 | | | EDIFICI LOGISTICI PER SERVIZI TECNO NAUTICI - RETRO DARSENA PORTO DI TARANTO | | Default Value | | Running | euro | 19.11.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 74100 | TARANTO | Office building | PORTO COMMERCIALE-MOLO SAN CATALDO | 10 - Information Phase | 19.11.2019 17:51 | | | | No | Yes | | | | 3.000,00 € | euro |
| 347377-001 | | | T&D INGEGNERE E ASSOCIATI / NUOPVA COSTRUZIONE DI 14 ALLOGGI NELLA ZONA DI ESPANSIONE C3 / BOLZANO / HDB | | Default Value | | Running | euro | 19.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39028 | Silandro | | * | 10 - Information Phase | 19.11.2019 10:24 | | | | No | No | | | | | euro |
| 347377 | | | T&D INGEGNERE E ASSOCIATI / NUOPVA COSTRUZIONE DI 14 ALLOGGI NELLA ZONA DI ESPANSIONE C3 / BOLZANO | | Default Value | | Running | euro | 19.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39028 | Silandro | | * | 30 - Tender & Submission Phase | 19.11.2019 10:24 | | | | No | No | | | | 7.500,00 € | euro |
| 347246-003 | | | NEXITY MILANO OLGIATI / MILANO /CANDELA / FK5 | | Default Value | | Running | euro | 23.03.2021 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 20143 | Milano | Residential houses | Via Olgiati 12 | 30 - Tender & Submission Phase | 23.03.2021 10:26 | | | | No | No | | | | | euro |
| 347246 | | | NEXITY MILANO OLGIATI / MILANO | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20143 | Milano | Residential houses | Via Olgiati 12 | 30 - Tender & Submission Phase | 15.11.2019 18:57 | | | | No | No | | | | 15.000,00 € | euro |
| 347069-003 | | | HDB / NEXTY MILANO PIRANESI / VIA PIRANESI 38 MILANO | | Default Value | | Running | euro | 16.01.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20137 | Milano | Residential houses | Via Piranesi 38 | 30 - Tender & Submission Phase | 16.01.2021 07:24 | | | | No | Yes | | | | | euro |
| 347069-002 | | | HSD / NEXTY MILANO PIRANESI / VIA PIRANESI 38 MILANO | | Default Value | | Running | euro | 14.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20137 | Milano | Residential houses | Via Piranesi 38 | 30 - Tender & Submission Phase | 14.11.2019 07:34 | | | | No | No | | | | 30.000,00 € | euro |
| 347069-001 | | | HIT / NEXTY MILANO PIRANESI / VIA PIRANESI 38 MILANO | | Default Value | | Running | euro | 14.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20137 | Milano | Residential houses | Via Piranesi 38 | 30 - Tender & Submission Phase | 14.11.2019 07:29 | | | | No | No | | | | 144.000,00 € | euro |
| 347069 | | | NEXTY MILANO PIRANESI / VIA PIRANESI 38 MILANO | | Default Value | | Running | euro | 14.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20137 | Milano | Residential houses | Via Piranesi 38 | 30 - Tender & Submission Phase | 14.11.2019 07:27 | | | | No | No | | | | 174.000,00 € | euro |
| 347062-001 | | | COSTRUZIONI VITALE / PALESTRA SCUOLA ELEMENTARE / VICENZA / DETAN | | Default Value | | Running | euro | 13.11.2019 | | IVEN-VENETO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 33050 | Zugliano | | * | 40 - Realisation Phase | 13.11.2019 16:24 | | | | No | No | | | | 4.400,00 € | euro |
| 347062 | | | COSTRUZIONI VITALE / PALESTRA SCUOLA ELEMENTARE / VICENZA | | Default Value | | Running | euro | 13.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 33050 | Zugliano | | * | 10 - Information Phase | 13.11.2019 16:24 | | | | No | No | | | | 4.400,00 € | euro |
| 346802-001 | | | UNIONBAU / NUOVA COSTRUZIONE DI UN NEGOZIO DI FERRAMENTA CON GARDEN CENTER E PARCHEGGIO SOTTERRANEO / BOLZANO / HDB | | Default Value | | Running | euro | 11.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 11.11.2019 09:51 | | | | No | No | | | | | euro |
| 346802 | | | UNIONBAU / NUOVA COSTRUZIONE DI UN NEGOZIO DI FERRAMENTA CON GARDEN CENTER E PARCHEGGIO SOTTERRANEO / BOLZANO | | Default Value | | Running | euro | 11.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 11.11.2019 09:51 | | | | No | No | | | | | euro |
| 346768-001 | | | HDB / RESIDENZIALE / VIA QUARTO CAGNINO MILANO / MANGIAVACCHI | | Default Value | | Running | euro | 10.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20153 | Milano | Residential houses | via Quarto Cagnino | 40 - Realisation Phase | 10.11.2019 11:36 | | | | No | Yes | | | | 20.000,00 € | euro |
| 346768 | | | RESIDENZIALE / VIA QUARTO CAGNINO MILANO / MANGIAVACCHI | | Default Value | | Running | euro | 10.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20153 | Milano | Residential houses | via Quarto Cagnino | 40 - Realisation Phase | 10.11.2019 11:33 | | | | No | No | | | | 20.000,00 € | euro |
| 346761-001 | | | HIT / RESIDENZIALE / VIA CAZZULANI LODI / COSPE SRL | | Default Value | | Running | euro | 08.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 26900 | Lodi | Residential houses | via elena cazzulani | 40 - Realisation Phase | 08.11.2019 17:11 | | | | No | No | | | | 10.000,00 € | euro |
| 346761 | | | RESIDENZIALE / VIA CAZZULANI LODI / COSPE SRL | | Default Value | | Running | euro | 08.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26900 | Lodi | Residential houses | via elena cazzulani | 40 - Realisation Phase | 08.11.2019 17:10 | | | | No | No | | | | 10.000,00 € | euro |
| 346759-001 | | | CORNAGLIA / COPERTURA E TRASFORMAZIONE CAMPI DA TENNIS / FOSSANO / DETAN | | Default Value | | Running | euro | 08.11.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 12045 | Fossano | | ZONA SANTA LUCIA | 10 - Information Phase | 08.11.2019 16:53 | | | | No | No | | | | 18.000,00 € | euro |
| 346759 | | | CORNAGLIA / COPERTURA E TRASFORMAZIONE CAMPI DA TENNIS / FOSSANO | | Default Value | | Running | euro | 08.11.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 12045 | Fossano | | ZONA SANTA LUCIA | 10 - Information Phase | 08.11.2019 16:53 | | | | No | No | | | | 18.000,00 € | euro |
| 346681-001 | | | MARTINI / MEDOLE / THERMOMASS | | Default Value | | Running | euro | 07.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 46046 | Medole | | VIA CROCEVIA | 20 - Planning Phase | 07.11.2019 16:26 | | | | No | No | | | | | euro |
| 346681 | | | MARTINI / MEDOLE | | Default Value | | Running | euro | 07.11.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 46046 | Medole | | VIA CROCEVIA | 10 - Information Phase | 07.11.2019 16:23 | | | | No | No | | | | | euro |
| 346632-001 | | | ITI / EX OSP CELESIA / GENOVA / HBS | | Default Value | | Running | euro | 07.11.2019 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | | ZONA RIVAROLO | 40 - Realisation Phase | 07.11.2019 10:47 | | | | No | No | | | | | euro |
| 346632 | | | ITI / EX OSP CELESIA / GENOVA | | Default Value | | Running | euro | 07.11.2019 | | ILIG-LIGURIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | ZONA RIVAROLO | 40 - Realisation Phase | 07.11.2019 10:42 | | | | No | No | | | | | euro |
| 346608-001 | | | HDB / RESIDENZIALE E DIREZIONALE ARTIGIANCASSA / VIA CRESCENZO DEL MONTE 25 ROMA | | Default Value | | Running | euro | 07.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 00153 | Roma | Residential houses | via crescenzo del monte 25-45 | 40 - Realisation Phase | 07.11.2019 08:13 | | | | No | Yes | | | | 3.000,00 € | euro |
| 346608 | | | RESIDENZIALE E DIREZIONALE ARTIGIANCASSA / VIA CRESCENZO DEL MONTE 25 ROMA | | Default Value | | Running | euro | 07.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 00153 | Roma | Residential houses | via crescenzo del monte 25-45 | 40 - Realisation Phase | 07.11.2019 08:10 | | | | No | No | | | | 3.000,00 € | euro |
| 346603-001 | | | HDB / RESIDENZIALE PLURIPIANO / VIALE INNOCENZO VIA TORRIANI COMO / MAZZUCCHI | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 22100 | Como | Residential houses | viale innocenzo via torriani | 40 - Realisation Phase | 06.11.2019 17:34 | | | | No | No | | | | 4.000,00 € | euro |
| 346603 | | | RESIDENZIALE PLURIPIANO / VIALE INNOCENZO VIA TORRIANI COMO / MAZZUCCHI | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | Como | Residential houses | viale innocenzo via torriani | 40 - Realisation Phase | 06.11.2019 17:32 | | | | No | No | | | | 4.000,00 € | euro |
| 346597-001 | | | HIT /PALZZINA RESIDENZIALE / VIA GULLI MILANO | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20147 | Milano | Residential houses | via Tommaso Gulli | 40 - Realisation Phase | 06.11.2019 16:45 | | | | No | No | | | | 10.000,00 € | euro |
| 346597 | | | PALZZINA RESIDENZIALE / VIA GULLI MILANO | | Default Value | | Running | euro | 06.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20147 | Milano | Residential houses | via Tommaso Gulli | 40 - Realisation Phase | 06.11.2019 16:43 | | | | No | No | | | | 10.000,00 € | euro |
| 346582-001 | | | LIBARDONI / NUOVO EDIFICIO RESIDENZIALE / TRENZO / HIT | | Default Value | | Running | euro | 06.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 38100 | TRENTO | | Via Bolognini | 10 - Information Phase | 06.11.2019 14:49 | | | | No | No | | | | 8.000,00 € | euro |
| 346582 | | | LIBARDONI / NUOVO EDIFICIO RESIDENZIALE / TRENTO | | Default Value | | Running | euro | 06.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38100 | TRENTO | | Via Bolognini | 10 - Information Phase | 06.11.2019 14:49 | | | | No | No | | | | 8.000,00 € | euro |
| 346513-001 | | | GARA / COSTRUZIONE CENTRO PRODUTTIVO "CONSORZIO GREEN" / BOLZANO / HBS / HTA / HTU | | Default Value | | Running | euro | 05.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | VIA EINSTEIN | 10 - Information Phase | 05.11.2019 16:43 | | | | No | No | | | | 21.000,00 € | euro |
| 346513 | | | GARA / COSTRUZIONE CENTRO PRODUTTIVO "CONSORZIO GREEN" / BOLZANO | | Default Value | | Running | euro | 05.11.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | VIA EINSTEIN | 10 - Information Phase | 05.11.2019 16:43 | | | | No | No | | | | 21.000,00 € | euro |
| 346511-004 | | | HTA / LIFE SOURCE / HOTEL / COSPE | | Default Value | | Running | euro | 09.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Medical facility | via Briantea | 40 - Realisation Phase | 09.11.2019 09:13 | | | | No | No | | | | 5.000,00 € | euro |
| 346511-002 | | | LIFE SOURCE / HOTEL / COSPE | | Default Value | | Running | euro | 09.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | Medical facility | via Briantea | 40 - Realisation Phase | 09.11.2019 09:13 | | | | No | No | | | | | euro |
| 346511-001 | | | DETAN / LIFE SOURCE / HOTEL / COSPE | | Default Value | | Running | euro | 05.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24124 | Bergamo | | via Briantea | 40 - Realisation Phase | 05.11.2019 16:23 | | | | No | No | | | | 2.000,00 € | euro |
| 346511 | | | LIFE SOURCE / HOTEL / COSPE | | Default Value | | Running | euro | 05.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24124 | Bergamo | | via Briantea | 40 - Realisation Phase | 05.11.2019 16:22 | | | | No | No | | | | 7.000,00 € | euro |
| 346399-001 | | | GARA/AMPLIAMANTO CENTRO PAC CONAD/ROMA/GIUNTI | | Default Value | | Running | euro | 04.11.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00151 | Roma | Shopping center | Viale Isacco Newton | 10 - Information Phase | 04.11.2019 14:31 | | | | No | No | | | | 20.000,00 € | euro |
| 346399 | | | GARA/AMPLIAMANTO CENTRO PAC CONAD/ROMA | | Default Value | | Running | euro | 04.11.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00151 | Roma | Shopping center | Viale Isacco Newton | 10 - Information Phase | 04.11.2019 14:30 | | | | No | No | | | | 20.000,00 € | euro |
| 345991 | | | Costruzione supermercato | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 55047 | SERAVEZZA | Technical facilities | Vie Federici / Ciocche | 10 - Information Phase | 28.10.2019 11:08 | 3088 | | | No | No | | | | | euro |
| 345990 | | | Riqual sito produttivo approntam locali x officina magazzino spogliatoi | | Default Value | | Running | euro | 06.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 55045 | PIETRASANTA | Industry building | Via Pontenuovo snc | 10 - Information Phase | 28.10.2019 11:08 | 3087 | | | No | No | | | | | euro |
| 345989 | | | Realizz piscina olimpionica scuola Marescialli e Brigadieri Carabinieri | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Localita' Castello | 10 - Information Phase | 28.10.2019 11:08 | 3086 | | | No | No | | | | | euro |
| 345988 | | | Costruzione albergo housing sociale negozi uffici | | Default Value | | Running | euro | 15.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Viale Belfiore 52 Ex Fiat | 10 - Information Phase | 28.10.2019 11:08 | 3085 | | | No | No | | | | | euro |
| 345987 | | | Costruzione nuovo biennio IIS Leonardo Da Vinci | | Default Value | | Running | euro | 30.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Via Del Terzolle 91 | 10 - Information Phase | 28.10.2019 11:08 | 3084 | | | No | No | | | | | euro |
| 345986 | | | Costruzione centro culturale ed edificio di culto buddista | | Default Value | | Running | euro | 22.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 50013 | CAMPI BISENZIO | Technical facilities | Via Di Limite | 10 - Information Phase | 28.10.2019 11:08 | 3083 | | | No | No | | | | | euro |
| 345985 | | | Costruzione centro sportivo su 25 ettari prima fase lavori propedeutici | | Default Value | | Running | euro | 08.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 50012 | BAGNO A RIPOLI | Technical facilities | Vie Pian Di Ripoli / Villa Cedri | 10 - Information Phase | 28.10.2019 11:08 | 3082 | | | No | No | | | | | euro |
| 345984 | | | Costruz palazzetto sport polifunz + 5000 mq commerciale Project Financ | | Default Value | | Running | euro | 18.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 05100 | TERNI | Technical facilities | Strada Di San Martino | 10 - Information Phase | 28.10.2019 11:08 | 3081 | | | No | No | | | | | euro |
| 345983 | | | Costruzione complesso residenziale ville a schiera | | Default Value | | Running | euro | 05.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25036 | PALAZZOLO SULL'OGLIO | Residential houses | Via Rino Taboni | 10 - Information Phase | 28.10.2019 11:08 | 3080 | | | No | No | | | | | euro |
| 345982 | | | Costruzione centro cottura e servizio di ristorazione comunale | | Default Value | | Running | euro | 29.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25025 | MANERBIO | Technical facilities | Capoluogo | 10 - Information Phase | 28.10.2019 11:08 | 3079 | | | No | No | | | | | euro |
| 345981 | | | Costruzione 2 edifici a 2 piani ft per 22 appartamenti totale classe A4 | | Default Value | | Running | euro | 12.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Claudia Grismondi 13 | 10 - Information Phase | 28.10.2019 11:08 | 3078 | | | No | No | | | | | euro |
| 345980 | | | Costruzione palazzina ad uso abitazione e box | | Default Value | | Running | euro | 12.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Ferruccio Dell'Orto 3 | 10 - Information Phase | 28.10.2019 11:08 | 3076 | | | No | No | | | | | euro |
| 345979 | | | Costruzione albergo 81 camere 27 monolocali e OO UU | | Default Value | | Running | euro | 30.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via M. L. King | 10 - Information Phase | 28.10.2019 11:08 | 3075 | | | No | No | | | | | euro |
| 345978 | | | Costruzione residenza sanitaria assistenziale 120 posti letto | | Default Value | | Running | euro | 05.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | GHISALBA | | Via Portico Nuovo | 10 - Information Phase | 28.10.2019 11:08 | 3074 | | | No | No | | | | | euro |
| 345977 | | | Costruzione edificio ad uso abitazione 4 unita' abitative a schiera | | Default Value | | Running | euro | 05.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | GHISALBA | Residential houses | Via Canonico Cossali 6 | 10 - Information Phase | 28.10.2019 11:08 | 3073 | | | No | No | | | | | euro |
| 345976 | | | Costruzione polo logistico 55000 mq | | Default Value | | Running | euro | 30.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | COVO | Industry building | Via Calcio | 10 - Information Phase | 28.10.2019 11:08 | 3072 | | | No | No | | | | | euro |
| 345975 | | | Costruzione nuovo stadio del calcio 1800 posti | | Default Value | | Running | euro | 22.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24050 | ZANICA | | Via Comun Nuovo | 10 - Information Phase | 28.10.2019 11:08 | 3071 | | | No | No | | | | | euro |
| 345974 | | | Realizzazione insediamento produttivo e centro di ricerca | | Default Value | | Running | euro | 12.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24040 | STEZZANO | Industry building | Via Boito | 10 - Information Phase | 28.10.2019 11:08 | 3070 | | | No | No | | | | | euro |
| 345973 | | | Costruzione centro di ricerca per nuove applicazioni dei gas | | Default Value | | Running | euro | 05.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24040 | OSIO SOPRA | Technical facilities | S.S. 525 Del Brembo 1 | 10 - Information Phase | 28.10.2019 11:08 | 3069 | | | No | No | | | | | euro |
| 345972 | | | Costruzione Caserma Carabinieri edificio ex sede Comunita' Montana | | Default Value | | Running | euro | 20.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24023 | CLUSONE | | Via Sant'Alessandro | 10 - Information Phase | 28.10.2019 11:08 | 3068 | | | No | No | | | | | euro |
| 345971 | | | Costruzione 2 edifici uso abitazione e box 24 unita' abitative totale | | Default Value | | Running | euro | 27.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24021 | ALBINO | Residential houses | Vie Liberta' / Provinciale | 10 - Information Phase | 28.10.2019 11:08 | 3067 | | | No | No | | | | | euro |
| 345970-002 | | | Costruzione nuova sede aziendale 17500 mq / HBS / HSC | | Default Value | | Running | euro | 08.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24016 | SAN PELLEGRINO TERME | Technical facilities | ZOGNO | 40 - Realisation Phase | 08.06.2020 09:47 | 3066 | | | No | No | | | | | euro |
| 345970-001 | | | HDB /Costruzione nuova sede aziendale 17500 mq / SAN PELLEGRINO | | Default Value | | Running | euro | 05.06.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24016 | SAN PELLEGRINO TERME | Technical facilities | ZOGNO | 30 - Tender & Submission Phase | 05.06.2020 11:00 | 3066 | | | No | No | | | | | euro |
| 345970 | | | Costruzione nuova sede aziendale 17500 mq | | Default Value | | Running | euro | 02.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24016 | SAN PELLEGRINO TERME | Technical facilities | ZOGNO | 30 - Tender & Submission Phase | 28.10.2019 11:08 | 3066 | | | No | No | | | | | euro |
| 345969 | | | Costruzione edificio ad uso abitazione, negozi e boxes | | Default Value | | Running | euro | 23.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO | Residential houses | Via Aspromonte 30 | 10 - Information Phase | 28.10.2019 11:08 | 3065 | | | No | No | | | | | euro |
| 345968 | | | Costruzione edificio 4 piani ft 20 appartamenti classe energetica A4 | | Default Value | | Running | euro | 19.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Via A. Lissi | 10 - Information Phase | 28.10.2019 11:08 | 3064 | | | No | No | | | | | euro |
| 345967 | | | Costruzione supermercato 3083 mq + edificio terziario 510 mq | | Default Value | | Running | euro | 19.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22079 | VILLA GUARDIA | Technical facilities | Via Corsica 1 Ex Filtex | 10 - Information Phase | 28.10.2019 11:08 | 3063 | | | No | No | | | | | euro |
| 345966 | | | Costruzione edificio ad uso abitazione 11 appartamenti e box | | Default Value | | Running | euro | 19.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22063 | CANTU' | Residential houses | Via XXV Maggio 3 | 10 - Information Phase | 28.10.2019 11:08 | 3062 | | | No | No | | | | | euro |
| 345965 | | | Costruzione ville a schiera | | Default Value | | Running | euro | 19.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22063 | CANTU' | Residential houses | Via Domea | 10 - Information Phase | 28.10.2019 11:08 | 3061 | | | No | No | | | | | euro |
| 345964 | | | Costruzione ristorante | | Default Value | | Running | euro | 18.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22036 | ERBA | Technical facilities | Via Delle Grigne | 10 - Information Phase | 28.10.2019 11:08 | 3060 | | | No | No | | | | | euro |
| 345963 | | | Costruzione palazzina per 10 unita' abitative classe A1 | | Default Value | | Running | euro | 18.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21040 | ORIGGIO | Residential houses | Viale Della Resistenza | 10 - Information Phase | 28.10.2019 11:08 | 3059 | | | No | No | | | | | euro |
| 345962 | | | Costruzione nuova sede Vodafone Automotive Telematics 5000 mq | | Default Value | | Running | euro | 27.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21010 | VIZZOLA TICINO | Technical facilities | Via G. D'Annunzio | 10 - Information Phase | 28.10.2019 11:08 | 3058 | | | No | No | | | | | euro |
| 345961 | | | Costruzione complesso residenziale 20 unita' abitative a schiera | | Default Value | | Running | euro | 12.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20864 | AGRATE BRIANZA | Residential houses | Via Don Gnocchi | 10 - Information Phase | 28.10.2019 11:08 | 3057 | | | No | No | | | | | euro |
| 345960 | | | Lavori di demolizione e ricostruzione edificio ERP | | Default Value | | Running | euro | 23.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20831 | SEREGNO | Residential houses | Via Macalle' 41 | 10 - Information Phase | 28.10.2019 11:08 | 3056 | | | No | No | | | | | euro |
| 345959 | | | Costruzione supermercato 2300 mq | | Default Value | | Running | euro | 11.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20813 | BOVISIO | Technical facilities | MASCIAGO | 10 - Information Phase | 28.10.2019 11:08 | 3055 | | | No | No | | | | | euro |
| 345958 | | | Costruzione residenza assistenziale per anziani 120 posti letto | | Default Value | | Running | euro | 11.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20813 | BOVISIO | | MASCIAGO | 10 - Information Phase | 28.10.2019 11:08 | 3054 | | | No | No | | | | | euro |
| 345957 | | | Realizzazione incubatore di imprese Smart City Lab | | Default Value | | Running | euro | 10.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Ripamonti 88 | 10 - Information Phase | 28.10.2019 11:08 | 3053 | | | No | No | | | | | euro |
| 345956 | | | Costruzione nuova sede concessionaria automobili Flli Giacomel | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Cassano D'Adda 1 | 10 - Information Phase | 28.10.2019 11:08 | 3052 | | | No | No | | | | | euro |
| 345955 | | | Costruzione edificio ad uso abitazione 20 appartamenti e box | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Freikofel 26 | 10 - Information Phase | 28.10.2019 11:08 | 3051 | | | No | No | | | | | euro |
| 345954 | | | Costruzione edificio multipiano ad uso abitazione 55 unita' abitative | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Presolana 6 | 10 - Information Phase | 28.10.2019 11:08 | 3050 | | | No | No | | | | | euro |
| 345953 | | | Costruzione 2 edifici ad uso abitazione 18 appartamenti e box | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Viale Umbria 128 | 10 - Information Phase | 28.10.2019 11:08 | 3049 | | | No | No | | | | | euro |
| 345952 | | | Recupero Palazzo Broggi ad uso commerciale direzionale 55000 mq | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazza Cordusio 1 | 10 - Information Phase | 28.10.2019 11:08 | 3048 | | | No | No | | | | | euro |
| 345951 | | | Ristrutturazione 3 edifici ad uso uffici 45000 mq | | Default Value | | Running | euro | 03.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Italia 23 | 10 - Information Phase | 28.10.2019 11:08 | 3047 | | | No | No | | | | | euro |
| 345950 | | | Costruzione edificio ad uso abitazione 26 unita' abitative e box | | Default Value | | Running | euro | 02.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Viale Monza 273 | 10 - Information Phase | 28.10.2019 11:08 | 3046 | | | No | No | | | | | euro |
| 345949 | | | Costruzione 4 edifici a torre per 117 appartamenti totale | | Default Value | | Running | euro | 26.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Dei Canzi Ex De Nora | 10 - Information Phase | 28.10.2019 11:08 | 3045 | | | No | No | | | | | euro |
| 345948 | | | Costruzione edificio a torre ad uso abitazione 35 appartamenti | | Default Value | | Running | euro | 18.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Comasina 2 | 10 - Information Phase | 28.10.2019 11:08 | 3044 | | | No | No | | | | | euro |
| 345947 | | | Costruzione edificio uso abitazione uffici negozi parcheggio interr | | Default Value | | Running | euro | 11.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via C. Beccaria | 10 - Information Phase | 28.10.2019 11:08 | 3043 | | | No | No | | | | | euro |
| 345946 | | | Costruzione 3 palazzine per 23 unita' abitative totale | | Default Value | | Running | euro | 11.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via F.lli Gorlini 43 | 10 - Information Phase | 28.10.2019 11:08 | 3042 | | | No | No | | | | | euro |
| 345945 | | | Costruzione edificio per 28 appartamenti e 42 box interrati | | Default Value | | Running | euro | 05.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Varese 20 | 10 - Information Phase | 28.10.2019 11:08 | 3041 | | | No | No | | | | | euro |
| 345944 | | | Costruzione (demoric) edificio multip uso abitazione e box 97 appartam | | Default Value | | Running | euro | 30.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via S. Botticelli 19 | 10 - Information Phase | 28.10.2019 11:08 | 3040 | | | No | No | | | | | euro |
| 345943 | | | Costruzione (demoric) complesso multip uso abitazione 62 appart e box | | Default Value | | Running | euro | 22.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Giuseppe Govone 66 | 10 - Information Phase | 28.10.2019 11:08 | 3039 | | | No | No | | | | | euro |
| 345942 | | | Realizz nuovo edificio da adibire ad uffici giudiziari secondo stralcio | | Default Value | | Running | euro | 21.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie San Barnaba / Pace | 10 - Information Phase | 28.10.2019 11:07 | 3038 | | | No | No | | | | | euro |
| 345941 | | | Costruzione supermercato Lidl 2100 mq + 2 MSV 800+600 mq | | Default Value | | Running | euro | 04.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20098 | SAN GIULIANO MILANESE | Technical facilities | Via L. Tolstoi 63 | 10 - Information Phase | 28.10.2019 11:07 | 3037 | | | No | No | | | | | euro |
| 345940 | | | Costruzione nuova sede aziendale edificio per uffici amministrativi | | Default Value | | Running | euro | 18.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20092 | CINISELLO BALSAMO | Technical facilities | Via M. Gorky 50 | 10 - Information Phase | 28.10.2019 11:07 | 3036 | | | No | No | | | | | euro |
| 345939 | | | Costruzione supermercato Aldi ristorante galleria negozi 3502 mq tot | | Default Value | | Running | euro | 02.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | Vie Cassanese / O. Pagani | 10 - Information Phase | 28.10.2019 11:07 | 3035 | | | No | No | | | | | euro |
| 345938 | | | Realizzazione vasca di laminazione sul Fiume Seveso | | Default Value | | Running | euro | 22.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20030 | SENAGO | Technical facilities | Capoluogo | 10 - Information Phase | 28.10.2019 11:07 | 3034 | | | No | No | | | | | euro |
| 345873-001 | | | HIT / IMMOBILIARE VISCONTEA / RESIDENZIALE OPERA MI | | Default Value | | Running | euro | 25.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Opera | Residential houses | Via Cascina Grande | 30 - Tender & Submission Phase | 25.10.2019 14:41 | | | | No | No | | | | | euro |
| 345873 | | | IMMOBILIARE VISCONTEA / RESIDENZIALE OPERA MI | | Default Value | | Running | euro | 25.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | Opera | Residential houses | Via Cascina Grande | 30 - Tender & Submission Phase | 25.10.2019 14:40 | | | | No | No | | | | | euro |
| 345510-001 | | | UNIONBAU / RISTRUTTURAZIONE, AMPLIAMENTO E ADATTAMENTO ALLE NUOVE RORMEMINISTERIALOI DEL LABORATORIO E NUOVO UFFICIO / BOLZANO / HDB | | Default Value | | Running | euro | 21.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 40 - Realisation Phase | 21.10.2019 11:13 | | | | No | No | | | | | euro |
| 345510 | | | UNIONBAU / RISTRUTTURAZIONE, AMPLIAMENTO E ADATTAMENTO ALLE NUOVE RORMEMINISTERIALOI DEL LABORATORIO E NUOVO UFFICIO / BOLZANO | | Default Value | | Running | euro | 21.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 21.10.2019 11:13 | | | | No | No | | | | | euro |
| 345446 | | | IMMOBILIARE GIA.MA / RESIDENZIALE / F.LLI BRONZETTI BERGAMO | | Default Value | | Running | euro | 19.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24124 | Bergamo | Residential houses | via f.lli bronzetti 20 | 40 - Realisation Phase | 19.10.2019 13:11 | | | | No | No | | | | | euro |
| 345366-001 | | | MASSINI & GORI / PROGETTO ARCHITETTONICO PER LA COSTRUZIONE DI NUOVA CANTINA / MAGLIANO / HDB | | Default Value | | Running | euro | 17.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 58051 | Magliano in Toscana | | * | 10 - Information Phase | 17.10.2019 16:03 | | | | No | No | | | | | euro |
| 345366 | | | MASSINI & GORI / PROGETTO ARCHITETTONICO PER LA COSTRUZIONE DI NUOVA CANTINA / MAGLIANO | | Default Value | | Running | euro | 17.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 58051 | Magliano in Toscana | | * | 10 - Information Phase | 17.10.2019 16:03 | | | | No | No | | | | | euro |
| 345349-001 | | | EDIL EFFE / NUOVO CENTRO POLIFUNZIONALE IN MERCATALE / CORTONA / DETAN | | Default Value | | Running | euro | 17.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 52044 | Cortona | | * | 10 - Information Phase | 17.10.2019 14:20 | | | | No | No | | | | | euro |
| 345349 | | | EDIL EFFE / NUOVO CENTRO POLIFUNZIONALE IN MERCATALE / CORTONA | | Default Value | | Running | euro | 17.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52044 | Cortona | | * | 10 - Information Phase | 17.10.2019 14:20 | | | | No | No | | | | | euro |
| 345301-001 | | | HDB / COMPLESSO DIREZIONALE VP22 / MILANO | | Default Value | | Running | euro | 17.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | MILANO (MI) | Office building | via vittor pisani 22 | 40 - Realisation Phase | 17.10.2019 10:12 | | | | No | No | | | | | euro |
| 345301 | | | COMPLESSO DIREZIONALE VP22 / MILANO | | Default Value | | Running | euro | 17.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20124 | MILANO (MI) | | via vittor pisani 22 | 30 - Tender & Submission Phase | 17.10.2019 07:55 | | | | No | No | | | | | euro |
| 345271-001 | | | GRANDI LAVORI FINCOSIT / NUOVO OSPEDALE / UDINE / FACCIATA VENTILATA | | Default Value | | Running | euro | 16.10.2019 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 33050 | Udine | | VIA CHIUSA FORTE. INGRESSO 3 | 10 - Information Phase | 16.10.2019 15:47 | | | | No | No | | | | | euro |
| 345271 | | | GRANDI LAVORI FINCOSIT / NUOVO OSPEDALE / UDINE | | Default Value | | Running | euro | 16.10.2019 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 33050 | Udine | | VIA CHIUSA FORTE. INGRESSO 3 | 10 - Information Phase | 16.10.2019 15:47 | | | | No | No | | | | | euro |
| 345266-002 | | | RIZZANI DE ECCHER - SACAIM / OSPEDALE CATTINARA / HDB | | Default Value | | Running | euro | 23.11.2020 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 34100 | TRIESTE | | STRADA DI FIUME 447 | 40 - Realisation Phase | 23.11.2020 12:10 | | | | No | No | | | | | euro |
| 345266-001 | | | RIZZANI DE ECCHER-SACAIM / OSPEDALE CATTINARA / GIUNTI | | Default Value | | Running | euro | 16.10.2019 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 34100 | TRIESTE | | STRADA DI FIUME 447 | 40 - Realisation Phase | 16.10.2019 15:26 | | | | No | No | | | | | euro |
| 345266 | | | RIZZANI DE ECCHER - SACAIM / OSPEDALE CATTINARA | | Default Value | | Running | euro | 16.10.2019 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | STRADA DI FIUME 447 | 40 - Realisation Phase | 16.10.2019 15:26 | | | | No | No | | | | | euro |
| 345210 | | | Realizz terzo binario tra le stazioni di MI Affori e Cormano Cusano M | | Default Value | | Running | euro | 04.12.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Localita' Affori | 10 - Information Phase | 16.10.2019 10:44 | 3131 | | | No | No | | | | | euro |
| 345208 | | | IMP LORANDI / Recupero ex centro logistico per mercato ittico e nuova Caserma CC | | Default Value | | Running | euro | 23.08.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Via Isola Nuova Del Tronchetto | 10 - Information Phase | 16.10.2019 10:44 | 3029 | | | No | No | | | | | euro |
| 345205 | | | COLETTO e ADRIA STRADE / Messa sicurezza Via Pordelio real pista ciclopedonale sul waterfront | | Default Value | | Running | euro | 22.08.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30013 | CAVALLINO TREPORTI | Technical facilities | Loc. Cavallino e Ca' Savio | 10 - Information Phase | 16.10.2019 10:44 | 3026 | | | No | No | | | | | euro |
| 345204 | | | MANELLI / Costruzione sede Camera Commercio VE e RO e staz sperim del vetro | | Default Value | | Running | euro | 09.10.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Mestre Via Torino | 10 - Information Phase | 16.10.2019 10:44 | 3025 | | | No | No | | | | | euro |
| 345203-001 | | | EMAPRICE M (Geom. Pistollato) / Lavori di ristrutturazione e ampliamento Ospedale / GIUNTI | | Default Value | | Running | euro | 01.10.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 32043 | CORTINA D'AMPEZZO | | Via Codivilla 1 | 40 - Realisation Phase | 01.10.2021 12:22 | 3024 | | | No | No | | | | | euro |
| 345203 | | | EMAPRICE M (Geom. Pistollato) / Lavori di ristrutturazione e ampliamento Ospedale | | Default Value | | Running | euro | 02.10.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32043 | CORTINA D'AMPEZZO | | Via Codivilla 1 | 10 - Information Phase | 16.10.2019 10:44 | 3024 | | | No | No | | | | | euro |
| 345199 | | | SETTEN / Costruzione supermercato 1500 mq e 2 edifici per 30 appartamenti totale | | Default Value | | Running | euro | 30.08.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 31030 | CASIER | Technical facilities | Strada Terraglio / Viale Pindemonte | 10 - Information Phase | 16.10.2019 10:44 | 3020 | | | No | No | | | | | euro |
| 345197-001 | | | E.MA.PRI.CE / HOTEL ***** catena Falkensteiner 4 edifici 110 camere p interr / CORTINA / HDB | | Default Value | | Running | euro | 08.01.2020 | | IVEN-VENETO | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 32043 | CORTINA D'AMPEZZO | Technical facilities | Vie Del Castello / Dello Stadio | 10 - Information Phase | 08.01.2020 14:48 | 3018 | | | No | No | | | | | euro |
| 345197 | | | EMA.PRI.CE / HOTEL ***** catena Falkensteiner 4 edifici 110 camere p interr / CORTINA | | Default Value | | Running | euro | 09.10.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 32043 | CORTINA D'AMPEZZO | Technical facilities | Vie Del Castello / Dello Stadio | 10 - Information Phase | 16.10.2019 10:44 | 3018 | | | No | No | | | | | euro |
| 345196 | | | PIZZAROTTI CARRON / Lavori ampliamento terminal passeggeri Lotto 2A 56000 mq Aeroporto | | Default Value | | Running | euro | 22.08.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Viale G. Galilei 30 | 10 - Information Phase | 16.10.2019 10:44 | 3017 | | | No | No | | | | | euro |
| 345194-001 | | | HDB / VARALLO RE / VIA NICCOLINI ANGOLO VIA GIUSTI MILANO | | Default Value | | Running | euro | 16.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20154 | Milano | Residential houses | via niccolini 8 and. via giusti | 40 - Realisation Phase | 16.10.2019 10:38 | | | | No | Yes | | | | | euro |
| 345194 | | | VARALLO RE / VIA NICCOLINI ANGOLO VIA GIUSTI MILANO | | Default Value | | Running | euro | 16.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20154 | Milano | Residential houses | via niccolini 8 and. via giusti | 40 - Realisation Phase | 16.10.2019 10:37 | | | | No | Yes | | | | | euro |
| 345178-001 | | | BETONFORM / DEMOLIZIONE E RICOSTRUZIONE DEGLI IMPIANTI DI RISALITA OLANG / PLAN DER CORONES / VALDAORA / FPA SL | | Default Value | | Running | euro | 16.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 39030 | Valdaora | Infrastructural facility | X | 10 - Information Phase | 16.10.2019 10:04 | | | | No | No | | | | | euro |
| 345178 | | | BETONFORM / DEMOLIZIONE E RICOSTRUZIONE DEGLI IMPIANTI DI RISALITA OLANG / PLAN DER CORONES / VALDAORA | | Default Value | | Running | euro | 16.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39030 | Valdaora | Infrastructural facility | X | 10 - Information Phase | 16.10.2019 10:03 | | | | No | No | | | | | euro |
| 345173-001 | | | SCUOLA VIA BARI / BOLZANO / HDB | | Default Value | | Running | euro | 16.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | Bolzano | Educational facility | VIA BARI | 10 - Information Phase | 16.10.2019 09:31 | | | | No | No | | | | | euro |
| 345173 | | | SCUOLA VIA BARI / BOLZANO | | Default Value | | Running | euro | 16.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | Bolzano | | VIA BARI | 10 - Information Phase | 16.10.2019 09:31 | | | | No | No | | | | | euro |
| 345008 | | | GRAND HOTEL VICTORIA / MENAGGIO | | Default Value | | Running | euro | 14.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22017 | Menaggio | Residential houses | via benedetto castelli 9 | 40 - Realisation Phase | 14.10.2019 07:25 | | | | No | No | | | | | euro |
| 344981-001 | | | COCI / REALIZZAZIONE DI UN NUOVO EDIFICIO PER N° 30 APPARTAMENTI / PISTOIA / HDB | | Default Value | | Running | euro | 11.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 51100 | Pistoia (PT) | | VIA MOLINA DI GORA | 10 - Information Phase | 11.10.2019 12:30 | | | | No | No | | | | | euro |
| 344981 | | | COCI / REALIZZAZIONE DI UN NUOVO EDIFICIO PER N° 30 APPARTAMENTI / PISTOIA | | Default Value | | Running | euro | 11.10.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 51100 | Pistoia (PT) | | VIA MOLINA DI GORA | 10 - Information Phase | 11.10.2019 12:30 | | | | No | No | | | | | euro |
| 344819-001 | | | HCC / MP FILTRI / PESSANO CON BORNAGO / INDUSTRIALE | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20060 | Pessano con Bornago | Industry building | via 1°maggio | 30 - Tender & Submission Phase | 09.10.2019 15:14 | | | | No | No | | | | | euro |
| 344819 | | | MP FILTRI / PESSANO CON BORNAGO / INDUSTRIALE | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20060 | Pessano con Bornago | Industry building | via 1°maggio | 30 - Tender & Submission Phase | 09.10.2019 15:13 | | | | No | No | | | | | euro |
| 344753-001 | | | DETAN / BMV ADEGUAMENTO SISMICO / INDUSTRIALE / PROVINCIA DI VERONA | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 37135 | Verona | Industry building | viale del lavoro fittizio | 30 - Tender & Submission Phase | 09.10.2019 10:33 | | | | No | No | | | | | euro |
| 344753 | | | BMV ADEGUAMENTO SISMICO / INDUSTRIALE / PROVINCIA DI VERONA | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 37135 | Verona | | viale del lavoro fittizio | 20 - Planning Phase | 09.10.2019 10:32 | | | | No | No | | | | | euro |
| 344743-001 | | | HDB / RESIDENZIALE / QUARTIERE BRIZZI / VERONA | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 37123 | Verona | Residential houses | via galliano | 30 - Tender & Submission Phase | 09.10.2019 09:56 | | | | No | Yes | | | | | euro |
| 344743 | | | RESIDENZIALE / QUARTIERE BRIZZI / VERONA | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 37123 | Verona | Residential houses | via galliano | 30 - Tender & Submission Phase | 09.10.2019 09:54 | | | | No | Yes | | | | | euro |
| 344723-001 | | | DETAN / PASSERELLA CICLOPEDONALE / PARCO DELLE CAVE / MILANO | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20152 | Milano | Sports facility | via bianca milesi | 20 - Planning Phase | 09.10.2019 08:31 | | | | No | No | | | | | euro |
| 344723 | | | PASSERELLA CICLOPEDONALE / PARCO DELLE CAVE / MILANO | | Default Value | | Running | euro | 09.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20152 | Milano | Sports facility | via bianca milesi | 20 - Planning Phase | 09.10.2019 08:30 | | | | No | No | | | | | euro |
| 344619 | | | TERREAL/EX ZUCCHERIFICIO | | Default Value | | Running | euro | 07.10.2019 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 37047 | San Bonifacio | | _ | 10 - Information Phase | 07.10.2019 14:49 | | | | No | No | | | | | euro |
| 344617 | | | TERREAL/EX ZUCCHERIFICIO SAN BONIFACIO | | Default Value | | Running | euro | 07.10.2019 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 37100 | SAN BONIFACIO | | - | 40 - Realisation Phase | 07.10.2019 14:45 | | | | No | No | | | | | euro |
| 344504-001 | | | DETAN / ADEGUAMENTO SISMICO / BRACCO IMAGIN / CERIANI LAGHETTO | | Default Value | | Running | euro | 04.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20816 | Ceriano Laghetto | Industry building | Via per Ceriano 1 - 20816 CERIANO LAGHETTO (MI). | 40 - Realisation Phase | 04.10.2019 12:02 | | | | No | Yes | | | | | euro |
| 344504 | | | ADEGUAMENTO SISMICO / BRACCO IMAGIN / CERIANO LAGHETTO | | Default Value | | Running | euro | 04.10.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20816 | Ceriano Laghetto | Industry building | Via per Ceriano 1 - 20816 CERIANO LAGHETTO (MI). | 20 - Planning Phase | 04.10.2019 12:00 | | | | No | Yes | | | | | euro |
| 344367-001 | | | GARA / UNIONBAU / NUOVA COSTRUZIONE HOTEL STADELE / LANA / HDB / HIT | | Default Value | | Running | euro | 02.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39011 | Lana | | * | 10 - Information Phase | 02.10.2019 11:59 | | | | No | No | | | | | euro |
| 344367 | | | GARA / UNIONBAU / NUOVA COSTRUZIONE HOTEL STADELE / LANA | | Default Value | | Running | euro | 02.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39011 | Lana | | * | 10 - Information Phase | 02.10.2019 11:59 | | | | No | No | | | | | euro |
| 344220-001 | | | GARA / NUOVA CASERMA CC /SAN DEMETRIO DE VESTINI (L'AQ) /HK4 | | Default Value | | Running | euro | 30.09.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 67028 | San Demetrio ne' Vestini | Office building | Via della Concia | 10 - Information Phase | 30.09.2019 17:55 | | | | No | No | | | | | euro |
| 344220 | | | GARA / NUOVA CASERMA CC /SAN DEMETRIO DE VESTINI (L'AQ) | | Default Value | | Running | euro | 30.09.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 67028 | San Demetrio ne' Vestini | Office building | Via della Concia | 10 - Information Phase | 30.09.2019 17:54 | | | | No | No | | | | | euro |
| 344205-001 | | | PASSERELLA PEDONALE VIA RABUINA / BUDRIO / DETAN | | Default Value | | Running | euro | 30.09.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40054 | Budrio | Infrastructural facility | VIA RABUINA | 30 - Tender & Submission Phase | 30.09.2019 14:26 | | | | No | No | | | | | euro |
| 344205 | | | PASSERELLA PEDONALE VIA RABUINA / BUDRIO | | Default Value | | Running | euro | 30.09.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 40054 | Budrio | Infrastructural facility | VIA RABUINA | 10 - Information Phase | 30.09.2019 14:22 | | | | No | No | | | | | euro |
| 344183-001 | | | HIT / RESIDENZIALE / VIA SAN MARTINO MILANO | | Default Value | | Running | euro | 30.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20122 | Milano | Residential houses | via san Martino | 30 - Tender & Submission Phase | 30.09.2019 12:53 | | | | No | No | | | | | euro |
| 344183 | | | RESIDENZIALE / VIA SAN MARTINO MILANO | | Default Value | | Running | euro | 30.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20122 | Milano | Residential houses | via san Martino | 30 - Tender & Submission Phase | 30.09.2019 12:49 | | | | No | No | | | | | euro |
| 344164-001 | | | M.C.I / INTERVENTO DI RECUPERO E FUNZIONALIZZAZIONE DELL'AREA ARCHEOLOGICA DI CORIGLIA / TERNI / DETAN | | Default Value | | Running | euro | 30.09.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 05014 | Castel Viscardo | | * | 10 - Information Phase | 30.09.2019 11:10 | | | | No | No | | | | | euro |
| 344164 | | | M.C.I / INTERVENTO DI RECUPERO E FUNZIONALIZZAZIONE DELL'AREA ARCHEOLOGICA DI CORIGLIA / TERNI / DETAN | | Default Value | | Running | euro | 30.09.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 05014 | Castel Viscardo | | * | 10 - Information Phase | 30.09.2019 11:10 | | | | No | No | | | | | euro |
| 344151-001 | | | COOP / CORSO NOVARA / TORINO / GIUNTI | | Default Value | | Running | euro | 30.09.2019 | | IPIE-PIEMONTE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | CORSO NOVARA, 122 | 40 - Realisation Phase | 30.09.2019 09:34 | | | | No | No | | | | 5.000,00 € | euro |
| 344151 | | | COOP / CORSO NOVARA / TORINO | | Default Value | | Running | euro | 30.09.2019 | | IPIE-PIEMONTE | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | CORSO NOVARA, 122 | 30 - Tender & Submission Phase | 30.09.2019 09:31 | | | | No | No | | | | 5.000,00 € | euro |
| 344126-001 | | | HIT / MAPPALE 545 / VIA DE AMICIS LAINATE / EDIL ART | | Default Value | | Running | euro | 27.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20020 | Lainate | Residential houses | Via De Amicis | 40 - Realisation Phase | 27.09.2019 15:31 | | | | No | No | | | | | euro |
| 344126 | | | MAPPALE 545 / VIA DE AMICIS LAINATE / EDIL ART | | Default Value | | Running | euro | 27.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | Lainate | Residential houses | Via De Amicis | 40 - Realisation Phase | 27.09.2019 15:30 | | | | No | No | | | | | euro |
| 344062-001 | | | DETAN / CONTROVENTI COPERTURA / MILANO / EOS | | Default Value | | Running | euro | 27.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20121 | Milano | Industry building | via Porpora | 20 - Planning Phase | 27.09.2019 06:26 | | | | No | No | | | | | euro |
| 344062 | | | CONTROVENTI COPERTURA / MILANO / EOS | | Default Value | | Running | euro | 27.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20121 | Milano | Industry building | via Porpora | 20 - Planning Phase | 27.09.2019 06:25 | | | | No | No | | | | | euro |
| 344019-001 | | | MIDA COSTRUZIONI / LAVORO RESIDENZIALE / CATANIA / HDB | | Default Value | | Running | euro | 26.09.2019 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 95032 | Catania | | VIA RUGGERI SETTIMO | 10 - Information Phase | 26.09.2019 10:42 | | | | No | No | | | | | euro |
| 344019 | | | MIDA COSTRUZIONI / LAVORO RESIDENZIALE / CATANIA | | Default Value | | Running | euro | 26.09.2019 | | ISIC-SICILIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 95032 | Catania | | VIA RUGGERI SETTIMO | 10 - Information Phase | 26.09.2019 10:42 | | | | No | No | | | | | euro |
| 343970-001 | | | PICHLER / GREENPOINT LANDING BLOCK D / BROOKLYN / DEMU | | Default Value | | Running | euro | 25.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | VIA EDISON 15 | 10 - Information Phase | 25.09.2019 14:50 | | | | No | No | | | | | euro |
| 343970 | | | PICHLER / GREENPOINT LANDING BLOCK D / BROOKLYN | | Default Value | | Running | euro | 25.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | VIA EDISON 15 | 10 - Information Phase | 25.09.2019 14:50 | | | | No | No | | | | | euro |
| 343959-001 | | | ITINERA / AMPLIAMENTO E RIQUALIFICA DEL TERMINAL PRTENZE DELL' AEREOPORTO CATULLO / VERONA / GIUNTI | | Default Value | | Running | euro | 25.09.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | * | 10 - Information Phase | 25.09.2019 12:05 | | | | No | No | | | | | euro |
| 343959 | | | ITINERA / AMPLIAMENTO E RIQUALIFICA DEL TERMINAL PRTENZE DELL' AEREOPORTO CATULLO / VERONA | | Default Value | | Running | euro | 25.09.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | * | 10 - Information Phase | 25.09.2019 12:04 | | | | No | No | | | | | euro |
| 343939-001 | | | HIT / RESIDENZIALE LUINO VA / SIRTORI | | Default Value | | Running | euro | 25.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 21016 | Luino | Residential houses | VIA TURATI | 30 - Tender & Submission Phase | 25.09.2019 09:53 | | | | No | No | | | | | euro |
| 343939 | | | RESIDENZIALE LUINO VA / SIRTORI | | Default Value | | Running | euro | 25.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21016 | Luino | Residential houses | VIA TURATI | 30 - Tender & Submission Phase | 25.09.2019 09:52 | | | | No | No | | | | | euro |
| 343915-001 | | | HIT / VILLA PROGETTO / VIA MAZZINI 24 PARATICO BS | | Default Value | | Running | euro | 25.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 25030 | Paratico | Residential houses | Via Mazzini 24 | 20 - Planning Phase | 25.09.2019 06:41 | | | | No | No | | | | | euro |
| 343915 | | | VILLA PROGETTO / VIA MAZZINI 24 PARATICO BS | | Default Value | | Running | euro | 25.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25030 | Paratico | Residential houses | Via Mazzini 24 | 20 - Planning Phase | 25.09.2019 06:39 | | | | No | No | | | | | euro |
| 343849-003 | | | GARA / RESIDENZIALE VIA VALTORTA 22 / MILANO / HTA | | Default Value | | Running | euro | 12.05.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20127 | Milano | | Via Valtorta 22 | 10 - Information Phase | 12.05.2021 15:36 | | | | No | No | | | | | euro |
| 343849-002 | | | HIT / GARA / RESIDENZIALE VIA VALTORTA 22 / MILANO | | Default Value | | Running | euro | 24.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20127 | Milano | Residential houses | Via Valtorta 22 | 30 - Tender & Submission Phase | 24.09.2019 10:05 | | | | No | No | | | | | euro |
| 343849-001 | | | HDB / GARA / RESIDENZIALE VIA VALTORTA 22 / MILANO | | Default Value | | Running | euro | 24.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20127 | Milano | Residential houses | Via Valtorta 22 | 30 - Tender & Submission Phase | 24.09.2019 10:04 | | | | No | Yes | | | | | euro |
| 343849 | | | GARA / RESIDENZIALE VIA VALTORTA 22 / MILANO | | Default Value | | Running | euro | 24.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20127 | Milano | | Via Valtorta 22 | 30 - Tender & Submission Phase | 24.09.2019 10:02 | | | | No | No | | | | | euro |
| 343845 | | | TERREAL/ FONDAZIONE MAZZALLI | | Default Value | | Running | euro | 24.09.2019 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 46100 | Mantova | | via trento 10 | 30 - Tender & Submission Phase | 24.09.2019 09:37 | | | | No | No | | | | | euro |
| 343724-001 | | | RENOZEB / EUROPEAN COMMUNITY / HS | | Default Value | | Running | euro | 23.09.2019 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 47824 | POGGIO TORRIANA | Residential houses | X | 40 - Realisation Phase | 23.09.2019 08:41 | | | | No | No | | | | | euro |
| 343724 | | | RENOZEB / EUROPEAN COMMUNITY | | Default Value | | Running | euro | 23.09.2019 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Project | Halfen System Account | Italy | 47824 | POGGIO TORRIANA | Residential houses | X | 10 - Information Phase | 23.09.2019 08:40 | | | | No | No | | | | | euro |
| 343708-001 | | | HIT / F.S. IMMOBILIARE / BARAGGIA / BRUGHERIO | | Default Value | | Running | euro | 20.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20861 | Brugherio | Residential houses | Via Santa Margherita | 20 - Planning Phase | 20.09.2019 15:54 | | | | No | No | | | | | euro |
| 343708 | | | F.S. IMMOBILIARE / BARAGGIA / BRUGHERIO | | Default Value | | Running | euro | 20.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20861 | Brugherio | Residential houses | Via Santa Margherita | 20 - Planning Phase | 20.09.2019 15:53 | | | | No | No | | | | | euro |
| 343704 | | | GARA/ CONSOLIDAMENTO STRUTTURE UFFICI RAI/ROMA | | Default Value | | Running | euro | 20.09.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Parent Project | Halfen System Account | Italy | 00195 | Roma | Office building | Teulada, 66 | 10 - Information Phase | 20.09.2019 15:29 | | | | No | No | | | | | euro |
| 343651-002 | | | AEC / POLICLINICO TORRI LETTIGHE / MODENA / HBT | | Default Value | | Running | euro | 20.09.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 41100 | MODENA | | -- | 40 - Realisation Phase | 20.09.2019 09:49 | | | | No | No | | | | | euro |
| 343651-001 | | | AEC / POLICLINICO TORRI LETTIGHE / MODENA / HSC | | Default Value | | Running | euro | 20.09.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 41100 | MODENA | | -- | 40 - Realisation Phase | 20.09.2019 09:48 | | | | No | No | | | | | euro |
| 343651 | | | AEC / POLICLINICO TORRI LETTIGHE / MODENA | | Default Value | | Running | euro | 20.09.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41100 | MODENA | | -- | 40 - Realisation Phase | 20.09.2019 09:35 | | | | No | No | | | | | euro |
| 343535-001 | | | AMPLIAMENTO ALBERGO / MALCESINE / GIUNTI | | Default Value | | Running | euro | 18.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 37018 | Malcesine | | * | 10 - Information Phase | 18.09.2019 13:57 | | | | No | No | | | | | euro |
| 343535 | | | AMPLIAMENTO ALBERGO / MALCESINE | | Default Value | | Running | euro | 18.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 37018 | Malcesine | | * | 10 - Information Phase | 18.09.2019 13:57 | | | | No | No | | | | | euro |
| 343514-001 | | | CENTRO ANZIANI CASANOVA / BOLZANO / HDB / ISI | | Default Value | | Running | euro | 18.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 40 - Realisation Phase | 18.09.2019 10:39 | | | | No | No | | | | | euro |
| 343514 | | | CENTRO ANZIANI CASANOVA / BOLZANO | | Default Value | | Running | euro | 18.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 18.09.2019 10:39 | | | | No | No | | | | | euro |
| 343503-001 | | | AZIENDA AGRICOLA VALDICAVA / MONTALCINO / DETAN | | Default Value | | Running | euro | 18.09.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 53024 | Montalcino | | * | 10 - Information Phase | 18.09.2019 10:07 | | | | No | No | | | | | euro |
| 343503 | | | AZIENDA AGRICOLA VALDICAVA / MONTALCINO | | Default Value | | Running | euro | 18.09.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 53024 | Montalcino | | * | 10 - Information Phase | 18.09.2019 10:07 | | | | No | No | | | | | euro |
| 343489-001 | | | F.LLI SIMONETTI/CENTRO DI FORMAZIONE AVIATION/HIT VELETTA | | Default Value | | Running | euro | 18.09.2019 | | IMAR-MARCHE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 62018 | Potenza Picena | | _ | 30 - Tender & Submission Phase | 18.09.2019 08:23 | | | | No | No | | | | | euro |
| 343489 | | | F.LII SIMONETTI/CENTRO DI FORMAZIONE AVIATION | | Default Value | | Running | euro | 18.09.2019 | | IMAR-MARCHE | Anna Magri | | | | No | Project | Halfen System Account | Italy | 62018 | Potenza Picena | | _ | 30 - Tender & Submission Phase | 18.09.2019 08:22 | | | | No | No | | | | | euro |
| 343468-002 | | | Bispebjerg Hospital / FPA | | Default Value | | Running | euro | 19.11.2021 | | IFRI-FRIULI VENEZIA GIULIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Denmark | 2400 | København NV | | Bispebjerg Bakke | 10 - Information Phase | 19.11.2021 09:56 | | | | No | No | | | | | euro |
| 343420 | | | DIGEA/Costruzione nuovo ALBERGO/ FIUMICINO | | Default Value | | Running | euro | 17.09.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00054 | Fiumicino aeroporto | Office building | Portuense | 10 - Information Phase | 17.09.2019 08:47 | | | | No | No | | | | | euro |
| 343410-001 | | | HDB / RESIDENZA VECCHIA OGHINA / VIA ROMA SEGRATE | | Default Value | | Running | euro | 17.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Segrate | Residential houses | via Roma | 30 - Tender & Submission Phase | 17.09.2019 07:32 | | | | No | No | | | | | euro |
| 343410 | | | RESIDENZA VECCHIA OGHINA / VIA ROMA SEGRATE | | Default Value | | Running | euro | 17.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | Segrate | Residential houses | via Roma | 20 - Planning Phase | 17.09.2019 07:30 | | | | No | No | | | | | euro |
| 343299-001 | | | RIORGANIZZZIONE E AMPLIAMENTO CASA DI RIPOSO / SAN LEONARDO / HDB | | Default Value | | Running | euro | 13.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 09075 | San Leonardo | | * | 10 - Information Phase | 13.09.2019 15:46 | | | | No | No | | | | 10.624,00 € | euro |
| 343299 | | | RIORGANIZZZIONE E AMPLIAMENTO CASA DI RIPOSO / SAN LEONARDO | | Default Value | | Running | euro | 13.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09075 | San Leonardo | | * | 10 - Information Phase | 13.09.2019 15:45 | | | | No | No | | | | 10.624,00 € | euro |
| 343287 | | | INCOS / NUOVA COSTRUZIONE DI EDIFICIO COMMERCIALE / PADOVA | | Default Value | | Running | euro | 13.09.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | | VIA SARPI | 30 - Tender & Submission Phase | 13.09.2019 12:06 | | | | No | No | | | | | euro |
| 343285-002 | | | GIUNTI / LIBESKIND RESIDENZIALE CITY LIFE / MILANO | | Default Value | | Running | euro | 14.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | Residential houses | * | 30 - Tender & Submission Phase | 14.11.2019 07:06 | | | | No | No | | | | 13.000,00 € | euro |
| 343285-001 | | | HDB / LIBESKIND RESIDENZIALE CITY LIFE / MILANO | | Default Value | | Running | euro | 13.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | * | 40 - Realisation Phase | 13.09.2019 11:59 | | | | No | No | | | | 2.483,00 € | euro |
| 343285 | | | LIBESKIND RESIDENZIALE CITY LIFE / MILANO | | Default Value | | Running | euro | 13.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | * | 30 - Tender & Submission Phase | 13.09.2019 11:58 | | | | No | No | | | | 15.483,00 € | euro |
| 343209 | | | CEA / NUOVA COSTRUZIONE DI COMPLESSO RESIDENZIALE E OPERE DI URBANIZZAZIONE / REGGIO EMILIA 12/11 TUTTO FERMO | | Default Value | | Running | euro | 12.09.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | | VIA MILANO | 30 - Tender & Submission Phase | 12.09.2019 13:44 | | | | No | No | | | | | euro |
| 343193 | | | Ristrutt ampliam mercato civico e parcheggio multip Riappalto Lavori | | Default Value | | Running | euro | 18.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09170 | ORISTANO | Technical facilities | Via Mazzini | 10 - Information Phase | 12.09.2019 12:03 | 3008 | | | No | No | | | | | euro |
| 343192 | | | Laovri di restauro archivio di stato | | Default Value | | Running | euro | 11.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Via Gallura 2 | 10 - Information Phase | 12.09.2019 12:03 | 3007 | | | No | No | | | | | euro |
| 343191 | | | Costruzione (demoric) edificio a destinazione commerciale ed uffici | | Default Value | | Running | euro | 19.06.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Via Venturi 8 | 10 - Information Phase | 12.09.2019 12:03 | 3006 | | | No | No | | | | | euro |
| 343190 | | | Lavori di ristrutturazione del palazzo municipale | | Default Value | | Running | euro | 12.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09016 | IGLESIAS | | Piazza Municipio | 10 - Information Phase | 12.09.2019 12:03 | 3005 | | | No | No | | | | | euro |
| 343189 | | | Lavori di revamping delle linee A e B termovalorizzatore di Cagliari | | Default Value | | Running | euro | 04.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | Technical facilities | Localita' Macchiareddu | 10 - Information Phase | 12.09.2019 12:03 | 3004 | | | No | No | | | | | euro |
| 343188 | | | Ristrutturazione della scuola primaria secondo lotto secondo stralcio | | Default Value | | Running | euro | 04.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | UTA | | Via Regina Margherita | 10 - Information Phase | 12.09.2019 12:03 | 3003 | | | No | No | | | | | euro |
| 343187 | | | Adeguamento impianto di depurazione | | Default Value | | Running | euro | 21.06.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | DOMUS DE MARIA | Technical facilities | Localita' Chia | 10 - Information Phase | 12.09.2019 12:03 | 3002 | | | No | No | | | | | euro |
| 343186 | | | Recupero e rifunzionalizzazione locali ex I.S.O.L.A. | | Default Value | | Running | euro | 26.06.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08039 | TONARA | | Via Karalis | 10 - Information Phase | 12.09.2019 12:03 | 3001 | | | No | No | | | | | euro |
| 343185 | | | Recupero ex asilo per museo minerario | | Default Value | | Running | euro | 26.06.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08030 | GADONI | Technical facilities | Via Cui Polla | 10 - Information Phase | 12.09.2019 12:03 | 3000 | | | No | No | | | | | euro |
| 343184 | | | Lavori e forniture relativi alla realizzazione campus dell'istruzione | | Default Value | | Running | euro | 04.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08020 | POSADA | | Via Peppino Mereu | 10 - Information Phase | 12.09.2019 12:02 | 2999 | | | No | No | | | | | euro |
| 343183 | | | Realizz campo a 11 erba artificiale ultima generaz c/o imp sportivo | | Default Value | | Running | euro | 26.06.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Dei Pini Borgata Campanedda | 10 - Information Phase | 12.09.2019 12:02 | 2998 | | | No | No | | | | | euro |
| 343182 | | | Risanam ambient bacino idrografico Fiume Coghinas depuratore Lotto 1 | | Default Value | | Running | euro | 18.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07039 | VALLEDORIA | Technical facilities | Fiume Coghinas | 10 - Information Phase | 12.09.2019 12:02 | 2997 | | | No | No | | | | | euro |
| 343181 | | | Risanam ambient bacino idrografico Fiume Coghinas collettori fognari | | Default Value | | Running | euro | 18.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07030 | VIDDALBA | Technical facilities | SANTA MARIA COGHINAS | 10 - Information Phase | 12.09.2019 12:02 | 2996 | | | No | No | | | | | euro |
| 343180 | | | Riqualif urbana paesaggistica architettonica c/o aree ex mattatoio | | Default Value | | Running | euro | 13.06.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07028 | SANTA TERESA GALLURA | Technical facilities | Via Nazionale | 10 - Information Phase | 12.09.2019 12:02 | 2995 | | | No | No | | | | | euro |
| 343179 | | | Recupero manutenz straordinaria ed adeguam normativo 2 alloggi | | Default Value | | Running | euro | 12.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07014 | OZIERI | Residential houses | Piazza Medaglie D'Oro | 10 - Information Phase | 12.09.2019 12:02 | 2994 | | | No | No | | | | | euro |
| 343178 | | | Recupero manutenz straord adeguam normativo 5 alloggi Palazzina D | | Default Value | | Running | euro | 10.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07014 | OZIERI | Residential houses | Via Dei Ferrovieri | 10 - Information Phase | 12.09.2019 12:02 | 2993 | | | No | No | | | | | euro |
| 343017-001 | | | HIT / RSA FONDAZIONE CARLOTTA / VILLANTERIO PV | | Default Value | | Running | euro | 10.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 27019 | Villanterio | Residential houses | PIAZZA CASTELLO 11 | 40 - Realisation Phase | 10.09.2019 15:44 | | | | No | Yes | | | | | euro |
| 343017 | | | RSA FONDAZIONE CARLOTTA / VILLANTERIO PV | | Default Value | | Running | euro | 10.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27019 | Villanterio | Residential houses | PIAZZA CASTELLO 11 | 40 - Realisation Phase | 10.09.2019 15:43 | | | | No | No | | | | | euro |
| 342977-001 | | | TERREAL/ ED. TRIESTE CANTIERE UNYCA/HK4 | | Default Value | | Running | euro | 10.09.2019 | | IFRI-FRIULI VENEZIA GIULIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 34100 | TRIESTE | | Cantiere Unyca | 30 - Tender & Submission Phase | 10.09.2019 10:41 | | | | No | No | | | | | euro |
| 342977 | | | TERREAL/ ED. TRIESTE CANTIERE UNYCA | | Default Value | | Running | euro | 10.09.2019 | | IFRI-FRIULI VENEZIA GIULIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 34100 | TRIESTE | | Cantiere Unyca | 30 - Tender & Submission Phase | 10.09.2019 10:35 | | | | No | No | | | | | euro |
| 342965-001 | | | REALIZZAZIONE COPERTURA DI UN MERCATO / GENOVA / DETAN | | Default Value | | Running | euro | 10.09.2019 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | | * | 10 - Information Phase | 10.09.2019 09:55 | | | | No | No | | | | 12.938,00 € | euro |
| 342965 | | | REALIZZAZIONE COPERTURA DI UN MERCATO / GENOVA | | Default Value | | Running | euro | 10.09.2019 | | ILIG-LIGURIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 16100 | GENOVA | | * | 10 - Information Phase | 10.09.2019 09:55 | | | | No | No | | | | 12.938,00 € | euro |
| 342919-001 | | | NUOVO CANTIERE VIA VIGNOLA / MARANELLO | | Default Value | | Running | euro | 09.09.2019 | | IEMI-EMILIA ROMAGNA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 41053 | Maranello | | VIA VIGNOLA | 10 - Information Phase | 09.09.2019 14:56 | | | | No | No | | | | | euro |
| 342697-001 | | | PROLUNGAMENTO OVEST METROPOLITANA DI TORINO LINEA 1 / TORINO / HSB | | Default Value | | Running | euro | 05.09.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 05.09.2019 11:17 | | | | No | No | | | | | euro |
| 342697 | | | PROLUNGAMENTO OVEST METROPOLITANA DI TORINO LINEA 1 / TORINO | | Default Value | | Running | euro | 05.09.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 10100 | TORINO | | * | 10 - Information Phase | 05.09.2019 11:14 | | | | No | No | | | | | euro |
| 342471-001 | | | REALIZZAZIONE BANCHINA PORTO / NAPOLI / HSD | | Default Value | | Running | euro | 02.09.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 80100 | NAPOLI | | * | 10 - Information Phase | 02.09.2019 16:32 | | | | No | No | | | | 16.224,00 € | euro |
| 342471 | | | REALIZZAZIONE BANCHINA PORTO / NAPOLI | | Default Value | | Running | euro | 02.09.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 80100 | NAPOLI | | * | 10 - Information Phase | 02.09.2019 16:32 | | | | No | No | | | | 16.224,00 € | euro |
| 342454 | | | BOLOGNINI (PROGRESS MASCH) . / BRESSANONE | | Default Value | | Running | euro | 02.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39042 | Bressanone | | ZONA INDUSTRIALE SUD | 30 - Tender & Submission Phase | 02.09.2019 15:33 | | | | No | No | | | | 20.000,00 € | euro |
| 342447 | | | PASSERELLA / COMANO TERME | | Default Value | | Running | euro | 02.09.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 38077 | Bagni di Comano | Infrastructural facility | ---- | 30 - Tender & Submission Phase | 02.09.2019 15:12 | | | | No | No | | | | 11.000,00 € | euro |
| 342353-001 | | | REALIZZAZIONE DELLA STAZIONE MUNICIPIO DELLA LINEA METROPOLITANA 1 / NAPOLI / MBT | | Default Value | | Running | euro | 30.08.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 80100 | NAPOLI | | Vico II San Nicola alla Dogana, 9 | 10 - Information Phase | 30.08.2019 12:26 | | | | No | No | | | | 29.184,00 € | euro |
| 342353 | | | REALIZZAZIONE DELLA STAZIONE MUNICIPIO DELLA LINEA METROPOLITANA 1 / NAPOLI | | Default Value | | Running | euro | 30.08.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 80100 | NAPOLI | | Vico II San Nicola alla Dogana, 9 | 10 - Information Phase | 30.08.2019 12:25 | | | | No | No | | | | 29.184,00 € | euro |
| 342344-001 | | | REALIZZAZIONE DI INFRASTRUTTURE E SERVIZI NEL PORTO TURISTICO / CETARA / GIUNTI | | Default Value | | Running | euro | 30.08.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 84010 | Cetara | | * | 10 - Information Phase | 30.08.2019 10:43 | | | | No | No | | | | | euro |
| 342344 | | | REALIZZAZIONE DI INFRASTRUTTURE E SERVIZI NEL PORTO TURISTICO / CETARA | | Default Value | | Running | euro | 30.08.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 84010 | Cetara | | * | 10 - Information Phase | 30.08.2019 10:43 | | | | No | No | | | | | euro |
| 342225-001 | | | SPAZI DI VITA PER GIOVANI E ANZIANI / FONDAZIONE SANTA ELISABETTA / MERANO / HDB | | Default Value | | Running | euro | 29.08.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39012 | Merano | Residential houses | WINKEL 6+10+12 | 30 - Tender & Submission Phase | 29.08.2019 09:48 | | | no | No | No | | | | | euro |
| 342225 | | | SPAZI DI VITA PER GIOVANI E ANZIANI / FONDAZIONE SANTA ELISABETTA / MERANO | | Default Value | | Running | euro | 29.08.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39012 | Merano | Residential houses | WINKEL 6+10+12 | 10 - Information Phase | 29.08.2019 09:46 | | | no | No | No | | | | | euro |
| 342192 | | | HIT CANTIERE SARENTINO | | Default Value | | Running | euro | 28.08.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39058 | Sarentino | | - | 10 - Information Phase | 28.08.2019 16:45 | | | | No | No | | | | | euro |
| 342153-001 | | | GARA/Ricostruzione Nuovo Ospedale di Amandola/FERMO / giunti | | Default Value | | Running | euro | 28.08.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 63857 | Amandola | Medical facility | L.go Plebani | 30 - Tender & Submission Phase | 28.08.2019 11:54 | | | | No | No | | | | | euro |
| 342153 | | | GARA/Ricostruzione Nuovo Ospedale di Amandola/FERMO | | Default Value | | Running | euro | 28.08.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 63857 | Amandola | Medical facility | L.go Plebani | 10 - Information Phase | 28.08.2019 11:53 | | | | No | No | | | | | euro |
| 342092-001 | | | LAVORI DI MIGLIORAMENTO SISMICO DELLA SCUOLA ELEMENTARE - MATERNA / SALERNO / DETAN | | Default Value | | Running | euro | 27.08.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 84020 | Oliveto Citra | | Via Vittorio Emanuele II n. 46 | 10 - Information Phase | 27.08.2019 14:04 | | | | No | No | | | | | euro |
| 342092 | | | LAVORI DI MIGLIORAMENTO SISMICO DELLA SCUOLA ELEMENTARE - MATERNA / SALERNO | | Default Value | | Running | euro | 27.08.2019 | | ICAM-CAMPANIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 84020 | Oliveto Citra | | Via Vittorio Emanuele II n. 46 | 10 - Information Phase | 27.08.2019 14:03 | | | | No | No | | | | | euro |
| 342088 | | | GARIBALDI FRAGASSO/AMPLIAMENTO LOGISTICO MERCK/ BARI | | Default Value | | Running | euro | 20.06.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 70026 | Modugno | | Viale delle Magnolie, 15 | 10 - Information Phase | 27.08.2019 13:54 | | | | No | No | | | | | euro |
| 340884 | | | Costruzione supermercato Esselunga | | Default Value | | Running | euro | 19.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26900 | LODI | Technical facilities | Vie Visconti / Anelli Abate | 10 - Information Phase | 01.08.2019 09:31 | 2989 | | | No | No | | | | | euro |
| 340883 | | | Costruzione edificio direzionale terziario avanzato 4 piani 10000 mq | | Default Value | | Running | euro | 26.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Via Innovazione Digitale | 30 - Tender & Submission Phase | 01.08.2019 09:31 | 2988 | | | No | No | | | | | euro |
| 340882 | | | Costruzione complesso residenziale appartamenti e ville a schiera | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via XI Quartiere La Famiglia | 30 - Tender & Submission Phase | 01.08.2019 09:31 | 2987 | | | No | No | | | | | euro |
| 340881 | | | Costruzione fabbricato commerciale media struttura vendita 1500 mq | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Vie G. Nicolini 5 / Milano 84 | 30 - Tender & Submission Phase | 01.08.2019 09:31 | 2986 | | | No | No | | | | | euro |
| 340880 | | | Costruzione edifici ad uso abitazione | | Default Value | | Running | euro | 12.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25056 | PONTE DI LEGNO | Residential houses | Via F.lli Calvi | 40 - Realisation Phase | 01.08.2019 09:31 | 2985 | | | No | No | | | | | euro |
| 340879 | | | Costruzione scuola materna | | Default Value | | Running | euro | 21.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25040 | CORTE FRANCA | | Localita' Colombaro | 40 - Realisation Phase | 01.08.2019 09:31 | 2984 | | | No | No | | | | | euro |
| 340878 | | | Costruzione supermercato alimentare 1534 mq SLP primo lotto | | Default Value | | Running | euro | 14.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25015 | DESENZANO DEL GARDA | Technical facilities | Via Marconi 142 | 40 - Realisation Phase | 01.08.2019 09:31 | 2983 | | | No | No | | | | | euro |
| 340877 | | | Costruzione supermercato alimentare catena MD 1285 mq | | Default Value | | Running | euro | 05.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22077 | OLGIATE COMASCO | Technical facilities | Vie Roma / F. Momo | 40 - Realisation Phase | 01.08.2019 09:31 | 2982 | | | No | No | | | | | euro |
| 340876 | | | Costruzione 2 villette bifamiliari | | Default Value | | Running | euro | 19.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22073 | FINO MORNASCO | Residential houses | Via Grigna | 40 - Realisation Phase | 01.08.2019 09:31 | 2981 | | | No | No | | | | | euro |
| 340875 | | | Realizzazione parcheggio multipiano | | Default Value | | Running | euro | 04.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21052 | BUSTO ARSIZIO | Technical facilities | Via Volturno | 40 - Realisation Phase | 01.08.2019 09:31 | 2980 | | | No | No | | | | | euro |
| 340874 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Via Gallarana | 40 - Realisation Phase | 01.08.2019 09:31 | 2979 | | | No | No | | | | | euro |
| 340873 | | | Costruzione palazzina uso abitazione e box 12 appartamenti classe A1 | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20864 | AGRATE BRIANZA | Residential houses | Via G. Verdi 28 | 10 - Information Phase | 01.08.2019 09:31 | 2978 | | | No | No | | | | | euro |
| 340872 | | | Costruzione palazzina ad uso abitazione 6 unita' abitative | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20854 | VEDANO AL LAMBRO | Residential houses | Viale C. Battisti 69 | 10 - Information Phase | 01.08.2019 09:31 | 2977 | | | No | No | | | | | euro |
| 340871 | | | Costruzione 2 palazzine 18 appartamenti e box classe A | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Via C. Beccaria | 10 - Information Phase | 01.08.2019 09:31 | 2976 | | | No | No | | | | | euro |
| 340870 | | | Costruz edificio multip 7 pft uso abitaz 28 alloggi classe A2 Lotto B | | Default Value | | Running | euro | 11.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Via Giotto 61 | 30 - Tender & Submission Phase | 01.08.2019 09:31 | 2975 | | | No | No | | | | | euro |
| 340869 | | | Costruzione 2 palazzine ad uso abitazione 6+6 appartamenti | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20847 | ALBIATE | Residential houses | Via Trieste | 10 - Information Phase | 01.08.2019 09:31 | 2974 | | | No | No | | | | | euro |
| 340868 | | | Adeguamento antincendio Presidio Ospedaliero Lotto 2 | | Default Value | | Running | euro | 21.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20832 | DESIO | | Via Mazzini 1 | 10 - Information Phase | 01.08.2019 09:31 | 2973 | | | No | No | | | | | euro |
| 340867 | | | Costruzione palazzina ad uso abitazione e box | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20813 | BOVISIO | Residential houses | MASCIAGO | 10 - Information Phase | 01.08.2019 09:31 | 2972 | | | No | No | | | | | euro |
| 340866 | | | Ristrutturazione edificio multip ad uso abitazione | | Default Value | | Running | euro | 18.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Pola 4 | 10 - Information Phase | 01.08.2019 09:30 | 2971 | | | No | No | | | | | euro |
| 340865 | | | Recupero ex seminario per hotel ***** Lungarno Collection Hotels | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Venezia 11 / Via S. Andrea 10 | 10 - Information Phase | 01.08.2019 09:30 | 2970 | | | No | No | | | | | euro |
| 340864 | | | Riqualificazione Palazzo Ravizza destinato ad uffici | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Italia 6 | 10 - Information Phase | 01.08.2019 09:30 | 2969 | | | No | No | | | | | euro |
| 340863 | | | Ristrutturazione edificio ad uso commerciale | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazzetta Pattari 5/7 | 10 - Information Phase | 01.08.2019 09:30 | 2968 | | | No | No | | | | | euro |
| 340862 | | | Ristrutturazione edificio a destinazione terziaria | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Galleria San Carlo 6 | 10 - Information Phase | 01.08.2019 09:30 | 2967 | | | No | No | | | | | euro |
| 340861 | | | Costruzione complesso multip ad uso abitaz 43 appart classe A1 e box | | Default Value | | Running | euro | 12.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via A. Kramer 26 | 10 - Information Phase | 01.08.2019 09:30 | 2966 | | | No | No | | | | | euro |
| 340860 | | | Costruzione complesso residenziale | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Piazza Siena 7 | 10 - Information Phase | 01.08.2019 09:30 | 2965 | | | No | No | | | | | euro |
| 340859 | | | Costruzione 2 edifici ad uso abitazione e box | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Broglio 21 | 10 - Information Phase | 01.08.2019 09:30 | 2964 | | | No | No | | | | | euro |
| 340858 | | | Ristrutturazione edificio multipiano ad uso uffici 15500 mq | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale Sarca 223 | 40 - Realisation Phase | 01.08.2019 09:30 | 2963 | | | No | No | | | | | euro |
| 340857 | | | Recupero Cascina Gerola 5 edifici per 50 alloggi cohousing | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Sant'Arialdo 91 | 10 - Information Phase | 01.08.2019 09:30 | 2962 | | | No | No | | | | | euro |
| 340856 | | | Costruzione palazzina 9 appartamenti e box | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Gracchi 7 | 10 - Information Phase | 01.08.2019 09:30 | 2961 | | | No | No | | | | | euro |
| 340855 | | | Costruzione edificio per ricerca scientifica in canpo oncologico NZEB | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie Serio / Condino | 10 - Information Phase | 01.08.2019 09:30 | 2960 | | | No | No | | | | | euro |
| 340854 | | | Costruzione complesso scolastico e sportivo Ludum School | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Viale Ortles 36 | 40 - Realisation Phase | 01.08.2019 09:30 | 2959 | | | No | No | | | | | euro |
| 340853 | | | Costruzione 4 edifici ad uso uffici | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via P.e G. Pestagalli 45 Ex Xerox | 40 - Realisation Phase | 01.08.2019 09:30 | 2958 | | | No | No | | | | | euro |
| 340852 | | | Costruzione 2 edifici a torre ad uso abitazione | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Ugo Tognazzi | 40 - Realisation Phase | 01.08.2019 09:30 | 2957 | | | No | No | | | | | euro |
| 340851 | | | Costruz edificio multip uso alberghiero 185 camere sale conf piscina | | Default Value | | Running | euro | 05.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via B. Colleoni 14 | 30 - Tender & Submission Phase | 01.08.2019 09:30 | 2956 | | | No | No | | | | | euro |
| 340850 | | | Riqualificazione fronte sud MiCo Milano Congressi | | Default Value | | Running | euro | 04.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazzale Carlo Magno 1 | 10 - Information Phase | 01.08.2019 09:30 | 2955 | | | No | No | | | | | euro |
| 340849 | | | Costruzione complesso multip 198 appartamenti e box interrati | | Default Value | | Running | euro | 03.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Principe Eugenio 1 | 30 - Tender & Submission Phase | 01.08.2019 09:30 | 2954 | | | No | No | | | | | euro |
| 340848 | | | Costruzione edificio multip ad uso direzionale 14000 mq | | Default Value | | Running | euro | 27.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via V. Pisani 22 | 20 - Planning Phase | 01.08.2019 09:30 | 2953 | | | No | No | | | | | euro |
| 340847 | | | Costruzione 3 edifici multip residenziali + 1 supermercato | | Default Value | | Running | euro | 26.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Cancano 5 | 40 - Realisation Phase | 01.08.2019 09:30 | 2952 | | | No | No | | | | | euro |
| 340846 | | | Riqualificaz area Osp Maggiore Policlinico Mangiagalli e Regina Elena | | Default Value | | Running | euro | 26.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Della Commenda | 10 - Information Phase | 01.08.2019 09:30 | 2951 | | | No | No | | | | | euro |
| 340845 | | | Costruzione (demoric) edificio ad uso abitazione 20 appartamenti | | Default Value | | Running | euro | 14.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G. Pastorelli 13 | 40 - Realisation Phase | 01.08.2019 09:30 | 2950 | | | No | No | | | | | euro |
| 340844 | | | Costruzione (demoric) edificio residenziale ricettivo | | Default Value | | Running | euro | 14.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Zecca Vecchia 3 | 40 - Realisation Phase | 01.08.2019 09:30 | 2949 | | | No | No | | | | | euro |
| 340843 | | | Costruzione palazzina 10 appartamenti e 2 ville singole classe A4 | | Default Value | | Running | euro | 03.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20020 | BUSTO GAROLFO | Residential houses | Via A. Battaglia | 40 - Realisation Phase | 01.08.2019 09:30 | 2948 | | | No | No | | | | | euro |
| 340842 | | | Costruzione 3 bifamiliari e 2 palazzine | | Default Value | | Running | euro | 26.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | BUSCATE | Residential houses | Via P. Micca | 40 - Realisation Phase | 01.08.2019 09:30 | 2947 | | | No | No | | | | | euro |
| 340830-001 | | | CANTIERE VALDOBBIADENE / VALDOBBIADENE / GIUNTI | | Default Value | | Running | euro | 31.07.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 31030 | Valdobbiadene | | * | 10 - Information Phase | 31.07.2019 15:12 | | | | No | No | | | | | euro |
| 340830 | | | CANTIERE VALDOBBIADENE / VALDOBBIADENE | | Default Value | | Running | euro | 31.07.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 31030 | Valdobbiadene | | * | 10 - Information Phase | 31.07.2019 15:12 | | | | No | No | | | | | euro |
| 340821-001 | | | PROGETTAZIONE, COSTRUZIONE E GESTIONE DELLA RESIDENZA SANITARIA ASSISTENZIALE / VILLACIDRO / HDB | | Default Value | | Running | euro | 31.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 09039 | Villacidro | | VIA DON LUIGI STURZO | 10 - Information Phase | 31.07.2019 14:12 | | | | No | No | | | | 15.290,00 € | euro |
| 340821 | | | PROGETTAZIONE, COSTRUZIONE E GESTIONE DELLA RESIDENZA SANITARIA ASSISTENZIALE / VILLACIDRO / HDB | | Default Value | | Running | euro | 31.07.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09039 | Villacidro | | VIA DON LUIGI STURZO | 10 - Information Phase | 31.07.2019 14:12 | | | | No | No | | | | 15.290,00 € | euro |
| 340744 | | | OASI / Costruzione 4 palazzine 50 unita' abitative totale | | Default Value | | Running | euro | 03.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 47900 | RIMINI | Residential houses | Via Fantoni | 10 - Information Phase | 30.07.2019 13:49 | 2937 | | | No | No | | | | | euro |
| 340743 | | | ( SICREA conc ) / CONAD alimentare 5000 mq 450 posti auto 12/11 URBANIZZ FIN | | Default Value | | Running | euro | 12.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Technical facilities | Viale Rosa Luxemburg / Croce | 10 - Information Phase | 30.07.2019 13:49 | 2936 | | | No | No | | | | | euro |
| 340742 | | | PASSARELLI / Costruzione Citta' delle Arti e dello Sport struttura polivalente / (PROG ING MAJOWIECKI) 25/3 FONDAZIONI CANTIERE FERMO PER MAFIA | | Default Value | | Running | euro | 19.06.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 48100 | RAVENNA | | Viale Europa | 10 - Information Phase | 30.07.2019 13:49 | 2935 | | | No | No | | | | | euro |
| 340670 | | | CERVET / CENTRO COMMERCIALE / PADOVA 12/11 NIENTE | | Default Value | | Running | euro | 13.06.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 35100 | PADOVA | Technical facilities | Via San Marco | 10 - Information Phase | 30.07.2019 09:58 | 2901 | | | No | No | | | | | euro |
| 340669-001 | | | QUADRIO / NUOVA ESSELUNGA 2500 mq e 450 p auto interrati 21/2 FONDAZIONI / HK4 | | Default Value | | Running | euro | 26.05.2020 | | IVEN-VENETO | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 36100 | VICENZA | Technical facilities | Viale San Lazzaro 19 | 10 - Information Phase | 26.05.2020 15:51 | 2900 | | | No | No | | | | | euro |
| 340667-001 | | | ICM (CARRON) / NUOVO CASELLO MONTECCHIO MAGG e collegam con viabilita' / MBT | | Default Value | | Running | euro | 29.01.2021 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 36075 | MONTECCHIO MAGGIORE | Technical facilities | Localita' diverse | 30 - Tender & Submission Phase | 29.01.2021 13:25 | 2898 | | | No | No | | | | | euro |
| 340667 | | | ICM (CARRON) / NUOVO CASELLO MONTECCHIO MAGG e collegam con viabilita' ordin 18/6 PICCOLI CANTIERI | | Default Value | | Running | euro | 13.06.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 36075 | MONTECCHIO MAGGIORE | Technical facilities | Localita' diverse | 40 - Realisation Phase | 30.07.2019 09:57 | 2898 | | | No | No | | | | | euro |
| 340625 | | | Costruzione nuovo Ospedale San Cataldo | | Default Value | | Running | euro | 05.07.2019 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 74100 | TARANTO | | Strada San Giorgio | 10 - Information Phase | 29.07.2019 13:54 | 2896 | | | No | No | | | | | euro |
| 340620 | | | Adeguamento sismico strutturale scuola Aldo Moro | | Default Value | | Running | euro | 12.06.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 03034 | CASALVIERI | | Via Colle Santa Maria | 10 - Information Phase | 29.07.2019 13:47 | 2895 | | | No | No | | | | | euro |
| 340619 | | | Lavori adeguam sismico e messa sicurezza viadotti gallerie A24 e A25 | | Default Value | | Running | euro | 14.06.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 02021 | BORGOROSE | Technical facilities | Localita' diverse | 10 - Information Phase | 29.07.2019 13:47 | 2594 | | | No | No | | | | | euro |
| 340618 | | | Costruzione parco commerciale 13950 mc | | Default Value | | Running | euro | 28.06.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00055 | LADISPOLI | Technical facilities | Vie Aurelia / Settevene Palo Nord | 10 - Information Phase | 29.07.2019 13:47 | 2893 | | | No | No | | | | | euro |
| 340615 | | | Completamento centro turistico integrato e struttura polifunz piscina | | Default Value | | Running | euro | 10.07.2019 | | IABR-ABRUZZO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 67031 | CASTEL DI SANGRO | | Capoluogo | 10 - Information Phase | 29.07.2019 13:42 | 2892 | | | No | No | | | | | euro |
| 340552 | | | NUOVO ORATORIO DI SAN ROCCO SONDRIO | | Default Value | | Running | euro | 27.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23100 | Sondrio | Educational facility | Via Nicolò Rusca 2 | 40 - Realisation Phase | 27.07.2019 17:36 | | | | No | No | | | | | euro |
| 340548 | | | NUOVO TEATRO DONIZZETTI BERGAMO | | Default Value | | Running | euro | 26.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24122 | Bergamo (BG) | Educational facility | Piazza Matteotti, 27 | 40 - Realisation Phase | 26.07.2019 15:03 | | | | No | No | | | | | euro |
| 340512-001 | | | Costruzione complesso residenziale c/o Santa Palomba-Roma / SISTEMI ANTIRIBALTAMENTO TAMPONATURE | | Default Value | | Running | euro | 26.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00040 | Santa Palomba | Residential houses | Via della Cancelliera | 30 - Tender & Submission Phase | 26.07.2019 09:19 | | | | No | No | | | | | euro |
| 340512 | | | Costruzione complesso residenziale c/o Santa Palomba-Roma | | Default Value | | Running | euro | 26.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00040 | Santa Palomba | Residential houses | Via della Cancelliera | 10 - Information Phase | 26.07.2019 09:11 | | | | No | No | | | | | euro |
| 340481 | | | GALLONI / NUOVO PROGETTO RESIDENZIALE / PARMA 12/11 NIENTE | | Default Value | | Running | euro | 25.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | VIA FALLACI | 10 - Information Phase | 25.07.2019 13:41 | | | | No | No | | | | | euro |
| 340478 | | | EDIL P3 / NUOVO PROGETTO RESIDENZIALE / PARMA 12/11 NIENTE | | Default Value | | Running | euro | 25.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 43100 | PARMA | | VIA 9 NOVEMBRE | 10 - Information Phase | 25.07.2019 13:39 | | | | No | No | | | | | euro |
| 340421-001 | | | IRCOP / ANCORAGGIO AEREI IN SOSTA /AEROPORTO CIAMPINO /ROMA/BOCCOLE+RESINA+MALTA | | Default Value | | Running | euro | 24.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00043 | Ciampino aeroporto | Infrastructural facility | Via Appia | 40 - Realisation Phase | 24.07.2019 17:17 | | | | No | No | | | | 180.000,00 € | euro |
| 340421 | | | IRCOP / ANCORAGGIO AEREI IN SOSTA /AEROPORTO CIAMPINO /ROMA | | Default Value | | Running | euro | 24.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00043 | Ciampino aeroporto | Infrastructural facility | Via Appia | 10 - Information Phase | 24.07.2019 17:08 | | | | No | No | | | | 180.000,00 € | euro |
| 340418-001 | | | Riqualificazione centro commerciale-Bari /giunti | | Default Value | | Running | euro | 24.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 70100 | BARI | | Bari | 30 - Tender & Submission Phase | 24.07.2019 16:02 | | | | No | No | | | | | euro |
| 340418 | | | Riqualificazione centro commerciale-Bari | | Default Value | | Running | euro | 24.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 70100 | BARI | | Bari | 10 - Information Phase | 24.07.2019 16:01 | | | | No | No | | | | | euro |
| 340372-001 | | | RECUPERO ARCHITETTONICO E FUNZIONALE DEL COMPLESSO EDILIZIO "EX MACELLO" / UDINE / DETAN | | Default Value | | Running | euro | 24.07.2019 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 33050 | Udine | | VIA SABBADINI | 30 - Tender & Submission Phase | 24.07.2019 11:45 | | | | No | No | | | | 41.077,00 € | euro |
| 340372 | | | RECUPERO ARCHITETTONICO E FUNZIONALE DEL COMPLESSO EDILIZIO "EX MACELLO" / UDINE | | Default Value | | Running | euro | 24.07.2019 | 24.07.2019 | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 33050 | Udine | | VIA SABBADINI | 30 - Tender & Submission Phase | 24.07.2019 11:45 | | | | No | No | | | | 41.077,00 € | euro |
| 340368-001 | | | TERREAL/EDIFICIO XLAM LECCO/HW | | Default Value | | Running | euro | 28.08.2019 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 23900 | LECCO (LC) | | VIA | 10 - Information Phase | 28.08.2019 17:20 | | | | No | No | | | | | euro |
| 340368 | | | TERREAL/EDIFICIO XLAM LECCO | | Default Value | | Running | euro | 24.07.2019 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Project | Halfen System Account | Italy | 23900 | LECCO (LC) | | VIA | 10 - Information Phase | 24.07.2019 11:09 | | | | No | No | | | | | euro |
| 340271 | | | Realizzazione corridoi ciclabili corridoio 3 Terramaini | | Default Value | | Running | euro | 23.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Localita' Terramaini | 10 - Information Phase | 23.07.2019 14:10 | 2891 | | | No | No | | | | | euro |
| 340270 | | | Costruzione (demoric) 2 palazzine ad uso abitazione 36 alloggi | | Default Value | | Running | euro | 22.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Via Flumentepido Ex Scuola | 10 - Information Phase | 23.07.2019 14:10 | 2890 | | | No | No | | | | | euro |
| 340269 | | | Costruzione (demoric) edificio residenziale ad uso abitazione | | Default Value | | Running | euro | 16.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Via Giulio II angolo Via Marmilla | 10 - Information Phase | 23.07.2019 14:10 | 2889 | | | No | No | | | | | euro |
| 340268 | | | Complet viabilita' interna (3� lotto) sistema di raccordo con SS 195 | | Default Value | | Running | euro | 03.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Porto Canale | 10 - Information Phase | 23.07.2019 14:10 | 2888 | | | No | No | | | | | euro |
| 340267 | | | Adeguam sismico messa sicur scuola primaria secondaria di primo grado | | Default Value | | Running | euro | 24.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Via Falzarego 35 | 10 - Information Phase | 23.07.2019 14:10 | 2887 | | | No | No | | | | | euro |
| 340266 | | | Realizzazione corridoio ciclabile 4 Cagliari Monte Mixi | | Default Value | | Running | euro | 24.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Monte Mixi | 10 - Information Phase | 23.07.2019 14:10 | 2886 | | | No | No | | | | | euro |
| 340265 | | | Costruzione (demoric) edificio residenziale | | Default Value | | Running | euro | 17.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Via F. Corridoni 99 | 10 - Information Phase | 23.07.2019 14:10 | 2885 | | | No | No | | | | | euro |
| 340264 | | | Adeguam igienico sanitario efficient scuola primaria secondaria I grado | | Default Value | | Running | euro | 18.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09070 | BARATILI SAN PIETRO | | Capoluogo | 10 - Information Phase | 23.07.2019 14:10 | 2884 | | | No | No | | | | | euro |
| 340263 | | | Adeguamento norme sicurezza scuola elementare secondo lotto | | Default Value | | Running | euro | 15.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09047 | SELARGIUS | | Via Roma | 10 - Information Phase | 23.07.2019 14:10 | 2883 | | | No | No | | | | | euro |
| 340262 | | | Lavori di riqualificazione di Piazza Del Popolo | | Default Value | | Running | euro | 24.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | BARRALI | Technical facilities | Piazza Del Popolo | 10 - Information Phase | 23.07.2019 14:10 | 2882 | | | No | No | | | | | euro |
| 340261 | | | Riqualificazione impianti sportivi campo di calcio | | Default Value | | Running | euro | 23.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | GUASILA | | Largo Padre Virgilio Mirto | 10 - Information Phase | 23.07.2019 14:10 | 2881 | | | No | No | | | | | euro |
| 340260 | | | Miglioram infrastrutture rurali x sviluppo settore agroforestale | | Default Value | | Running | euro | 18.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09040 | GUASILA | Technical facilities | Capoluogo | 10 - Information Phase | 23.07.2019 14:10 | 2880 | | | No | No | | | | | euro |
| 340259 | | | Lavori di ristrutturazione scuola media | | Default Value | | Running | euro | 08.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09018 | SARROCH | | Via Dante | 10 - Information Phase | 23.07.2019 14:10 | 2879 | | | No | No | | | | | euro |
| 340258 | | | Lavori di completamento servizi igienici | | Default Value | | Running | euro | 31.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | DOMUS DE MARIA | | Litorale Di Chia | 10 - Information Phase | 23.07.2019 14:10 | 2877 | | | No | No | | | | | euro |
| 340257 | | | Adeguamento laboratori sede ITC Beccaria | | Default Value | | Running | euro | 24.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | VILLAMASSARGIA | | Via Stazione 10 | 10 - Information Phase | 23.07.2019 14:10 | 2876 | | | No | No | | | | | euro |
| 340256 | | | Ristrutturazione scuola secondaria E. Porrino (2� lotto) | | Default Value | | Running | euro | 03.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 09010 | UTA | | Via Regina Margherita | 10 - Information Phase | 23.07.2019 14:10 | 2875 | | | No | No | | | | | euro |
| 340255 | | | Manutenz straord ed adeguam igienico sanitario scuola infanzia di Su Tauli | | Default Value | | Running | euro | 03.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08045 | LANUSEI | | Localita' Su Tauli | 10 - Information Phase | 23.07.2019 14:10 | 2874 | | | No | No | | | | | euro |
| 340254 | | | Restauro risanamento conserv riqualific funz ex mulino pastificio | | Default Value | | Running | euro | 31.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08030 | NURAGUS | | Via Roma | 10 - Information Phase | 23.07.2019 14:10 | 2873 | | | No | No | | | | | euro |
| 340253 | | | Completam (copertura) adeguam norme impianto sportivo campo bocce | | Default Value | | Running | euro | 08.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08026 | ORANI | | Centro Abitato | 10 - Information Phase | 23.07.2019 14:10 | 2872 | | | No | No | | | | | euro |
| 340252 | | | Manutenzione straordinaria adduttrice schema 12 ramo Bosa | | Default Value | | Running | euro | 15.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 08013 | BOSA | Technical facilities | Loc. Barasumene e Monte Crispu | 10 - Information Phase | 23.07.2019 14:10 | 2871 | | | No | No | | | | | euro |
| 340250 | | | Ottimizz funzion sezione raffinazione compost imp trattamento rifiuti | | Default Value | | Running | euro | 17.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07029 | TEMPIO PAUSANIA | Technical facilities | ZIR | 10 - Information Phase | 23.07.2019 14:10 | 2870 | | | No | No | | | | | euro |
| 340249 | | | Riqualificazione energetica scuola media e scuola materna | | Default Value | | Running | euro | 09.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07028 | SANTA TERESA GALLURA | | Capoluogo | 10 - Information Phase | 23.07.2019 14:10 | 2869 | | | No | No | | | | | euro |
| 340248 | | | Messa a norma museo etnografico | | Default Value | | Running | euro | 17.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07021 | ARZACHENA | Technical facilities | Via Mozart | 10 - Information Phase | 23.07.2019 14:10 | 2868 | | | No | No | | | | | euro |
| 340247 | | | Costruzione nuovo polo scolastico | | Default Value | | Running | euro | 06.06.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | MONTI | | Via Montessori angolo Via Don Sturzo | 10 - Information Phase | 23.07.2019 14:10 | 2867 | | | No | No | | | | | euro |
| 340245 | | | Opere di urbanizzazione primaria secondo stralcio funzionale | | Default Value | | Running | euro | 02.05.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 07020 | PALAU | Technical facilities | Area PIP | 10 - Information Phase | 23.07.2019 14:08 | 2866 | | | No | No | | | | | euro |
| 340143 | | | RESIDENZIALE / VIA MONTE ROSA VARESE | | Default Value | | Running | euro | 22.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | Varese | Residential houses | via Monte rosa | 40 - Realisation Phase | 22.07.2019 15:07 | | | | No | No | | | | | euro |
| 339992-001 | | | COSTRUZIONE DI UNA NUOVA TETTOIA PERTINENZIALE ADIBITA A POSTO AUTO / DETAN | | Default Value | | Running | euro | 18.07.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 28062 | Cameri | | * | 30 - Tender & Submission Phase | 18.07.2019 14:18 | | | | No | No | | | | 1.243,00 € | euro |
| 339992 | | | COSTRUZIONE DI UNA NUOVA TETTOIA PERTINENZIALE ADIBITA A POSTO AUTO COPERTO | | Default Value | | Running | euro | 18.07.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 28062 | Cameri | | * | 10 - Information Phase | 18.07.2019 14:18 | | | | No | No | | | | 1.243,00 € | euro |
| 339931-001 | | | DETAN / PARCO COMMERCIALE NOV'ARIA / NOVARA | | Default Value | | Running | euro | 18.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 28100 | Novara | Shopping center | via Pavesi | 30 - Tender & Submission Phase | 18.07.2019 08:06 | | | | No | No | | | | | euro |
| 339931 | | | PARCO COMMERCIALE NOV'ARIA / NOVARA | | Default Value | | Running | euro | 18.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 28100 | Novara | Shopping center | via Pavesi | 10 - Information Phase | 18.07.2019 08:04 | | | | No | No | | | | | euro |
| 339913 | | | RESIDENZIALE / VIALE MONTELLO MILANO | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20151 | Milano | Residential houses | Viale Montello 6 | 40 - Realisation Phase | 17.07.2019 18:13 | | | | No | No | | | | | euro |
| 339910 | | | AUXOLOGICO ITALIANO / MEDA / RIMOND | | Default Value | | Running | euro | 17.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20821 | Meda | Medical facility | Via Gagarin | 40 - Realisation Phase | 17.07.2019 17:13 | | | | No | No | | | | | euro |
| 339852 | | | CASA BERTACCHINI MOTTA DI LIVENZA | | Default Value | | Running | euro | 17.07.2019 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 31100 | TREVISO (TV) | | Via | 40 - Realisation Phase | 17.07.2019 09:27 | | | | No | No | | | | | euro |
| 339849-001 | | | ESSELUNGA DI VICENZA/CANDELA / FK5 | | Default Value | | Running | euro | 23.03.2021 | | IVEN-VENETO | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 36066 | Sandrigo | | VIALE IPPODROMO | 40 - Realisation Phase | 23.03.2021 10:32 | | | | No | No | | | | | euro |
| 339849 | | | ESSELUNGA DI VICENZA | | Default Value | | Running | euro | 17.07.2019 | | IVEN-VENETO | Anna Magri | | | | No | Project | Halfen System Account | Italy | 36066 | Sandrigo | | VIALE IPPODROMO | 30 - Tender & Submission Phase | 17.07.2019 09:12 | | | | No | No | | | | | euro |
| 339838-001 | | | HIT / CASA UNIFAMILIARE / CASALI / ALZANO LOMBARDO | | Default Value | | Running | euro | 16.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 24022 | Alzano Lombardo | Residential houses | via Cà Paterna 75 | 40 - Realisation Phase | 16.07.2019 18:49 | | | | No | No | | | | | euro |
| 339838 | | | CASA UNIFAMILIARE / CASALI / ALZANO LOMBARDO | | Default Value | | Running | euro | 16.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24022 | Alzano Lombardo | Residential houses | via Cà Paterna 75 | 40 - Realisation Phase | 16.07.2019 18:48 | | | | No | No | | | | | euro |
| 339834-002 | | | HBS / SOUNDPORT / MPNM / KASTRUP - DENMARK | | Default Value | | Running | euro | 16.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Denmark | 2770 | Kastrup | Office building | Amager Strandvej 399/405 2770 Kastrup – Denmark | 40 - Realisation Phase | 16.07.2019 18:44 | | | | No | No | | | | | euro |
| 339834-001 | | | MBT / SOUNDPORT / MPNM / KASTRUP - DENMARK | | Default Value | | Running | euro | 16.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Denmark | 2770 | Kastrup | Office building | Amager Strandvej 399/405 2770 Kastrup – Denmark | 40 - Realisation Phase | 16.07.2019 17:47 | | | | No | No | | | | | euro |
| 339834 | | | SOUNDPORT / MPNM / KASTRUP - DENMARK | | Default Value | | Running | euro | 16.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Denmark | 2770 | Kastrup | Office building | Amager Strandvej 399/405 2770 Kastrup – Denmark | 40 - Realisation Phase | 16.07.2019 17:44 | | | | No | No | | | | | euro |
| 339827-001 | | | HK5 / RESIDENZIALE EX MACCHIARLATTI / BORGARO TORINESE / VIBRAPAC | | Default Value | | Running | euro | 16.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 10071 | Borgaro Torinese | Shopping center | VIA SETTIMO | 40 - Realisation Phase | 16.07.2019 16:08 | | | | No | No | | | | 1.420,00 € | euro |
| 339827 | | | RESIDENZIALE EX MACCHIARLATTI / BORGARO TORINESE / VIBRAPAC | | Default Value | | Running | euro | 16.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 10071 | Borgaro Torinese | Shopping center | VIA SETTIMO | 30 - Tender & Submission Phase | 16.07.2019 16:07 | | | | No | No | | | | 1.420,00 € | euro |
| 339717-001 | | | HDB / LUXOTTICA / VIA TORTONA 35 MILANO | | Default Value | | Running | euro | 15.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20144 | Milano | Educational facility | Via Tortona 35 | 40 - Realisation Phase | 15.07.2019 11:39 | | | | No | No | | | | | euro |
| 339717 | | | LUXOTTICA / VIA TORTONA 35 MILANO | | Default Value | | Running | euro | 15.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20144 | Milano | Educational facility | Via Tortona 35 | 40 - Realisation Phase | 15.07.2019 11:36 | | | | No | No | | | | | euro |
| 339659 | | | SCUOLA PRIMARIA / PIRANICA - QUINTANO | | Default Value | | Running | euro | 15.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 26017 | Pieranica | Educational facility | Via Marconi, n.10 | 10 - Information Phase | 15.07.2019 08:47 | | | | No | No | | | | 800,00 € | euro |
| 339618-001 | | | LA MAGGIO' / FACCIATE / IL CAIRO / HTA | | Default Value | | Running | euro | 12.07.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Egypt | 11371 | Cairo | Office building | ---- | 10 - Information Phase | 12.07.2019 12:08 | | | | No | No | | | | 100.000,00 € | euro |
| 339618 | | | LA MAGGIO' / FACCIATE / IL CAIRO | | Default Value | | Running | euro | 12.07.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Egypt | 11371 | Cairo | Office building | ---- | 10 - Information Phase | 12.07.2019 12:07 | | | | No | No | | | | 100.000,00 € | euro |
| 339614-001 | | | PALESTRA / VERONA / DETAN (ING. & GEOL) | | Default Value | | Running | euro | 12.07.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | | --- | 10 - Information Phase | 12.07.2019 11:51 | | | | No | No | | | | 16.000,00 € | euro |
| 339614 | | | PALESTRA / VERONA | | Default Value | | Running | euro | 12.07.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | | --- | 40 - Realisation Phase | 12.07.2019 11:49 | | | | No | No | | | | 16.000,00 € | euro |
| 339612-001 | | | EDILCOSTR / UNIVERSITA' / VERONA / DETAN | | Default Value | | Running | euro | 12.07.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 37100 | VERONA | Educational facility | ---- | 40 - Realisation Phase | 12.07.2019 11:46 | | | | No | No | | | | 9.000,00 € | euro |
| 339612 | | | UNIVERSITA' / VERONA | | Default Value | | Running | euro | 12.07.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 37100 | VERONA | Educational facility | ---- | 40 - Realisation Phase | 12.07.2019 11:45 | | | | No | No | | | | 9.000,00 € | euro |
| 339608-001 | | | OLVI / EDIFIICIO / SOLIERA / DETAN | | Default Value | | Running | euro | 12.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 41010 | Soliera | Industry building | --- | 40 - Realisation Phase | 12.07.2019 11:41 | | | | No | No | | | | 8.000,00 € | euro |
| 339608 | | | EDIFIICIO / SOLIERA | | Default Value | | Running | euro | 12.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41010 | Soliera | Industry building | --- | 40 - Realisation Phase | 12.07.2019 11:40 | | | | No | No | | | | 8.000,00 € | euro |
| 339603-001 | | | INDUSTRIALE / FORMIGINE / DEMU (NET ENG) | | Default Value | | Running | euro | 12.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 41043 | Formigine | Industry building | -- | 30 - Tender & Submission Phase | 12.07.2019 10:57 | | | | No | No | | | | 20.000,00 € | euro |
| 339603 | | | INDUSTRIALE / FORMIGINE | | Default Value | | Running | euro | 12.07.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Project | Halfen System Account | Italy | 41043 | Formigine | | -- | 30 - Tender & Submission Phase | 12.07.2019 10:57 | | | | No | No | | | | 20.000,00 € | euro |
| 339519-001 | | | COPERTURA DEI PARCHI MINERALI E FOSSILI / TARANTO / HSD | | Default Value | | Running | euro | 11.07.2019 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 74100 | TARANTO | | * | 40 - Realisation Phase | 11.07.2019 12:32 | | | | No | No | | | | 28.900,00 € | euro |
| 339519 | | | COPERTURA DEI PARCHI MINERALI E FOSSILI | | Default Value | | Running | euro | 11.07.2019 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 74100 | TARANTO | | * | 10 - Information Phase | 11.07.2019 12:32 | | | | No | No | | | | 28.900,00 € | euro |
| 339462-001 | | | GARA/PALAZZETTO SPORT CENTRO GIULIO ONESTI/ROMA/GIUNTI | | Default Value | | Running | euro | 10.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00197 | Roma | Sports facility | Largo Piero Gabrielli 1 | 30 - Tender & Submission Phase | 10.07.2019 16:15 | | | | No | No | | | | | euro |
| 339462 | | | GARA/PALAZZETTO SPORT CENTRO GIULIO ONESTI/ROMA | | Default Value | | Running | euro | 05.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Project | Halfen System Account | Italy | 00197 | Roma | Sports facility | Largo Piero Gabrielli 1 | 10 - Information Phase | 10.07.2019 14:59 | | | | No | No | | | | | euro |
| 339439-001 | | | DETAN / COPERTURA PIAZZA DURAZZO ALBANIA / MAP | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20094 | Corsico | Infrastructural facility | VIA A. Volta 12 | 40 - Realisation Phase | 10.07.2019 14:23 | | | | No | No | | | | | euro |
| 339439 | | | COPERTURA PIAZZA DURAZZO ALBANIA / MAP | | Default Value | | Running | euro | 10.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20094 | Corsico | Infrastructural facility | VIA A. Volta 12 | 40 - Realisation Phase | 10.07.2019 14:22 | | | | No | No | | | | | euro |
| 339427-001 | | | TERREAL RESIDENZIALE / LIMENA / HK4 | | Default Value | | Running | euro | 10.07.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 35010 | LIMENA (PD) | Residential houses | ----- | 40 - Realisation Phase | 10.07.2019 12:59 | | | | No | No | | | | 5.000,00 € | euro |
| 339334 | | | RESIDENZIALE LOTTO B1 / MADONE / EDILCENTRO | | Default Value | | Running | euro | 09.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24040 | Madone | | VIA PAPINI | 40 - Realisation Phase | 09.07.2019 09:12 | | | | No | No | | | | | euro |
| 339327 | | | HOTEL TYROL GSIES / BOLZANO | | Default Value | | Running | euro | 09.07.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 39030 | Valle di Casies | Residential houses | FRAZIONE COLLE DI DENTRO, 3 | 30 - Tender & Submission Phase | 09.07.2019 08:39 | | | no | No | No | | | | 20.000,00 € | euro |
| 339010 | | | Costruzione nuova RSA e centro diurno integrato | | Default Value | | Running | euro | 18.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 46042 | CASTEL GOFFREDO | | Capoluogo | 10 - Information Phase | 02.07.2019 14:16 | 2864 | | | No | No | | | | | euro |
| 339009 | | | Costruz nuova sede aziendale uffici laboratori e produzione 4000 mq tot | | Default Value | | Running | euro | 17.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 27100 | PAVIA | Technical facilities | Via C. Treves | 40 - Realisation Phase | 02.07.2019 14:16 | 2863 | | | No | No | | | | | euro |
| 339008 | | | Lavori di adeguamento stadio del calcio Rigamonti | | Default Value | | Running | euro | 06.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via G. Novagani 9 | 10 - Information Phase | 02.07.2019 14:16 | 2862 | | | No | No | | | | | euro |
| 339007 | | | Costruzione 2 edifici a 2 piani ft per 22 appartamenti totale | | Default Value | | Running | euro | 09.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Claudia Grismondi 13 | 40 - Realisation Phase | 02.07.2019 14:16 | 2861 | | | No | No | | | | | euro |
| 339006 | | | Restilng stadio del calcio prima fase curva nord | | Default Value | | Running | euro | 03.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24100 | BERGAMO | | Piazzale L. Goisis 7 | 40 - Realisation Phase | 02.07.2019 14:16 | 2860 | | | No | No | | | | | euro |
| 339005 | | | Costruzione polo sanitario nuova sede ATS e ASST Bergamo Est | | Default Value | | Running | euro | 18.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24069 | TRESCORE BALNEARIO | | Viale Rimembranza | 40 - Realisation Phase | 02.07.2019 14:16 | 2859 | | | No | No | | | | | euro |
| 339004 | | | Costruzione nuova sede aziendale 3500 mq esposizione officina uffici | | Default Value | | Running | euro | 22.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24058 | ROMANO DI LOMBARDIA | Technical facilities | Via Duca D'Aosta 154 | 40 - Realisation Phase | 02.07.2019 14:16 | 2858 | | | No | No | | | | | euro |
| 339003 | | | Costruzione residenza sanitaria 240 posti letto e poliambulatorio | | Default Value | | Running | euro | 18.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24051 | ANTEGNATE | | Via Milano / S.P. 492 | 40 - Realisation Phase | 02.07.2019 14:16 | 2857 | | | No | No | | | | | euro |
| 339002 | | | Costruzione residenza sanitaria 120 posti letto e poliambulatorio | | Default Value | | Running | euro | 18.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24048 | TREVIOLO | | Vie Galetti / Gorizia | 40 - Realisation Phase | 02.07.2019 14:16 | 2856 | | | No | No | | | | | euro |
| 339000 | | | Costruzione edificio ad uso abitazione 11 appartamenti classe A | | Default Value | | Running | euro | 02.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Residential houses | Viale Montello 4 | 40 - Realisation Phase | 02.07.2019 14:16 | 2854 | | | No | No | | | | | euro |
| 338999 | | | Costruzione complesso ad uso abitazione 75 appartamenti | | Default Value | | Running | euro | 02.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Residential houses | Via Baslini Ex Baslini | 40 - Realisation Phase | 02.07.2019 14:16 | 2853 | | | No | No | | | | | euro |
| 338998 | | | Costruzione edifici produttivi 45000 mq coperti | | Default Value | | Running | euro | 03.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24034 | CISANO BERGAMASCO | Industry building | Via Bergamo Loc. Bondi' | 40 - Realisation Phase | 02.07.2019 14:16 | 2852 | | | No | No | | | | | euro |
| 338997 | | | Completamento variante alla SP ex SS 470 della Valle Brembana | | Default Value | | Running | euro | 19.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 24019 | ZOGNO | Technical facilities | Localita' diverse | 40 - Realisation Phase | 02.07.2019 14:16 | 2851 | | | No | No | | | | | euro |
| 338996 | | | Costruzione 3 edifici commerciali non alimentari 8900 mq tot | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23875 | OSNAGO | Technical facilities | S.P. 342 / Via Marasche | 40 - Realisation Phase | 02.07.2019 14:16 | 2850 | | | No | No | | | | | euro |
| 338995 | | | Ampliam edificio industriale e palazzina uffici Ferper Spring 5000 mq | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 23842 | BOSISIO PARINI | Industry building | Via Livelli 7 | 40 - Realisation Phase | 02.07.2019 14:16 | 2849 | | | No | No | | | | | euro |
| 338994 | | | Costruzione edificio multip ad uso abitazione e box | | Default Value | | Running | euro | 24.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Vie Innocenzo XI 57 / Napo Torriani | 10 - Information Phase | 02.07.2019 14:16 | 2848 | | | No | No | | | | | euro |
| 338993 | | | Costruzione nuovo capannone ad uso magazzino | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 22077 | OLGIATE COMASCO | Industry building | Via XXV Aprile 15 | 10 - Information Phase | 02.07.2019 14:16 | 2847 | | | No | No | | | | | euro |
| 338992 | | | Costruzione edificio multip uso abitazione 25 appartamenti classe A1 | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21100 | VARESE | Residential houses | Via Monte Rosa | 40 - Realisation Phase | 02.07.2019 14:16 | 2846 | | | No | No | | | | | euro |
| 338991 | | | Costruzione complesso residenziale | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 21057 | OLGIATE OLONA | Residential houses | Via Piave 116 | 40 - Realisation Phase | 02.07.2019 14:16 | 2845 | | | No | No | | | | | euro |
| 338990 | | | Costruzione edificio ad uso abitazione 28 unita' abitative classe A | | Default Value | | Running | euro | 15.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Viale Europa | 40 - Realisation Phase | 02.07.2019 14:16 | 2844 | | | No | No | | | | | euro |
| 338989 | | | Costruz casa riposo 140 p letto e recupero Villa Banfi ad uso pubblico | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20866 | CARNATE | | Via G. Marconi | 40 - Realisation Phase | 02.07.2019 14:16 | 2843 | | | No | No | | | | | euro |
| 338988 | | | Ampliamento sito industriale nuovo modulo R3 | | Default Value | | Running | euro | 02.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20864 | AGRATE BRIANZA | Industry building | Via C. Olivetti 2 | 40 - Realisation Phase | 02.07.2019 14:16 | 2842 | | | No | No | | | | | euro |
| 338987 | | | Costruzione 3 edifici 110 appartamenti classe A + 95 box interrati | | Default Value | | Running | euro | 06.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Compagnoni 12 | 40 - Realisation Phase | 02.07.2019 14:16 | 2841 | | | No | No | | | | | euro |
| 338986 | | | Costruzione torre 22 piani e ristrutt piastra 133 appart 200 autorim int | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Ippodromo 8 | 40 - Realisation Phase | 02.07.2019 14:16 | 2840 | | | No | No | | | | | euro |
| 338985 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Vanvitelli 6 | 40 - Realisation Phase | 02.07.2019 14:16 | 2839 | | | No | No | | | | | euro |
| 338984 | | | Costruzione 3 edifici a torre residenziali 8500 mq | | Default Value | | Running | euro | 29.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Gallarate 1/3 | 40 - Realisation Phase | 02.07.2019 14:16 | 2838 | | | No | No | | | | | euro |
| 338983 | | | Restauro edificio multipiano ad uso uffici | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazza Del Liberty 4 | 40 - Realisation Phase | 02.07.2019 14:15 | 2837 | | | No | No | | | | | euro |
| 338982 | | | Riqualificazione palazzo storico uffici 8000 mq retail 3300 mq | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazza San Fedele 3 | 40 - Realisation Phase | 02.07.2019 14:15 | 2836 | | | No | No | | | | | euro |
| 338981 | | | Riqualificazione complesso ad uso uffici 10000 mq | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via G. Mazzini 9 | 40 - Realisation Phase | 02.07.2019 14:15 | 2835 | | | No | No | | | | | euro |
| 338980 | | | Ristrutturazione edificio 7 piani ft uso uffici 4900 mq retail 1200 mq | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Italia 3 | 40 - Realisation Phase | 02.07.2019 14:15 | 2834 | | | No | No | | | | | euro |
| 338979 | | | Ristrutturaz edificio per Radisson Hotel 160 camere ristorante roof bar | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Santa Sofia 37 | 10 - Information Phase | 02.07.2019 14:15 | 2833 | | | No | No | | | | | euro |
| 338978 | | | Costruzione (demoric) 2 palazzine uso abitazione ed autorimessa interr | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Montebello 21 | 10 - Information Phase | 02.07.2019 14:15 | 2832 | | | No | No | | | | | euro |
| 338977 | | | Costruzione 2 edifici uso abitazione uffici negozi parcheggio interr | | Default Value | | Running | euro | 22.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via C. Beccaria | 10 - Information Phase | 02.07.2019 14:15 | 2831 | | | No | No | | | | | euro |
| 338976 | | | Ristrutturazione 3 edifici ad uso uffici | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via San Giovanni Sul Muro 9 | 10 - Information Phase | 02.07.2019 14:15 | 2830 | | | No | No | | | | | euro |
| 338975 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 22.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Mangone 4 / Papiniano 53 | 10 - Information Phase | 02.07.2019 14:15 | 2829 | | | No | No | | | | | euro |
| 338974 | | | Ristrutturazione complesso ad uso direzionale commerciale | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Meravigli 2 Casa Broggi | 10 - Information Phase | 02.07.2019 14:15 | 2828 | | | No | No | | | | | euro |
| 338973 | | | Costruzione (demoric) edificio multip uso abitaz 27 appartamenti e box | | Default Value | | Running | euro | 17.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Val Bogna 8 | 10 - Information Phase | 02.07.2019 14:15 | 2827 | | | No | No | | | | | euro |
| 338972 | | | Costruzione (demoric) edificio ad uso abitazione 32 alloggi classe A | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Savona 120 | 10 - Information Phase | 02.07.2019 14:15 | 2826 | | | No | No | | | | | euro |
| 338971 | | | Costruz (demoric) 3 edifici multip direzionali + edif comm 50000 mq tot | | Default Value | | Running | euro | 24.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie Angelo Rizzoli / Cazzaniga | 10 - Information Phase | 02.07.2019 14:15 | 2825 | | | No | No | | | | | euro |
| 338970 | | | Costruzione supermercato | | Default Value | | Running | euro | 24.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Privata A. Maffucci 73 | 10 - Information Phase | 02.07.2019 14:15 | 2824 | | | No | No | | | | | euro |
| 338969 | | | Riqual Le Corti Di Baires 17000 mq resid 160 app 8000 mq comm 5 MSV | | Default Value | | Running | euro | 24.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Corso Buenos Aires 59 | 10 - Information Phase | 02.07.2019 14:15 | 2823 | | | No | No | | | | | euro |
| 338968 | | | Costruzione complesso ad uso abitazione e box | | Default Value | | Running | euro | 24.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Columella / Pindaro 12 | 10 - Information Phase | 02.07.2019 14:15 | 2822 | | | No | No | | | | | euro |
| 338967-001 | | | HDB /COMPLESSO EDILIZIO U10 aule sale studio uffici resid 104 pletto | | Default Value | | Running | euro | 14.07.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20100 | MILANO | | Via Sesto San Giovanni | 40 - Realisation Phase | 14.07.2021 06:58 | 2821 | | | No | No | | | | | euro |
| 338967 | | | COMPLESSO EDILIZIO U10 aule sale studio uffici resid 104 pletto | | Default Value | | Running | euro | 17.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Sesto San Giovanni | 40 - Realisation Phase | 02.07.2019 14:15 | 2821 | | | No | No | | | | | euro |
| 338965 | | | Ristrutturazione pista di volo 18/36 taxiway T etc | | Default Value | | Running | euro | 31.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | Aeroporto Linate | 10 - Information Phase | 02.07.2019 14:15 | 2819 | | | No | No | | | | | euro |
| 338964 | | | Lavori riqualificazione e ampliamento Corpo F aerostazione passeggeri | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | Viale E. Forlanini | 10 - Information Phase | 02.07.2019 14:15 | 2818 | | | No | No | | | | | euro |
| 338963 | | | Costruzione 9 palazzine 3 piani ft ad uso abitazione 60 appartamenti | | Default Value | | Running | euro | 09.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20090 | TREZZANO SUL NAVIGLIO | Residential houses | Via P. Maroncelli | 10 - Information Phase | 02.07.2019 14:15 | 2817 | | | No | No | | | | | euro |
| 338962 | | | Costruzione nuova scuola secondaria di primo grado | | Default Value | | Running | euro | 16.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20069 | VAPRIO D'ADDA | | Piazza Trieste / Viale Vittoria / etc. | 10 - Information Phase | 02.07.2019 14:15 | 2816 | | | No | No | | | | | euro |
| 338961 | | | TECHBAU / Costruz magazzino logistico a temperatura controllata 26000 mq coperti | | Default Value | | Running | euro | 02.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20060 | POZZUOLO MARTESANA | Industry building | S.P. 103 / Via Pieregrosso | 10 - Information Phase | 02.07.2019 14:15 | 2815 | | | No | No | | | | | euro |
| 338959 | | | Costruzione edificio ad uso abitazione 25 alloggi classe A | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20016 | PERO | Residential houses | Via Bergamina | 10 - Information Phase | 02.07.2019 14:15 | 2813 | | | No | No | | | | | euro |
| 338958 | | | Costruzione residenza sanitaria assistenziale 100 posti letto | | Default Value | | Running | euro | 02.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Project | Halfen System Account | Italy | 20010 | CORNAREDO | | Via Adamello | 10 - Information Phase | 02.07.2019 14:15 | 2812 | | | No | No | | | | | euro |
| 338813-001 | | | INFINITY BLOCK A / LIVERPOOL / HTA | | Default Value | | Running | euro | 01.07.2019 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Opportunity | Halfen System Account | United Kingdom | L1 0AB | Liverpool | | X | 40 - Realisation Phase | 01.07.2019 10:32 | | | | No | No | | | | 50.000,00 € | euro |
| 338813 | | | INFINITY BLOCK A / LIVERPOOL | | Default Value | | Running | euro | 01.07.2019 | 16.07.2019 | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Project | Halfen System Account | United Kingdom | L1 0AB | Liverpool | | X | 10 - Information Phase | 01.07.2019 10:31 | | | | No | No | | | | 50.000,00 € | euro |
| 338448 | | | Costruzione porto turistico prima fase infrastrutture | | Default Value | | Running | euro | 17.04.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 57025 | PIOMBINO | Technical facilities | Localita' Chiusa Di Pontedoro | 10 - Information Phase | 24.06.2019 11:17 | 2811 | | | No | No | | | | | euro |
| 338447 | | | Costruzione 2 edifici per 18 alloggi edilizia sovvenzionata | | Default Value | | Running | euro | 03.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Pietrasantina | 10 - Information Phase | 24.06.2019 11:17 | 2810 | | | No | No | | | | | euro |
| 338446 | | | Costruz polo sanitario RSA 53 p letto centro riabilitativo ambulatori | | Default Value | | Running | euro | 03.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 56017 | SAN GIULIANO TERME | | Via Di Giacomo | 10 - Information Phase | 24.06.2019 11:17 | 2809 | | | No | No | | | | | euro |
| 338445 | | | Costruzione e manut pluriennale nuova sede Comando Polizia Municipale | | Default Value | | Running | euro | 29.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 52100 | AREZZO | | Via Filzi 27 | 10 - Information Phase | 24.06.2019 11:17 | 2808 | | | No | No | | | | | euro |
| 338444 | | | Ristrutturazione edificio per nuovo supermercato | | Default Value | | Running | euro | 31.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 51100 | PISTOIA | Technical facilities | Viale Matteotti 15 | 10 - Information Phase | 24.06.2019 11:17 | 2807 | | | No | No | | | | | euro |
| 338443 | | | Realizzazione vasche di laminazione | | Default Value | | Running | euro | 17.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Aeroporto A. Vespucci | 10 - Information Phase | 24.06.2019 11:17 | 2806 | | | No | No | | | | | euro |
| 338442 | | | Costruzione nuovo centro culturale con biblioteca multimediale | | Default Value | | Running | euro | 19.04.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Via Di Novoli Ex Fiat | 10 - Information Phase | 24.06.2019 11:17 | 2805 | | | No | No | | | | | euro |
| 338441 | | | Costruzione 2 edifici multip ad uso abitazione e box classe A | | Default Value | | Running | euro | 19.04.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Via Di Novoli Ex Fiat | 10 - Information Phase | 24.06.2019 11:17 | 2804 | | | No | No | | | | | euro |
| 338440 | | | Ristrutt ricostr (demoric) edificio polifunzionale preval uso sanitario | | Default Value | | Running | euro | 16.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50052 | CERTALDO | | Piazza Dei Macelli | 10 - Information Phase | 24.06.2019 11:17 | 2803 | | | No | No | | | | | euro |
| 338439 | | | Ampliamento e ristrutturazione plesso scolastico del Padule | | Default Value | | Running | euro | 05.06.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50012 | BAGNO A RIPOLI | | Via Don Lorenzo Perosi 1 | 10 - Information Phase | 24.06.2019 11:17 | 2802 | | | No | No | | | | | euro |
| 338438 | | | Miglioram sismico riqualific energetica blocco est scuola Redi | | Default Value | | Running | euro | 16.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50012 | BAGNO A RIPOLI | | Via Belmonte 40 | 10 - Information Phase | 24.06.2019 11:17 | 2801 | | | No | No | | | | | euro |
| 338437 | | | Costruzione nuovo stabilimento Fendi 1� lotto demolizione | | Default Value | | Running | euro | 03.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 50012 | BAGNO A RIPOLI | Industry building | Via Di Tizzano Loc. Capannuccia | 10 - Information Phase | 24.06.2019 11:17 | 2800 | | | No | No | | | | | euro |
| 338436 | | | Ristrutturazione fabbricati C1 e C2 c/o Il Castello Di Antognolla | | Default Value | | Running | euro | 24.04.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06100 | PERUGIA | Technical facilities | Strada San Giovanni Del Pantano | 10 - Information Phase | 24.06.2019 11:17 | 2799 | | | No | No | | | | | euro |
| 338435 | | | Costruzione 4 villette plurifamiliari | | Default Value | | Running | euro | 29.05.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | No | Project | Halfen System Account | Italy | 06073 | CORCIANO | Residential houses | Via Adolfo Venturi | 10 - Information Phase | 24.06.2019 11:17 | 2798 | | | No | No | | | | | euro |
| 338334-002 | | | GIUNTI / MILANO FIORI SVILUPPOU1-U3 AD ASSAGO | | Default Value | | Running | euro | 02.02.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20090 | Assago | | Via del bosco rinnovato | 40 - Realisation Phase | 02.02.2021 18:42 | | | | No | No | | | | | euro |
| 338334 | | | MILANO FIORI SVILUPPOU1-U3 AD ASSAGO | | Default Value | | Running | euro | 20.06.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20090 | Assago | | Via del bosco rinnovato | 40 - Realisation Phase | 20.06.2019 15:21 | | | | No | No | | | | 33.519,00 € | euro |
| 337906 | | | SAPABA (???) / Costruzione stabilimento con centro ricerca e marketing 10500 mq | | Default Value | | Running | euro | 10.05.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 41018 | SAN CESARIO SUL PANARO | Industry building | Via Della Meccanica | 10 - Information Phase | 13.06.2019 16:18 | 2756 | | | No | No | | | | | euro |
| 337901 | | | ENG 2K / Costruzione polo logistico | | Default Value | | Running | euro | 17.05.2019 | | IEMI-EMILIA ROMAGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 40053 | VALSAMOGGIA | Industry building | Via Chiesaccia | 10 - Information Phase | 13.06.2019 16:18 | 2751 | | | No | No | | | | | euro |
| 337900-001 | | | CMB / Ampliam restyling centro commerciale Shopville Gran Reno 12000 mq / HDB | | Default Value | | Running | euro | 28.07.2020 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 40033 | CASALECCHIO DI RENO | Technical facilities | Via M. Monroe | 30 - Tender & Submission Phase | 28.07.2020 15:26 | 2750 | | | No | No | | | | | euro |
| 337900 | | | CMB / Ampliam restyling centro commerciale Shopville Gran Reno 12000 mq | | Default Value | | Running | euro | 24.05.2019 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | | Project | Halfen System Account | Italy | 40033 | CASALECCHIO DI RENO | Technical facilities | Via M. Monroe | 10 - Information Phase | 13.06.2019 16:18 | 2750 | | | No | No | | | | | euro |
| 337609-001 | | | EX MANIFATTURA TABACCHI / GIUNTI | | Default Value | | Running | euro | 11.06.2019 | | ITOS-TOSCANA | Andrea Piazzalunga | | | | | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | * | 40 - Realisation Phase | 11.06.2019 09:54 | | | | No | No | | | | | euro |
| 337609 | | | SETTEN / X MANIFATTURA TABACCHI / FIRENZE | | Default Value | | Running | euro | 11.06.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | * | 10 - Information Phase | 11.06.2019 09:54 | | | | No | No | | | | | euro |
| 337492-002 | | | MAK COSTRUZIONI / RISTRUTTURAZIONE, RIQUALIFICAZIONE ED AMPLIAMENTO STADIO DRUSO / CRET / HIT | | Default Value | | Running | euro | 09.09.2020 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 30 - Tender & Submission Phase | 09.09.2020 11:45 | | | | No | No | | | | 8.200,00 € | euro |
| 337492-001 | | | MAK COSTRUZIONI / RISTRUTTURAZIONE, RIQUALIFICAZIONE ED AMPLIAMENTO STADIO DRUSO / HDB | | Default Value | | Running | euro | 23.10.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 40 - Realisation Phase | 23.10.2019 15:52 | | | | No | No | | | | 7.100,00 € | euro |
| 337492 | | | MAK COSTRUZIONI / RISTRUTTURAZIONE, RIQUALIFICAZIONE ED AMPLIAMENTO STADIO DRUSO | | Default Value | | Running | euro | 06.06.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | * | 10 - Information Phase | 06.06.2019 14:29 | | | | No | No | | | | 15.300,00 € | euro |
| 337285-001 | | | NUOVO PROSCUTTIFICIO / HTA | | Default Value | | Running | euro | 03.06.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 06174 | ELLERA SCALO (PG) | | * | 10 - Information Phase | 03.06.2019 16:03 | | | | No | No | | | | | euro |
| 337285 | | | NUOVO PROSCUTTIFICIO | | Default Value | | Running | euro | 03.06.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 06174 | ELLERA SCALO (PG) | | * | 10 - Information Phase | 03.06.2019 16:02 | | | | No | No | | | | | euro |
| 337183-001 | | | CENTRO COMMERCIALE "I GIGLI" / GIUNTI | | Default Value | | Running | euro | 30.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | CAMPI BISENZIO | 10 - Information Phase | 30.05.2019 15:14 | | | | No | No | | | | | euro |
| 337183 | | | CENTRO COMMERCIALE "I GIGLI" | | Default Value | | Running | euro | 30.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | CAMPI BISENZIO | 10 - Information Phase | 30.05.2019 15:13 | | | | No | No | | | | | euro |
| 336919-001 | | | HDB / NUOVO EDIFICIO DIREZIONALE - BOLOGNA Via della Beverara 21-23 | | Default Value | | Running | euro | 24.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 40131 | Bologna | Office building | Via Beverara 21-23 | 40 - Realisation Phase | 24.05.2019 09:13 | | | | No | No | | | | 25.516,00 € | euro |
| 336919 | | | NUOVO EDIFICIO DIREZIONALE - BOLOGNA Via della Beverara 21-23 | | Default Value | | Running | euro | 24.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 40131 | Bologna | Office building | Via Beverara 21-23 | 30 - Tender & Submission Phase | 24.05.2019 09:08 | | | | No | No | | | | 25.516,00 € | euro |
| 336899-001 | | | HIT / EDILIZIA RESIDENZIALE 31 ALLOGGI / LOC POGGI / MASSA | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 54100 | Massa | Residential houses | Vi Pisacane-via sciesa loc.Poggi | 30 - Tender & Submission Phase | 23.05.2019 17:53 | | | | No | No | | | | 2.465,00 € | euro |
| 336899 | | | EDILIZIA RESIDENZIALE 31 ALLOGGI / LOC POGGI / MASSA | | Default Value | | Running | euro | 23.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 54100 | Massa | Residential houses | Vi Pisacane-via sciesa loc.Poggi | 30 - Tender & Submission Phase | 23.05.2019 17:52 | | | | No | No | | | | 2.465,00 € | euro |
| 336702 | | | Costruzione grande struttura di vendita non alimentare | | Default Value | | Running | euro | 11.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09170 | ORISTANO | Technical facilities | Vie Del Porto / Bonn | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336701 | | | Costruzione centro intermodale passeggeri e azione interscambio | | Default Value | | Running | euro | 10.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09170 | ORISTANO | Technical facilities | Via Ghilarza | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336700 | | | Adeguam sismico messa sicur scuola secondaria I grado Regina Elena | | Default Value | | Running | euro | 03.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Via Stoccolma | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336699 | | | Rifunzionalizzazione parco della musica e teatro lirico | | Default Value | | Running | euro | 13.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Piazza A. Nazzari | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336698 | | | Costruzione (demoric) edificio a destinazione residenziale | | Default Value | | Running | euro | 05.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Vie Giovane Italia / F.lli Cairoli | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336697 | | | Completam strutturale del villaggio rurale e sistemazione area esterna | | Default Value | | Running | euro | 03.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09089 | ULA' TIRSO | Technical facilities | Localita' Sant'Isidoro | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336696 | | | Realizzaz piscina comunale e relative attrezzature sportive e ricettive | | Default Value | | Running | euro | 02.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09080 | SIAMANNA | | Capoluogo | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336695 | | | Lavori riqualificazione e manutenz straordinaria ex mercato civico | | Default Value | | Running | euro | 20.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09079 | TRESNURAGHES | | Capoluogo | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336694 | | | Costruzione polo scolastico intercomunale | | Default Value | | Running | euro | 20.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09070 | NURACHI | | Viale Gramsci / Via Giovanni XXIII | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336693 | | | Recupero e riqualificaz edificio comunale ex casermetta militare | | Default Value | | Running | euro | 08.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09070 | PAULILATINO | | Piazza Rinascita | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336692 | | | Lavori di completamento Campus della Scienza e della Tecnica | | Default Value | | Running | euro | 02.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09047 | SELARGIUS | | Via Della Scienza | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336691 | | | Riqualificazione palestra e locali annessi | | Default Value | | Running | euro | 03.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09040 | SANT'ANDREA FRIUS | | Via Garibaldi 36 | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336690 | | | Ristrutturazione e riqualificazione del palazzo comunale | | Default Value | | Running | euro | 05.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09040 | GUAMAGGIORE | | Viale IV Novembre | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336689 | | | Ristrutturazione e riqualificazione magazzino comunale | | Default Value | | Running | euro | 05.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09040 | GUAMAGGIORE | | Capoluogo | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336688 | | | Lavori di restauro Chiesa di San Pietro | | Default Value | | Running | euro | 05.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09040 | GUAMAGGIORE | Technical facilities | Via Centrale | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336687 | | | Costruzione residenza sanitaria assistenziale 80 posti letto | | Default Value | | Running | euro | 04.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09039 | VILLACIDRO | | Via Don Sturzo | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336686 | | | Ampliam adeguam a norme e sistemazione palestra IIS Buonarroti | | Default Value | | Running | euro | 13.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09038 | SERRAMANNA | | Via Svezia 10 | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336685 | | | Lavori di completamento della palestra comunale terzo lotto | | Default Value | | Running | euro | 27.02.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09033 | DECIMOMANNU | | Via Ballero | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336684 | | | Ristr sede giudice di pace x caserma Guardia di Finanza con alloggio | | Default Value | | Running | euro | 02.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09025 | SANLURI | | Via Trento | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336683 | | | Recupero e rifunzionalizz ex stazione ferrov per ostello gioventu' | | Default Value | | Running | euro | 27.02.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09021 | BARUMINI | Technical facilities | Via Stazione | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336682 | | | Restauro e valorizzazione Castello Medievale Della Marmilla | | Default Value | | Running | euro | 01.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09020 | LAS PLASSAS | | Via Manzoni 4 | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336681 | | | Ristrutt e recupero immobile sede del vecchio commissariato Polizia | | Default Value | | Running | euro | 15.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09013 | CARBONIA | | Via Ala Italiana | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336680 | | | Recupero vecchi percorsi ferroviari x piste ciclabili primo stralcio funz | | Default Value | | Running | euro | 13.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09010 | SAN GIOVANNI SUERGIU | Technical facilities | SANT'ANTIOCO | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336679 | | | Costruzione nuovo Museo Man ex Albergo Sotgiu e ex Casa Deriu | | Default Value | | Running | euro | 08.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08100 | NUORO | Technical facilities | Piazza Satta | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336678 | | | Ristrutturazione e restauro conservativo Faro Capo Bellavista | | Default Value | | Running | euro | 01.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08048 | TORTOLI' | | Localita' Arbatax | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336677 | | | Lavori di efficientamento energetico casa protetta Letizia | | Default Value | | Running | euro | 05.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08046 | PERDASDEFOGU | | Via San Salvatore snc | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336676 | | | Lavori di completamento ed adeguamento impianti sportivi | | Default Value | | Running | euro | 02.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08035 | NURRI | | Capoluogo | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336675 | | | Lavori di completamento Piazza Dei Mille a La Caletta | | Default Value | | Running | euro | 05.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08029 | SINISCOLA | Technical facilities | Piazza Dei Mille | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336674 | | | Completam messa a norma realizz manto erba sintetica campo sportivo | | Default Value | | Running | euro | 10.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08026 | ORANI | | Localita' Iniddo | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336673 | | | Lavori di completamento campo sportivo comunale | | Default Value | | Running | euro | 27.02.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08020 | GAVOI | | Localita' Maristiai | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336672 | | | Adeguam strutture e ristrutturaz Istituto Tecnico per rilascio CPI | | Default Value | | Running | euro | 27.02.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Montegrappa | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336671 | | | Rifacim opera d'arte ubicata litoranea SS 200 Marina di Sorso Platamone | | Default Value | | Running | euro | 05.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07037 | SORSO | Technical facilities | S.P. 81 KM. 5+850 | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336670 | | | Lavori di adeguamento campo sportivo Demuro | | Default Value | | Running | euro | 14.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07029 | TEMPIO PAUSANIA | | Via Limbara | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336669 | | | Opere di urbanizzazione prmaria 11 intervento | | Default Value | | Running | euro | 02.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | PRU Pittulongu | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336668 | | | Manutenzione e ristrutturazione immobile ex isola | | Default Value | | Running | euro | 27.02.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07019 | VILLANOVA MONTELEONE | | Via Nazionale 71 | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336667 | | | Ristrutt palestra all'aperto annessa alla scuola elementare e materna | | Default Value | | Running | euro | 14.03.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07014 | OZIERI | | Via Kennedy | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336666 | | | Completam opere infrastrutturali costruzione impianto depurazione | | Default Value | | Running | euro | 03.04.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07011 | BONO | Technical facilities | Capoluogo | 10 - Information Phase | 21.05.2019 11:47 | | | | No | No | | | | | euro |
| 336396-001 | | | HTA / EDIFICIO AD USO UFFICI / VIA GATTAMELATA 30-34 MILANO | | Default Value | | Running | euro | 17.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20149 | Milano | Office building | Via Gattamelata 30/34 | 40 - Realisation Phase | 17.05.2019 07:37 | | | | No | No | | | | | euro |
| 336396 | | | EDIFICIO AD USO UFFICI / VIA GATTAMELATA 30-34 MILANO | | Default Value | | Running | euro | 17.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20149 | Milano | Office building | Via Gattamelata 30/34 | 30 - Tender & Submission Phase | 17.05.2019 07:36 | | | | No | No | | | | | euro |
| 336345-001 | | | HIT / EDIFICIO PLURIFAMILIARE / GERA LARIO / INSQUADRA | | Default Value | | Running | euro | 16.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 22010 | Gera Lario | Residential houses | via dall'alto | 30 - Tender & Submission Phase | 16.05.2019 10:26 | | | | No | No | | | | 2.414,00 € | euro |
| 336345 | | | EDIFICIO PLURIFAMILIARE / GERA LARIO / INSQUADRA | | Default Value | | Running | euro | 16.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22010 | Gera Lario | Residential houses | via dall'alto | 30 - Tender & Submission Phase | 16.05.2019 10:24 | | | | No | No | | | | 2.414,00 € | euro |
| 336308-001 | | | HBT / GIUNTI / STONEHILL – NUOVO STUDENTATO VIA SERLIO BOLOGNA | | Default Value | | Running | euro | 15.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 40128 | Bologna | Educational facility | sebastiano serlio | 30 - Tender & Submission Phase | 15.05.2019 17:55 | | | | No | No | | | | 21.220,00 € | euro |
| 336308 | | | STONEHILL – NUOVO STUDENTATO VIA SERLIO BOLOGNA | | Default Value | | Running | euro | 15.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 40128 | Bologna | Educational facility | sebastiano serlio | 30 - Tender & Submission Phase | 15.05.2019 17:53 | | | | No | No | | | | 21.220,00 € | euro |
| 336148 | | | Costruzione 3 palazzine ad uso abitazione e negozi | | Default Value | | Running | euro | 04.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27029 | VIGEVANO | Residential houses | Corso G. Garibaldi 47 | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336147 | | | Realizzazione area oncologica multidisciplinare Cancer Center | | Default Value | | Running | euro | 22.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26100 | CREMONA | | Largo Priori 1 Ospedale | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336145 | | | Costruzione 2 MSV supermercato 3100 mq + ristorante 500 mq | | Default Value | | Running | euro | 07.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26013 | CREMA | Technical facilities | Vie Europa / Milano | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336144 | | | Ristrutt ampliam edifici x struttura turistica ***** SPA biolago 12000 mq | | Default Value | | Running | euro | 01.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25084 | GARGNANO | Technical facilities | Via Della Quiete Loc. Formaga | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336137 | | | Costruzione struttura sanitaria multifunzionale primo lotto | | Default Value | | Running | euro | 10.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24050 | CAVERNAGO | | Via Rogge Colleonesche | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336136 | | | Costruzione complesso residenziale Lotto 1B 20 unita' abitative | | Default Value | | Running | euro | 10.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24040 | MADONE | Residential houses | Via A. Manzoni | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336134 | | | Costruzione centro distribuzione merci alimentari Iper Montebello spa | | Default Value | | Running | euro | 07.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24040 | CASIRATE D'ADDA | Industry building | Via Rossini Ex Agip | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336133 | | | Costruzione edificio produttivo e deposito | | Default Value | | Running | euro | 28.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24040 | LALLIO | Industry building | Vie Dei Chiosi / Europa | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336132 | | | Costruzione 1 supermercato 1 MSV 1 ristorante 7000 mq SLP totale | | Default Value | | Running | euro | 22.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24030 | CARVICO | Technical facilities | Via Carlo G. Conti | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336130 | | | Ristrutturazione e ampliamento complesso industriale | | Default Value | | Running | euro | 21.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23892 | BULCIAGO | Industry building | Via Conte Taverna 1 | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336128 | | | Realizzazione galleria artificiale nell'area della frana del Ruinon | | Default Value | | Running | euro | 01.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23030 | VALFURVA | Technical facilities | SP 29 Del Gavia | 10 - Information Phase | 14.05.2019 10:53 | | | | No | No | | | | | euro |
| 336126 | | | Costruzione 4 palazzine per 48 appartamenti totale | | Default Value | | Running | euro | 01.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22077 | OLGIATE COMASCO | Residential houses | Viale Boselli 9 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336125 | | | Riqualif comparto stazioni miglioram sicurezza mobilita' Riappalto Lavori | | Default Value | | Running | euro | 21.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Piazzali Kennedy / Trieste / etc. | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336121 | | | Costruzione edificio multip 6 piani ft ad uso abitazione e box | | Default Value | | Running | euro | 03.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20851 | LISSONE | Residential houses | Via N. Copernico | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336118 | | | Costruzione palazzina ad uso abitazione 22 unita' abitative | | Default Value | | Running | euro | 08.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20846 | MACHERIO | Residential houses | Via G. Verdi | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336115 | | | Costruzione residenza sanitaria assistenziale 180 posti letto | | Default Value | | Running | euro | 22.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20823 | LENTATE SUL SEVESO | | Centro Urbano | 30 - Tender & Submission Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336108 | | | Recupero edificio per spazi commerciali ristorante | | Default Value | | Running | euro | 11.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Bagutta 2 Ex Garage Traversi | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336107 | | | Recupero complesso ad uso abitazione e autorimessa interrata | | Default Value | | Running | euro | 05.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Bramante 5 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336106 | | | Costruzione polo ospedaliero 16 piani 150000 mq 589 posti letto | | Default Value | | Running | euro | 01.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Cristina Belgioioso 173 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336105 | | | Costruzione edificio multipiano 7 pft 19 appartamenti classe A | | Default Value | | Running | euro | 01.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Livigno 4/3 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336104 | | | Realizzazione nuovo centro nuoto | | Default Value | | Running | euro | 14.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Cambini 4 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336103 | | | Ristrutturazione complesso multip ad uso residenziale | | Default Value | | Running | euro | 14.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Alserio 10 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336102 | | | Costruzione 4 edifici di 5/6 piani per 100 appartamenti e 74 box | | Default Value | | Running | euro | 14.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G. B. Passerini 13/17 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336101 | | | Riqualificazione edifici direzionali 56000 mq | | Default Value | | Running | euro | 08.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie U. Bassi 4 / G. Pepe | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336100 | | | Costruzione edificio per sede Fondazione Teatro alla Scala | | Default Value | | Running | euro | 07.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Verdi 3 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336099 | | | Centro commerciale GLA 65000 mq 192 negozi cinema multisala food court | | Default Value | | Running | euro | 06.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via G. W. Daimler | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336098 | | | Costruzione edificio ad uso uffici direzionali | | Default Value | | Running | euro | 04.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazzale Luigi Cadorna 3 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336097 | | | Costruzione edificio multipiano ad uso abitazione SLP 4345 mq | | Default Value | | Running | euro | 04.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via F. Argelati 37 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336096 | | | Restauro edificio multipiano ad uso uffici | | Default Value | | Running | euro | 05.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazza del Liberty 4 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336095 | | | Recupero ex convento ad uso residenziale 82 unita' abit di prestigio | | Default Value | | Running | euro | 01.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Lamarmora 25 | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336093 | | | Costruzione 4 edifici residenziali 1 media struttura di vendita | | Default Value | | Running | euro | 11.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20090 | TREZZANO SUL NAVIGLIO | Residential houses | Vie Marchesina / G. Matteotti | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336092 | | | Costruzione centro commerciale 185000 mq opere di fondazione | | Default Value | | Running | euro | 05.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20090 | SEGRATE | Technical facilities | Via R. Sanzio Ex Dogana | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336090 | | | Costruzione complesso residenziale primo lotto 42 alloggi classe A | | Default Value | | Running | euro | 01.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20021 | BOLLATE | Residential houses | Via C. Cattaneo Ex Timavo | 10 - Information Phase | 14.05.2019 10:52 | | | | No | No | | | | | euro |
| 336087 | | | Costruzione complesso uso abitazione e box 40 appartamenti classe A3 | | Default Value | | Running | euro | 01.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20013 | MAGENTA | Residential houses | Vie Milano / Dalmazia | 10 - Information Phase | 14.05.2019 10:51 | | | | No | No | | | | | euro |
| 336071 | | | Costruzione supermercato Conad ex Officina S Jacopo | | Default Value | | Running | euro | 04.04.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 57038 | RIO MARINA | Technical facilities | Via Principe Amedeo | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 336070 | | | Costruzione cantina vinificazione 3 piani tetto verde 5000 mq | | Default Value | | Running | euro | 15.03.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 57022 | CASTAGNETO CARDUCCI | Industry building | Localita' Cariola Ex Cava | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 336069 | | | Ristrutturazione Hotel Giada ***** 12 suites SPA piscina | | Default Value | | Running | euro | 11.04.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 55042 | FORTE DEI MARMI | Technical facilities | Viale Repubblica 7 | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 336068 | | | Costruzione nuova scuola primaria e dell'infanzia primo lotto | | Default Value | | Running | euro | 22.03.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 55035 | PIAZZA AL SERCHIO | | Frazione San Michele | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 336067 | | | Costruzione palazzina 4 piani ad uso 14 appartamenti | | Default Value | | Running | euro | 22.03.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 51100 | PISTOIA | Residential houses | Via S. Ciampi 32 | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 336066 | | | Riqualificazione edif 6 per nuova sede Polimoda primo lotto 1000 mq | | Default Value | | Running | euro | 04.04.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Via Delle Cascine Ex Manifattura | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 336065 | | | Costruzione centro uffici e biblioteca | | Default Value | | Running | euro | 13.03.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 06100 | PERUGIA | | Via Cestellini Loc. Ponte San Giovanni | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 336064 | | | Costruzione edificio per 4 unita' abitative | | Default Value | | Running | euro | 01.04.2019 | | IUMB-UMBRIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 06012 | CITTA' DI CASTELLO | Residential houses | Via G. Pellegrini | 10 - Information Phase | 14.05.2019 09:14 | | | | No | No | | | | | euro |
| 335986-001 | | | HDB / HIT / RESIDENZIALE / VANVITELLI 6 / MILANO | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20129 | Milano | Residential houses | Vanvitelli 6 | 30 - Tender & Submission Phase | 10.05.2019 18:12 | | | | No | No | | | | 24.499,00 € | euro |
| 335986 | | | RESIDENZIALE / VANVITELLI 6 / MILANO | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20129 | Milano | Residential houses | Vanvitelli 6 | 20 - Planning Phase | 10.05.2019 18:11 | | | | No | No | | | | 24.499,00 € | euro |
| 335972-001 | | | HDB / HSD / RESIDENZIALE / VIA FARAVELLI MILANO | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20149 | Milano | Residential houses | Luigi Cesare Faravelli | 40 - Realisation Phase | 10.05.2019 13:30 | | | | No | No | | | | 38.079,00 € | euro |
| 335972 | | | RESIDENZIALE / VIA FARAVELLI MILANO | | Default Value | | Running | euro | 10.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20149 | Milano | Residential houses | Luigi Cesare Faravelli | 20 - Planning Phase | 10.05.2019 13:28 | | | | No | No | | | | 38.079,00 € | euro |
| 335755 | | | ??? Ampliamento complesso industriale 11000 mq | | Default Value | | Running | euro | 11.04.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 32013 | LONGARONE | Industry building | Z.I. Villanova 16 | 10 - Information Phase | 08.05.2019 13:50 | | | | No | No | | | | | euro |
| 335724 | | | CATTOLICA / Costruzione 5 edifici ad uso abitazione 1 edificio terziario / 12/11 NIENTE | | Default Value | | Running | euro | 11.04.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 42100 | REGGIO EMILIA | Residential houses | Via G. Tomasi Di Lampedusa | 10 - Information Phase | 08.05.2019 11:56 | | | | No | No | | | | | euro |
| 335723 | | | ??? Costruzione RSA anziani non autosuff 75 posti centro diurno 20 posti / 12/11 NIENTE CANTIERE | | Default Value | | Running | euro | 04.03.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 41100 | MODENA | | Vie San Faustino / Padovani | 10 - Information Phase | 08.05.2019 11:56 | | | | No | No | | | | | euro |
| 335720 | | | ??? Polo polifunz 14700 mq commerciale 1400 mq palestra albergo 30 camere / ????? | | Default Value | | Running | euro | 28.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 41012 | CARPI | Technical facilities | Vie Industria / Stradello Frignani | 10 - Information Phase | 08.05.2019 11:56 | | | | No | No | | | | | euro |
| 335429 | | | NUOVE TERME | | Default Value | | Running | euro | 03.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25056 | Ponte di Legno | | * | 40 - Realisation Phase | 03.05.2019 13:53 | | | | No | No | | | | | euro |
| 335428 | | | COSTRUZIONE DI NUOVA GRANDE STRUTTURA DI VENDITA | | Default Value | | Running | euro | 03.05.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 51016 | MONTECATINI TERME (PT) | | Via Macchiavelli | 10 - Information Phase | 03.05.2019 13:47 | | | | No | No | | | | | euro |
| 335404-004 | | | HZS / ST MICROELECTRONICS / AGRATE | | Default Value | | Running | euro | 17.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20864 | Agrate Brianza | Industry building | Camillo Olivetti | 40 - Realisation Phase | 17.11.2019 16:33 | | | | No | No | | | | | euro |
| 335404-003 | | | ST MICROELECTRONICS / AGRATE / HZA | | Default Value | | Running | euro | 27.08.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20864 | Agrate Brianza | Industry building | Camillo Olivetti | 40 - Realisation Phase | 27.08.2019 15:33 | | | | No | No | | | | | euro |
| 335404 | | | ST MICROELECTRONICS / AGRATE | | Default Value | | Running | euro | 03.05.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20864 | Agrate Brianza | Industry building | Camillo Olivetti | 40 - Realisation Phase | 03.05.2019 09:53 | | | | No | No | | | | | euro |
| 335271-001 | | | HIT / UNIFAMILARE / MAURI ALFREDO / BULCIAGO | | Default Value | | Running | euro | 30.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 23892 | Bulciago | Residential houses | Via Don Guanella | 30 - Tender & Submission Phase | 30.04.2019 18:18 | | | | No | No | | | | 2.733,00 € | euro |
| 335271 | | | UNIFAMILARE / MAURI ALFREDO / BULCIAGO | | Default Value | | Running | euro | 30.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23892 | Bulciago | Residential houses | Via Don Guanella | 40 - Realisation Phase | 30.04.2019 18:17 | | | | No | No | | | | 2.733,00 € | euro |
| 335218-003 | | | HBT / THE STUDENT HOTEL Viale Belfiore FIRENZE / EX FIAT | | Default Value | | Running | euro | 18.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 50144 | Firenze | Educational facility | Viale Belforte | 30 - Tender & Submission Phase | 18.05.2020 14:41 | | | | No | No | | | | | euro |
| 335218-002 | | | GIUNTI / THE STUDENT HOTEL Viale Belfiore FIRENZE / EX FIAT | | Default Value | | Running | euro | 18.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 50144 | Firenze | Educational facility | Viale Belforte | 30 - Tender & Submission Phase | 18.05.2020 14:40 | | | | No | No | | | | | euro |
| 335218-001 | | | HDB / THE STUDENT HOTEL Viale Belfiore FIRENZE / EX FIAT | | Default Value | | Running | euro | 30.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 50144 | Firenze | Educational facility | Viale Belforte | 30 - Tender & Submission Phase | 30.04.2019 09:18 | | | | No | No | | | | 27.432,00 € | euro |
| 335218 | | | THE STUDENT HOTEL Viale Belfiore FIRENZE / EX FIAT | | Default Value | | Running | euro | 30.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 50144 | Firenze | Educational facility | Viale Belforte | 30 - Tender & Submission Phase | 30.04.2019 09:12 | | | | No | No | | | | 27.432,00 € | euro |
| 335136 | | | Costruz campus universitario 600 posti letto centro servizi biblioteca | | Default Value | | Running | euro | 28.02.2019 | | IPUG-PUGLIA | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 73047 | MONTERONI DI LECCE | Residential houses | Strada Tufi Area Ecotecne | 10 - Information Phase | 29.04.2019 11:07 | 2591 | | | No | No | | | | | euro |
| 335131 | | | Lavori di ricostruzione scuola ITIS Divini | | Default Value | | Running | euro | 02.04.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62027 | SAN SEVERINO MARCHE | | Via Mazzini | 10 - Information Phase | 29.04.2019 11:02 | 2590 | | | No | No | | | | | euro |
| 335120-001 | | | HDB / HSD / HBT / FENDI FABBRICA FENDI / CAPANUCCIA BAGNO A RIPOLI | | Default Value | | Running | euro | 29.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 50012 | Bagno a Ripoli | Industry building | Capannuccia | 40 - Realisation Phase | 29.04.2019 10:38 | | | | No | No | | | | 120.301,00 € | euro |
| 335120 | | | FENDI FABBRICA FENDI / CAPANUCCIA BAGNO A RIPOLI | | Default Value | | Running | euro | 29.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 50012 | Bagno a Ripoli | Industry building | Capannuccia | 30 - Tender & Submission Phase | 29.04.2019 10:34 | | | | No | No | | | | 120.301,00 € | euro |
| 334885 | | | EDIFICIO RESIDENZIALE / VIA BARONA MILANO | | Default Value | | Running | euro | 24.04.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20142 | Milano | Residential houses | Barona | 40 - Realisation Phase | 24.04.2019 14:00 | | | | No | No | | | | | euro |
| 333793-001 | | | TECHNOALPIN / BOLZANO / KKT | | Default Value | | Running | euro | 04.04.2019 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Via Piero Agostini | 40 - Realisation Phase | 04.04.2019 16:08 | | | | No | No | | | | 30.000,00 € | euro |
| 333793 | | | TECHNOALPIN / BOLZANO | | Default Value | | Running | euro | 04.04.2019 | | ITRE-TRENTINO ALTO ADIGE | Diego Carminati | | | | | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Via Piero Agostini | 40 - Realisation Phase | 04.04.2019 16:06 | | | | No | No | | | | 30.000,00 € | euro |
| 333710 | | | REALIZZAZIONE DEL POSTO CENTRALE SCC | | Default Value | | Running | euro | 03.04.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | piazza della croce | 10 - Information Phase | 03.04.2019 17:03 | | | | No | No | | | | | euro |
| 333098-001 | | | KRM 26 SPA / RESIDENZIALE / MILANO / HDB | | Default Value | | Running | euro | 26.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20129 | Milano | Residential houses | A.KRAMER 24/26 | 30 - Tender & Submission Phase | 26.03.2019 18:34 | | | | No | No | | | | 13.472,00 € | euro |
| 333098 | | | KRM 26 SPA / RESIDENZIALE / MILANO / | | Default Value | | Running | euro | 26.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20129 | Milano | Residential houses | A.KRAMER 24/26 | 30 - Tender & Submission Phase | 26.03.2019 18:33 | | | | No | No | | | | 13.472,00 € | euro |
| 333075-001 | | | RIQUALIFICAZIONE INTERNI SEGRETERIE UNI RM 1-LA SAPIENZA / GIUNTI | | Default Value | | Running | euro | 26.03.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Opportunity | Halfen System Account | Italy | 00185 | Roma | Educational facility | P.le ALDO MORO | 40 - Realisation Phase | 26.03.2019 14:37 | | | | No | No | | | | | euro |
| 333075 | | | RIQUALIFICAZIONE INTERNI SEGRETERIE UNI RM 1- LA SAPIENZA | | Default Value | | Running | euro | 26.03.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 00185 | Roma | Educational facility | P.le ALDO MORO | 10 - Information Phase | 26.03.2019 14:32 | | | | No | No | | | | | euro |
| 332758-001 | | | ICS SCHOOL / MILANO / DEMU | | Default Value | | Running | euro | 20.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20139 | Milano | Educational facility | viale Ortles | 30 - Tender & Submission Phase | 20.03.2019 15:48 | | | | No | No | | | | 1.751,00 € | euro |
| 332758 | | | ICS SCHOOL / MILANO | | Default Value | | Running | euro | 20.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20139 | Milano | Educational facility | viale Ortles | 30 - Tender & Submission Phase | 20.03.2019 15:43 | | | | No | No | | | | 1.751,00 € | euro |
| 332570-002 | | | DIREZIONALE UFFICI "CRIF" / BOLOGNA /GIUNTI | | Default Value | | Running | euro | 03.07.2019 | | IEMI-EMILIA ROMAGNA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | Office building | VIA BEVERARA | 40 - Realisation Phase | 03.07.2019 10:24 | | | | No | No | | | | 18.000,00 € | euro |
| 332570-001 | | | DIREZIONALE UFFICI "CRIF" / BOLOGNA / HDB | | Default Value | | Running | euro | 18.03.2019 | | IEMI-EMILIA ROMAGNA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | Office building | VIA BEVERARA | 40 - Realisation Phase | 18.03.2019 16:37 | | | | No | No | | | | 25.000,00 € | euro |
| 332570 | | | DIREZIONALE UFFICI "CRIF" / BOLOGNA | | Default Value | | Running | euro | 18.03.2019 | | IEMI-EMILIA ROMAGNA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 40100 | BOLOGNA | Office building | VIA BEVERARA | 40 - Realisation Phase | 18.03.2019 16:36 | | | | No | No | | | | 43.000,00 € | euro |
| 332379-001 | | | RIQUALIFICAZIONE MERCATO E PIAZZA 3 PONTI / DETAN | | Default Value | | Running | euro | 15.03.2019 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | | P.zza Porto 3 | 10 - Information Phase | 15.03.2019 10:56 | | | | No | No | | | | | euro |
| 332379 | | | RIQUALIFICAZIONE MERCATO E PIAZZA 3 PONTI | | Default Value | | Running | euro | 15.03.2019 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16100 | GENOVA | | P.zza Porto 3 | 10 - Information Phase | 15.03.2019 10:54 | | | | No | No | | | | | euro |
| 332290 | | | Costruzione (demoric) edificio 4 pft ad uso abitazione negozi e box | | Default Value | | Running | euro | 23.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26900 | LODI | Residential houses | Vie Volturno / Legnano | 40 - Realisation Phase | 14.03.2019 09:39 | 2588 | | | No | No | | | | | euro |
| 332288 | | | Costruzione supermercato catena U2 e OO UU | | Default Value | | Running | euro | 09.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26845 | CODOGNO | Technical facilities | Viale Trento 30 | 10 - Information Phase | 14.03.2019 09:39 | 2586 | | | No | No | | | | | euro |
| 332287 | | | Costruzione centro di accoglienza e dormitorio con 76 posti letto | | Default Value | | Running | euro | 06.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via G. Trivellini 11 | 10 - Information Phase | 14.03.2019 09:39 | 2585 | | | No | No | | | | | euro |
| 332285 | | | Ristrutturazione e ampliamento complesso per nuova sede universitaria | | Default Value | | Running | euro | 06.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via Garzetta Ex Seminario | 10 - Information Phase | 14.03.2019 09:39 | 2584 | | | No | No | | | | | euro |
| 332280 | | | Risanam conserv ex consorzio agrario x spazi commerc e artigianali | | Default Value | | Running | euro | 07.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via B. Bono 3 | 10 - Information Phase | 14.03.2019 09:38 | 2579 | | | No | No | | | | | euro |
| 332279 | | | Costruzione 2 edifici commerciali primo lotto demoliz e OO UU | | Default Value | | Running | euro | 24.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Vie S.G. Bosco / Mugazzone | 10 - Information Phase | 14.03.2019 09:38 | 2578 | | | No | No | | | | | euro |
| 332278 | | | Costruz ville a schiera appartam e area commerciale primo lotto 5 ville | | Default Value | | Running | euro | 09.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24050 | CAVERNAGO | Residential houses | Vie Manzoni / Papa Giovanni | 10 - Information Phase | 14.03.2019 09:38 | 2577 | | | No | No | | | | | euro |
| 332273 | | | Lavori per adeguamento strutturale e funzionale ponte San Michele | | Default Value | | Running | euro | 17.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23877 | PADERNO D'ADDA | Technical facilities | S.P. 54 | 10 - Information Phase | 14.03.2019 09:38 | 2572 | | | No | No | | | | | euro |
| 332271-001 | | | HDB / Costruzione RSA 60 posti letto e 67 minialloggi protetti | | Default Value | | Running | euro | 11.09.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 23100 | SONDRIO | Medical facility | Via N. Sauro 64 | 40 - Realisation Phase | 11.09.2019 07:21 | 2570 | | | No | Yes | | | | | euro |
| 332271 | | | Costruzione RSA 60 posti letto e 67 minialloggi protetti | | Default Value | | Running | euro | 04.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23100 | SONDRIO | | Via N. Sauro 64 | 10 - Information Phase | 14.03.2019 09:37 | 2570 | | | No | Yes | | | | | euro |
| 332270 | | | Ampliam Hotel Victoria***** 45 camere SPA ristorante conferenze piscina | | Default Value | | Running | euro | 08.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22017 | MENAGGIO | Technical facilities | Via B. Castelli 9/13 | 10 - Information Phase | 14.03.2019 09:37 | 2569 | | | No | No | | | | | euro |
| 332269 | | | Comparto stazioni miglior sicurezza ed interconnessione con infrastr | | Default Value | | Running | euro | 11.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Piazzali Kennedy / Trieste / etc. | 10 - Information Phase | 14.03.2019 09:37 | 2568 | | | No | No | | | | | euro |
| 332268 | | | Costruzione media struttura di vendita 4971 mq SLP e OO UU | | Default Value | | Running | euro | 09.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21040 | VENEGONO INFERIORE | Technical facilities | Vie F.lli Kennedy / Galizia | 10 - Information Phase | 14.03.2019 09:37 | 2567 | | | No | No | | | | | euro |
| 332267 | | | Ampliamento Facolta' Medicina e Casa Studente primo lotto recinzione | | Default Value | | Running | euro | 07.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20854 | VEDANO AL LAMBRO | | Via R. Follereau | 10 - Information Phase | 14.03.2019 09:37 | 2566 | | | No | No | | | | | euro |
| 332265 | | | Costruzione complesso ad uso abitazione e box interrati | | Default Value | | Running | euro | 13.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via C. I. Petitti 5 | 10 - Information Phase | 14.03.2019 09:37 | 2564 | | | No | No | | | | | euro |
| 332264 | | | Costruzione complesso ad uso abitazione e boxes | | Default Value | | Running | euro | 13.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Columella / Pindaro 12 | 10 - Information Phase | 14.03.2019 09:37 | 2563 | | | No | No | | | | | euro |
| 332263 | | | Ristrutt reparto radiodiagnostica c/o Osp Ferrari e rep mielolesi CTO | | Default Value | | Running | euro | 07.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazza Cardinal Ferrari 1 | 10 - Information Phase | 14.03.2019 09:37 | | | | No | No | | | | | euro |
| 332262 | | | Ristrutt complesso x nuova sede Volkswagen Financial Services 20000 mq | | Default Value | | Running | euro | 13.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Privata Grosio 10/4 | 10 - Information Phase | 14.03.2019 09:37 | 2561 | | | No | No | | | | | euro |
| 332260 | | | Costruzione campus universitario 700 posti letto | | Default Value | | Running | euro | 13.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G. Ripamonti 37 Ex Consorzio | 10 - Information Phase | 14.03.2019 09:36 | 2559 | | | No | No | | | | | euro |
| 332259 | | | Costruzione (demoric) complesso uso abitazione 60 appartamenti e box | | Default Value | | Running | euro | 07.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via L. G. Faravelli 14 | 10 - Information Phase | 14.03.2019 09:36 | 2558 | | | No | No | | | | | euro |
| 332258 | | | Riqualificazione immobili da destinare a sede aziendale | | Default Value | | Running | euro | 25.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Italia 52 | 10 - Information Phase | 14.03.2019 09:36 | 2557 | | | No | No | | | | | euro |
| 332257 | | | Ristrutt 5 edifici 480 all social housing +1 MSV 2000 mq servizi 2300 mq | | Default Value | | Running | euro | 25.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Antegnati | 10 - Information Phase | 14.03.2019 09:36 | 2556 | | | No | No | | | | | euro |
| 332256 | | | Ristrutturazione edificio multipiano ad uso uffici 15500 mq | | Default Value | | Running | euro | 18.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale Sarca 223 | 10 - Information Phase | 14.03.2019 09:36 | 2555 | | | No | No | | | | | euro |
| 332255 | | | Ristruttur edificio storico ad uso commerciale direzionale 23800 mq | | Default Value | | Running | euro | 18.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Della Moscova 33 | 10 - Information Phase | 14.03.2019 09:36 | 2554 | | | No | No | | | | | euro |
| 332254 | | | Risanamento conservativo facciate Tribunale Minorenni | | Default Value | | Running | euro | 11.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Leopardi 18 | 10 - Information Phase | 14.03.2019 09:36 | 2553 | | | No | No | | | | | euro |
| 332253 | | | Riqualificazione complesso ad uso uffici 10000 mq | | Default Value | | Running | euro | 11.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via G. Mazzini 9 | 10 - Information Phase | 14.03.2019 09:36 | 2552 | | | No | No | | | | | euro |
| 332252 | | | Miglioramento adeguamento sismico infrastrutture civili aeroportuali | | Default Value | | Running | euro | 09.01.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Aeroporti Linate e Malpensa | 10 - Information Phase | 14.03.2019 09:36 | 2551 | | | No | No | | | | | euro |
| 332251 | | | Costruzione 2 edifici multip 84 appartamenti totale classe A | | Default Value | | Running | euro | 14.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20067 | PAULLO | Residential houses | Via Mascherpa | 10 - Information Phase | 14.03.2019 09:36 | 2550 | | | No | No | | | | | euro |
| 332161-001 | | | POLITECNICO DI TORINO / FS | | Default Value | | Running | euro | 13.03.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 10100 | TORINO | | Corso duca degli Abruzzi | 10 - Information Phase | 13.03.2019 10:16 | | | | No | No | | | | | euro |
| 332161 | | | POLITECNICO DI TORINO | | Default Value | | Running | euro | 13.03.2019 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | Corso duca degli Abruzzi | 10 - Information Phase | 13.03.2019 10:16 | | | | No | No | | | | | euro |
| 331914 | | | Manutenzione straordinaria scuola primaria | | Default Value | | Running | euro | 31.01.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09040 | FURTEI | | Piazza Municipio | 10 - Information Phase | 08.03.2019 15:00 | 2546 | | | No | No | | | | | euro |
| 331913 | | | Lavori di completamento opere di recupero del vecchio municipio | | Default Value | | Running | euro | 24.01.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09040 | VILLAPUTZU | | Capoluogo | 10 - Information Phase | 08.03.2019 15:00 | 2545 | | | No | No | | | | | euro |
| 331912 | | | Costruzione sede Compagnia e Stazione dei Carabinieri primo lotto | | Default Value | | Running | euro | 31.01.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09025 | SANLURI | | Via Parigi | 10 - Information Phase | 08.03.2019 15:00 | 2544 | | | No | No | | | | | euro |
| 331911 | | | Manutenz straordin sede Istituto Tecnico Professionale IPSIA Volta | | Default Value | | Running | euro | 17.01.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08100 | NUORO | | Via Pietro Mastino 50 | 10 - Information Phase | 08.03.2019 15:00 | 2543 | | | No | No | | | | | euro |
| 331910 | | | Completamento di uno stralcio funzionale del terzo lotto ITCG Zappa | | Default Value | | Running | euro | 17.01.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08033 | ISILI | | Via G. Cedda 7 | 10 - Information Phase | 08.03.2019 15:00 | 2542 | | | No | No | | | | | euro |
| 331909 | | | Riqualificazione patrimonio edilizia residenziale pubblica | | Default Value | | Running | euro | 10.01.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | Residential houses | Vie Leoncavallo 5 A | 10 - Information Phase | 08.03.2019 15:00 | 2541 | | | No | No | | | | | euro |
| 331658 | | | WESTFIELD MILAN SPA / SEGRATE | | Default Value | | Running | euro | 06.03.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20090 | Segrate | Shopping center | Via R. Sanzio Ex Dogana | 40 - Realisation Phase | 06.03.2019 10:03 | | | | No | No | | | | | euro |
| 331522 | | | Costruzione supermercato Eurospin 2000 mq ed opere urbanizzazione | | Default Value | | Running | euro | 30.01.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 61032 | FANO | Technical facilities | Via Pisacane Ex Molino | 10 - Information Phase | 04.03.2019 16:18 | | | | No | No | | | | | euro |
| 331521 | | | Costruzione nuova struttura ospedaliera materno infantile Salesi | | Default Value | | Running | euro | 31.01.2019 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 60100 | ANCONA | | Localita' Torrette | 10 - Information Phase | 04.03.2019 16:18 | | | | No | No | | | | | euro |
| 331518 | | | Ristrutturazione edilizia Centro Commerciale Aprilia 2 | | Default Value | | Running | euro | 14.02.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 04011 | APRILIA | Technical facilities | Via Riserva Nuova Km 44 Area ASI | 10 - Information Phase | 04.03.2019 15:48 | | | | No | No | | | | | euro |
| 331517 | | | Costruzione hotel 30 camere e ristorante 300 posti | | Default Value | | Running | euro | 17.01.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 02012 | AMATRICE | Technical facilities | Via Del Castagneto | 10 - Information Phase | 04.03.2019 15:48 | | | | No | No | | | | | euro |
| 331512 | | | Costruzione scuola media Fermi secondo stralcio Riappalto Lavori | | Default Value | | Running | euro | 09.01.2019 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 64011 | ALBA ADRIATICA | | Via Dei Ludi 35 | 10 - Information Phase | 04.03.2019 15:40 | | | | No | No | | | | | euro |
| 331238-002 | | | CHIESA SAN PAOLO VI / Q.RE ROMITI FORLI / FK4 | | Default Value | | Running | euro | 27.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Opportunity | Halfen System Account | Italy | 47100 | FORLI' | Infrastructural facility | Q.RE ROMITI | 30 - Tender & Submission Phase | 27.02.2019 15:59 | | | | No | No | | | | 70.000,00 € | euro |
| 331238-001 | | | CHIESA SAN PAOLO VI / Q.RE ROMITI FORLI / HDB | | Default Value | | Running | euro | 27.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Opportunity | Halfen System Account | Italy | 47100 | FORLI' | Infrastructural facility | Q.RE ROMITI | 30 - Tender & Submission Phase | 27.02.2019 15:56 | | | | No | No | | | | 22.000,00 € | euro |
| 331238 | | | CHIESA SAN PAOLO VI / Q.RE ROMITI FORLI | | Default Value | | Running | euro | 27.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 47100 | FORLI' | Infrastructural facility | Q.RE ROMITI | 10 - Information Phase | 27.02.2019 15:55 | | | | No | No | | | | 92.000,00 € | euro |
| 331236-001 | | | CEA / CENTRALE TERNA / BELCASTRO CZ / HAB SK | | Default Value | | Running | euro | 27.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Opportunity | Halfen System Account | Italy | 88050 | Belcastro | Technical facilities (Energy) | -- | 40 - Realisation Phase | 27.02.2019 15:51 | | | | No | No | | | | 50.000,00 € | euro |
| 331236 | | | CEA / CENTRALE TERNA / BELCASTRO CZ | | Default Value | | Running | euro | 27.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 88050 | Belcastro | Technical facilities (Energy) | -- | 40 - Realisation Phase | 27.02.2019 15:46 | | | | No | No | | | | 50.000,00 € | euro |
| 331208-001 | | | BIT / GALLERIA ANTIFONICA / GENOVA / DETAN | | Default Value | | Running | euro | 27.02.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Opportunity | Halfen System Account | Italy | 16100 | GENOVA | Infrastructural facility | A 10 | 30 - Tender & Submission Phase | 27.02.2019 12:50 | | | | No | No | | | | 60.000,00 € | euro |
| 331208 | | | BIT / GALLERIA ANTIFONICA / GENOVA | | Default Value | | Running | euro | 27.02.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 16100 | GENOVA | Infrastructural facility | A 10 | 10 - Information Phase | 27.02.2019 12:50 | | | | No | No | | | | 60.000,00 € | euro |
| 331154-002 | | | HBS / FALCON MALLS CASCINA MERLATA / MILANO | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20157 | Milano | Shopping center | Cascina Merlata | 40 - Realisation Phase | 24.03.2021 13:01 | | | | No | No | | | | | euro |
| 331154-001 | | | HDB / FALCON MALLS CASCINA MERLATA / MILANO | | Default Value | | Running | euro | 27.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20157 | Milano | Shopping center | Cascina Merlata | 40 - Realisation Phase | 27.02.2019 07:42 | | | | No | No | | | | 13.308,00 € | euro |
| 331154 | | | FALCON MALLS CASCINA MERLATA / MILANO | | Default Value | | Running | euro | 27.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20157 | Milano | Shopping center | Cascina Merlata | 40 - Realisation Phase | 27.02.2019 07:41 | | | | No | No | | | | 13.308,00 € | euro |
| 331057 | | | ??? CENTRO COMMERCIALE ipermercato 2 MSV 14430 mq / SASSUOLO / IMP TURCHI / 15/5 URBANIZZAZ MA TUTTO FERMO | | Default Value | | Running | euro | 14.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 41049 | SASSUOLO | Technical facilities | Via Statale Ovest Ex Cisa | 40 - Realisation Phase | 26.02.2019 09:52 | 2515 | | | No | No | | | | | euro |
| 331056-001 | | | EX MANIFATTURA / PIACENZA / GIUNTI / Costruzione 260 alloggi social housing supermercato Conad parco 12/11 FINE DEMOLIZIONE | | Default Value | | Running | euro | 27.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Opportunity | Halfen System Account | Italy | 29100 | PIACENZA | Residential houses | Via Montebello Ex Manifattura | 10 - Information Phase | 27.02.2019 16:14 | | | | No | No | | | | | euro |
| 331056 | | | EX MANIFATTURA / PIACENZA / Costruzione 260 alloggi social housing supermercato Conad parco 10/5 FINE DMOLIZIONE | | Default Value | | Running | euro | 08.02.2019 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 29100 | PIACENZA | Residential houses | Via Montebello Ex Manifattura | 10 - Information Phase | 26.02.2019 09:52 | 2514 | | | No | No | | | | | euro |
| 330787 | | | Realizzazione nuovo mercato Zaera | | Default Value | | Running | euro | 12.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98100 | MESSINA | Technical facilities | Via Cesare Battisti | 10 - Information Phase | 22.02.2019 11:32 | 2408 | | | No | No | | | | | euro |
| 330786 | | | Riqualif ambientale risanam igienico alveo Torrente Cataratti Bisconte | | Default Value | | Running | euro | 09.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98100 | MESSINA | Technical facilities | Zone diverse | 10 - Information Phase | 22.02.2019 11:32 | 2407 | | | No | No | | | | | euro |
| 330785 | | | Costruzione edificio 3 piani fuori terra ad uso abitazione | | Default Value | | Running | euro | 25.10.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98100 | MESSINA | Residential houses | Via Dei Mille Loc. Torre Faro | 10 - Information Phase | 22.02.2019 11:32 | 2406 | | | No | No | | | | | euro |
| 330784 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 25.10.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98100 | MESSINA | Residential houses | Via Contesse | 10 - Information Phase | 22.02.2019 11:32 | 2405 | | | No | No | | | | | euro |
| 330783 | | | Ristrutt spazi ospedalieri da adibire a presidio accoglienza ex OPG | | Default Value | | Running | euro | 31.10.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98074 | NASO | | Via Convento | 10 - Information Phase | 22.02.2019 11:32 | 2404 | | | No | No | | | | | euro |
| 330782 | | | Recupero completam adeguam normativo funzionale Chiesa Madre | | Default Value | | Running | euro | 06.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98054 | FURNARI | Technical facilities | Centro Storico | 10 - Information Phase | 22.02.2019 11:32 | 2403 | | | No | No | | | | | euro |
| 330781 | | | Lavori di riqualificazione campo di calcio e tennis | | Default Value | | Running | euro | 14.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98028 | SANTA TERESA DI RIVA | | Localita' Bucalo | 10 - Information Phase | 22.02.2019 11:31 | 2402 | | | No | No | | | | | euro |
| 330780 | | | Costruzione 800 loculi cimitero centrale e 200 cimitero di Misserio | | Default Value | | Running | euro | 09.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98028 | SANTA TERESA DI RIVA | Technical facilities | Localita' diverse | 10 - Information Phase | 22.02.2019 11:31 | 2401 | | | No | No | | | | | euro |
| 330779 | | | Lavori di ristrutturazione e messa in sicurezza della Chiesa Madre | | Default Value | | Running | euro | 15.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 98023 | FURCI SICULO | | Piazza Sacro Cuore | 10 - Information Phase | 22.02.2019 11:31 | 2400 | | | No | No | | | | | euro |
| 330778 | | | Ristrutturazione e adeguamento normativo Caserma Carabinieri | | Default Value | | Running | euro | 20.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 97017 | SANTA CROCE CAMERINA | | Piazza Celestri II | 10 - Information Phase | 22.02.2019 11:31 | 2399 | | | No | No | | | | | euro |
| 330777 | | | Recupero e ristrutturazione 18 alloggi ERP | | Default Value | | Running | euro | 15.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 96017 | NOTO | Residential houses | Via Sonnino | 10 - Information Phase | 22.02.2019 11:31 | 2398 | | | No | No | | | | | euro |
| 330776 | | | Completamento edificio strategico Complesso del Carmine e piazzetta | | Default Value | | Running | euro | 06.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 96013 | CARLENTINI | | Piazza Crispi | 10 - Information Phase | 22.02.2019 11:31 | 2397 | | | No | No | | | | | euro |
| 330775 | | | Ristrutt e adeguam campo di calcio presso area impianti sportivi | | Default Value | | Running | euro | 06.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 96010 | CANICATTINI BAGNI | | Via Solferino | 10 - Information Phase | 22.02.2019 11:31 | 2396 | | | No | No | | | | | euro |
| 330774 | | | Completamento alloggi sperimentali per riduzione disagio abitativo | | Default Value | | Running | euro | 30.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95100 | CATANIA | Residential houses | Capoluogo | 10 - Information Phase | 22.02.2019 11:31 | 2395 | | | No | No | | | | | euro |
| 330773 | | | Opere di urbanizzazione Quartiere Castagnola Spina Verde | | Default Value | | Running | euro | 08.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95100 | CATANIA | Technical facilities | Quartiere Castagnola | 10 - Information Phase | 22.02.2019 11:31 | 2394 | | | No | No | | | | | euro |
| 330772 | | | Opere di urbanizzazione parco urbano Quartiere Librino Strade | | Default Value | | Running | euro | 08.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95100 | CATANIA | Technical facilities | Quartiere Librino | 10 - Information Phase | 22.02.2019 11:31 | 2392 | | | No | No | | | | | euro |
| 330771 | | | Manutenzione straordinaria Ipssar | | Default Value | | Running | euro | 06.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95040 | SAN MICHELE DI GANZARIA | | Vie Berlinguer / A. Moro | 10 - Information Phase | 22.02.2019 11:31 | 2391 | | | No | No | | | | | euro |
| 330770 | | | Restauro conserv recupero e messa sicurezza Chiesa Maria SS Rosario | | Default Value | | Running | euro | 12.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95034 | BRONTE | Technical facilities | Piazza Rosario 7 | 10 - Information Phase | 22.02.2019 11:31 | 2390 | | | No | No | | | | | euro |
| 330769 | | | Riqualificaz polo sportivo e ristrutturazione palazzetto dello sport | | Default Value | | Running | euro | 15.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95034 | BRONTE | | Vie Dalmazia / Dello Stadio | 10 - Information Phase | 22.02.2019 11:31 | 2389 | | | No | No | | | | | euro |
| 330768 | | | Costruzione resort alberghiero Hilton Riappalto Lavori | | Default Value | | Running | euro | 28.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95024 | ACIREALE | Technical facilities | Loc. Capo Mulino | 10 - Information Phase | 22.02.2019 11:30 | 2388 | | | No | No | | | | | euro |
| 330767 | | | Ristrutt e recupero strutturale Istituto Majorana secondo stralcio | | Default Value | | Running | euro | 21.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 94015 | PIAZZA ARMERINA | | Piazza Marescalchi 2 | 10 - Information Phase | 22.02.2019 11:30 | 2387 | | | No | No | | | | | euro |
| 330766 | | | Ristrutturazione capannone ad uso artigianale | | Default Value | | Running | euro | 25.10.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 94010 | NISSORIA | Industry building | Ex Nissometal | 10 - Information Phase | 22.02.2019 11:30 | 2386 | | | No | No | | | | | euro |
| 330765 | | | Manut straord ripristino locali sottostanti copertura Palazzina Comando | | Default Value | | Running | euro | 13.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 91100 | TRAPANI | | Caserma Giannettino | 10 - Information Phase | 22.02.2019 11:30 | 2385 | | | No | No | | | | | euro |
| 330764 | | | Lavori di manutenzione straordinaria edificio scolastico | | Default Value | | Running | euro | 06.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 91017 | PANTELLERIA | | Localita' Tracino | 10 - Information Phase | 22.02.2019 11:30 | 2384 | | | No | No | | | | | euro |
| 330763 | | | Ammodern copertura muretti d'attico sostit infissi palazzina alloggi | | Default Value | | Running | euro | 13.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90100 | PALERMO | | Via Della Favorita 4 | 10 - Information Phase | 22.02.2019 11:30 | 2383 | | | No | No | | | | | euro |
| 330762 | | | Rifunzionalizzaz idraulica canale emissario ed opere connesse | | Default Value | | Running | euro | 21.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90100 | PALERMO | Technical facilities | Porto Industriale | 10 - Information Phase | 22.02.2019 11:30 | 2382 | | | No | No | | | | | euro |
| 330761 | | | Lavori di riqualificazione porticciolo Sant'Erasmo | | Default Value | | Running | euro | 08.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90100 | PALERMO | Technical facilities | Caletta Sant'Erasmo | 10 - Information Phase | 22.02.2019 11:30 | 2381 | | | No | No | | | | | euro |
| 330760 | | | Realizzazione rete fognante | | Default Value | | Running | euro | 18.10.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90100 | PALERMO | Technical facilities | Localita' Sferracavallo | 10 - Information Phase | 22.02.2019 11:30 | 2380 | | | No | No | | | | | euro |
| 330759 | | | Costruzione nuova Caserma Arma Carabinieri Riappalto Lavori | | Default Value | | Running | euro | 30.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90047 | PARTINICO | | Contrada Ramo | 10 - Information Phase | 22.02.2019 11:30 | 2379 | | | No | No | | | | | euro |
| 330758 | | | Ampliamento del cimitero Project Financing | | Default Value | | Running | euro | 31.10.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90039 | VILLABATE | Technical facilities | Via Cimitero | 10 - Information Phase | 22.02.2019 11:30 | 2378 | | | No | No | | | | | euro |
| 330757 | | | Costruzione edificio da adibire a museo archeologico etnoantropologico | | Default Value | | Running | euro | 06.12.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90020 | BAUCINA | Technical facilities | Capoluogo | 10 - Information Phase | 22.02.2019 11:29 | 2377 | | | No | No | | | | | euro |
| 330756 | | | Realizz infrastrutture ed impianti progetto Port Facility Security Plan | | Default Value | | Running | euro | 30.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90018 | TERMINI IMERESE | Technical facilities | Porto | 10 - Information Phase | 22.02.2019 11:29 | 2376 | | | No | No | | | | | euro |
| 330755 | | | Realizzazione 17 alloggi ERP mediante recupero centro storico | | Default Value | | Running | euro | 25.10.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90010 | POLLINA | Residential houses | Centro Storico | 10 - Information Phase | 22.02.2019 11:29 | 2375 | | | No | No | | | | | euro |
| 330753 | | | Riqualificazione sala congressi del PO San Michele | | Default Value | | Running | euro | 08.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Piazzale A. Ricchi 1 | 10 - Information Phase | 22.02.2019 10:52 | 2374 | | | No | No | | | | | euro |
| 330752 | | | Realizzaz e gestione centro sportivo polivalente Project Financing | | Default Value | | Running | euro | 31.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | | Via Abruzzi | 10 - Information Phase | 22.02.2019 10:52 | 2373 | | | No | No | | | | | euro |
| 330751 | | | Ristrutt messa in sicurezza miglioram energetico scuola media | | Default Value | | Running | euro | 09.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09096 | SANTA GIUSTA | | Via Copernico | 10 - Information Phase | 22.02.2019 10:52 | 2372 | | | No | No | | | | | euro |
| 330750 | | | Lavori di restauro edificio per struttura polivalente | | Default Value | | Running | euro | 09.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09092 | ARBOREA | | Ex Gil | 10 - Information Phase | 22.02.2019 10:52 | 2371 | | | No | No | | | | | euro |
| 330749 | | | Costruzione palestra nuovo Istituto Comprensivo | | Default Value | | Running | euro | 12.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09049 | VILLASIMIUS | | Via L. Da Vinci | 10 - Information Phase | 22.02.2019 10:52 | 2370 | | | No | No | | | | | euro |
| 330748 | | | Ristrutturazione ex sede del municipio completamento | | Default Value | | Running | euro | 19.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09040 | GESICO | | Via Umberto I | 10 - Information Phase | 22.02.2019 10:52 | 2369 | | | No | No | | | | | euro |
| 330747 | | | Manutenzione straordinaria di 16 alloggi secondo lotto | | Default Value | | Running | euro | 14.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09016 | IGLESIAS | Residential houses | Piazza Giovanni XXIII 11 | 10 - Information Phase | 22.02.2019 10:52 | 2368 | | | No | No | | | | | euro |
| 330746 | | | Completamento blocchi A B C relativi a 72 locali a servizio residenze | | Default Value | | Running | euro | 25.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09013 | CARBONIA | Residential houses | Corso Iglesias | 10 - Information Phase | 22.02.2019 10:52 | 2367 | | | No | No | | | | | euro |
| 330745 | | | Lavori di ristrutturazione scuola primaria | | Default Value | | Running | euro | 19.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09010 | UTA | | Via Regina Margherita | 10 - Information Phase | 22.02.2019 10:51 | 2366 | | | No | No | | | | | euro |
| 330744 | | | Riqualificazione ed adeguamento fabbricati della stazione | | Default Value | | Running | euro | 05.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08033 | ISILI | | Localita' Sarcidano | 10 - Information Phase | 22.02.2019 10:51 | 2365 | | | No | No | | | | | euro |
| 330743 | | | Costruzione palestra comunale | | Default Value | | Running | euro | 02.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08020 | OSIDDA | | Localita' Cunzadu De Idda | 10 - Information Phase | 22.02.2019 10:51 | 2364 | | | No | No | | | | | euro |
| 330742 | | | Manutenzione straordinaria palazzetto | | Default Value | | Running | euro | 19.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08018 | SINDIA | | Capoluogo | 10 - Information Phase | 22.02.2019 10:51 | 2363 | | | No | No | | | | | euro |
| 330741 | | | Risanam adeguam locali secondo piano palazzo SS Annunziata x degenza | | Default Value | | Running | euro | 07.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via E. De Nicola 1 | 10 - Information Phase | 22.02.2019 10:51 | 2362 | | | No | No | | | | | euro |
| 330740 | | | Ristrutt sala attesa e locali adiac pronto soccorso PO SS Annunziata | | Default Value | | Running | euro | 07.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via E. De Nicola 1 | 10 - Information Phase | 22.02.2019 10:51 | 2361 | | | No | No | | | | | euro |
| 330739 | | | Ristrutt edile impiant blocco operatorio IV piano PO SS Annunziata | | Default Value | | Running | euro | 07.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via E. De Nicola 1 | 10 - Information Phase | 22.02.2019 10:51 | 2360 | | | No | No | | | | | euro |
| 330738 | | | Ampliam complesso ospedaliero compreso complet adeg funz e collegam | | Default Value | | Running | euro | 10.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | | Via Coppino 26 | 10 - Information Phase | 22.02.2019 10:51 | 2359 | | | No | No | | | | | euro |
| 330737 | | | Lavori di ripristino SP 38 bis dal km 1,250 al km 4,600 | | Default Value | | Running | euro | 08.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Localita' Monte Pino | 10 - Information Phase | 22.02.2019 10:51 | 2358 | | | No | No | | | | | euro |
| 330736 | | | Ristrutturazione Chiesa San Ponziano e oratorio | | Default Value | | Running | euro | 01.02.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Localita' Poltu Quadu | 10 - Information Phase | 22.02.2019 10:51 | 2357 | | | No | No | | | | | euro |
| 330699-001 | | | HK5 / HSD/ COOPERATIVA SOLIDARNOSC PIRANESI | | Default Value | | Running | euro | 21.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20136 | Milano | Residential houses | Via Piranesi 18 | 30 - Tender & Submission Phase | 21.02.2019 18:30 | | | | No | No | | | | 33.550,00 € | euro |
| 330699 | | | COOPERATIVA SOLIDARNOSC PIRANESI | | Default Value | | Running | euro | 21.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20136 | Milano | | Via Piranesi 18 | 30 - Tender & Submission Phase | 21.02.2019 18:29 | | | | No | No | | | | 33.550,00 € | euro |
| 330697-002 | | | MBT/LE CASE DEL PRINCIPE / FONDO LEONE | | Default Value | | Running | euro | 16.01.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20155 | Milano | Residential houses | via Principe Eugenio 1-3-5 | 10 - Information Phase | 16.01.2020 13:44 | | | | No | No | | | | | euro |
| 330697-001 | | | HIT / LE CASE DEL PRINCIPE / FONDO LEONE | | Default Value | | Running | euro | 21.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20155 | Milano | Residential houses | via Principe Eugenio 1-3-5 | 40 - Realisation Phase | 21.02.2019 18:20 | | | | No | No | | | | 15.551,00 € | euro |
| 330697 | | | LE CASE DEL PRINCIPE / FONDO LEONE | | Default Value | | Running | euro | 21.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20155 | Milano | Residential houses | via Principe Eugenio 1-3-5 | 40 - Realisation Phase | 21.02.2019 18:17 | | | | No | No | | | | 15.551,00 € | euro |
| 330678 | | | Costruzione 8 edifici multip ad uso abitazione 75000 mc | | Default Value | | Running | euro | 28.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Vie Montecassino / Zucca | 10 - Information Phase | 21.02.2019 14:41 | 2356 | | | No | No | | | | | euro |
| 330677 | | | Costruzione nuovi loculi c/o cimitero di San Michele | | Default Value | | Running | euro | 20.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Piazza Dei Castellani | 10 - Information Phase | 21.02.2019 14:41 | 2355 | | | No | No | | | | | euro |
| 330676 | | | Concessione gestione conduzione impianto cremazione ammodern imp | | Default Value | | Running | euro | 20.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Piazza Dei Castellani | 10 - Information Phase | 21.02.2019 14:40 | 2354 | | | No | No | | | | | euro |
| 330675 | | | Riqual Padiglione Nervi ponte ciclopedonale sul canale San Bartolomeo | | Default Value | | Running | euro | 20.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Quartiere Sant'Elia | 10 - Information Phase | 21.02.2019 14:40 | 2353 | | | No | No | | | | | euro |
| 330674 | | | Lavori da eseguirsi nella zona ovest all'esterno area di security | | Default Value | | Running | euro | 13.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Porto | 10 - Information Phase | 21.02.2019 14:40 | 2352 | | | No | No | | | | | euro |
| 330673 | | | Ristrutturazione ed adeguamento asilo nido comunale | | Default Value | | Running | euro | 28.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09039 | VILLACIDRO | | Via Loru 19 | 10 - Information Phase | 21.02.2019 14:40 | 2351 | | | No | No | | | | | euro |
| 330672 | | | Lavori di riqualificazione di Viale Trieste | | Default Value | | Running | euro | 28.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09025 | SANLURI | Technical facilities | Viale Trieste | 10 - Information Phase | 21.02.2019 14:40 | 2350 | | | No | No | | | | | euro |
| 330671 | | | Manutenzione straordinaria campo di calcio e campo calcetto | | Default Value | | Running | euro | 28.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09020 | VILLAMAR | | Capoluogo | 10 - Information Phase | 21.02.2019 14:40 | 2349 | | | No | No | | | | | euro |
| 330670 | | | Ristrutt adeguam messa sicurezza scuola primaria e infanzia | | Default Value | | Running | euro | 05.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09013 | CARBONIA | | Via Mazzini | 10 - Information Phase | 21.02.2019 14:40 | 2348 | | | No | No | | | | | euro |
| 330669 | | | Rifacimento condotta foranea di approvvigionamento idrico | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09010 | SANTADI | Technical facilities | Centro Abitato | 10 - Information Phase | 21.02.2019 14:40 | 2347 | | | No | No | | | | | euro |
| 330668 | | | Costruzione alloggi ERP nei piano pilotis | | Default Value | | Running | euro | 04.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08100 | NUORO | Residential houses | Via G. Pinna / Viale S. Pertini | 10 - Information Phase | 21.02.2019 14:39 | 2346 | | | No | No | | | | | euro |
| 330667 | | | Riqualif ed incremento efficienza energetica centro sociale e biblioteca | | Default Value | | Running | euro | 12.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08040 | TRIEI | | Via Europa 6 | 10 - Information Phase | 21.02.2019 14:39 | 2345 | | | No | No | | | | | euro |
| 330665 | | | Ristrutt edificio Azienda Ottava Polo Agrario Veterinario Dip Agraria | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | | Viale Italia | 10 - Information Phase | 21.02.2019 14:39 | 2344 | | | No | No | | | | | euro |
| 330664 | | | Ristrutt edificio Polo Agrario Veterinario potenz didattica Dip Agraria | | Default Value | | Running | euro | 20.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07100 | SASSARI | | Viale Italia | 10 - Information Phase | 21.02.2019 14:39 | 2343 | | | No | No | | | | | euro |
| 330663 | | | Messa in sicurezza ed adeguamento scuola primaria | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Piazza Venezia Giulia B.ta Fertilia | 10 - Information Phase | 21.02.2019 14:39 | 2342 | | | No | No | | | | | euro |
| 330662 | | | Messa in sicurezza ed adeguamento norme scuola secondaria 1� grado Satta | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Via De Biase | 10 - Information Phase | 21.02.2019 14:39 | 2341 | | | No | No | | | | | euro |
| 330661 | | | Messa sicurezza ed adeguamento scuola primaria La Cunetta | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Via Mauro Manca | 10 - Information Phase | 21.02.2019 14:39 | 2340 | | | No | No | | | | | euro |
| 330660 | | | Messa sicurezza ed adeguamento scuola primaria Maria Immacolata | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Via Giovanni XXIII | 10 - Information Phase | 21.02.2019 14:38 | 2339 | | | No | No | | | | | euro |
| 330659 | | | Messa sicurezza adeguam norme vigenti scuola secondaria di primo grado | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Via Malta | 10 - Information Phase | 21.02.2019 14:38 | 2338 | | | No | No | | | | | euro |
| 330658 | | | Ripristino parti strutturali dell'hangar | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07041 | ALGHERO | Industry building | Aeroporto | 10 - Information Phase | 21.02.2019 14:38 | 2337 | | | No | No | | | | | euro |
| 330657 | | | Ristruttur e miglioramento funzionale campo sportivo Basilio Canu | | Default Value | | Running | euro | 11.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07036 | SENNORI | | Localita' Barisone | 10 - Information Phase | 21.02.2019 14:38 | 2336 | | | No | No | | | | | euro |
| 330655 | | | Completamento torre di controllo e servizi del porto turistico | | Default Value | | Running | euro | 28.09.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07021 | ARZACHENA | Technical facilities | Localita' Cannigione | 10 - Information Phase | 21.02.2019 14:38 | 2335 | | | No | No | | | | | euro |
| 330555 | | | Costruzione edificio residenziale | | Default Value | | Running | euro | 20.12.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Via Della Menta | 10 - Information Phase | 20.02.2019 15:03 | 2334 | | | No | No | | | | | euro |
| 330554 | | | Lavori di riqualificazione delle aree circostanti il capannone Nervi | | Default Value | | Running | euro | 19.12.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Zona Ovest del Porto | 10 - Information Phase | 20.02.2019 15:03 | 2333 | | | No | No | | | | | euro |
| 330553 | | | Risanamento ristrutturazione piano seminterrato per realizzaz uffici | | Default Value | | Running | euro | 30.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Via Is Mirrionis 195 | 10 - Information Phase | 20.02.2019 15:03 | 2332 | | | No | No | | | | | euro |
| 330551 | | | Recupero riqualif naturalistica paesagg aree degradate fascia costiera | | Default Value | | Running | euro | 08.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Technical facilities | Localita' Calamosca | 10 - Information Phase | 20.02.2019 15:03 | 2330 | | | No | No | | | | | euro |
| 330550 | | | Costruzione palazzina 3 pft per 23 appartamenti classe energetica A | | Default Value | | Running | euro | 17.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09100 | CAGLIARI | Residential houses | Via Delle Cicale | 10 - Information Phase | 20.02.2019 15:03 | 2329 | | | No | No | | | | | euro |
| 330549 | | | Ampliam museo civico Marongiu x musealizz patrimonio Mont'e Prama | | Default Value | | Running | euro | 21.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09072 | CABRAS | Technical facilities | Via Tharros | 10 - Information Phase | 20.02.2019 15:03 | 2328 | | | No | No | | | | | euro |
| 330548 | | | Programma di riqualificazione urbana Su Bixinau Antigu | | Default Value | | Running | euro | 28.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09036 | GUSPINI | Technical facilities | Vie Diaz / Ferracciu | 10 - Information Phase | 20.02.2019 15:03 | 2327 | | | No | No | | | | | euro |
| 330547 | | | Ristrutturazione e completam messa a norma palestra comunale | | Default Value | | Running | euro | 19.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09020 | SIDDI | | Via Cimitero | 10 - Information Phase | 20.02.2019 15:03 | 2326 | | | No | No | | | | | euro |
| 330546 | | | Manutenz pista di atletica e completam alcune parti della palestra | | Default Value | | Running | euro | 18.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09020 | VILLAMAR | | Via Cadello | 10 - Information Phase | 20.02.2019 15:03 | 2325 | | | No | No | | | | | euro |
| 330545 | | | Adeguam messa sicur svincolo Viale Villa Chiesa innesto SS 126 e 130 | | Default Value | | Running | euro | 09.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09016 | IGLESIAS | Technical facilities | S.S. 130 Viale Villa Di Chiesa | 10 - Information Phase | 20.02.2019 15:03 | 2324 | | | No | No | | | | | euro |
| 330544 | | | Completam centro sportivo polivalente sovracomunale Su Suergiu | | Default Value | | Running | euro | 24.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09012 | CAPOTERRA | | Via F. Serafini Loc. Su Suergiu | 10 - Information Phase | 20.02.2019 15:03 | 2323 | | | No | No | | | | | euro |
| 330543 | | | Costruzione 7 alloggi ERP in zona B2 | | Default Value | | Running | euro | 14.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08040 | OSINI | Residential houses | Circonvallazione Sud Ovest | 10 - Information Phase | 20.02.2019 15:02 | 2322 | | | No | No | | | | | euro |
| 330542 | | | Adeguam impianto sportivo polivalente stralcio funz sist campo sportivo | | Default Value | | Running | euro | 18.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 08020 | GALTELLI | | Capoluogo | 10 - Information Phase | 20.02.2019 15:02 | 2321 | | | No | No | | | | | euro |
| 330541 | | | Messa sicurezza ed adeguam norme vigenti scuola primaria Asfodelo | | Default Value | | Running | euro | 31.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07041 | ALGHERO | | Via Asfodelo | 10 - Information Phase | 20.02.2019 15:02 | 2320 | | | No | No | | | | | euro |
| 330540 | | | Ristrutturazione e miglioramento impianto sportivo La Piramide | | Default Value | | Running | euro | 30.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07037 | SORSO | | Via Puggioni | 10 - Information Phase | 20.02.2019 15:02 | 2319 | | | No | No | | | | | euro |
| 330539 | | | Lavori di restyling Piazza Mercato e parcheggio interrato | | Default Value | | Running | euro | 08.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07026 | OLBIA | Technical facilities | Piazza Mercato | 10 - Information Phase | 20.02.2019 15:02 | 2318 | | | No | No | | | | | euro |
| 330538 | | | Riqualif impianto atletica leggera ubicato nel complesso Fausto Noce | | Default Value | | Running | euro | 18.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07026 | OLBIA | | Localita' San Simplicio | 10 - Information Phase | 20.02.2019 15:02 | 2317 | | | No | No | | | | | euro |
| 330537 | | | Riqualif area denominata La Piccola primo lotto funzionale La Piazza | | Default Value | | Running | euro | 28.11.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07020 | GOLFO ARANCI | Technical facilities | Vie Liberta' / Cagliari / Sardegna | 10 - Information Phase | 20.02.2019 15:02 | 2316 | | | No | No | | | | | euro |
| 330536 | | | Completamento e messa a norma degli impianti sportivi comunali | | Default Value | | Running | euro | 24.10.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 07020 | BUDDUSO' | | Via Damiano Chiesa | 10 - Information Phase | 20.02.2019 15:02 | 2315 | | | No | No | | | | | euro |
| 330506 | | | Costruz piattaforma logistica 63500 mq uffici 1500 mq primo stralcio | | Default Value | | Running | euro | 24.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 46030 | SAN GIORGIO DI MANTOVA | Industry building | Via F. Ferretti | 10 - Information Phase | 20.02.2019 11:00 | 2314 | | | No | No | | | | | euro |
| 330505 | | | Costruzione residenza sanitaria assistenziale 120 posti letto | | Default Value | | Running | euro | 16.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27028 | SAN MARTINO SICCOMARIO | | Via Degli Ontani | 10 - Information Phase | 20.02.2019 11:00 | 2313 | | | No | No | | | | | euro |
| 330504 | | | TECHBAU / Costruzione polo logistico | | Default Value | | Running | euro | 20.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27010 | SIZIANO | Industry building | S.P. 40 | 10 - Information Phase | 20.02.2019 11:00 | 2312 | | | No | No | | | | | euro |
| 330503 | | | Ampliamento centro commerciale 13918 mq | | Default Value | | Running | euro | 17.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26865 | SAN ROCCO AL PORTO | Technical facilities | Via Emilia 100 | 10 - Information Phase | 20.02.2019 11:00 | 2311 | | | No | No | | | | | euro |
| 330499 | | | Torre logistica automatizzata refrigerata 29 mt 4321 mq e capannone serv | | Default Value | | Running | euro | 06.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26815 | MASSALENGO | Industry building | S.P. 23 Cascina Postino | 10 - Information Phase | 20.02.2019 11:00 | 2307 | | | No | No | | | | | euro |
| 330497 | | | Costruz sede aziendale Uffici e Magazz a temperatura controllata 18500 MQ | | Default Value | | Running | euro | 02.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26016 | SPINO D'ADDA | Technical facilities | Via Madonna del bosco | 10 - Information Phase | 20.02.2019 11:00 | 2305 | | | No | No | | | | | euro |
| 330494 | | | Costruzione 2 edifici commerciali 1057 mq + 2390 mq alimentari | | Default Value | | Running | euro | 24.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Viale Sant'Eufemia 109 | 10 - Information Phase | 20.02.2019 10:59 | 2302 | | | No | No | | | | | euro |
| 330493 | | | Costruzione capannone produttivo 2170 mq e palazzina uffici 386 mq | | Default Value | | Running | euro | 06.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25036 | PALAZZOLO SULL'OGLIO | Industry building | Via Lega Lombarda | 10 - Information Phase | 20.02.2019 10:59 | 2301 | | | No | No | | | | | euro |
| 330489 | | | Costruzione residence mini alloggi arredati ristorante bar | | Default Value | | Running | euro | 28.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via M. L. King | 10 - Information Phase | 20.02.2019 10:59 | 2297 | | | No | No | | | | | euro |
| 330488 | | | Ristrutturazione e ampliamento stadio calcio Atleti Azzurri D'Italia | | Default Value | | Running | euro | 24.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | | Viale Giulio Cesare 18 | 10 - Information Phase | 20.02.2019 10:59 | 2296 | | | No | No | | | | | euro |
| 330487 | | | Costruz supermercato Eurospin 2000 mq e 1 MSV non alimentare 3000 mq | | Default Value | | Running | euro | 28.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24068 | SERIATE | Technical facilities | Vie Nazionale / Fonderia Rumi | 10 - Information Phase | 20.02.2019 10:59 | 2295 | | | No | No | | | | | euro |
| 330486 | | | Ristrutt complesso industriale produz e nuova palazz uffici Serioplast | | Default Value | | Running | euro | 28.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24068 | SERIATE | Industry building | Via Comonte 15 Ex Frattini | 10 - Information Phase | 20.02.2019 10:59 | 2294 | | | No | No | | | | | euro |
| 330485 | | | Ampliamento aerostazione Lotto 4A Lato Est | | Default Value | | Running | euro | 14.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24050 | ORIO AL SERIO | Technical facilities | Aeroporto Il Caravaggio | 10 - Information Phase | 20.02.2019 10:59 | 2293 | | | No | No | | | | | euro |
| 330484 | | | Costruzione supermercato COOP ristorante distributore carburanti | | Default Value | | Running | euro | 14.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24047 | TREVIGLIO | Technical facilities | Largo La Marmora Ex Foro Boario | 10 - Information Phase | 20.02.2019 10:58 | 2292 | | | No | No | | | | | euro |
| 330480 | | | Costruzione supermercato 3083 mq + edificio terziario 510 mq | | Default Value | | Running | euro | 08.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22079 | VILLA GUARDIA | Technical facilities | Via Corsica 1 Ex Filtex | 10 - Information Phase | 20.02.2019 10:58 | 2288 | | | No | No | | | | | euro |
| 330479 | | | Costruzione (demoric) palasport Pallacanestro Cantu' | | Default Value | | Running | euro | 07.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22060 | CUCCIAGO | | Via Cantu' 10 Loc. Pianella | 10 - Information Phase | 20.02.2019 10:58 | 2287 | | | No | No | | | | | euro |
| 330478 | | | Ristrutturazione edificio per supermercato Carrefour 1500 mq | | Default Value | | Running | euro | 30.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Viale Belforte 7 Ex Enel | 10 - Information Phase | 20.02.2019 10:58 | 2286 | | | No | No | | | | | euro |
| 330477 | | | Costruzione parcheggio multipiano 4 piani 317 posti auto | | Default Value | | Running | euro | 21.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Vie Del Ponte / N. Bixio 32 | 10 - Information Phase | 20.02.2019 10:58 | 2285 | | | No | No | | | | | euro |
| 330474 | | | Costruzione 3 edifici 21 unita' abitative totale classe A4 | | Default Value | | Running | euro | 15.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21037 | LAVENA PONTE TRESA | Residential houses | Via Tarca | 10 - Information Phase | 20.02.2019 10:58 | 2282 | | | No | No | | | | | euro |
| 330473 | | | Costruz media struttura di vendita 11 negozi alloggi cohousing parco | | Default Value | | Running | euro | 31.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21027 | ISPRA | Residential houses | Vie Giuseppe Leva / Roma | 10 - Information Phase | 20.02.2019 10:58 | 2281 | | | No | No | | | | | euro |
| 330472 | | | Ampliamento nord del Terminal 1 | | Default Value | | Running | euro | 07.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21019 | SOMMA LOMBARDO | Technical facilities | Aeroporto Malpensa | 10 - Information Phase | 20.02.2019 10:58 | 2280 | | | No | No | | | | | euro |
| 330466 | | | Costruzione 4 edifici 85 appart totale classe A3 primo lotto 2 edifici | | Default Value | | Running | euro | 15.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20863 | CONCOREZZO | Residential houses | Via Dante 15 Ex Frette | 10 - Information Phase | 20.02.2019 10:57 | 2274 | | | No | No | | | | | euro |
| 330464 | | | Costruzione nuova sede magazzino 5000 mq e uffici | | Default Value | | Running | euro | 09.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20861 | BRUGHERIO | Technical facilities | Viale Della Vittoria | 10 - Information Phase | 20.02.2019 10:57 | 2272 | | | No | No | | | | | euro |
| 330463 | | | Costruzione 2 edifici 8+8 appartamenti e 4 ville bifamiliari | | Default Value | | Running | euro | 22.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20856 | CORREZZANA | Residential houses | Via J.e R. Kennedy 28 | 10 - Information Phase | 20.02.2019 10:57 | 2271 | | | No | No | | | | | euro |
| 330462 | | | Costruzione 2 palazzine ad uso abitazione 20 appartamenti totale | | Default Value | | Running | euro | 06.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20852 | VILLASANTA | Residential houses | Via Farina 3 | 10 - Information Phase | 20.02.2019 10:57 | 2270 | | | No | No | | | | | euro |
| 330461 | | | Costruzione palazzina uso abitazione 20 appart classe energetica A | | Default Value | | Running | euro | 06.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20852 | VILLASANTA | Residential houses | Vie F. Gioia / Don G. Galli | 10 - Information Phase | 20.02.2019 10:57 | 2269 | | | No | No | | | | | euro |
| 330456 | | | Riqualificaz edificio multip ad uso uffici denominato Palazzo Di Fuoco | | Default Value | | Running | euro | 19.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale Monza 2 | 10 - Information Phase | 20.02.2019 10:56 | 2264 | | | No | No | | | | | euro |
| 330455 | | | Costruzione edificio multipiano ad uso abitazione Lotto 1 | | Default Value | | Running | euro | 19.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Dei Canzi / Crespi Ex De Nora | 10 - Information Phase | 20.02.2019 10:56 | 2263 | | | No | No | | | | | euro |
| 330454 | | | Riqualificazione immobile ad uso direzionale | | Default Value | | Running | euro | 19.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazzale Lodi 3 | 10 - Information Phase | 20.02.2019 10:56 | 2262 | | | No | No | | | | | euro |
| 330452 | | | Recupero ex seminario per hotel ***** Lungarno Collection Hotels | | Default Value | | Running | euro | 12.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Venezia 11 / Via Sant'Andrea 10 | 10 - Information Phase | 20.02.2019 10:56 | 2260 | | | No | No | | | | | euro |
| 330451 | | | Costruzione edificio di social housing | | Default Value | | Running | euro | 12.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Stella Bianca | 10 - Information Phase | 20.02.2019 10:56 | 2259 | | | No | No | | | | | euro |
| 330448 | | | Costruzione 3 edifici ad uso abitazione di cui un edificio 14 piani ft | | Default Value | | Running | euro | 05.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Viale Suzzani 225 | 10 - Information Phase | 20.02.2019 10:56 | 2257 | | | No | No | | | | | euro |
| 330447 | | | Costruzione (demoric) torre residenz 25 piani 103 appart e 149 box | | Default Value | | Running | euro | 05.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Stresa 22/24 | 10 - Information Phase | 20.02.2019 10:56 | 2256 | | | No | No | | | | | euro |
| 330446 | | | Ristrutturaz ed adeguam funzionale complesso edilizio Universita' Studi | | Default Value | | Running | euro | 30.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Mercalli 23 | 10 - Information Phase | 20.02.2019 10:56 | 2255 | | | No | No | | | | | euro |
| 330442 | | | Costruz 3 edifici multip direzionali certific LEED GOOLD 31000 mq GLA | | Default Value | | Running | euro | 23.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Schievano | 30 - Tender & Submission Phase | 20.02.2019 10:55 | 2251 | | | No | No | | | | | euro |
| 330439 | | | Costruzione edificio scolastico classe energetica A4 | | Default Value | | Running | euro | 26.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Viscontini 7 | 30 - Tender & Submission Phase | 20.02.2019 10:55 | 2249 | | | No | No | | | | | euro |
| 330434 | | | Costruzione nuovo punto vendita 11000 mq coperti | | Default Value | | Running | euro | 08.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20016 | PERO | Technical facilities | S.S. 33 / Via V. Monti | 30 - Tender & Submission Phase | 20.02.2019 10:55 | 2244 | | | No | No | | | | | euro |
| 330418 | | | Costruzione complesso ad uso abitazione nuovo lotto | | Default Value | | Running | euro | 22.11.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 59100 | PRATO | Residential houses | Via G. Pascoli | 10 - Information Phase | 20.02.2019 09:58 | 2243 | | | No | No | | | | | euro |
| 330417 | | | Costruzione nuovo resort **** 112 camere | | Default Value | | Running | euro | 14.11.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 58022 | FOLLONICA | Technical facilities | Viale Italia 315 | 10 - Information Phase | 20.02.2019 09:58 | 2242 | | | No | No | | | | | euro |
| 330416 | | | Costruzione ipermercato Conad 5500 mq 1 MSV 2500 mq Uffici 7500 mq | | Default Value | | Running | euro | 26.10.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 57023 | CECINA | Technical facilities | S.R. 68 Svincolo Cecina Nord | 10 - Information Phase | 20.02.2019 09:58 | 2241 | | | No | No | | | | | euro |
| 330415 | | | Costruzione mensa centralizzata a servizio scuole secondo stralcio | | Default Value | | Running | euro | 19.12.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 53035 | MONTERIGGIONI | Technical facilities | Localita' San Martino | 10 - Information Phase | 20.02.2019 09:58 | 2240 | | | No | No | | | | | euro |
| 330414 | | | Costruzione 4 palazzine 2 piani per 16 unita' abitative totale | | Default Value | | Running | euro | 07.11.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 52028 | TERRANUOVA BRACCIOLINI | Residential houses | PEEP Il Poderino | 10 - Information Phase | 20.02.2019 09:58 | 2239 | | | No | No | | | | | euro |
| 330413 | | | Costruzione nuova scuola primaria Localita' Stazione | | Default Value | | Running | euro | 14.12.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 51037 | MONTALE | | Vie Pacinotti / Compietra | 10 - Information Phase | 20.02.2019 09:58 | 2238 | | | No | No | | | | | euro |
| 330412 | | | Messa in sicurezza restauro e risanamento ex Monastero Sant'Orsola | | Default Value | | Running | euro | 15.11.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Via Sant'Orsola | 10 - Information Phase | 20.02.2019 09:58 | 2237 | | | No | No | | | | | euro |
| 330411 | | | Costruzione albergo housing sociale negozi uffici | | Default Value | | Running | euro | 14.11.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | Technical facilities | Viale Belfiore Ex Fiat | 10 - Information Phase | 20.02.2019 09:57 | 2236 | | | No | No | | | | | euro |
| 330410 | | | Costruzione (demoric) supermercato MD 1650 mq | | Default Value | | Running | euro | 26.10.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50054 | FUCECCHIO | Technical facilities | Vie Dante / Saettino | 10 - Information Phase | 20.02.2019 09:57 | 2235 | | | No | No | | | | | euro |
| 330409 | | | Costruzione complesso residenziale 4900 mq negozi 380 mq e parco | | Default Value | | Running | euro | 18.10.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50053 | EMPOLI | Residential houses | Vie Convento / Bottego | 10 - Information Phase | 20.02.2019 09:57 | 2234 | | | No | No | | | | | euro |
| 330408 | | | Costruzione edificio uso commerciale market 300 mq negozi ristorante | | Default Value | | Running | euro | 14.11.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50051 | CASTELFIORENTINO | Technical facilities | Via XX Settembre | 10 - Information Phase | 20.02.2019 09:57 | 2233 | | | No | No | | | | | euro |
| 330407 | | | Costruzione nuova scuola primaria secondo lotto | | Default Value | | Running | euro | 25.10.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50050 | CERRETO GUIDI | | Via Ildebrandino Loc. Caracosta | 10 - Information Phase | 20.02.2019 09:57 | 2232 | | | No | No | | | | | euro |
| 330406 | | | Completamento complesso al rustico per 170 alloggi di social housing | | Default Value | | Running | euro | 09.11.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50019 | SESTO FIORENTINO | Residential houses | Via Della Pace | 10 - Information Phase | 20.02.2019 09:57 | 2231 | | | No | No | | | | | euro |
| 330405 | | | Costruzione villetta plurifamiliare Lotto A1-2 | | Default Value | | Running | euro | 29.11.2018 | | IUMB-UMBRIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 06073 | CORCIANO | Residential houses | Via Adolfo Venturi | 10 - Information Phase | 20.02.2019 09:57 | 2230 | | | No | No | | | | | euro |
| 329676 | | | Esecuzione lavori relativi all'interconnessione TAP secondo tronco | | Default Value | | Running | euro | 23.11.2018 | | IPUG-PUGLIA | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 73026 | MELENDUGNO | Technical facilities | Localita' diverse | 10 - Information Phase | 11.02.2019 11:13 | 2229 | | | No | No | | | | | euro |
| 329675 | | | Esecuzione lavori relativi interconnessione TAP primo+secondo tronco | | Default Value | | Running | euro | 23.11.2018 | | IPUG-PUGLIA | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 73026 | MELENDUGNO | Technical facilities | Localita' diverse | 10 - Information Phase | 11.02.2019 11:13 | 2228 | | | No | No | | | | | euro |
| 329670 | | | Sistema integrato viabilita' con parcheggio interrato multipiano | | Default Value | | Running | euro | 21.11.2018 | | IMOL-MOLISE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 86039 | TERMOLI | Technical facilities | Piazza Sant'Antonio | 10 - Information Phase | 11.02.2019 10:56 | 2227 | | | No | No | | | | | euro |
| 329669 | | | Costruzione immobile per sede Comando Prov Corpo Forestale Stato | | Default Value | | Running | euro | 06.12.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67100 | L'AQUILA | | Localita' Polveriera | 10 - Information Phase | 11.02.2019 10:56 | 2226 | | | No | No | | | | | euro |
| 329668 | | | Costruzione nuovo polo scolastico scuole infanzia elementare media | | Default Value | | Running | euro | 23.11.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67035 | PRATOLA PELIGNA | | S.P. 10 Via Per Prezza | 10 - Information Phase | 11.02.2019 10:56 | 2225 | | | No | No | | | | | euro |
| 329667 | | | Costruzione supermercato Eurospin Lazio 1200 mq | | Default Value | | Running | euro | 20.12.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 66100 | CHIETI | Technical facilities | Macrozona 21 | 10 - Information Phase | 11.02.2019 10:56 | 2224 | | | No | No | | | | | euro |
| 329666 | | | Costruzione 2 edifici a torre 120 appart totale e piastra commerciale | | Default Value | | Running | euro | 14.12.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 65100 | PESCARA | Residential houses | Via Italica Ex Fater | 10 - Information Phase | 11.02.2019 10:56 | 2223 | | | No | No | | | | | euro |
| 329625-001 | | | REALIZZAZIONE DI COMPLESSO RESIDENZIALE VIA PIANI D'ISARCO BOLZANO / HDB | | Default Value | | Running | euro | 08.02.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Via piani d'Iisarco | 30 - Tender & Submission Phase | 08.02.2019 15:53 | | | | No | No | | | | 15.000,00 € | euro |
| 329625 | | | REALIZZAZIONE DI COMPLESSO RESIDENZIALE VIA PIANI D'ISARCO BOLZANO | | Default Value | | Running | euro | 08.02.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Via piani d'Iisarco | 10 - Information Phase | 08.02.2019 15:53 | | | | No | No | | | | 15.000,00 € | euro |
| 329523-002 | | | HTA / NUOVO ISTITUTO ORTOPEDICO GALEAZZI | | Default Value | | Running | euro | 15.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20157 | Milano | Medical facility | via Cristina Belgioioso | 40 - Realisation Phase | 15.07.2019 13:11 | | | | No | No | | | | 4.014,00 € | euro |
| 329523-001 | | | HDB / NUOVO ISTITUTO ORTOPEDICO GALEAZZI | | Default Value | | Running | euro | 07.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20157 | Milano | Medical facility | via Cristina Belgioioso | 40 - Realisation Phase | 07.02.2019 14:04 | | | | No | No | | | | 5.828,00 € | euro |
| 329523 | | | NUOVO ISTITUTO ORTOPEDICO GALEAZZI | | Default Value | | Running | euro | 07.02.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20157 | Milano | Medical facility | via Cristina Belgioioso | 40 - Realisation Phase | 07.02.2019 14:03 | | | | No | No | | | | 9.842,00 € | euro |
| 329378-001 | | | CONVENTO SANT'ORSOLA / FIRENZE / UMA | | Default Value | | Running | euro | 06.02.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | X | 10 - Information Phase | 06.02.2019 08:35 | | | | No | No | | | | | euro |
| 329378 | | | CONVENTO SANT'ORSOLA / FIRENZE | | Default Value | | Running | euro | 06.02.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | X | 10 - Information Phase | 06.02.2019 08:34 | | | | No | No | | | | | euro |
| 328565 | | | ICI COOP (CLEA CONC) / RESIDENZA UNIVERSITARIA EDIF E / MESTRE / | | Default Value | | Running | euro | 24.01.2019 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 30171 | Mestre | Educational facility | VIA TORINO | 40 - Realisation Phase | 24.01.2019 14:18 | | | | No | No | | | | 25.000,00 € | euro |
| 328103-001 | | | NUOVO COMPLESSO RESIDENZIALE DODICIVILLE(BZ) / HDB | | Default Value | | Running | euro | 18.01.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | Residential houses | X | 10 - Information Phase | 18.01.2019 09:31 | | | | No | No | | | | | euro |
| 328103 | | | NUOVO COMPLESSO RESIDENZIALE DODICIVILLE(BZ) | | Default Value | | Running | euro | 18.01.2019 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | Residential houses | X | 10 - Information Phase | 18.01.2019 09:28 | | | | No | No | | | | | euro |
| 327521 | | | RIORGANIZZAZIONE DELLA DEPURAZIONE INDUSTRIALE DEL COMPRENSORIO DEL CUOIO | | Default Value | | Running | euro | 10.01.2019 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 56029 | Santa Croce sull'Arno | | * | 10 - Information Phase | 10.01.2019 09:40 | | | | No | No | | | | | euro |
| 326818-001 | | | PRYSMIAN GROUP (FIBBRA OTTICA) / BATTIPAGLIA / HBT | | Default Value | | Running | euro | 18.12.2018 | | ICAM-CAMPANIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 84091 | Battipaglia | | * | 40 - Realisation Phase | 18.12.2018 09:31 | | | | No | No | | | | 10.000,00 € | euro |
| 326818 | | | PRYSMIAN GROUP (FIBBRA OTTICA) / BATTIPAGLIA | | Default Value | | Running | euro | 18.12.2018 | | ICAM-CAMPANIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 84091 | Battipaglia | | * | 40 - Realisation Phase | 18.12.2018 09:31 | | | | No | No | | | | 10.000,00 € | euro |
| 326748 | | | LEITNER / VIPITENO | | Default Value | | Running | euro | 17.12.2018 | | ITRE-TRENTINO ALTO ADIGE | Marco Testa | | | | | Project | Halfen System Account | Italy | 39049 | VIPITENO (BZ) | | X | 10 - Information Phase | 17.12.2018 09:57 | | | | No | No | | | | | euro |
| 326697-003 | | | MILANO CITY VILLAGE / MILANO / HDB | | Default Value | | Running | euro | 19.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20137 | Milano | Residential houses | Via Cornelio Tacito 10/14 | 40 - Realisation Phase | 19.05.2020 16:08 | | | | No | No | | | | | euro |
| 326697-002 | | | MILANO CITY VILLAGE / MILANO / HIT | | Default Value | | Running | euro | 19.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20137 | Milano | Residential houses | Via Cornelio Tacito 10/14 | 40 - Realisation Phase | 19.05.2020 16:04 | | | | No | No | | | | | euro |
| 326697-001 | | | MILANO CITY VILLAGE / MILANO / HSD | | Default Value | | Running | euro | 14.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20137 | Milano | | Via Cornelio Tacito 10/14 | 40 - Realisation Phase | 14.12.2018 10:12 | | | | No | No | | | | 65.000,00 € | euro |
| 326697 | | | MILANO CITY VILLAGE / MILANO | | Default Value | | Running | euro | 14.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20137 | Milano | | Via Cornelio Tacito 10/14 | 20 - Planning Phase | 14.12.2018 10:11 | | | | No | No | | | | 65.000,00 € | euro |
| 326450-001 | | | RIFACIMENTO PIAZZALE CARRABILE - CHIETI / GIUNTI CARRABILI IMPERMEABILI | | Default Value | | Running | euro | 10.12.2018 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Opportunity | Halfen System Account | Italy | 66100 | Chieti | | CHIETI | 10 - Information Phase | 10.12.2018 18:17 | | | | No | No | | | | | euro |
| 326450 | | | RIFACIMENTO PIAZZALE CARRABILE - CHIETI | | Default Value | | Running | euro | 10.12.2018 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 66100 | Chieti | | CHIETI | 10 - Information Phase | 10.12.2018 18:15 | | | | No | No | | | | | euro |
| 326427-001 | | | RESIDENZE E AUTORIMESSA G&B / VIALE UMBRIA / HIT | | Default Value | | Running | euro | 10.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20135 | Milano | Residential houses | Viale Umbria 128 | 30 - Tender & Submission Phase | 10.12.2018 13:53 | | | | No | No | | | | 9.353,00 € | euro |
| 326427 | | | RESIDENZE E AUTORIMESSA G&B / VIALE UMBRIA | | Default Value | | Running | euro | 10.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20135 | Milano | Residential houses | Viale Umbria 128 | 20 - Planning Phase | 10.12.2018 13:50 | | | | No | No | | | | 9.353,00 € | euro |
| 326224-001 | | | progetto EFFEGI stabilimento / zanche TPA-FS 4t | | Default Value | | Running | euro | 05.12.2018 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Opportunity | Halfen System Account | Italy | 03013 | Ferentino | Industry building | Via Mola Bracaglia, 2 | 40 - Realisation Phase | 05.12.2018 15:53 | | | | No | No | | | | | euro |
| 326152 | | | PENSILINA PORTA VOLTA VIA CERESIO MILANO | | Default Value | | Running | euro | 05.12.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20154 | Milano | Office building | via Ceresio | 40 - Realisation Phase | 05.12.2018 08:45 | | | | No | No | | | | | euro |
| 325886-001 | | | STUDENTATO / VIA GIOVENALE 15 MILANO / HIT | | Default Value | | Running | euro | 30.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20136 | Milano | Residential houses | Giovenale | 40 - Realisation Phase | 30.11.2018 10:49 | | | | No | No | | | | 27.540,00 € | euro |
| 325886 | | | RESIDENZIALE ALER / VIA GIOVENALE MILANO | | Default Value | | Running | euro | 30.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20136 | Milano | | Giovenale | 30 - Tender & Submission Phase | 30.11.2018 10:47 | | | | No | No | | | | 27.540,00 € | euro |
| 325359-001 | | | REALIZZAZIONE DI UNA STRUTTURA PREFABBRICATA A DESTINAZIONE D'USO DI SEDE MUNICIPALE / TORRICELLA SICURA / HCC | | Default Value | | Running | euro | 21.11.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Opportunity | Halfen System Account | Italy | 64010 | Torricella Sicura | | * | 30 - Tender & Submission Phase | 21.11.2018 17:13 | | | | No | No | | | | 25.000,00 € | euro |
| 325359 | | | REALIZZAZIONE DI UNA STRUTTURA PREFABBRICATA A DESTINAZIONE D'USO DI SEDE MUNICIPALE / TORRICELLA SICURA | | Default Value | | Running | euro | 21.11.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 64010 | Torricella Sicura | | * | 10 - Information Phase | 21.11.2018 17:11 | | | | No | No | | | | 25.000,00 € | euro |
| 325092-001 | | | CENTRO PER LE BIOTECNOLOGIE E LA RICERCA BIOMEDICA DELLA FONDAZIONE RI.MED / CARINI / GIUNTI / HIT | | Default Value | | Running | euro | 19.11.2018 | 17.07.2019 | ISIC-SICILIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 90044 | Carini | | * | 30 - Tender & Submission Phase | 19.11.2018 15:00 | | | | No | No | | | | | euro |
| 325092 | | | CENTRO PER LE BIOTECNOLOGIE E LA RICERCA BIOMEDICA DELLA FONDAZIONE RI.MED / CARINI | | Default Value | | Running | euro | 19.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90044 | Carini | | * | 10 - Information Phase | 19.11.2018 14:59 | | | | No | No | | | | | euro |
| 324816 | | | Costruzione scuola secondaria di primo grado | | Default Value | | Running | euro | 20.09.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56040 | CRESPINA LORENZANA | | Localita' Valdisonzi | 10 - Information Phase | 14.11.2018 14:14 | 2221 | | | No | No | | | | | euro |
| 324815 | | | Riqualificazione ed ampliamento scuola dell'infanzia | | Default Value | | Running | euro | 05.10.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56033 | CAPANNOLI | | Via P. Togliatti 17 | 10 - Information Phase | 14.11.2018 14:13 | 2220 | | | No | No | | | | | euro |
| 324814 | | | Costruzione supermercato Conad 1200 mq e galleria negozi 300 mq | | Default Value | | Running | euro | 05.10.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56029 | SANTA CROCE SULL'ARNO | Technical facilities | Via Caravaggio | 10 - Information Phase | 14.11.2018 14:13 | 2219 | | | No | No | | | | | euro |
| 324813 | | | Costruzione scuola secondaria primo lotto blocco aule | | Default Value | | Running | euro | 19.09.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55025 | COREGLIA ANTELMINELLI | | Localita' Ghivizzano | 10 - Information Phase | 14.11.2018 14:13 | 2218 | | | No | No | | | | | euro |
| 324812 | | | Adeguam sismico e ristrutt igienico sanitaria scuola primaria | | Default Value | | Running | euro | 04.10.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55023 | BORGO A MOZZANO | | Via San Francesco | 10 - Information Phase | 14.11.2018 14:13 | 2217 | | | No | No | | | | | euro |
| 324811 | | | Riqualificazione e adeguamento sismico scuola materna | | Default Value | | Running | euro | 12.09.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55023 | BORGO A MOZZANO | | Localita' Valdottavo | 10 - Information Phase | 14.11.2018 14:13 | 2216 | | | No | No | | | | | euro |
| 324810 | | | Costruzione scuola primaria | | Default Value | | Running | euro | 11.10.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 52044 | CORTONA | | Localita' Camucia | 10 - Information Phase | 14.11.2018 14:13 | 2215 | | | No | No | | | | | euro |
| 324809 | | | Costruzione (demoric) 2 palazzine 18 appartamenti classe A4 | | Default Value | | Running | euro | 26.09.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | Vie Manni 71 / Del Bargeo | 10 - Information Phase | 14.11.2018 14:13 | 2214 | | | No | No | | | | | euro |
| 324808 | | | Opere di adeguamento sismico scuola primaria Gabriella De Majo | | Default Value | | Running | euro | 27.09.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50060 | PELAGO | | Via Vittorio Emanuele 24 | 10 - Information Phase | 14.11.2018 14:13 | 2213 | | | No | No | | | | | euro |
| 324807 | | | Costruz 15 edifici bifamiliari e quadrifam 39 unita' abitative totale | | Default Value | | Running | euro | 10.10.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50054 | FUCECCHIO | Residential houses | Via Banti | 10 - Information Phase | 14.11.2018 14:13 | 2212 | | | No | No | | | | | euro |
| 324806 | | | Costruz edifici residenziali 5000 mq direzionale commerciale 1300 mq | | Default Value | | Running | euro | 27.09.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50053 | EMPOLI | Residential houses | Vie Tripoli / Ricasoli Ex Vitrum | 10 - Information Phase | 14.11.2018 14:12 | 2211 | | | No | No | | | | | euro |
| 324805 | | | Costruzione scuola materna | | Default Value | | Running | euro | 11.10.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50021 | BARBERINO VAL D'ELSA | | Localita' Marcialla | 10 - Information Phase | 14.11.2018 14:12 | 2210 | | | No | No | | | | | euro |
| 324804 | | | Costruzione nuova scuola media Carducci Purgotti | | Default Value | | Running | euro | 12.09.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06100 | PERUGIA | | Via Fonti Coperte 50 | 10 - Information Phase | 14.11.2018 14:12 | 2209 | | | No | No | | | | | euro |
| 324803 | | | Costruzione parco commerciale 5000 mq prima fase OO UU | | Default Value | | Running | euro | 13.09.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06059 | TODI | Technical facilities | S.S. 79 Localita' Ponte Rio | 10 - Information Phase | 14.11.2018 14:12 | 2208 | | | No | No | | | | | euro |
| 324802 | | | Adeguamento sismico scuola secondaria primo grado Cocchi Aosta | | Default Value | | Running | euro | 28.09.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06054 | FRATTA TODINA | | Via Della Barca 16 | 10 - Information Phase | 14.11.2018 14:12 | 2207 | | | No | No | | | | | euro |
| 324786-001 | | | EDILFERRI / PRASSICOOP / MILANO / HIT OTX | | Default Value | | Running | euro | 14.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20121 | Milano | Residential houses | Via Privata Andrea Vochieri | 40 - Realisation Phase | 14.11.2018 12:34 | | | | No | No | | | | | euro |
| 324786 | | | EDILFERRI / PRASSICOOP / MILANO | | Default Value | | Running | euro | 14.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20121 | Milano | Residential houses | Via Privata Andrea Vochieri | 30 - Tender & Submission Phase | 14.11.2018 12:33 | | | | No | No | | | | | euro |
| 324582-003 | | | SPARK ONE / FASE 2 / SANTA GIULIA / HZM | | Default Value | | Running | euro | 26.05.2020 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20138 | Milano | Office building | Via Kuigi Russolo | 40 - Realisation Phase | 26.05.2020 06:56 | | | | No | No | | | | | euro |
| 324582-002 | | | HSD-CRET / SPARK ONE / FASE 2 / SANTA GIULIA | | Default Value | | Running | euro | 13.11.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20138 | Milano | Office building | Via Kuigi Russolo | 40 - Realisation Phase | 13.11.2019 17:00 | | | | No | No | | | | 22.000,00 € | euro |
| 324582-001 | | | SPARK ONE / FASE 2 / SANTA GIULIA / HDB / HSD / DEMU | | Default Value | | Running | euro | 12.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20138 | Milano | Office building | Via Luigi Russolo | 40 - Realisation Phase | 12.11.2018 09:58 | | | | No | No | | | | 56.941,00 € | euro |
| 324582 | | | SPARK ONE / FASE 2 / SANTA GIULIA | | Default Value | | Running | euro | 12.11.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20138 | Milano | Office building | Via Kuigi Russolo | 40 - Realisation Phase | 12.11.2018 09:56 | | | | No | No | | | | 78.941,00 € | euro |
| 324441-001 | | | CASERMA CASCINO / PALERMO / HIT | | Default Value | | Running | euro | 08.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 90100 | PALERMO | | X | 10 - Information Phase | 08.11.2018 11:58 | | | | No | No | | | | | euro |
| 324441 | | | CASERMA CASCINO / PALERMO | | Default Value | | Running | euro | 08.11.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 90100 | PALERMO | | X | 10 - Information Phase | 08.11.2018 11:57 | | | | No | No | | | | | euro |
| 323595-001 | | | Costruz (demoric) complesso parrocchiale San Lorenzo Diacono Martire/Pegognaga/HK4 | | Default Value | | Running | euro | 27.09.2019 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 46020 | PEGOGNAGA | Technical facilities | Piazza G. Matteotti | 40 - Realisation Phase | 27.09.2019 15:46 | 2206 | | | No | No | | | | | euro |
| 323591 | | | Costruzione 2 edifici commerciali 1057 mq + 2390 mq alimentari | | Default Value | | Running | euro | 26.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25100 | BRESCIA | Technical facilities | Viale Sant'Eufemia 109 | 10 - Information Phase | 24.10.2018 14:31 | 2203 | | | No | No | | | | | euro |
| 323588 | | | Realizzazione centro termale di benessere Project Financing | | Default Value | | Running | euro | 21.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25056 | PONTE DI LEGNO | Technical facilities | Piazzale Europa | 10 - Information Phase | 24.10.2018 14:30 | 2200 | | | No | No | | | | | euro |
| 323587 | | | Costruzione supermercato Iperal 3000 mq | | Default Value | | Running | euro | 04.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25050 | SONICO | Technical facilities | Vie Nazionale / Mu' | 10 - Information Phase | 24.10.2018 14:30 | 2199 | | | No | No | | | | | euro |
| 323586 | | | Riqualificaz e ampliamento scuola primaria Benedetta Bianchi Porro | | Default Value | | Running | euro | 28.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25019 | SIRMIONE | | Via XXIV Maggio 15 | 10 - Information Phase | 24.10.2018 14:30 | 2198 | | | No | No | | | | | euro |
| 323585 | | | Costruzione 2 edifici 25 appartamenti classe A uffici e negozi | | Default Value | | Running | euro | 26.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via V. Ghislandi 10 | 10 - Information Phase | 24.10.2018 14:30 | 2197 | | | No | No | | | | | euro |
| 323584 | | | Realizzazione campus scolastico scuola media primo lotto | | Default Value | | Running | euro | 03.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24046 | OSIO SOTTO | | Via Liberta' / Piazza Caduti | 10 - Information Phase | 24.10.2018 14:30 | 2196 | | | No | No | | | | | euro |
| 323577 | | | Costruzione 4 palazzine ad uso abitazione classe A++ | | Default Value | | Running | euro | 26.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23868 | VALMADRERA | Residential houses | Via G. Parini Localita' Pare' | 10 - Information Phase | 24.10.2018 14:29 | 2189 | | | No | No | | | | | euro |
| 323575 | | | Costruzione (demoric) edificio ad uso abitazione negozi e box | | Default Value | | Running | euro | 26.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21047 | SARONNO | Residential houses | Piazza Aviatori D'Italia 13 | 10 - Information Phase | 24.10.2018 14:29 | 2187 | | | No | No | | | | | euro |
| 323574 | | | Ampliamento stabilimento produzione magazzino uffici 8000 mq | | Default Value | | Running | euro | 14.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21020 | BODIO LOMNAGO | Industry building | Via L. Galvani 1 | 10 - Information Phase | 24.10.2018 14:29 | 2186 | | | No | No | | | | | euro |
| 323571 | | | Costruzione complesso ad uso abitazione 60 appartamenti classe A | | Default Value | | Running | euro | 20.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20861 | BRUGHERIO | Residential houses | Via G. Garibaldi 30 | 10 - Information Phase | 24.10.2018 14:29 | 2183 | | | No | No | | | | | euro |
| 323568 | | | Costruzione torre direzionale nuova sede UnipolSai | | Default Value | | Running | euro | 10.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie M. Gioia / F.lli Castiglioni | 10 - Information Phase | 24.10.2018 14:28 | 2180 | | | No | No | | | | 1.146,00 € | euro |
| 323567 | | | Recupero ex fabbrica Borletti ad uso residenziale | | Default Value | | Running | euro | 05.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Piazza Irnerio 18 | 10 - Information Phase | 24.10.2018 14:28 | 2179 | | | No | No | | | | | euro |
| 323566 | | | Costruzione 3 edifici multip 100 appartam totale primo lotto fondazioni | | Default Value | | Running | euro | 04.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via A. Spinola Ex Fiera | 10 - Information Phase | 24.10.2018 14:28 | 2178 | | | No | No | | | | | euro |
| 323565 | | | Costruzione torre direzionale 26 piani fuori terra 68432 mq | | Default Value | | Running | euro | 21.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via M. Gioia 22 | 10 - Information Phase | 24.10.2018 14:28 | 2177 | | | No | No | | | | | euro |
| 323564 | | | Costruzione edificio 6 pft uso abitaz 60 appartamenti classe A e 48 box | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Giudice M. Donadoni 16 | 10 - Information Phase | 24.10.2018 14:28 | 2176 | | | No | No | | | | | euro |
| 323563 | | | Costruz complesso edifici (uno a torre 67 mt) ad uso uffici Leed Gold | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Gattamelata 30 | 10 - Information Phase | 24.10.2018 14:28 | 2175 | | | No | No | | | | | euro |
| 323562 | | | Costruzione 2 edifici a torre di edilizia residenziale convenzionata | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G.W. Daimler | 10 - Information Phase | 24.10.2018 14:28 | 2174 | | | No | No | | | | | euro |
| 323561 | | | Costruzione 2 edifici a torre di edilizia residenziale convenzionata | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G.W. Daimler | 10 - Information Phase | 24.10.2018 14:28 | 2173 | | | No | No | | | | | euro |
| 323560 | | | Costruzione supermercato | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale E. Bezzi 69 | 10 - Information Phase | 24.10.2018 14:28 | 2172 | | | No | No | | | | | euro |
| 323559 | | | Costruzione edificio multip 60 appartamenti e box classe A | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Matilde Serao 1 | 10 - Information Phase | 24.10.2018 14:28 | 2171 | | | No | No | | | | | euro |
| 323558 | | | Costruzione palazzina ad uso abitazione e box | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Canella 4/6 | 10 - Information Phase | 24.10.2018 14:28 | 2170 | | | No | No | | | | | euro |
| 323557 | | | Costruzione complesso ad uso abitazione social housing | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G.E. Pestalozzi 18 | 10 - Information Phase | 24.10.2018 14:27 | 2169 | | | No | No | | | | | euro |
| 323556 | | | Lavori di riqualificazione Torre Direzionale C 15 piani fuori terra | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale Richard | 10 - Information Phase | 24.10.2018 14:27 | 2168 | | | No | No | | | | | euro |
| 323555 | | | Costruzione edificio ad uso abitazione e box | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Verona 5 Ex ATM | 10 - Information Phase | 24.10.2018 14:27 | 2167 | | | No | No | | | | | euro |
| 323551 | | | Costruzione nuovo Campus di Architettura 4200 mq | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via E. Bonardi | 10 - Information Phase | 24.10.2018 14:27 | 2163 | | | No | No | | | | | euro |
| 323549 | | | Completamento RSA 100 posti centro diurno 18 alloggi protetti | | Default Value | | Running | euro | 19.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Adriano 96 | 10 - Information Phase | 24.10.2018 14:27 | 2161 | | | No | No | | | | | euro |
| 323548 | | | Costruzione edificio residenziale denominato Corte Verde | | Default Value | | Running | euro | 12.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via San Cristoforo | 10 - Information Phase | 24.10.2018 14:27 | 2160 | | | No | No | | | | | euro |
| 323547 | | | Ristrutturazione torre uffici 16500 mq + nuovo edificio 4500 mq | | Default Value | | Running | euro | 12.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via N. Bonnet 8/10 | 10 - Information Phase | 24.10.2018 14:26 | 2159 | | | No | No | | | | | euro |
| 323546 | | | Costruz centro comm Lotto A 84000 mq e centro direz Lotto B 35000 mq | | Default Value | | Running | euro | 10.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20092 | CINISELLO BALSAMO | Technical facilities | Via Ciro Menotti | 10 - Information Phase | 24.10.2018 14:26 | 2158 | | | No | No | | | | | euro |
| 323545 | | | Costruz stabilimento industriale trasformaz carta e cartone 50000 mq | | Default Value | | Running | euro | 03.10.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20056 | GREZZAGO | Industry building | Strada Caldera Casello A4 | 10 - Information Phase | 24.10.2018 14:26 | 2157 | | | No | No | | | | | euro |
| 323543 | | | Costruzione 2 palazzine 56 appartamenti + 4 ville unifamiliari NZEB | | Default Value | | Running | euro | 14.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20024 | GARBAGNATE MILANESE | Residential houses | Via Roma 94 | 10 - Information Phase | 24.10.2018 14:26 | 2155 | | | No | No | | | | | euro |
| 323542 | | | Costruz impianto di recupero FORSU per produzione biometano 12000 mq | | Default Value | | Running | euro | 14.09.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20010 | MARCALLO CON CASONE | Industry building | Via Boffalora | 10 - Information Phase | 24.10.2018 14:26 | 2154 | | | No | No | | | | | euro |
| 323507 | | | Costruzione casa di cura 80 posti letto poliambulatorio 1180 mq | | Default Value | | Running | euro | 12.09.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62100 | MACERATA | | Via A. Nuzi 1 | 10 - Information Phase | 24.10.2018 10:16 | 2153 | | | No | No | | | | | euro |
| 323505 | | | Restauro consolidamento e recupero scuola elementare De Amicis | | Default Value | | Running | euro | 04.10.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67100 | L'AQUILA | | Piazza San Bernardino | 10 - Information Phase | 24.10.2018 10:10 | 5152 | | | No | No | | | | | euro |
| 323504 | | | Costruzione polo scolastico materna ed elementare Riappalto Lavori | | Default Value | | Running | euro | 04.10.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 66050 | SAN SALVO | | Capoluogo | 10 - Information Phase | 24.10.2018 10:09 | 2151 | | | No | No | | | | | euro |
| 323040-002 | | | CARRON/NUOVO OSPEDALE/FERMO / HUC | | Default Value | | Running | euro | 02.03.2021 | | IMAR-MARCHE | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 10060 | Campiglione | | * | 40 - Realisation Phase | 02.03.2021 13:29 | | | | No | No | | | | | euro |
| 323040-001 | | | CARRON/NUOVO OSPEDALE/ FERMO / HSD | | Default Value | | Running | euro | 17.10.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Opportunity | Halfen System Account | Italy | 10060 | Campiglione | | * | 10 - Information Phase | 17.10.2018 15:52 | | | | No | No | | | | | euro |
| 323040 | | | CARRON/NUOVO OSPEDALE/FERMO | | Default Value | | Running | euro | 17.10.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 10060 | Campiglione | | * | 10 - Information Phase | 17.10.2018 15:52 | | | | No | No | | | | | euro |
| 322378-001 | | | COSTRUZIONE DI UN EDIFICIO PROVINCIALE PER LA RIPARTIZIONE DEL PERSONALE / BOLZANO / HDB | | Default Value | | Running | euro | 05.10.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Opportunity | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Via renon | 30 - Tender & Submission Phase | 05.10.2018 16:15 | | | | No | No | | | | | euro |
| 322378 | | | COSTRUZIONE DI UN EDIFICIO PROVINCIALE PER LA RIPARTIZIONE DEL PERSONALE / BOLZANO / HDB | | Default Value | | Running | euro | 05.10.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | Via renon | 10 - Information Phase | 05.10.2018 16:15 | | | | No | No | | | | | euro |
| 321377-001 | | | COSTRUZIONE DI 30 ALLOGGI "TOGGENBURG" / LAIVES / HIT e HDB | | Default Value | | Running | euro | 21.09.2018 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 39055 | Laives | | * | 40 - Realisation Phase | 21.09.2018 09:25 | | | | No | No | | | | | euro |
| 321377 | | | COSTRUZIONE DI 30 ALLOGGI "TOGGENBURG" / LAIVES | | Default Value | | Running | euro | 21.09.2018 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 39055 | Laives | | * | 40 - Realisation Phase | 21.09.2018 09:24 | | | | No | No | | | | | euro |
| 321100-001 | | | ITI / POLO MECCATRONICA, PARCO TECNOLOGICO / DETAN | | Default Value | | Running | euro | 18.09.2018 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 26010 | Rovereto | | Via fortunato zeni 8 | 10 - Information Phase | 18.09.2018 09:02 | | | | No | No | | | | | euro |
| 321100 | | | ITI / POLO MECCATRONICA PARCO TECNOLOGICO / ROVERETO | | Default Value | | Running | euro | 18.09.2018 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 26010 | Rovereto | | Via fortunato zeni 8 | 10 - Information Phase | 18.09.2018 09:01 | | | | No | No | | | | | euro |
| 320519-001 | | | REALIZZAZIONE COMPENDIO IMMOBILIARE "ST MARTIN" APPIANO / HDB | | Default Value | | Running | euro | 07.09.2018 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 39050 | Appiano sulla strada del vino | | fraz Cornaiano | 30 - Tender & Submission Phase | 07.09.2018 11:07 | | | | No | No | | | | | euro |
| 320519 | | | REALIZZAZIONE COMPENDIO IMMOBILIARE | | Default Value | | Running | euro | 07.09.2018 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 39050 | Appiano sulla strada del vino | | * | 10 - Information Phase | 07.09.2018 11:06 | | | | No | No | | | | | euro |
| 320261-002 | | | REALIZZAZIONE DEL RADDOPPIO TRATTA FRASSO TELESINO VITULANO / DISTANZIATORI E MORSETTI | | Default Value | | Running | euro | 11.04.2019 | | ICAM-CAMPANIA | Amedeo Geraldi | | | | | Opportunity | Halfen System Account | Italy | 82038 | Vitulano | | * | 10 - Information Phase | 11.04.2019 09:59 | | | | No | No | | | | | euro |
| 320261-001 | | | REALIZZAZIONE DEL RADDOPPIO TRATTA FRASSO TELESINO VITULANO / GIUNTI | | Default Value | | Running | euro | 04.09.2018 | | ICAM-CAMPANIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 82038 | Vitulano | | * | 10 - Information Phase | 04.09.2018 16:04 | | | | No | No | | | | | euro |
| 320261 | | | REALIZZAZIONE DEL RADDOPPIO TRATTA FRASSO TELESINO VITULANO | | Default Value | | Running | euro | 04.09.2018 | | ICAM-CAMPANIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 82038 | Vitulano | | * | 10 - Information Phase | 04.09.2018 16:04 | | | | No | No | | | | | euro |
| 320090 | | | Costruzione nuovo polo scolastico Alighieri Mestica | | Default Value | | Running | euro | 21.06.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62100 | MACERATA | | Area Ex Casermette | 10 - Information Phase | 31.08.2018 16:52 | 2089 | | | No | No | | | | | euro |
| 320089 | | | Costruzione centro commerciale | | Default Value | | Running | euro | 06.07.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62032 | CAMERINO | Technical facilities | Localita' San Paolo | 10 - Information Phase | 31.08.2018 16:52 | 2088 | | | No | No | | | | | euro |
| 320088-001 | | | RSA/APPIGNANO (MC)/HBT | | Default Value | | Running | euro | 22.01.2020 | | IMAR-MARCHE | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 62010 | APPIGNANO | Medical facility | Via IV Novembre 116 | 10 - Information Phase | 22.01.2020 14:54 | 2087 | | | No | No | | | | | euro |
| 320088 | | | RSA/APPIGNANO (MC) | | Default Value | | Running | euro | 13.07.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62010 | APPIGNANO | Medical facility | Via IV Novembre 116 | 10 - Information Phase | 31.08.2018 16:52 | 2087 | | | No | No | | | | | euro |
| 320087 | | | Costruzione insediamento produttivo imbottigliamento acque 10000 mq | | Default Value | | Running | euro | 15.06.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67050 | CANISTRO | Industry building | Via VI Aprile | 10 - Information Phase | 31.08.2018 16:44 | 2086 | | | No | No | | | | | euro |
| 319963 | | | Ampliamento supermercato 3500 mq totale | | Default Value | | Running | euro | 22.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 46012 | BOZZOLO | Technical facilities | Via Cremona 16 | 10 - Information Phase | 30.08.2018 11:30 | 2084 | | | No | No | | | | | euro |
| 319961 | | | Costruzione 3 palazzine ad uso abitazione e negozi | | Default Value | | Running | euro | 29.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27029 | VIGEVANO | Residential houses | Corso G. Garibaldi 47 | 10 - Information Phase | 30.08.2018 11:30 | 2083 | | | No | No | | | | | euro |
| 319960 | | | Costruzione (demoric) 3 edifici ad uso residenziale | | Default Value | | Running | euro | 13.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via Badia 34/36 | 10 - Information Phase | 30.08.2018 11:30 | 2082 | | | No | No | | | | | euro |
| 319959 | | | Costruzione centro di accoglienza e dormitorio con 76 posti letto | | Default Value | | Running | euro | 13.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25100 | BRESCIA | | Via G. Trivellini 11 | 10 - Information Phase | 30.08.2018 11:30 | 2081 | | | No | No | | | | | euro |
| 319956 | | | Costruzione stabilimento industr lavoraz prodotti alluminio 55600 mq | | Default Value | | Running | euro | 29.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25032 | CHIARI | Industry building | URAGO D'OGLIO | 10 - Information Phase | 30.08.2018 11:29 | 2078 | | | No | No | | | | | euro |
| 319955 | | | Lavori riqualifica infrastrutture di volo pista 14/32 e del raccordo AB | | Default Value | | Running | euro | 20.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25018 | MONTICHIARI | Technical facilities | Aeroporto D'Annunzio | 10 - Information Phase | 30.08.2018 11:29 | 2077 | | | No | No | | | | | euro |
| 319954 | | | Costruzione centro commerciale 7250 mq | | Default Value | | Running | euro | 11.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25017 | LONATO | Technical facilities | Vie Battaglie / Mantova | 10 - Information Phase | 30.08.2018 11:29 | 2076 | | | No | No | | | | | euro |
| 319953 | | | Costr centro comm ipermercato 3600 mq 12 MSV 1 ristorante 1700 pauto | | Default Value | | Running | euro | 21.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25016 | GHEDI | Technical facilities | S.S. Lenese / Strada Costa | 10 - Information Phase | 30.08.2018 11:29 | 2075 | | | No | No | | | | | euro |
| 319952 | | | Adeguamento impianto di depurazione | | Default Value | | Running | euro | 26.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via Galtara | 10 - Information Phase | 30.08.2018 11:29 | 2074 | | | No | No | | | | | euro |
| 319951 | | | Costruzione nuova sede Accademia Guardia di Finanza secondo lotto | | Default Value | | Running | euro | 20.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | | Largo Barozzi 1 Ex HP Riuniti | 40 - Realisation Phase | 30.08.2018 11:29 | 2073 | | | No | No | | | | | euro |
| 319950 | | | Costruzione edificio ad uso abitazione 24 appartamenti classe A+ | | Default Value | | Running | euro | 05.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Vie Calzecchi Onesti 8 | 10 - Information Phase | 30.08.2018 11:29 | 2072 | | | No | No | | | | | euro |
| 319949 | | | Costruzione 2 edifici commerciali e OO UU | | Default Value | | Running | euro | 04.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Vie S.G. Bosco / Mugazzone | 10 - Information Phase | 30.08.2018 11:29 | 2071 | | | No | No | | | | | euro |
| 319945 | | | Adeguamento impianto di depurazione ai nuovi limiti di scarico | | Default Value | | Running | euro | 04.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24055 | COLOGNO AL SERIO | Technical facilities | Capoluogo | 10 - Information Phase | 30.08.2018 11:28 | 2067 | | | No | No | | | | | euro |
| 319941 | | | Costruzione copmplesso ad uso abitazione | | Default Value | | Running | euro | 20.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24020 | SCANZOROSCIATE | Residential houses | Vie G. Marconi / A. Manzoni | 10 - Information Phase | 30.08.2018 11:28 | 2063 | | | No | No | | | | | euro |
| 319940 | | | Ampliamento complesso industriale | | Default Value | | Running | euro | 20.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24020 | SCANZOROSCIATE | Industry building | Via C.A.Dalla Chiesa 18 | 10 - Information Phase | 30.08.2018 11:28 | 2062 | | | No | No | | | | | euro |
| 319939 | | | Costruzione media struttura di vendita alimentare Iperal 1485 mq | | Default Value | | Running | euro | 20.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24020 | SCANZOROSCIATE | Technical facilities | Via A. Galimberti | 10 - Information Phase | 30.08.2018 11:28 | 2061 | | | No | No | | | | | euro |
| 319937 | | | Costruzione media struttura di vendita alimentare e non con OO UU | | Default Value | | Running | euro | 13.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Via Cecilio 4 | 10 - Information Phase | 30.08.2018 11:28 | 2058 | | | No | No | | | | | euro |
| 319936-001 | | | Costruzione supermercato Esselunga 700 posti auto coperti 4307 mq/CANDELA / ESSELUNGA FINO MORNASCO / FK5 | | Default Value | | Running | euro | 27.01.2021 | | ILOM-LOMBARDIA | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 22073 | FINO MORNASCO | Technical facilities | Via Risorgimento 34 | 40 - Realisation Phase | 27.01.2021 17:22 | 2057 | | | No | No | | | | | euro |
| 319936 | | | Costruzione supermercato Esselunga 700 posti auto coperti 4307 mq | | Default Value | | Running | euro | 25.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22073 | FINO MORNASCO | Technical facilities | Via Risorgimento 34 | 10 - Information Phase | 30.08.2018 11:28 | 2057 | | | No | No | | | | | euro |
| 319935 | | | Costruzione scuola media | | Default Value | | Running | euro | 29.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22070 | CAPIAGO INTIMIANO | | Via Serenza | 10 - Information Phase | 30.08.2018 11:28 | 2056 | | | No | No | | | | | euro |
| 319933 | | | Costruzione supermercato 2293 mq Lotto A | | Default Value | | Running | euro | 13.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21058 | SOLBIATE OLONA | Technical facilities | Via Dei Patrioti Ex SIR | 10 - Information Phase | 30.08.2018 11:27 | 2054 | | | No | No | | | | | euro |
| 319930 | | | Costruzione 2 edifici commerciali 880+1800 mq e palazzina 30 appartam | | Default Value | | Running | euro | 04.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21047 | SARONNO | Technical facilities | Via Varese 38 | 10 - Information Phase | 30.08.2018 11:27 | 2051 | | | No | No | | | | | euro |
| 319929 | | | Costruzione supermercato negozi e OO UU | | Default Value | | Running | euro | 04.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21040 | GERENZANO | Technical facilities | Vie Carducci / Ugo Foscolo | 10 - Information Phase | 30.08.2018 11:27 | 2050 | | | No | No | | | | | euro |
| 319928 | | | Costruzione palazzina 2 piani ft 13 appartamenti classe A | | Default Value | | Running | euro | 20.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20900 | MONZA | Residential houses | Vie Monte Bianco / Dolomiti | 10 - Information Phase | 30.08.2018 11:27 | 2049 | | | No | No | | | | | euro |
| 319927 | | | Realizzazione vasca volano interrata di Biassono e Macherio | | Default Value | | Running | euro | 11.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20846 | MACHERIO | Technical facilities | Via A. Volta | 10 - Information Phase | 30.08.2018 11:27 | 2048 | | | No | No | | | | | euro |
| 319922 | | | Costruzione edificio ad uso abitazione negozi uffici e boxes | | Default Value | | Running | euro | 20.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20821 | MEDA | Residential houses | Corso G. Matteotti | 10 - Information Phase | 30.08.2018 11:26 | 2043 | | | No | No | | | | | euro |
| 319919 | | | Ristrutt torre+piastra x WPP Campus polo marketing comunic 16800 mq | | Default Value | | Running | euro | 20.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Vie L. Il Moro 27 / Richard 3 | 10 - Information Phase | 30.08.2018 11:26 | 2040 | | | No | No | | | | | euro |
| 319918 | | | Ampliamento hotel 28 camere palestra 2 sale riunioni | | Default Value | | Running | euro | 11.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Mecenate 89 | 10 - Information Phase | 30.08.2018 11:26 | 2039 | | | No | No | | | | | euro |
| 319917 | | | Ristrutturazione complesso multip ad uso residenziale | | Default Value | | Running | euro | 28.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Alserio 10 | 10 - Information Phase | 30.08.2018 11:26 | 2038 | | | No | No | | | | | euro |
| 319916 | | | Costruziome complesso ad uso abitazione e boxes | | Default Value | | Running | euro | 28.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via C.I. Petitti 3 | 10 - Information Phase | 30.08.2018 11:26 | 2037 | | | No | No | | | | | euro |
| 319915 | | | Ristrutturaz complesso ad uso uffici 25000 mq classe A Leed Goold | | Default Value | | Running | euro | 27.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Della Chiusa 2 | 10 - Information Phase | 30.08.2018 11:26 | 2036 | | | No | No | | | | | euro |
| 319913 | | | Ristrutt complesso per hotel SPA palestra piscina prima fase bonifica | | Default Value | | Running | euro | 27.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Brera 19 | 10 - Information Phase | 30.08.2018 11:26 | 2034 | | | No | No | | | | | euro |
| 319912 | | | Ristrutturazione edificio ad uso commerciale ed uffici 12000 mq | | Default Value | | Running | euro | 27.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via C. Cantu' 2 | 10 - Information Phase | 30.08.2018 11:26 | 2033 | | | No | No | | | | | euro |
| 319911 | | | Ristrutturazione complesso ad uso uffici 45000 mq | | Default Value | | Running | euro | 27.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Italia 23 | 10 - Information Phase | 30.08.2018 11:25 | 2032 | | | No | No | | | | | euro |
| 319910 | | | Ristrutturazione edificio ad uso uffici e negozi 8600 mq | | Default Value | | Running | euro | 27.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Corso Italia 3 | 10 - Information Phase | 30.08.2018 11:25 | 2031 | | | No | No | | | | | euro |
| 319909 | | | Riqualificazione funzionale unita' immobiliari uffici e appartamenti | | Default Value | | Running | euro | 27.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Lgo Corsia Servi 11/Gall Passarella 2 | 10 - Information Phase | 30.08.2018 11:25 | 2030 | | | No | No | | | | | euro |
| 319908 | | | Riqualificaz edificio multip ad uso uffici denominato Palazzo Di Fuoco | | Default Value | | Running | euro | 27.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Viale Monza 2 | 10 - Information Phase | 30.08.2018 11:25 | 2029 | | | No | No | | | | | euro |
| 319907 | | | Costruz complesso torre+piastra 180 all 2 lotto citta' contemporanea | | Default Value | | Running | euro | 13.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via P. Pasolini | 10 - Information Phase | 30.08.2018 11:25 | 2028 | | | No | No | | | | | euro |
| 319906 | | | Costruzione complesso di edilizia residenziale convenzionata | | Default Value | | Running | euro | 20.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20099 | SESTO SAN GIOVANNI | Residential houses | Area Ex Falck | 10 - Information Phase | 30.08.2018 11:25 | 2027 | | | No | No | | | | | euro |
| 319905 | | | Costruz ristorante Mc Donald's 476 mq + edificio commerciale 2550 mq | | Default Value | | Running | euro | 19.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20092 | CINISELLO BALSAMO | Technical facilities | Viale Valtellina / Battisti | 10 - Information Phase | 30.08.2018 11:25 | 2026 | | | No | No | | | | | euro |
| 319904 | | | Costruzione scuola media aule laboratori palestra | | Default Value | | Running | euro | 20.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20086 | MOTTA VISCONTI | | Via Don Milani 1 | 10 - Information Phase | 30.08.2018 11:25 | 2025 | | | No | No | | | | | euro |
| 319903 | | | Ristrutt e nuova costruzione villette e appartam 14 unita' abitative | | Default Value | | Running | euro | 04.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20032 | CORMANO | Residential houses | Via Figini 43 | 10 - Information Phase | 30.08.2018 11:25 | 2024 | | | No | No | | | | | euro |
| 319865 | | | Costruzione centro sportivo polifunzionale | | Default Value | | Running | euro | 13.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 58100 | GROSSETO | | Localita' Roselle | 10 - Information Phase | 30.08.2018 09:16 | 2017 | | | No | No | | | | | euro |
| 319864 | | | Costr parco commerc Bricoman Sogegross Iperceramica Roadhouse Grill | | Default Value | | Running | euro | 22.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | Technical facilities | Via Aurelia Sud | 10 - Information Phase | 30.08.2018 09:16 | 2016 | | | No | No | | | | | euro |
| 319863 | | | Costruzione grande struttura di vendita non alimentare 2900 mq | | Default Value | | Running | euro | 20.07.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55041 | CAMAIORE | Technical facilities | Vie Aurelia / Del Secco | 10 - Information Phase | 30.08.2018 09:16 | 2015 | | | No | No | | | | | euro |
| 319862 | | | Costruzione nuova sede 3800 mq produzione e 1200 mq uffici | | Default Value | | Running | euro | 21.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 53017 | RADDA IN CHIANTI | Technical facilities | Via G. Amendola Ex Laca | 10 - Information Phase | 30.08.2018 09:16 | 2014 | | | No | No | | | | | euro |
| 319861 | | | Costruzione gestione impianto sportivo polivalente Project Financing | | Default Value | | Running | euro | 14.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 52026 | CASTELFRANCO PIANDISCO' | | Frazione Vaggio | 10 - Information Phase | 30.08.2018 09:16 | 2013 | | | No | No | | | | | euro |
| 319860 | | | Ampliamento per realizzazione 8 aule Liceo Ernesto Balducci | | Default Value | | Running | euro | 06.07.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50065 | PONTASSIEVE | | Via Aretina 78/a | 10 - Information Phase | 30.08.2018 09:16 | 2012 | | | No | No | | | | | euro |
| 319859 | | | Costruzione edificio 8 alloggi edilizia residenziale pubblica | | Default Value | | Running | euro | 19.07.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50063 | FIGLINE E INCISA VALDARNO | Residential houses | Loc. Palazzuolo | 10 - Information Phase | 30.08.2018 09:16 | 2011 | | | No | No | | | | | euro |
| 319858 | | | Costruzione 16 villette a schiera in bioedilizia | | Default Value | | Running | euro | 13.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50032 | BORGO SAN LORENZO | Residential houses | Via G. Chini | 10 - Information Phase | 30.08.2018 09:16 | 2010 | | | No | No | | | | | euro |
| 319683-001 | | | EUROCAR / FIRENZE / HDB | | Default Value | | Running | euro | 27.08.2018 | | ITOS-TOSCANA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | X | 10 - Information Phase | 27.08.2018 16:37 | | | | No | No | | | | | euro |
| 319683 | | | EUROCAR / FIRENZE | | Default Value | | Running | euro | 27.08.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | X | 10 - Information Phase | 27.08.2018 16:36 | | | | No | No | | | | | euro |
| 318394-001 | | | PORTA A MARE / VARIANTE SUB AMBITO E OFFICINE STORICHE / LIVORNO / GIUNTI | | Default Value | | Running | euro | 31.07.2018 | | ITOS-TOSCANA | Diego Carminati | | | | | Opportunity | Halfen System Account | Italy | 57100 | LIVORNO | | X | 30 - Tender & Submission Phase | 31.07.2018 11:34 | | | | No | No | | | | 139.165,00 € | euro |
| 318394 | | | PORTA A MARE / VARIANTE SUB AMBITO E OFFICINE STORICHE / LIVORNO | | Default Value | | Running | euro | 31.07.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 57100 | LIVORNO | | X | 10 - Information Phase | 31.07.2018 11:33 | | | | No | No | | | | 139.165,00 € | euro |
| 317610 | | | SOLLEVAMENTO SPRINT PREFABBRICATI | | Default Value | | Running | euro | 17.07.2018 | | ICAM-CAMPANIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 87064 | Corigliano Calabro | | X | 10 - Information Phase | 17.07.2018 08:07 | | | | No | No | | | | | euro |
| 317119 | | | Costruz magazzino prodotti finiti e materie prime 14150 SLP coperta | | Default Value | | Running | euro | 11.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 46043 | CASTIGLIONE DELLE STIVIERE | Industry building | Via Fossadone | 10 - Information Phase | 09.07.2018 10:29 | 2009 | | | No | No | | | | | euro |
| 317118 | | | Costruzione 5 villette bifamiliari 1 quadrifamiliare 10 singole | | Default Value | | Running | euro | 23.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 46010 | CURTATONE | Residential houses | Vie F. Parri / V. Gementi | 10 - Information Phase | 09.07.2018 10:28 | 2008 | | | No | No | | | | | euro |
| 317117 | | | Costruz polo logistico FM Logistic Italia magazzino e uffici 43000 mq | | Default Value | | Running | euro | 30.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27010 | VELLEZZO BELLINI | Industry building | Via G. Natta | 10 - Information Phase | 09.07.2018 10:28 | 2007 | | | No | No | | | | | euro |
| 317116 | | | Costruz stabilimento Produz 5527 mq Magazz 14285 mq Uffici 3456 mq | | Default Value | | Running | euro | 25.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27010 | TORREVECCHIA PIA | Industry building | Via Ex SS 412 | 10 - Information Phase | 09.07.2018 10:28 | 2006 | | | No | No | | | | | euro |
| 317115 | | | Costruz supermercato Coop 2499 mq+Brico io 1499 mq+ristorante 500 mq | | Default Value | | Running | euro | 07.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26900 | LODI | Technical facilities | Viale Pavia 98 | 10 - Information Phase | 09.07.2018 10:28 | 2005 | | | No | No | | | | | euro |
| 317114 | | | Costruzione complesso industriale Torrefazione Portioli | | Default Value | | Running | euro | 31.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26839 | ZELO BUON PERSICO | Industry building | S.P. 201 | 10 - Information Phase | 09.07.2018 10:28 | 2004 | | | No | No | | | | | euro |
| 317112 | | | Costruzione 3 medie strutture di vendita | | Default Value | | Running | euro | 31.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26839 | ZELO BUON PERSICO | Technical facilities | Vie Miglioli / Cavour | 10 - Information Phase | 09.07.2018 10:28 | 2002 | | | No | No | | | | | euro |
| 317109 | | | Costruzione centro commerciale 3 MSV 12000 mq | | Default Value | | Running | euro | 30.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Via Sesto | 10 - Information Phase | 09.07.2018 10:28 | 1999 | | | No | No | | | | | euro |
| 317108 | | | Costruzione concessionaria auto e officina | | Default Value | | Running | euro | 30.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Via Castelleone Ex Nuvolari | 10 - Information Phase | 09.07.2018 10:28 | 1998 | | | No | No | | | | | euro |
| 317106 | | | Costruzione complesso residenziale | | Default Value | | Running | euro | 17.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25015 | DESENZANO DEL GARDA | Residential houses | Viale Agello / Via Aureliano | 10 - Information Phase | 09.07.2018 10:27 | 1996 | | | No | No | | | | | euro |
| 317103 | | | Costruzione edifici A1 e A2 ad uso abitazione | | Default Value | | Running | euro | 18.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Papa Leone XIII 8 | 10 - Information Phase | 09.07.2018 10:27 | 1993 | | | No | No | | | | | euro |
| 317102 | | | Costruz supermercato Eurospin 2000 mq e 1 MSV non alimentare 3000 mq | | Default Value | | Running | euro | 11.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24068 | SERIATE | Technical facilities | Vie Nazionale / Fonderia Rumi | 10 - Information Phase | 09.07.2018 10:27 | 1992 | | | No | No | | | | | euro |
| 317101 | | | Costruzione supermercato Lidl | | Default Value | | Running | euro | 27.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24064 | GRUMELLO DEL MONTE | Technical facilities | Via A. Volta | 10 - Information Phase | 09.07.2018 10:27 | 1991 | | | No | No | | | | | euro |
| 317095 | | | Costruzione supermercato Iperal 1500 mq e negozi 600 mq | | Default Value | | Running | euro | 16.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23826 | MANDELLO DEL LARIO | Technical facilities | Via Nazionale 87 | 10 - Information Phase | 09.07.2018 10:27 | 1985 | | | No | No | | | | | euro |
| 317093 | | | Ampliamento Hotel Astra 60 camere ***** ristorante SPA | | Default Value | | Running | euro | 23.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23030 | LIVIGNO | Technical facilities | Via Saroch 604 | 10 - Information Phase | 09.07.2018 10:26 | 1983 | | | No | No | | | | | euro |
| 317092 | | | Costruzione struttura di vendita non alimentare Decathlon e opere urbanizz | | Default Value | | Running | euro | 04.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22100 | COMO | Technical facilities | Via Cecilio 15 | 10 - Information Phase | 09.07.2018 10:26 | 1982 | | | No | No | | | | | euro |
| 317091 | | | Costruzione centro di riabilitazione ambulatoriale | | Default Value | | Running | euro | 18.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22100 | COMO | | Via Canturina 97 | 10 - Information Phase | 09.07.2018 10:26 | 1981 | | | No | No | | | | | euro |
| 317090 | | | Costruzione edificio multip 6 pft ad uso abitazione negozi e boxes | | Default Value | | Running | euro | 18.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Via Rezzonico | 10 - Information Phase | 09.07.2018 10:26 | 1980 | | | No | No | | | | | euro |
| 317089 | | | Costruzione edificio multip 7 pft 19 appartamenti e boxes | | Default Value | | Running | euro | 18.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22100 | COMO | Residential houses | Via Giulio Cesare 18 | 10 - Information Phase | 09.07.2018 10:26 | 1979 | | | No | No | | | | | euro |
| 317086 | | | Costruzione supermercato Carrefour 1500 mq uffici negozi OO UU | | Default Value | | Running | euro | 08.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21100 | VARESE | Technical facilities | Viale Belforte 7 Ex Enel | 10 - Information Phase | 09.07.2018 10:26 | 1976 | | | No | No | | | | | euro |
| 317085 | | | Costruzione supermercato 2293 mq Lotto A | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21058 | SOLBIATE OLONA | Technical facilities | Via Dei Patrioti Ex SIR | 10 - Information Phase | 09.07.2018 10:26 | 1975 | | | No | No | | | | | euro |
| 317083 | | | Costruz palazzina 10 appart 3 villette singole 1 bifamiliare classe A4 | | Default Value | | Running | euro | 23.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21040 | JERAGO CON ORAGO | Residential houses | Via C. Colombo | 10 - Information Phase | 09.07.2018 10:26 | 1973 | | | No | No | | | | | euro |
| 317082 | | | Costruzione supermercato negozi e OO UU | | Default Value | | Running | euro | 20.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21040 | GERENZANO | Technical facilities | Vie Carducci / Ugo Foscolo | 10 - Information Phase | 09.07.2018 10:26 | 1972 | | | No | No | | | | | euro |
| 317080 | | | Costruz supermercato alimentare 3518 mq centro civico 523 mq p interr | | Default Value | | Running | euro | 30.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20900 | MONZA | Technical facilities | Via Sant'Andrea 23 Ex Maestoso | 10 - Information Phase | 09.07.2018 10:25 | 1970 | | | No | No | | | | | euro |
| 317077 | | | Costruzione complesso ad uso abitazione | | Default Value | | Running | euro | 31.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20874 | BUSNAGO | Residential houses | Via V. Bellini | 10 - Information Phase | 09.07.2018 10:25 | 1967 | | | No | No | | | | | euro |
| 317076 | | | Costruzione residenza universitaria Edifico U82 | | Default Value | | Running | euro | 25.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20854 | VEDANO AL LAMBRO | Residential houses | Via R. Follereau | 10 - Information Phase | 09.07.2018 10:25 | 1966 | | | No | No | | | | | euro |
| 317074 | | | Costruzione 4 palazzine per 84 appartamenti e piscina | | Default Value | | Running | euro | 31.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20852 | VILLASANTA | Residential houses | Via B. Colleoni | 10 - Information Phase | 09.07.2018 10:25 | 1964 | | | No | No | | | | | euro |
| 317073 | | | Costruzione 2 MSV 3750 mq totale e 1 ristorante Mc Donald's | | Default Value | | Running | euro | 03.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20851 | LISSONE | Technical facilities | Vie G. Zanella / Trieste | 10 - Information Phase | 09.07.2018 10:25 | 1963 | | | No | No | | | | | euro |
| 317071 | | | Costruzione complesso ad uso abitazione e boxes | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20841 | CARATE BRIANZA | Residential houses | Via C. Colombo 16 | 10 - Information Phase | 09.07.2018 10:25 | 1961 | | | No | No | | | | | euro |
| 317068 | | | Ristruttur ex Hotel Executive ad uso uffici certificato Leed Platinum | | Default Value | | Running | euro | 07.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Don L. Sturzo 45 | 10 - Information Phase | 09.07.2018 10:24 | 1958 | | | No | No | | | | | euro |
| 317067 | | | Costruzione 2 edifici 1 a torre 160 appartamenti classe A+ | | Default Value | | Running | euro | 06.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Angelo Fava 20 | 10 - Information Phase | 09.07.2018 10:24 | 1957 | | | No | No | | | | | euro |
| 317066 | | | Costruzione edificio ad uso abitazione 31 appartamenti e boxes | | Default Value | | Running | euro | 06.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Angelo Fava 7 | 10 - Information Phase | 09.07.2018 10:24 | 1956 | | | No | No | | | | | euro |
| 317064 | | | Costruzione edificio multip 6 pft ad uso abitazione | | Default Value | | Running | euro | 06.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Termopili 6/12 | 10 - Information Phase | 09.07.2018 10:24 | 1954 | | | No | No | | | | | euro |
| 317061 | | | Riqualificazione e nuova costruzione Ostello 120 camere caffetteria | | Default Value | | Running | euro | 07.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via E. Noe' 24 Ex scuola | 10 - Information Phase | 09.07.2018 10:24 | 1952 | | | No | No | | | | | euro |
| 317059 | | | Costruzione 20 unita' abitative a schiera | | Default Value | | Running | euro | 06.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Trasimeno 84 | 10 - Information Phase | 09.07.2018 10:24 | 1950 | | | No | No | | | | | euro |
| 317058 | | | Costruzione complesso 6 pft 80 appartamenti 4 negozi 100 boxes interr | | Default Value | | Running | euro | 01.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Giusti 9 / Niccolini 8 | 10 - Information Phase | 09.07.2018 10:24 | 1949 | | | No | No | | | | | euro |
| 317057 | | | Costruzione 2 edifici 5+8 piani fuori terra per 58 alloggi NZEB | | Default Value | | Running | euro | 30.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G. Medici Del Vascello 22 | 10 - Information Phase | 09.07.2018 10:24 | 1948 | | | No | No | | | | | euro |
| 317056 | | | Costruzione complesso alberghiero 10 piani fuori terra 460 camere | | Default Value | | Running | euro | 30.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Boncompagni 101 | 10 - Information Phase | 09.07.2018 10:24 | 1947 | | | No | No | | | | | euro |
| 317054 | | | Costruzione (demoric) 3 edifici multip uso abitazione 100 appartamenti | | Default Value | | Running | euro | 30.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via L. Pastro 26 | 10 - Information Phase | 09.07.2018 10:23 | 1946 | | | No | No | | | | | euro |
| 317052 | | | Costruzione edificio multip 60 appartamenti e boxes classe A | | Default Value | | Running | euro | 11.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Matilde Serao 1 | 10 - Information Phase | 09.07.2018 10:23 | 1944 | | | No | No | | | | | euro |
| 317051 | | | Costruzione nuovo quartiere residenze uffici piazza commerciale parco | | Default Value | | Running | euro | 04.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Vie Bisceglie / Calchi Taeggi | 10 - Information Phase | 09.07.2018 10:23 | 1943 | | | No | No | | | | | euro |
| 317050 | | | Lavori di manutenzione straord ristrutt adeguam a norma e rifac fabbricati | | Default Value | | Running | euro | 27.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Stazione Centrale / VENEZIA / VERONA | 10 - Information Phase | 09.07.2018 10:23 | 1942 | | | No | No | | | | | euro |
| 317049 | | | Costruzione edificio multip ad uso abitazione Comparto R4 Edificio 2 | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Gallarate | 10 - Information Phase | 09.07.2018 10:23 | 1941 | | | No | No | | | | | euro |
| 317048 | | | Costruzione edificio multip 16 pft uso abitaz 97 appartamenti classe A | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G. W. Daimler 8 | 10 - Information Phase | 09.07.2018 10:23 | 1940 | | | No | No | | | | | euro |
| 317047 | | | Costruzione palazzina ad uso abitazione classe energetica A3 | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via D. Cucchiari 21 | 10 - Information Phase | 09.07.2018 10:23 | 1939 | | | No | No | | | | | euro |
| 317045 | | | Costruzione palazzina ad uso abitazione e boxes | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Canella 4/6 | 10 - Information Phase | 09.07.2018 10:23 | 1937 | | | No | No | | | | | euro |
| 317044 | | | Costruzione edificio multip 7 pft ad uso abitazione 37 alloggi | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via G. Ripamonti 200 | 10 - Information Phase | 09.07.2018 10:23 | 1936 | | | No | No | | | | | euro |
| 317041 | | | Costruzione complesso ad uso abitazione | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Valtorta 32 | 10 - Information Phase | 09.07.2018 10:22 | 1933 | | | No | No | | | | | euro |
| 317040 | | | Costruzione 3 edifici multip ad uso abitazione e boxes | | Default Value | | Running | euro | 26.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20099 | SESTO SAN GIOVANNI | Residential houses | Viale Flli Casiraghi 422 | 10 - Information Phase | 09.07.2018 10:22 | 1932 | | | No | No | | | | | euro |
| 317039-002 | | | CARRON / ZAMBON Ampliamento centro ricerca primo lotto uffici 4600 mq conferenze / HUC | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20091 | BRESSO | Technical facilities | Via Lillo Del Duca 10 | 40 - Realisation Phase | 24.03.2021 16:55 | 1931 | | | No | No | | | | | euro |
| 317039-001 | | | CARRON / ZAMBON Ampliamento centro ricerca primo lotto uffici 4600 mq conferenze / HOP e ANGOLARI | | Default Value | | Running | euro | 24.03.2021 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 20091 | BRESSO | Technical facilities | Via Lillo Del Duca 10 | 40 - Realisation Phase | 24.03.2021 16:54 | 1931 | | | No | No | | | | | euro |
| 317039 | | | CARRON / ZAMBON Ampliamento centro ricerca primo lotto uffici 4600 mq conferenze | | Default Value | | Running | euro | 07.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20091 | BRESSO | Technical facilities | Via Lillo Del Duca 10 | 40 - Realisation Phase | 09.07.2018 10:22 | 1931 | | | No | No | | | | | euro |
| 317038 | | | Costruz (demoric) edificio multip 38 appartamenti e boxes classe A+ | | Default Value | | Running | euro | 31.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20090 | BUCCINASCO | Residential houses | Via A. Grandi 16 | 10 - Information Phase | 09.07.2018 10:22 | 1930 | | | No | No | | | | | euro |
| 317037 | | | Costruzione 2 medie strutture vendita Acqua e Sapone 850+650 mq | | Default Value | | Running | euro | 03.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20081 | ABBIATEGRASSO | Technical facilities | Via D. Alighieri | 10 - Information Phase | 09.07.2018 10:22 | 1929 | | | No | No | | | | | euro |
| 317033 | | | Costruzione 2 edifici multip C e D ad uso abitazione | | Default Value | | Running | euro | 18.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20026 | NOVATE MILANESE | Residential houses | Via C. Marzorati | 10 - Information Phase | 09.07.2018 10:22 | 1925 | | | No | No | | | | | euro |
| 317031 | | | Adeguamento Parco Sud e attestamento Linea S13 | | Default Value | | Running | euro | 11.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20024 | GARBAGNATE MILANESE | Technical facilities | Linea Ferroviaria MI/Saronno | 10 - Information Phase | 09.07.2018 10:22 | 1923 | | | No | No | | | | | euro |
| 317028 | | | Costruzione nuova sede aziendale 12000 mq training center 800 mq | | Default Value | | Running | euro | 01.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20020 | LAINATE | Technical facilities | Vie De Gasperi / Varese / S.P.101 | 10 - Information Phase | 09.07.2018 10:21 | 1920 | | | No | No | | | | | euro |
| 317027 | | | Costruzione villette | | Default Value | | Running | euro | 03.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20018 | SEDRIANO | Residential houses | Via G. Garibaldi | 10 - Information Phase | 09.07.2018 10:21 | 1918 | | | No | No | | | | | euro |
| 317026 | | | Costruzione supermercato | | Default Value | | Running | euro | 03.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20011 | CORBETTA | Technical facilities | Via Simone Da Corbetta 89/91 | 10 - Information Phase | 09.07.2018 10:21 | 1917 | | | No | No | | | | | euro |
| 316697 | | | Costruz 3 edifici industriali artigianali 7200 mq e OO UU a scomputo | | Default Value | | Running | euro | 26.04.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 59100 | PRATO | Industry building | Vie A. Ghisleri / Cipriani | 10 - Information Phase | 03.07.2018 10:12 | 1916 | | | No | No | | | | | euro |
| 316696 | | | Costruzione parcheggio interrato 7 piani 350 box con giardino pensile | | Default Value | | Running | euro | 01.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 58019 | MONTE ARGENTARIO | Technical facilities | Via Jacovacci Porto Santo Stefano | 10 - Information Phase | 03.07.2018 10:12 | 1915 | | | No | No | | | | | euro |
| 316695 | | | Costruzione supermercato Conad 1500 mq e OO UU | | Default Value | | Running | euro | 25.05.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 57025 | PIOMBINO | Technical facilities | Via Maestri Del Lavoro | 10 - Information Phase | 03.07.2018 10:12 | 1914 | | | No | No | | | | | euro |
| 316694 | | | Costruzione edificio ad uso abitazione 33 alloggi ERP | | Default Value | | Running | euro | 18.05.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Emilia Localita' San Ermete | 10 - Information Phase | 03.07.2018 10:12 | 1913 | | | No | No | | | | | euro |
| 316693 | | | Costruzione edificio di 18 alloggi e ambienti comuni | | Default Value | | Running | euro | 18.05.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Belli Localita' I Passi | 10 - Information Phase | 03.07.2018 10:12 | 1912 | | | No | No | | | | | euro |
| 316692 | | | Completamento 2 edifici a torre ad uso abitazione 93 appartam totale | | Default Value | | Running | euro | 20.04.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | Residential houses | Via Italo Bargagna | 10 - Information Phase | 03.07.2018 10:12 | 1911 | | | No | No | | | | | euro |
| 316691 | | | Riqualificazione alcuni Vicoli di Pisa Sud Est | | Default Value | | Running | euro | 19.04.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | Technical facilities | Vicoli Borghese / Rosselmini / etc. | 10 - Information Phase | 03.07.2018 10:12 | 1910 | | | No | No | | | | | euro |
| 316690 | | | Costruzione supermercato Eurospin e OO UU | | Default Value | | Running | euro | 23.05.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56038 | PONSACCO | Technical facilities | Vie Di Gello / Praga | 10 - Information Phase | 03.07.2018 10:11 | 1909 | | | No | No | | | | | euro |
| 316689 | | | Costruz complesso resid villette e appart 19 unita' abitative classe A | | Default Value | | Running | euro | 01.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55054 | MASSAROSA | Residential houses | Via Del Molino Di Fondo | 10 - Information Phase | 03.07.2018 10:11 | 1908 | | | No | No | | | | | euro |
| 316688 | | | Riqualif urbana area ex mattatoio x real 35 alloggi canone sostenibile | | Default Value | | Running | euro | 10.05.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 54100 | MASSA | Residential houses | Via Galvani Localita' Zecca | 10 - Information Phase | 03.07.2018 10:11 | 1907 | | | No | No | | | | | euro |
| 316687 | | | Adeguam muro d'argine in sinistra idraulica Torrente Taverone | | Default Value | | Running | euro | 11.05.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 54011 | AULLA | Technical facilities | LICCIANA NARDI | 10 - Information Phase | 03.07.2018 10:11 | 1906 | | | No | No | | | | | euro |
| 316686 | | | Ristrutt riqualif aree e realizz forno crematorio Project Financing | | Default Value | | Running | euro | 23.05.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 53100 | SIENA | Technical facilities | Cimiteri Comunali | 10 - Information Phase | 03.07.2018 10:11 | 1905 | | | No | No | | | | | euro |
| 316685 | | | Rifacimento e recupero copertura sede Istituto Vittorio Colonna | | Default Value | | Running | euro | 07.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 52100 | AREZZO | | Via Porta Buia | 10 - Information Phase | 03.07.2018 10:11 | 1904 | | | No | No | | | | | euro |
| 316684 | | | Costruzione 1 edificio per 16 appartamenti + 1 MSV 3600 mq | | Default Value | | Running | euro | 18.05.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06100 | PERUGIA | Residential houses | Via Palermo Ex Mattatoio | 10 - Information Phase | 03.07.2018 10:11 | 1903 | | | No | No | | | | | euro |
| 316683 | | | Recupero ex Fornace per 29 appartamenti uffici 1^ fase op.urbanizz | | Default Value | | Running | euro | 27.04.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06100 | PERUGIA | Residential houses | Via Assisana Loc. Piscille | 10 - Information Phase | 03.07.2018 10:11 | 1902 | | | No | No | | | | | euro |
| 316682 | | | Costr centro commerciale La Galleria x delocalizzare attivita' commerciali | | Default Value | | Running | euro | 18.05.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06046 | NORCIA | Technical facilities | Localita' Castelluccio | 10 - Information Phase | 03.07.2018 10:11 | 1901 | | | No | No | | | | | euro |
| 316584-001 | | | REALIZZAZIONE NUOVO COMPLESSO EDILIZIO A DESTINAZIONE RESIDENZIALE / CITY IN BERGAMO / VIA GHISLANZONI / HIT | | Default Value | | Running | euro | 02.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 24121 | Bergamo | | GHISLANZONI | 40 - Realisation Phase | 02.07.2018 09:30 | | | | No | No | | | | 2.534,00 € | euro |
| 316584 | | | REALIZZAZIONE NUOVO COMPLESSO EDILIZIO A DESTINAZIONE RESIDENZIALE / CITY IN BERGAMO / VIA GHISLANZONI | | Default Value | | Running | euro | 02.07.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24121 | Bergamo | | GHISLANZONI | 40 - Realisation Phase | 02.07.2018 09:30 | | | | No | No | | | | 2.534,00 € | euro |
| 316486 | | | LPM PREZZI SPECIALI HCC | | Default Value | | Running | euro | 28.06.2018 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12084 | Mondovì | | X | 10 - Information Phase | 28.06.2018 15:24 | | | | No | No | | | | | euro |
| 316391-001 | | | AMPL PARCHEGGIO FIERA (TECNOPOLIS) / VERONA / GIUNTI | | Default Value | | Running | euro | 27.06.2018 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Opportunity | Halfen System Account | Italy | 37100 | VERONA | Infrastructural facility | VIALE DEL LAVOR | 40 - Realisation Phase | 27.06.2018 11:04 | | | | No | No | | | | 100.000,00 € | euro |
| 316391 | | | AMPL PARCHEGGIO FIERA / VERONA | | Default Value | | Running | euro | 27.06.2018 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 37100 | VERONA | Infrastructural facility | VIALE DEL LAVOR | 20 - Planning Phase | 27.06.2018 11:03 | | | | No | No | | | | 100.000,00 € | euro |
| 316356-001 | | | 25 HOURS / FIRENZE / HDB | | Default Value | | Running | euro | 27.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | VIA PALAZZUOLO 9 | 10 - Information Phase | 27.06.2018 09:43 | | | | No | No | | | | 10.000,00 € | euro |
| 316356 | | | 25 HOURS / FIRENZE | | Default Value | | Running | euro | 27.06.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | Residential houses | VIA PALAZZUOLO 9 | 10 - Information Phase | 27.06.2018 09:41 | | | | No | No | | | | 10.000,00 € | euro |
| 316284 | | | Costruzione nuova scuola media Don Bosco | | Default Value | | Running | euro | 18.05.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 63837 | FALERONE | | Capoluogo | 10 - Information Phase | 26.06.2018 11:33 | 1900 | | | No | No | | | | | euro |
| 316283 | | | Costruzione scuola primaria Giacomo Leopardi | | Default Value | | Running | euro | 18.05.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62028 | SARNANO | | Via del Colle | 10 - Information Phase | 26.06.2018 11:33 | 1899 | | | No | No | | | | | euro |
| 316282 | | | Costruzione nuova scuola primaria Pietro Santini | | Default Value | | Running | euro | 18.05.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62020 | LORO PICENO | | Capoluogo | 10 - Information Phase | 26.06.2018 11:33 | 1898 | | | No | No | | | | | euro |
| 316281 | | | Ampliamento impianto di depurazione | | Default Value | | Running | euro | 04.05.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 61022 | VALLEFOGLIA | Technical facilities | Localita' Montecchio | 10 - Information Phase | 26.06.2018 11:33 | 1897 | | | No | No | | | | | euro |
| 316280 | | | Costruz compl turistico ricettivo resid 80000 mc campo golf 18 buche | | Default Value | | Running | euro | 24.05.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 60041 | SASSOFERRATO | Technical facilities | Loc. Fondiglie Di Catobagli | 10 - Information Phase | 26.06.2018 11:33 | 1896 | | | No | No | | | | | euro |
| 316278 | | | Costruzione edificio alberghiero 55 camere SPA Ripresa Lavori | | Default Value | | Running | euro | 04.05.2018 | | IMOL-MOLISE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 86039 | TERMOLI | Technical facilities | Lungomare Colombo Ex Rosary | 10 - Information Phase | 26.06.2018 11:23 | 1895 | | | No | No | | | | | euro |
| 316277 | | | Costruzione 2 medie strutture di vendita | | Default Value | | Running | euro | 27.04.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 65013 | CITTA' SANT'ANGELO | Technical facilities | S.P. 1 / Via Maestrale | 10 - Information Phase | 26.06.2018 11:23 | 1894 | | | No | No | | | | | euro |
| 316276 | | | Costruzione nuova scuola media | | Default Value | | Running | euro | 31.05.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 65012 | CEPAGATTI | | Via Milano Localita' Villanova | 10 - Information Phase | 26.06.2018 11:23 | 1893 | | | No | No | | | | | euro |
| 316275 | | | Costruzione scuola primaria e dell'infanzia | | Default Value | | Running | euro | 26.04.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 64043 | CROGNALETO | | Localita' Tottea | 10 - Information Phase | 26.06.2018 11:23 | 1892 | | | No | No | | | | | euro |
| 316206 | | | ALCIATI PROGETTO HCC | | Default Value | | Running | euro | 25.06.2018 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 14040 | Vigliano d'Asti | | X | 10 - Information Phase | 25.06.2018 09:54 | | | | No | No | | | | | euro |
| 316186 | | | ROMA METROPOLITANE - ammodernamento linee di sottoservizi linea "B" | | Default Value | | Running | euro | 22.06.2018 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 00182 | Roma | Infrastructural facilities (Metro) | Tuscolana, 171 | 10 - Information Phase | 22.06.2018 17:57 | | | | No | No | | | | | euro |
| 315928 | | | IEG / AMPLIAMENTO FIERA 26000 mq Quartiere Fieristico VICENZA / 19/3 NIENTE | | Default Value | | Running | euro | 17.05.2018 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 36100 | VICENZA | Technical facilities | Via Oreficeria 16 | 10 - Information Phase | 20.06.2018 14:34 | 1821 | | | No | No | | | | | euro |
| 315787 | | | ESSELUNGA 2500 mq e OO UU / MODENA MAR 19 PROGETTO 12/11 NIENTE | | Default Value | | Running | euro | 04.05.2018 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 41100 | MODENA | Technical facilities | Via Canaletto Sud Ex Consorzio | 10 - Information Phase | 19.06.2018 15:37 | 1777 | | | No | No | | | | | euro |
| 315777 | | | ICAF ???/ TERMINAL INTERMODEALE Lotto 5B PIP Le Mose / PIACENZA 12/9 NIENTE | | Default Value | | Running | euro | 09.05.2018 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 29100 | PIACENZA | Technical facilities | Via Della Torre Della Razza | 10 - Information Phase | 19.06.2018 15:36 | 1767 | | | No | No | | | | | euro |
| 315170-001 | | | HIT / EDIFICIO RESIDENZIALE / MONTORFANO CO | | Default Value | | Running | euro | 08.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 22030 | Montorfano | | Via Crotto Urago | 10 - Information Phase | 08.06.2018 08:46 | | | | No | No | | | | | euro |
| 315170 | | | EDIFICIO RESIDENZIALE / MONTORFANO CO | | Default Value | | Running | euro | 08.06.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 22030 | Montorfano | | Via Crotto Urago | 30 - Tender & Submission Phase | 08.06.2018 08:45 | | | | No | No | | | | | euro |
| 314533-001 | | | CARRON / Costruz parcheggi interrati ex Pattinodromo 325 Cantarane 195 p auto / GIUNTI IMPERMEABILI / BLOCCATO FINO GENNAIO 2020 | | Default Value | | Running | euro | 21.02.2020 | | IVEN-VENETO | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 31100 | TREVISO | Technical facilities | Ex Pattinodromo / Cantarane | 10 - Information Phase | 21.02.2020 10:18 | 1629 | | | No | No | | | | | euro |
| 314533 | | | CARRON / Costruz parcheggi interrati ex Pattinodromo 325 Cantarane 195 p auto / BLOCCATO FINO GENNAIO 2020 | | Default Value | | Running | euro | 15.03.2018 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 31100 | TREVISO | Technical facilities | Ex Pattinodromo / Cantarane | 10 - Information Phase | 30.05.2018 10:39 | 1629 | | | No | No | | | | | euro |
| 314368 | | | IMP INNOCENETE ESTIPANOVIC / COSTRUZIONE ALBERGO 150 p.letto tot. 18.000 MC / 9/7 INIZIO AREA CANTIERE | | Default Value | | Running | euro | 12.01.2018 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 30100 | VENEZIA | Technical facilities | Isola del Tronchetto | 10 - Information Phase | 29.05.2018 10:41 | 1473 | | | No | No | | | | | euro |
| 314341 | | | LEROY MERLIN (AREA PALA GEOX) Costruzione MSV 16000 mq hotel food teatro / PROGETTO APPENA APPROVATO | | Default Value | | Running | euro | 20.10.2017 | | IVEN-VENETO | Andrea Piazzalunga | | | | | Project | Halfen System Account | Italy | 35100 | PADOVA | Technical facilities | Corso Australia Ex Foro Boario | 10 - Information Phase | 29.05.2018 09:40 | 1440 | | | No | No | | | | | euro |
| 314216-001 | | | SCUOLA ITIS VERZUOLO / HCC | | Default Value | | Running | euro | 25.05.2018 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 12039 | Verzuolo | | X | 10 - Information Phase | 25.05.2018 14:01 | | | | No | No | | | | | euro |
| 314216 | | | SCUOLA ITIS VERZUOLO | | Default Value | | Running | euro | 25.05.2018 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12039 | Verzuolo | | X | 10 - Information Phase | 25.05.2018 14:00 | | | | No | No | | | | | euro |
| 314116-001 | | | HIT / IMMOBILE VENTURA GALASSO / VIA VIGEVANO 29 MILANO | | Default Value | | Running | euro | 24.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 20144 | Milano | Residential houses | Via Vigevano 29 | 40 - Realisation Phase | 24.05.2018 16:08 | | | | No | | | | | 3.747,00 € | euro |
| 314116 | | | IMMOBILE VENTURA GALASSO / VIA VIGEVANO 29 MILANO | | Default Value | | Running | euro | 24.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20144 | Milano | Residential houses | Via Vigevano 29 | 10 - Information Phase | 24.05.2018 14:32 | | | | No | | | | | 3.747,00 € | euro |
| 313930 | | | EDIFICIO RESIDENZIALE MULTIPIANO / VIA M.GIOIA 177 MILANO | | Default Value | | Running | euro | 23.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20125 | Milano | Residential houses | Melchiorre Gioia 177 | 40 - Realisation Phase | 23.05.2018 07:08 | | | | No | | | | | | euro |
| 313336-001 | | | NUOVO COMPLESSO INDUSTRIALE / HTA / HOP | | Default Value | | Running | euro | 14.05.2018 | | ILAZ-LAZIO | Lucia Palagi | | | | | Opportunity | Halfen System Account | Italy | 04010 | Latina | | via Appia km, 934 | 10 - Information Phase | 14.05.2018 10:50 | | | | No | | | | | | euro |
| 313336 | | | NUOVO COMPLESSO INDUSTRIALE | | Default Value | | Running | euro | 14.05.2018 | | ILAZ-LAZIO | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 04010 | Latina | | via Appia km, 934 | 10 - Information Phase | 14.05.2018 10:49 | | | | No | | | | | | euro |
| 313217 | | | ENG 2K / ALDI Costruzione magazzino logistico | | Default Value | | Running | euro | 12.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27015 | LANDRIANO | Industry building | S.S. 412 | 10 - Information Phase | 09.05.2018 14:50 | 278 | | | No | | | | | | euro |
| 313216 | | | Costruzione 18 edifici a schiera 90 unita' abitative totali classe A4 | | Default Value | | Running | euro | 09.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 27010 | SIZIANO | Residential houses | Via P. Borsellino | 10 - Information Phase | 09.05.2018 14:50 | 277 | | | No | | | | | | euro |
| 313215 | | | Costruzione 16 ville a schera Classe A | | Default Value | | Running | euro | 06.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 25100 | BRESCIA | Residential houses | Via O. Montini | 10 - Information Phase | 09.05.2018 14:50 | 276 | | | No | | | | | | euro |
| 313204 | | | Costruzione palazzina uso abitaz 33 appartamenti classe energetica A | | Default Value | | Running | euro | 04.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Pelandi 7 | 10 - Information Phase | 09.05.2018 14:50 | 265 | | | No | | | | | | euro |
| 313203 | | | Costruzione albergo 81 camere 27 monolocali c/o Ospedale di Bergamo | | Default Value | | Running | euro | 04.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Technical facilities | Via M. L. King | 10 - Information Phase | 09.05.2018 14:50 | 264 | | | No | | | | | | euro |
| 313199 | | | Ristrutt complesso industriale produz e nuova palazz uffici Serioplast | | Default Value | | Running | euro | 04.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24068 | SERIATE | Industry building | Via Comonte 15 Ex Frattini | 10 - Information Phase | 09.05.2018 14:50 | 560 | | | No | | | | | | euro |
| 313198 | | | Costruzione 3 palazzine 40 appartamenti area commerciale parcheggi | | Default Value | | Running | euro | 15.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24067 | SARNICO | Residential houses | Via Monte Grappa Ex Stoppani | 10 - Information Phase | 09.05.2018 14:50 | 259 | | | No | | | | | | euro |
| 313196 | | | Ampliamento piazzale nord in direzione est | | Default Value | | Running | euro | 30.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24050 | ORIO AL SERIO | Technical facilities | Aeroporto di Bergamo | 10 - Information Phase | 09.05.2018 14:50 | 257 | | | No | | | | | | euro |
| 313192 | | | Ristrutturazione Oratorio San Luigi Gonzaga | | Default Value | | Running | euro | 21.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24043 | CARAVAGGIO | Technical facilities | Via Bernardo 24 | 10 - Information Phase | 09.05.2018 14:49 | 253 | | | No | | | | | | euro |
| 313191 | | | Costruzione centro servizi residenziali e semiresidenziali c/o RSA | | Default Value | | Running | euro | 30.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24027 | NEMBRO | | Via Dei Frati 1 | 10 - Information Phase | 09.05.2018 14:49 | 252 | | | No | | | | | | euro |
| 313189 | | | Recupero edificio ex maternita' per archivi storici e servizi annessi | | Default Value | | Running | euro | 02.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23900 | LECCO | | Via Ghislanzoni Ex Ospedale | 10 - Information Phase | 09.05.2018 14:49 | 250 | | | No | | | | | | euro |
| 313183 | | | Costruzione edificio commerciale | | Default Value | | Running | euro | 28.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 23012 | CASTIONE ANDEVENNO | Technical facilities | Via Del Piano | 10 - Information Phase | 09.05.2018 14:49 | 244 | | | No | | | | | | euro |
| 313180 | | | TECHBAU / Costruzione nuovo magazzino logistico e uffici annessi | | Default Value | | Running | euro | 30.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 21040 | ORIGGIO | Industry building | Polo Industriale | 10 - Information Phase | 09.05.2018 14:49 | 242 | | | No | | | | | | euro |
| 313178 | | | Ampliamento edificio produttivo | | Default Value | | Running | euro | 22.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20900 | MONZA | Industry building | Via G. B. Stucchi 110 | 10 - Information Phase | 09.05.2018 14:49 | 240 | | | No | | | | | | euro |
| 313169 | | | Costruzione nuovo Campus di Architettura 4200 mq | | Default Value | | Running | euro | 11.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via E. Bonardi | 10 - Information Phase | 09.05.2018 14:49 | 229 | | | No | | | | | | euro |
| 313168 | | | Recupero ex centro parrocchiale per centro accoglienza e diurno | | Default Value | | Running | euro | 30.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | | Via Feraboli 15 | 10 - Information Phase | 09.05.2018 14:49 | 228 | | | No | | | | | | euro |
| 313166 | | | Riqualificazione edificio direzionale 20000 mq | | Default Value | | Running | euro | 16.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Viale Fulvio Testi 280/A | 10 - Information Phase | 09.05.2018 14:48 | 226 | | | No | | | | | | euro |
| 313165 | | | Riqualificazione edificio ad uso uffici | | Default Value | | Running | euro | 16.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Manzoni 5/A | 10 - Information Phase | 09.05.2018 14:48 | 225 | | | No | | | | | | euro |
| 313164 | | | Costruzione edificio multip 10 pft uso abitazione e 131 box interrati | | Default Value | | Running | euro | 16.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Marco Polo 1 | 10 - Information Phase | 09.05.2018 14:48 | 223 | | | No | | | | | | euro |
| 313162 | | | Recupero edificio per spazi commerciali ristorante | | Default Value | | Running | euro | 16.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Bagutta 2 Ex Garage Traversi | 10 - Information Phase | 09.05.2018 14:48 | 221 | | | No | | | | | | euro |
| 313160 | | | Ristrutturazione edificio a destinazione terziaria | | Default Value | | Running | euro | 16.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Broletto 20/22 | 10 - Information Phase | 09.05.2018 14:48 | 220 | | | No | | | | | | euro |
| 313159 | | | Riqualificazione edificio a destinazione terziaria | | Default Value | | Running | euro | 16.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Broletto 16 | 10 - Information Phase | 09.05.2018 14:48 | 219 | | | No | | | | | | euro |
| 313158 | | | Ristrutt complesso x nuova sede Volkswagen Financial Services 20000 mq | | Default Value | | Running | euro | 16.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Privata Grosio 10/4 | 10 - Information Phase | 09.05.2018 14:48 | 218 | | | No | | | | | | euro |
| 313156 | | | Costruzione edificio multip 13 pft per 58 appartamenti e boxes | | Default Value | | Running | euro | 08.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Corno Di Cavento 2 | 10 - Information Phase | 09.05.2018 14:48 | 216 | | | No | | | | | | euro |
| 313155 | | | Costruzione edificio ad uso abitazione uffici e negozi | | Default Value | | Running | euro | 02.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Corso Di Porta Ticinese 28 | 10 - Information Phase | 09.05.2018 14:48 | 215 | | | No | | | | | | euro |
| 313152 | | | Costruzione torre direzionale 31 piani 175 mt altezza nuova sede PWC | | Default Value | | Running | euro | 22.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Piazzale G. Cesare Ex Fiera | 10 - Information Phase | 09.05.2018 14:48 | 212 | | | No | | | | | | euro |
| 313115 | | | Costruzione edificio multip ad uso abitazione 22 appartamenti classe A | | Default Value | | Running | euro | 22.03.2018 | 08.05.2018 | ILOM-LOMBARDIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 20098 | SAN GIULIANO MILANESE | Residential houses | Via Romagna | 10 - Information Phase | 08.05.2018 16:24 | 211 | | | No | | | | | | euro |
| 313054-001 | | | HDB / GIUNTI / THE MARKET / POLO DELLA MODA / SAN MARINO | | Default Value | | Running | euro | 08.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 47891 | ROVERETA RSM | Shopping center | STRADA ROVERETA | 40 - Realisation Phase | 08.05.2018 10:39 | | | | No | | | | | 477,00 € | euro |
| 313054 | | | THE MARKET / POLO DELLA MODA / SAN MARINO | | Default Value | | Running | euro | 08.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 47891 | ROVERETA RSM | Shopping center | STRADA ROVERETA | 40 - Realisation Phase | 08.05.2018 10:37 | | | | No | | | | | 477,00 € | euro |
| 312993-003 | | | SEALAND UNIVERSITY HOSPITAL / KOGE / DANIMARCA / GIUNTI | | Default Value | | Running | euro | 05.02.2021 | | ILOM-LOMBARDIA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Denmark | 4600 | Køge | Medical facility | polo universitario | 10 - Information Phase | 05.02.2021 16:22 | | | | No | No | | | | | euro |
| 312993-001 | | | HDB / CMB / SEALAND UNIVERSITY HOSPITAL / KOGE / DANIMARCA | | Default Value | | Running | euro | 07.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Denmark | 4600 | Køge | Medical facility | polo universitario | 10 - Information Phase | 07.05.2018 13:00 | | | | No | | | | | 126.240,00 € | euro |
| 312993 | | | SEALAND UNIVERSITY HOSPITAL / KOGE / DANIMARCA | | Default Value | | Running | euro | 07.05.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Denmark | 4600 | Køge | Medical facility | polo universitario | 10 - Information Phase | 07.05.2018 12:58 | | | | No | | | | | 139.719,00 € | euro |
| 312692 | | | Costruzione 3 medie strutture vendita e parcheggio interr Ex Maddalena | | Default Value | | Running | euro | 02.05.2018 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 34100 | TRIESTE | | Via dell' Istria / Marenzi | 10 - Information Phase | 02.05.2018 10:21 | 211 | | | No | | | | | | euro |
| 312691 | | | Costruzione nuovo edificio per commercio al dettaglio | | Default Value | | Running | euro | 02.05.2018 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 34100 | TRIESTE | | Via Flavia 56 | 10 - Information Phase | 02.05.2018 10:18 | 210 | | | No | | | | | | euro |
| 312690 | | | Recupero riqualificaz immobile 1084 mq ad uso turistico ricreativo | | Default Value | | Running | euro | 02.05.2018 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 34100 | TRIESTE | | Viale Miramare 72 | 10 - Information Phase | 02.05.2018 10:16 | 209 | | | No | | | | | | euro |
| 312687 | | | Costruzione edificio commerciale supermercato Aldi | | Default Value | | Running | euro | 02.05.2018 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 33050 | Udine | | Via Tricesimo 97 | 10 - Information Phase | 02.05.2018 10:11 | 207 | | | No | | | | | | euro |
| 312686 | | | Costruzione 8 unita' immobiliari residenziali ed OO UU | | Default Value | | Running | euro | 02.05.2018 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 33084 | Cordenons | | Via L. Einaudi | 10 - Information Phase | 02.05.2018 10:08 | 206 | | | No | | | | | | euro |
| 312681 | | | Completamento palazzetto dello sport primo stralcio Riappalto Lavori | | Default Value | | Running | euro | 02.05.2018 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 33043 | Cividale del Friuli | | via Perusini | 10 - Information Phase | 02.05.2018 09:45 | 205 | | | No | | | | | | euro |
| 312562 | | | Costruzione distretto socio sanitario supermercato 780 mq uffici | | Default Value | | Running | euro | 27.04.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 59024 | Vernio | | Via Caduti della Direttissima | 10 - Information Phase | 27.04.2018 14:46 | 204 | | | No | | | | | | euro |
| 312559 | | | Costruzione supermercato 2 piani 2300 mq | | Default Value | | Running | euro | 27.04.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 57100 | LIVORNO | | Viale I. Nievo 29 | 10 - Information Phase | 27.04.2018 14:39 | 202 | | | No | | | | | | euro |
| 312558 | | | Costruzione Polo Ospedaliero Universitario Nuovo Santa Chiara | | Default Value | | Running | euro | 27.04.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56120 | PISA | | Via Paradisa Loc. Cisanello | 10 - Information Phase | 27.04.2018 14:37 | 201 | | | No | | | | | | euro |
| 312530-001 | | | REALIZZAZIONE FACCIATA CASA PRIVATA / AGRIGENTO / HRC | | Default Value | | Running | euro | 27.04.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 92100 | Agrigento | | * | 10 - Information Phase | 27.04.2018 11:03 | | | | No | | | | | 500,00 € | euro |
| 312530 | | | REALIZZAZIONE FACCIATA CASA PRIVATA | | Default Value | | Running | euro | 27.04.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 92100 | Agrigento | | * | 10 - Information Phase | 27.04.2018 11:00 | | | | No | | | | | 500,00 € | euro |
| 312177 | | | Costruzione scuola media comprensiva Fracassetti Capadarco Ugo Betti | | Default Value | | Running | euro | 20.04.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 63900 | Fermo | | Via S. D'Acquisto | 10 - Information Phase | 20.04.2018 11:07 | 117 | | | No | | | | | | euro |
| 312173 | | | Realizzazione nuovi laboratori ITI Montani | | Default Value | | Running | euro | 20.04.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 63900 | Fermo | | Via G. Montani 7 | 10 - Information Phase | 20.04.2018 11:05 | 116 | | | No | | | | | | euro |
| 312169 | | | Costruzione RSA 100 posti letto classe energetica A | | Default Value | | Running | euro | 20.04.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 63828 | Campofilone | | Localita' Valdaso | 10 - Information Phase | 20.04.2018 11:02 | 115 | | | No | | | | | | euro |
| 312166 | | | Costruzione nuova scuola Alighieri / Mestica | | Default Value | | Running | euro | 20.04.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62100 | Macerata | | Ex Saram | 10 - Information Phase | 20.04.2018 11:00 | 114 | | | No | | | | | | euro |
| 312163 | | | Ricostruzione edificio scolastico ITIS Divini primo lotto laboratori | | Default Value | | Running | euro | 20.04.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62027 | San Severino Marche | | Viale Mazzini 31 | 10 - Information Phase | 20.04.2018 10:58 | 113 | | | No | | | | | | euro |
| 312162 | | | Costruzione nuova scuola secondaria di primo grado | | Default Value | | Running | euro | 20.04.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 61100 | PESARO | | Via Lamarmora | 10 - Information Phase | 20.04.2018 10:55 | 112 | | | No | | | | | | euro |
| 312157 | | | Adeguamento statico e miglioramento sismico IPSIA Laeng | | Default Value | | Running | euro | 20.04.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 60027 | Osimo | | Via Molino Meusa | 10 - Information Phase | 20.04.2018 10:52 | 111 | | | No | | | | | | euro |
| 312151 | | | costruzione polo scolastico materna ed elementare | | Default Value | | Running | euro | 20.04.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 66050 | San Salvo | | capolugo | 10 - Information Phase | 20.04.2018 10:34 | 108 | | | No | | | | | | euro |
| 312150 | | | Costruzione edificio multipiano 10 piani fuori terra uso abitazione | | Default Value | | Running | euro | 20.04.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | viale druso | 10 - Information Phase | 20.04.2018 10:21 | 107 | | | No | | | | | | euro |
| 312149 | | | costruzione 2 ville | | Default Value | | Running | euro | 20.04.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Project | Halfen System Account | Italy | 39047 | Santa Cristina Valgardena | | strada sacun | 10 - Information Phase | 20.04.2018 10:18 | 106 | | | No | | | | | | euro |
| 312146 | | | costruzione palazzina 3 appartamenti casa clima A | | Default Value | | Running | euro | 20.04.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Project | Halfen System Account | Italy | 12050 | Castelrotto | | via palmer oltretorrente | 10 - Information Phase | 20.04.2018 10:15 | 105 | | | No | | | | | | euro |
| 311181 | | | CAMPUS OPENZONE / EX BOCCARDO / BRESSO | | Default Value | | Running | euro | 05.04.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20091 | Bresso | Educational facility | Lillo del Duca 10 | 40 - Realisation Phase | 05.04.2018 17:18 | | | | No | | | | | 1.676,00 € | euro |
| 310999 | | | Costruzione concessionaria auto e officina | | Default Value | | Running | euro | 25.01.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26100 | CREMONA | Technical facilities | Via Castelleone Ex Nuvolari | 10 - Information Phase | 04.04.2018 11:00 | 067 | | | No | | | | | | euro |
| 310993 | | | Costruzione palazzina ad uso abitazione 33 appartam classe energ A | | Default Value | | Running | euro | 15.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Via Pelandi 7 | 10 - Information Phase | 04.04.2018 11:00 | 074 | | | No | | | | | | euro |
| 310992 | | | Costruzione (demoric) edificio ad uso abitazione e boxes | | Default Value | | Running | euro | 15.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 24100 | BERGAMO | Residential houses | Viale Vittorio Emanuele II 19 | 10 - Information Phase | 04.04.2018 11:00 | 075 | | | No | | | | | | euro |
| 310989 | | | Costruzione centro parrocchiale oratorio alloggio impianti sportivi | | Default Value | | Running | euro | 12.01.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20843 | VERANO BRIANZA | Technical facilities | Viale Rimembranze | 10 - Information Phase | 04.04.2018 11:00 | 078 | | | No | | | | | | euro |
| 310988 | | | Costruzione (demoric) edificio ad uso abitazione 40 appartam classe A | | Default Value | | Running | euro | 15.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Monviso 41 | 10 - Information Phase | 04.04.2018 11:00 | 079 | | | No | | | | | | euro |
| 310987 | | | Riqualificazione generale Hotel Sheraton 300 camere 35000 mq | | Default Value | | Running | euro | 15.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via Caldera 21 | 10 - Information Phase | 04.04.2018 11:00 | 080 | | | No | | | | | | euro |
| 310986 | | | Costruzione palazzina ad uso abitazione | | Default Value | | Running | euro | 08.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Melchiorre Gioia 177 | 10 - Information Phase | 04.04.2018 11:00 | 081 | | | No | | | | | | euro |
| 310985 | | | Costruzione edificio multip 7 pft ad uso abitazione negozi e boxes | | Default Value | | Running | euro | 08.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Residential houses | Via Giambellino 31 | 10 - Information Phase | 04.04.2018 11:00 | 082 | | | No | | | | | | euro |
| 310984 | | | Ristrutturazione complesso multipiano per nuova sede operativa | | Default Value | | Running | euro | 01.02.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20100 | MILANO | Technical facilities | Via De Castillia 23 | 10 - Information Phase | 04.04.2018 11:00 | 083 | | | No | | | | | | euro |
| 310981 | | | Costruzione 4 MSV 1012+1255+1946+2709 mq | | Default Value | | Running | euro | 18.01.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20013 | MAGENTA | Technical facilities | Via Padana Est Ex Penati | 10 - Information Phase | 04.04.2018 11:00 | 086 | | | No | | | | | | euro |
| 310705 | | | costruzione fabbricato industriale nel comparto I U.M.I.62 | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 42015 | Prato | | macrolotto Industriale 2 | 10 - Information Phase | 28.03.2018 11:12 | 65 | | | No | | | | | | euro |
| 310701 | | | costruzione residenza ecosostenibile per malati oncologici e familiari | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 58100 | Grosseto | | via cimabue | 10 - Information Phase | 28.03.2018 11:07 | 64 | | | No | | | | | | euro |
| 310699-003 | | | IMA / OZZANO NELL'EMILIA / carlo NON VEDERE | | Default Value | | Running | euro | 28.03.2018 | | IEMI-EMILIA ROMAGNA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 40064 | Ozzano dell'Emilia | Industry building | VIA TOLARA | 10 - Information Phase | 28.03.2018 11:31 | | | | No | | | | | | euro |
| 310698 | | | intervento adeguamento sismico e ristrutturazione complesso edilizio | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 57023 | Cecina | | piazza carducci | 10 - Information Phase | 28.03.2018 11:04 | 63 | | | No | | | | | | euro |
| 310695 | | | costruzione edificio ad uso abitazione 12 alloggi | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | | via T. Vecellio | 10 - Information Phase | 28.03.2018 11:00 | 62 | | | No | | | | | | euro |
| 310694 | | | costruzione 39 alloggi edilizia residenziale pubblica | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56120 | PISA | | via Emilia località S. ermete | 10 - Information Phase | 28.03.2018 10:57 | 61 | | | No | | | | | | euro |
| 310693 | | | realizz imp. risalita percorso/sovrappasso x accessibilità centro storico | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56037 | Peccioli | | centro storico | 10 - Information Phase | 28.03.2018 10:53 | 60 | | | No | | | | | | euro |
| 310692 | | | costruz scuola infanzia primaria secondaria sistem esterna parcheggi | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | * | * | | via commercio Nord | 10 - Information Phase | 28.03.2018 10:48 | 59 | | | No | | | | | | euro |
| 310690 | | | costruz. edificio polifunzionale sede associaz attività parrocchiali | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55040 | Seravezza | | piazza europa | 10 - Information Phase | 28.03.2018 10:44 | 58 | | | No | | | | | | euro |
| 310686 | | | costruzione supermercato 1500 mq | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55041 | Camaiore | | via roma/mattatoio | 10 - Information Phase | 28.03.2018 10:38 | 56 | | | No | | | | | | euro |
| 310684 | | | realizzazione nuovo ACC M centrale computer realizz fabbricati e locali tecn | | Default Value | | Running | euro | 28.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | campo di marte | 10 - Information Phase | 28.03.2018 10:34 | 55 | | | No | | | | | | euro |
| 310683-001 | | | HK5 / AMPLIAMENTO E NUOVA COSTRUZIONE | | Default Value | | Running | euro | 28.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 26018 | Trigolo | Residential houses | CANEVARI 85 | 40 - Realisation Phase | 28.03.2018 11:30 | | | | No | | | | | | euro |
| 310683 | | | AMPLIAMENTO E NUOVA COSTRUZIONE | | Default Value | | Running | euro | 28.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26018 | Trigolo | Residential houses | CANEVARI 85 | 40 - Realisation Phase | 28.03.2018 10:33 | | | | No | | | | | | euro |
| 310676 | | | costruzione MSV 2500 mq+edificio residenziale e uffici | | Default Value | | Running | euro | 28.03.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06100 | PERUGIA | | via palermo ex mattatoio | 10 - Information Phase | 28.03.2018 10:19 | 52 | | | No | | | | | | euro |
| 310674 | | | costruzione edificio scolastico per scuola media carducci | | Default Value | | Running | euro | 28.03.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06034 | Foligno | | via gentile da foligno | 10 - Information Phase | 28.03.2018 10:15 | 51 | | | No | | | | | | euro |
| 310413-001 | | | REALIZZAZIONE NUOVO ASCENSORE / GIUNTI | | Default Value | | Running | euro | 26.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Opportunity | Halfen System Account | Italy | 56100 | PISA | | * | 10 - Information Phase | 26.03.2018 15:30 | | | | No | | | | | | euro |
| 310413 | | | REALIZZAZIONE NUOVO ASCENSORE | | Default Value | | Running | euro | 26.03.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | | * | 10 - Information Phase | 26.03.2018 15:30 | | | | No | | | | | | euro |
| 310166 | | | RESIDENZIALE / VIA MATILDE SERAO MILANO / | | Default Value | | Running | euro | 22.03.2018 | 15.07.2019 | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 20144 | Milano | Residential houses | Via Matilde Serao 1 | 40 - Realisation Phase | 22.03.2018 10:14 | | | | No | | | | | 4.989,00 € | euro |
| 310048 | | | TORRE BZ IMMO / BOLZANO | | Default Value | | Running | euro | 21.03.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Project | Halfen System Account | Italy | 39100 | BOLZANO (BZ) | | VIA ALTO ADIGE | 10 - Information Phase | 21.03.2018 11:24 | | | | No | | | | | 19.000,00 € | euro |
| 309919-001 | | | HK5 / NUOVA COSTRUZIONE / VIA CANEVARI 85 TIGOLO CR / SCARINZI | | Default Value | | Running | euro | 19.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 26018 | Trigolo | Residential houses | CANEVARI 85 | 40 - Realisation Phase | 19.03.2018 17:37 | | | | No | | | | | 6.464,00 € | euro |
| 309919 | | | NUOVA COSTRUZIONE / VIA CANEVARI 85 TIGOLO CR / SCARINZI | | Default Value | | Running | euro | 19.03.2018 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | | Project | Halfen System Account | Italy | 26018 | Trigolo | Residential houses | CANEVARI 85 | 40 - Realisation Phase | 19.03.2018 17:33 | | | | No | | | | | 6.464,00 € | euro |
| 309866 | | | Rotatoria all'intersezione tra SR 439 Sarzanese Valdera e SP 1 | | Default Value | | Running | euro | 02.02.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55041 | CAMAIORE | Technical facilities | S.R. 439 Sarzanese Valdera e S.P.1 | 10 - Information Phase | 19.03.2018 13:46 | 57 | | | No | | | | | | euro |
| 309865 | | | Costruzione scuola secondaria superiore Elsa Morante secondo lotto | | Default Value | | Running | euro | 12.01.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | Via Chiantigiana 26 | 10 - Information Phase | 19.03.2018 13:46 | 54 | | | No | | | | | | euro |
| 309864 | | | Costruz 171 unita' abitative social housing negozi asilo scuola materna | | Default Value | | Running | euro | 19.01.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06100 | PERUGIA | Residential houses | Via Cortonese Ex Tabacchificio | 10 - Information Phase | 19.03.2018 13:46 | 53 | | | No | | | | | | euro |
| 309863 | | | Riqualificazione complesso ex Fornace per 85 alloggi social housing | | Default Value | | Running | euro | 08.02.2018 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06019 | UMBERTIDE | Residential houses | Via Latterini | 10 - Information Phase | 19.03.2018 13:45 | 50 | | | No | | | | | | euro |
| 309855 | | | Costruzione nuovo ospedale unico provinciale 250 posti letto | | Default Value | | Running | euro | 11.01.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 63900 | FERMO | | Via San Claudio Loc. Campiglione | 10 - Information Phase | 19.03.2018 11:58 | 08 | | | No | | | | | | euro |
| 309854 | | | Costr polo scolastico 350 alunni palestra 830 mq auditorium 300 p. bibliot | | Default Value | | Running | euro | 19.01.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62026 | SAN GINESIO | | Via Roma | 10 - Information Phase | 19.03.2018 11:58 | 07 | | | No | | | | | | euro |
| 309853 | | | Costruzione (ricostruzione) plesso scolastico 2 piani 1850 mq | | Default Value | | Running | euro | 02.02.2018 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62020 | CALDAROLA | | Viale Umberto I | 10 - Information Phase | 19.03.2018 11:58 | 06 | | | No | | | | | | euro |
| 309851 | | | Costruzione polo didattico antisismico primo stralcio | | Default Value | | Running | euro | 25.01.2018 | | ILAZ-LAZIO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 02015 | CITTADUCALE | | Via Dello Sport Frazione S. Rufina | 10 - Information Phase | 19.03.2018 11:52 | 05 | | | No | | | | | | euro |
| 309848 | | | Recupero edilizio Conservatorio Musicale opere sisma 6/4/2009 | | Default Value | | Running | euro | 10.01.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67100 | L'AQUILA | | Piazza Di Collemaggio | 10 - Information Phase | 19.03.2018 11:44 | 03 | | | No | | | | | | euro |
| 309847 | | | Costruzione nuova scuola materna nel Quartiere Borgo Angizia | | Default Value | | Running | euro | 12.01.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67051 | AVEZZANO | | Via America | 10 - Information Phase | 19.03.2018 11:44 | 02 | | | No | | | | | | euro |
| 309846 | | | Rafforzamento sismico edificio comunale | | Default Value | | Running | euro | 14.02.2018 | | IABR-ABRUZZO | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 66023 | FRANCAVILLA AL MARE | | Corso Roma 7 | 10 - Information Phase | 19.03.2018 11:44 | 01 | | | No | | | | | | euro |
| 309132-001 | | | RESORT ANTOGNOLLA / PERUGIA / HBS | | Default Value | | Running | euro | 08.03.2018 | | IUMB-UMBRIA | Diego Carminati | | | | | Opportunity | Halfen System Account | Italy | 06100 | PERUGIA | | X | 30 - Tender & Submission Phase | 08.03.2018 14:54 | | | | No | | | | | 40.000,00 € | euro |
| 309132 | | | RESORT ANTOGNOLLA / PERUGIA | | Default Value | | Running | euro | 08.03.2018 | | IUMB-UMBRIA | Diego Carminati | | | | | Project | Halfen System Account | Italy | 06100 | PERUGIA | | X | 10 - Information Phase | 08.03.2018 14:53 | | | | No | | | | | 40.000,00 € | euro |
| 309107-001 | | | SAVONA TERMINAL AUTO / SAVONA / HBS | | Default Value | | Running | euro | 08.03.2018 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 17100 | Savona | | X | 40 - Realisation Phase | 08.03.2018 12:24 | | | | No | | | | | | euro |
| 309107 | | | SAVONA TERMINAL AUTO / SAVONA | | Default Value | | Running | euro | 08.03.2018 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17100 | Savona | | X | 10 - Information Phase | 08.03.2018 12:24 | | | | No | | | | | | euro |
| 308196-001 | | | CAPANNONI LOGISTICA / GIUNTI | | Default Value | | Running | euro | 23.02.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 95100 | CATANIA | | * | 10 - Information Phase | 23.02.2018 11:03 | | | | No | | | | | 30.000,00 € | euro |
| 308196 | | | CAPANNONI LOGISTICA | | Default Value | | Running | euro | 23.02.2018 | | ISIC-SICILIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 95100 | CATANIA | | * | 10 - Information Phase | 23.02.2018 11:02 | | | | No | | | | | 30.000,00 € | euro |
| 308180-001 | | | PASSERELLA PEDONALE / RAPALLO / DETAN | | Default Value | | Running | euro | 23.02.2018 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 16035 | Rapallo | | X | 30 - Tender & Submission Phase | 23.02.2018 09:08 | | | | No | | | | | 4.800,00 € | euro |
| 308180 | | | PASSERELLA PEDONALE / RAPALLO | | Default Value | | Running | euro | 23.02.2018 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16035 | Rapallo | | X | 10 - Information Phase | 23.02.2018 09:07 | | | | No | | | | | 4.800,00 € | euro |
| 306473-001 | | | AMPLIAMENTO SCUOLA MARESCIALLI FIRENZE / GIUNTI | | Default Value | | Running | euro | 31.01.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Opportunity | Halfen System Account | Italy | 50100 | FIRENZE | | * | 10 - Information Phase | 31.01.2018 10:58 | | | | No | | | | | | euro |
| 306473 | | | AMPLIAMENTO SCUOLA MARESCIALLI FIRENZE | | Default Value | | Running | euro | 31.01.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 50100 | FIRENZE | | * | 10 - Information Phase | 31.01.2018 10:58 | | | | No | | | | | | euro |
| 305557-001 | | | RESTAURO RISTRUTTURALE ARCHIVIO DI STATO A CAGLIARI / MBT | | Default Value | | Running | euro | 19.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 09125 | Cagliari | | gallura 2 | 10 - Information Phase | 19.01.2018 16:03 | | | | No | | | | | 200.000,00 € | euro |
| 305557 | | | RESTAURO RISTRUTTURALE ARCHIVIO DI STATO A CAGLIARI | | Default Value | | Running | euro | 19.01.2018 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 09125 | Cagliari | | gallura 2 | 10 - Information Phase | 19.01.2018 16:03 | | | | No | | | | | 200.000,00 € | euro |
| 305401-001 | | | SCUOLA SAN GIMIGNANO / GIUNTI | | Default Value | | Running | euro | 18.01.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Opportunity | Halfen System Account | Italy | 53030 | San Gimignano | | DELFO GIACHI | 10 - Information Phase | 18.01.2018 11:54 | | | | No | | | | | 2.000,00 € | euro |
| 305401 | | | SCUOLA SAN GIMIGNANO | | Default Value | | Running | euro | 18.01.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 53030 | San Gimignano | | DELFO GIACHI | 10 - Information Phase | 18.01.2018 11:53 | | | | No | | | | | 2.000,00 € | euro |
| 305399-001 | | | CHIESA SAN MINIATO SIENA / FK4 | | Default Value | | Running | euro | 18.01.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Opportunity | Halfen System Account | Italy | 53100 | Siena | | VIA ALDO MORO | 10 - Information Phase | 18.01.2018 11:39 | | | | No | | | | | 15.000,00 € | euro |
| 305399 | | | CHIESA SAN MINIATO SIENA/ | | Default Value | | Running | euro | 18.01.2018 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 53100 | Siena | | VIA ALDO MORO | 10 - Information Phase | 18.01.2018 11:36 | | | | No | | | | | 15.000,00 € | euro |
| 305203 | | | Costruzione magazzino per la logistica 5760 mq coperti | | Default Value | | Running | euro | 01.12.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 59100 | PRATO | Industry building | Via Paronese 60 Macrolotto 1 | 10 - Information Phase | 16.01.2018 10:06 | 1293 | | | No | | | | | | euro |
| 305202 | | | Costruz fabbricato industriale 12 unita' immob Comparto L UMI 87/A | | Default Value | | Running | euro | 27.10.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 59100 | PRATO | Industry building | Macrolotto Industriale 2 | 10 - Information Phase | 16.01.2018 10:06 | 1291 | | | No | | | | | | euro |
| 305201 | | | Costruzione 4 edifici industriali 25.000 mq | | Default Value | | Running | euro | 16.11.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 59100 | PRATO | Technical facilities | Via Chermitz Macrolotto 2 | 10 - Information Phase | 16.01.2018 10:06 | 1290 | | | No | | | | | | euro |
| 305200 | | | Riqualif complessiva ambito Dogana d'acqua con riapertura bacino est | | Default Value | | Running | euro | 15.12.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 57100 | LIVORNO | Technical facilities | Via Della Cinta Esterna | 10 - Information Phase | 16.01.2018 10:06 | 1289 | | | No | | | | | | euro |
| 305199 | | | Ristrutturaz complesso uso commerciale supermercato e 23 negozi | | Default Value | | Running | euro | 23.11.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 57037 | PORTOFERRAIO | Residential houses | Viale Zambelli Ex Enel | 10 - Information Phase | 16.01.2018 10:06 | 1288 | | | No | | | | | | euro |
| 305198 | | | Costruzione edificio uso abitazione 20 appartam e 27 boxes interrati | | Default Value | | Running | euro | 08.11.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | Technical facilities | Via C. Matteucci | 10 - Information Phase | 16.01.2018 10:06 | 1287 | | | No | | | | | | euro |
| 305197 | | | Costruz centro commerciale ipermercato 3200 mq + palazzina 14 appart | | Default Value | | Running | euro | 20.10.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56100 | PISA | Technical facilities | Vie G. Luzzato / M. Valgimigli | 10 - Information Phase | 16.01.2018 10:06 | 1286 | | | No | | | | | | euro |
| 305196 | | | Costruzione centro polifunzionale per le famiglie prima fase OO UU | | Default Value | | Running | euro | 07.12.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 56021 | CASCINA | | Via N. Sauro | 10 - Information Phase | 16.01.2018 10:06 | 1285 | | | No | | | | | | euro |
| 305195 | | | Costruzione MSV primo lotto negozio Arcaplanet | | Default Value | | Running | euro | 17.11.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 55049 | VIAREGGIO | Technical facilities | Via Pisana 13 | 10 - Information Phase | 16.01.2018 10:06 | 1284 | | | No | | | | | | euro |
| 305194 | | | Lavori di riqualificazione della Piazza Mazzini | | Default Value | | Running | euro | 07.12.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 53036 | POGGIBONSI | Technical facilities | Piazza Mazzini | 10 - Information Phase | 16.01.2018 10:06 | 1283 | | | No | | | | | | euro |
| 305193 | | | Realizzazione nuovo stabilimento termale | | Default Value | | Running | euro | 30.11.2017 | | ITOS-TOSCANA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 53027 | SAN QUIRICO D'ORCIA | Technical facilities | Bagno Vignoni | 10 - Information Phase | 16.01.2018 10:06 | 1282 | | | No | | | | | | euro |
| 305192 | | | Costruzione nuovo complesso parrocchiale San Marco Evangelista | | Default Value | | Running | euro | 15.11.2017 | | IUMB-UMBRIA | Lucia Palagi | | | | | Project | Halfen System Account | Italy | 06083 | BASTIA UMBRA | Technical facilities | Villaggio XXV Aprile | 10 - Information Phase | 16.01.2018 10:06 | 1281 | | | No | | | | | | euro |
| 305053-001 | | | COSTRUZIONE EDIFICIO PER SERVIZI DI SUPPORTO, SISTEMAZIONE ESTERNA ED DI UN IMPIANTO FOTOVOLTAICO / HIT | | Default Value | | Running | euro | 15.01.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Opportunity | Halfen System Account | Italy | 39040 | Campo di Trens | | * | 10 - Information Phase | 15.01.2018 12:23 | | | | No | | | | | 6.000,00 € | euro |
| 305053 | | | COSTRUZIONE EDIFICIO PER SERVIZI DI SUPPORTO, SISTEMAZIONE ESTERNA ED DI UN IMPIANTO FOTOVOLTAICO | | Default Value | | Running | euro | 15.01.2018 | | ITRE-TRENTINO ALTO ADIGE | Andreas Demanega | | | | | Project | Halfen System Account | Italy | 39040 | Campo di Trens | | * | 10 - Information Phase | 15.01.2018 12:23 | | | | No | | | | | 6.000,00 € | euro |
| 305024 | | | Restauro e riqualificazione Villa San Remigio per attivita' culturali | | Default Value | | Running | euro | 30.08.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 28900 | VERBANIA | | Localita' Pallanza | 10 - Information Phase | 15.01.2018 09:09 | 1234 | | | No | | | | | | euro |
| 305023 | | | Opere varie alla stazione e linea ferroviaria Domodossola confine svizzero | | Default Value | | Running | euro | 01.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 28845 | DOMODOSSOLA | Technical facilities | DRUOGNO / S.MARIA MAGGIORE / RE | 10 - Information Phase | 15.01.2018 09:09 | 1233 | | | No | | | | | | euro |
| 305022 | | | Lavori di recupero e valorizzazione Lungolago cittadino | | Default Value | | Running | euro | 06.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 28831 | BAVENO | Technical facilities | Viale Della Vittoria | 10 - Information Phase | 15.01.2018 09:09 | 1232 | | | No | | | | | | euro |
| 305021 | | | Ristrutturazione piano terra Istituto Tecnico Mossotti 1200 mq | | Default Value | | Running | euro | 29.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 28100 | NOVARA | | Via Curtatone 5 | 10 - Information Phase | 15.01.2018 09:09 | 1231 | | | No | | | | | | euro |
| 305020 | | | Costruzione nuovo punto vendita generi alimentari | | Default Value | | Running | euro | 31.08.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 28100 | NOVARA | Technical facilities | Capoluogo | 10 - Information Phase | 15.01.2018 09:09 | 1230 | | | No | | | | | | euro |
| 305019 | | | Ampliamento cimitero e gestione delle concessioni di sepoltura | | Default Value | | Running | euro | 20.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 28062 | CAMERI | Technical facilities | Capoluogo | 10 - Information Phase | 15.01.2018 09:09 | 1229 | | | No | | | | | | euro |
| 305018 | | | Riqualificazione paesaggistica Lotto B | | Default Value | | Running | euro | 20.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 28041 | ARONA | Technical facilities | Lungolago Marconi | 10 - Information Phase | 15.01.2018 09:09 | 1228 | | | No | | | | | | euro |
| 305017 | | | Adeguam messa a norma fabbricato 23 Fisiopatologia Subacquea | | Default Value | | Running | euro | 22.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 19100 | LA SPEZIA | | Localita' Le Grazie | 10 - Information Phase | 15.01.2018 09:09 | 1227 | | | No | | | | | | euro |
| 305016 | | | Lavori di riduzione del rischio sismico del palazzo comunale | | Default Value | | Running | euro | 13.10.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 18039 | VENTIMIGLIA | | Piazza Della Liberta' 3 | 10 - Information Phase | 15.01.2018 09:09 | 1226 | | | No | | | | | | euro |
| 305015 | | | Costruzione nuovo plesso scolastico Giulio Natta struttura in acciaio | | Default Value | | Running | euro | 21.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 18027 | PONTEDASSIO | | Viale IV Novembre | 10 - Information Phase | 15.01.2018 09:09 | 1225 | | | No | | | | | | euro |
| 305014 | | | Costruzione supermercato Conad e scuola materna 770 mq | | Default Value | | Running | euro | 13.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 18019 | VALLECROSIA | Technical facilities | Corso O. Raimondo Ex Tonet | 10 - Information Phase | 15.01.2018 09:09 | 1224 | | | No | | | | | | euro |
| 305013 | | | Costruzione sede aziendale Unogas Energia 3000 mq 16552 mc | | Default Value | | Running | euro | 31.08.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 18018 | TAGGIA | Technical facilities | Vie Beglini / Aurelia Bis | 10 - Information Phase | 15.01.2018 09:09 | 1223 | | | No | | | | | | euro |
| 305011 | | | Ristrutturaz p.t. edificio per bookshop bar a servizio museo della ceramica | | Default Value | | Running | euro | 06.10.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17100 | SAVONA | Technical facilities | Piazza Vescovato | 10 - Information Phase | 15.01.2018 09:09 | 1221 | | | No | | | | | | euro |
| 305010 | | | Messa in sicurezza con demolizione controsoffitti e ripristino solai | | Default Value | | Running | euro | 29.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17100 | SAVONA | Residential houses | Via Istria 1 | 10 - Information Phase | 15.01.2018 09:09 | 1220 | | | No | | | | | | euro |
| 305009 | | | Costruzione supermercato | | Default Value | | Running | euro | 15.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17100 | SAVONA | Technical facilities | Via Nizza 4 Ex Rinaldi | 10 - Information Phase | 15.01.2018 09:09 | 1219 | | | No | | | | | | euro |
| 305008 | | | Riqualificazione ex scuola per 3 alloggi social housing | | Default Value | | Running | euro | 06.10.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17047 | VADO LIGURE | Residential houses | Localita' Segno | 10 - Information Phase | 15.01.2018 09:09 | 1218 | | | No | | | | | | euro |
| 305007 | | | Lavori di manutenzione straordinaria Viadotto Castellaro | | Default Value | | Running | euro | 29.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17041 | ALTARE | Technical facilities | CAIRO MONTENOTTE | 10 - Information Phase | 15.01.2018 09:09 | 1217 | | | No | | | | | | euro |
| 305006 | | | Costruzione edificio alberghiero 14.000 MC 90 camere | | Default Value | | Running | euro | 22.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17023 | CERIALE | Technical facilities | Via Nuova di Peagna | 10 - Information Phase | 15.01.2018 09:09 | 1216 | | | No | | | | | | euro |
| 305005 | | | Realizzazione grigliatore impianto pretrattamento sist fognario | | Default Value | | Running | euro | 07.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 17021 | ALASSIO | Technical facilities | Localita' Sant'Anna | 10 - Information Phase | 15.01.2018 09:09 | 1215 | | | No | | | | | | euro |
| 305004 | | | Lavori rifunzionalizz piscina Mameli primo stralcio del primo lotto | | Default Value | | Running | euro | 05.10.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16100 | GENOVA | | Piazza Villa Giusti 8/R | 10 - Information Phase | 15.01.2018 09:09 | 1214 | | | No | | | | | | euro |
| 305003 | | | Restauro scuole materna elem Papa Giovanni XXIII e media Lomellini | | Default Value | | Running | euro | 04.10.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16100 | GENOVA | | Piazza G. Ferraris 4 | 10 - Information Phase | 15.01.2018 09:09 | 1213 | | | No | | | | | | euro |
| 305002 | | | Adeguamento sezioni di deflusso tratto valle Torrente Sturla | | Default Value | | Running | euro | 13.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16100 | GENOVA | Technical facilities | Tratto Universita' Via Franchi | 10 - Information Phase | 15.01.2018 09:09 | 1212 | | | No | | | | | | euro |
| 305001 | | | Lavori p terra e terrazzi primo piano edificio rifac scalinata Quesada | | Default Value | | Running | euro | 13.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16100 | GENOVA | Residential houses | Via Nicolo' Costa 7A e 11 | 10 - Information Phase | 15.01.2018 09:09 | 1211 | | | No | | | | | | euro |
| 305000 | | | Realizzaz adeguam nuovi laboratori chimici ed uffici DICCA Pad A e B | | Default Value | | Running | euro | 08.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16100 | GENOVA | Technical facilities | Via All'Opera Pia 15 / 15A | 10 - Information Phase | 15.01.2018 09:09 | 1210 | | | No | | | | | | euro |
| 304999 | | | Realizzazione centro di inclusione sociale c/o Villa Le Rondini | | Default Value | | Running | euro | 13.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16038 | SANTA MARGHERITA LIGURE | | Via Dogali 45 | 10 - Information Phase | 15.01.2018 09:09 | 1209 | | | No | | | | | | euro |
| 304998 | | | Costruzione parcheggio interrao 2 piani 70 box auto | | Default Value | | Running | euro | 25.08.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16035 | RAPALLO | Technical facilities | Via Baisi | 10 - Information Phase | 15.01.2018 09:09 | 1208 | | | No | | | | | | euro |
| 304997 | | | Completam intervento recupero ed accessibilita' aree esterne Eremo | | Default Value | | Running | euro | 07.09.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16034 | PORTOFINO | Technical facilities | Eremo Sant'Antonio Di Niasca | 10 - Information Phase | 15.01.2018 09:09 | 1207 | | | No | | | | | | euro |
| 304996 | | | Costruzione supermercato 1500 mq + edificio per ristorazione | | Default Value | | Running | euro | 11.10.2017 | | ILIG-LIGURIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 16030 | AVEGNO | Technical facilities | Via L. Da Vinci Ex Ekon | 10 - Information Phase | 15.01.2018 09:09 | 1206 | | | No | | | | | | euro |
| 304995 | | | Realizzazione opere civili e di linea tratta AV/AC Lotto Castagnola | | Default Value | | Running | euro | 21.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 15060 | FRACONALTO | Technical facilities | Da Pk 12+673,50 a Pk 16+275,50 | 10 - Information Phase | 15.01.2018 09:09 | 1205 | | | No | | | | | | euro |
| 304994 | | | Realizzazione opere civili e di linea tratta AV/AC Lotto Val Lemme | | Default Value | | Running | euro | 07.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 15060 | VOLTAGGIO | Technical facilities | Localita' diverse | 10 - Information Phase | 15.01.2018 09:09 | 1204 | | | No | | | | | | euro |
| 304993 | | | Realizzazione e gestione impianto cremazione salme project-financing | | Default Value | | Running | euro | 25.08.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 15050 | CASTELLAR GUIDOBONO | Technical facilities | Cimitero | 10 - Information Phase | 15.01.2018 09:09 | 1203 | | | No | | | | | | euro |
| 304992 | | | Risanamento conservativo restauro efficient energetico alloggi ERP | | Default Value | | Running | euro | 13.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 15033 | CASALE MONFERRATO | Residential houses | Via Leoni 7 | 10 - Information Phase | 15.01.2018 09:09 | 1202 | | | No | | | | | | euro |
| 304991 | | | Costruzione casellario n.4 presso cimitero | | Default Value | | Running | euro | 04.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 15033 | CASALE MONFERRATO | Technical facilities | Frazione Popolo | 10 - Information Phase | 15.01.2018 09:09 | 1201 | | | No | | | | | | euro |
| 304990 | | | Completamento edificio al rustico per 18 alloggi ERPS | | Default Value | | Running | euro | 29.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 14049 | NIZZA MONFERRATO | Residential houses | Via Piemonte Loc. Piandolce | 10 - Information Phase | 15.01.2018 09:09 | 1200 | | | No | | | | | | euro |
| 304989 | | | Completamento depositi interrati archivio di stato op edili ed impianti | | Default Value | | Running | euro | 06.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 13900 | BIELLA | | Via G. Arnulfo 15/a | 10 - Information Phase | 15.01.2018 09:09 | 1199 | | | No | | | | | | euro |
| 304988 | | | Adeguam completam ristrutt scuola primaria e infanzia Schiaparelli | | Default Value | | Running | euro | 15.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 13897 | OCCHIEPPO INFERIORE | | Via Roma 7 | 10 - Information Phase | 15.01.2018 09:09 | 1198 | | | No | | | | | | euro |
| 304987 | | | Lavori di messa in sicurezza permanente ex inceneritore | | Default Value | | Running | euro | 11.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 13100 | VERCELLI | Technical facilities | Strada Per Asigliano 6/8 | 10 - Information Phase | 15.01.2018 09:08 | 1197 | | | No | | | | | | euro |
| 304986-001 | | | HDB / Adeguamento ristrutt e riqualif reparto dialisi Ospedale Sant'Andrea | | Default Value | | Running | euro | 28.05.2019 | | IPIE-PIEMONTE | Stefano Ceriani | | | | | Opportunity | Halfen System Account | Italy | 13100 | VERCELLI | Medical facility | Corso Mario Abbiate 21 | 10 - Information Phase | 28.05.2019 16:13 | 1196 | | | No | No | | | | | euro |
| 304986 | | | Adeguamento ristrutt e riqualif reparto dialisi Ospedale Sant'Andrea | | Default Value | | Running | euro | 31.08.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 13100 | VERCELLI | Medical facility | Corso Mario Abbiate 21 | 10 - Information Phase | 15.01.2018 09:08 | 1196 | | | No | | | | | | euro |
| 304985 | | | Costruzione palazzina 9 appartamenti 10 box interrati | | Default Value | | Running | euro | 22.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12100 | CUNEO | Residential houses | Frazione Borgo San Giuseppe | 10 - Information Phase | 15.01.2018 09:08 | 1195 | | | No | | | | | | euro |
| 304984 | | | Costruzione edificio bifamiliare | | Default Value | | Running | euro | 22.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12100 | CUNEO | Residential houses | Via Civalleri | 10 - Information Phase | 15.01.2018 09:08 | 1194 | | | No | | | | | | euro |
| 304983 | | | Costruzione (demoric) palestra comunale copertura legno lamellare | | Default Value | | Running | euro | 14.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12040 | PRIOCCA | | Via Giardina | 10 - Information Phase | 15.01.2018 09:08 | 1193 | | | No | | | | | | euro |
| 304982 | | | Ristrutturazione ex casa di riposo per casa delle associazioni | | Default Value | | Running | euro | 28.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12030 | MONTA' | | Borgo Antico | 10 - Information Phase | 15.01.2018 09:08 | 1192 | | | No | | | | | | euro |
| 304981 | | | Ampliamento e restauro conservativo casa di riposo | | Default Value | | Running | euro | 13.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12030 | CAVALLERMAGGIORE | | Via Roma 168 | 10 - Information Phase | 15.01.2018 09:08 | 1191 | | | No | | | | | | euro |
| 304980 | | | Costruzione supermercato 1550 mq e 500 mq magazzino | | Default Value | | Running | euro | 07.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 12025 | DRONERO | Technical facilities | Piazzale Stazione 9 | 10 - Information Phase | 15.01.2018 09:08 | 1190 | | | No | | | | | | euro |
| 304979 | | | Demolizione e recupero edifici denominati Villette | | Default Value | | Running | euro | 29.09.2017 | | IVAL-VALLE D'AOSTA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 11100 | AOSTA | | Via Paravera 16 Area Cogne | 10 - Information Phase | 15.01.2018 09:08 | 1189 | | | No | | | | | | euro |
| 304978 | | | Recupero edificio Piccola Fucina c/o area industriale ex Cogne | | Default Value | | Running | euro | 01.09.2017 | | IVAL-VALLE D'AOSTA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 11100 | AOSTA | Technical facilities | Via Pravera 16 | 10 - Information Phase | 15.01.2018 09:08 | 1188 | | | No | | | | | | euro |
| 304977 | | | Ristrutturaz ed adeguam normativo edificio VRY.01 primo lotto | | Default Value | | Running | euro | 29.09.2017 | | IVAL-VALLE D'AOSTA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 11020 | VERRAYES | Industry building | Localita' Champagne | 10 - Information Phase | 15.01.2018 09:08 | 1187 | | | No | | | | | | euro |
| 304976 | | | Realizzazione rotatoria al km 107+700 | | Default Value | | Running | euro | 06.10.2017 | | IVAL-VALLE D'AOSTA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 11010 | SARRE | Technical facilities | S.S. 26 Della Valle D'Aosta | 10 - Information Phase | 15.01.2018 09:08 | 1186 | | | No | | | | | | euro |
| 304975 | | | Collegam linea Torino Ceres con rete RFI realizz fermata Grosseto | | Default Value | | Running | euro | 04.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | Technical facilities | Corso Grosseto | 10 - Information Phase | 15.01.2018 09:08 | 1185 | | | No | | | | | | euro |
| 304974 | | | Opere di completamento Cappella Della Santa Sindone | | Default Value | | Running | euro | 04.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | Technical facilities | Piazza San Giovanni | 10 - Information Phase | 15.01.2018 09:08 | 1184 | | | No | | | | | | euro |
| 304973 | | | Costruzione C.R.A.L. spogliatoi ristorante sale soci impianti sportivi | | Default Value | | Running | euro | 29.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | Corso G. Agnelli / Cosenza | 10 - Information Phase | 15.01.2018 09:08 | 1183 | | | No | | | | | | euro |
| 304972 | | | Ristrutturazione edificio ad uso residenziale | | Default Value | | Running | euro | 22.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | Residential houses | Via Isonzo 17 | 10 - Information Phase | 15.01.2018 09:08 | 1182 | | | No | | | | | | euro |
| 304971 | | | Costruzione (demoric) edificio 5 pft ad uso abitazione e 3 p interrati | | Default Value | | Running | euro | 22.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | Residential houses | Via Delle Alpi 8 | 10 - Information Phase | 15.01.2018 09:08 | 1181 | | | No | | | | | | euro |
| 304970 | | | Manut x recupero funz edifici scolastici circoscrizioni 7-8-1 Crocetta | | Default Value | | Running | euro | 13.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | Localita' diverse | 10 - Information Phase | 15.01.2018 09:08 | 1180 | | | No | | | | | | euro |
| 304969 | | | Manut straord ed adeguam Caserma Cavour per stazione Carabinieri | | Default Value | | Running | euro | 07.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | Corso Brunelleschi | 10 - Information Phase | 15.01.2018 09:08 | 1179 | | | No | | | | | | euro |
| 304968 | | | Risanam conserv facciate esterne palazzina Comando Caserma Cernaia | | Default Value | | Running | euro | 07.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | Via Cernaia 23 | 10 - Information Phase | 15.01.2018 09:08 | 1178 | | | No | | | | | | euro |
| 304967 | | | Manut straord convitto Umberto I x real convitto residenziale maschile | | Default Value | | Running | euro | 06.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | Via Bligny 1/bis | 10 - Information Phase | 15.01.2018 09:08 | 1177 | | | No | | | | | | euro |
| 304966 | | | Costruzione 2 nuove sale cinematografiche interrate presso cinema Ideal | | Default Value | | Running | euro | 25.08.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | Technical facilities | Corso G.B.Beccaria 4 | 10 - Information Phase | 15.01.2018 09:08 | 1176 | | | No | | | | | | euro |
| 304965 | | | Ampliamento e ristr centro sportivo campi erba sint pallone pressostatico | | Default Value | | Running | euro | 04.08.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | | Via Trecate 46 | 10 - Information Phase | 15.01.2018 09:08 | 1175 | | | No | | | | | | euro |
| 304964 | | | Costruzione palazzina 6 piani FT ad uso abitazione e box | | Default Value | | Running | euro | 04.08.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10100 | TORINO | Residential houses | Via S.Paolo 5/8 | 10 - Information Phase | 15.01.2018 09:08 | 1174 | | | No | | | | | | euro |
| 304963 | | | Riqualific edificio uso direzionale commerciale residenziale 8000 mc | | Default Value | | Running | euro | 06.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10098 | RIVOLI | Technical facilities | Corso Francia 10 | 10 - Information Phase | 15.01.2018 09:08 | 1173 | | | No | | | | | | euro |
| 304962 | | | Realizz nuova copertura metallica corpo centrale IIS Curie Vittorini | | Default Value | | Running | euro | 28.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10095 | GRUGLIASCO | | Corso Allamanno 130 | 10 - Information Phase | 15.01.2018 09:08 | 1172 | | | No | | | | | | euro |
| 304961 | | | Centro commerciale 8500 mq tot superm Crai 1500 mq negozi 450 p auto | | Default Value | | Running | euro | 13.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10080 | BUSANO | Technical facilities | S.P. 13 | 10 - Information Phase | 15.01.2018 09:08 | 1171 | | | No | | | | | | euro |
| 304960 | | | Realizzazione locali destinati all'assistenza sanitaria | | Default Value | | Running | euro | 20.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10078 | VENARIA | | Piazza Deledda | 10 - Information Phase | 15.01.2018 09:08 | 1170 | | | No | | | | | | euro |
| 304959 | | | Lavori per trasferimento scuola Nino Costa c/o ex nido Serena | | Default Value | | Running | euro | 20.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10064 | PINEROLO | | Via Podgora 22 | 10 - Information Phase | 15.01.2018 09:08 | 1169 | | | No | | | | | | euro |
| 304958 | | | Costruzione edificio scolastico per scuola elementare e materna | | Default Value | | Running | euro | 20.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10050 | VENAUS | | Via Antica Reale | 10 - Information Phase | 15.01.2018 09:08 | 1168 | | | No | | | | | | euro |
| 304957 | | | ENG 2K / Costruzione polo logistico | | Default Value | | Running | euro | 15.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10037 | TORRAZZA PIEMONTE | Industry building | S.P. 90 | 10 - Information Phase | 15.01.2018 09:08 | 1167 | | | No | | | | | | euro |
| 304956 | | | Costruzione 3 torri 140 appartam totale piastra commerciale 3300 mq | | Default Value | | Running | euro | 05.10.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10036 | SETTIMO TORINESE | Residential houses | Via Italia Ex Standa | 10 - Information Phase | 15.01.2018 09:08 | 1166 | | | No | | | | | | euro |
| 304955 | | | Messa in sicurezza SS Chivasso Caluso e realizzaz variante di Are' | | Default Value | | Running | euro | 14.09.2017 | | IPIE-PIEMONTE | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 10034 | CHIVASSO | Technical facilities | CALUSO | 10 - Information Phase | 15.01.2018 09:08 | 1165 | | | No | | | | | | euro |
| 304946-003 | | | HDB / COIMA / VIA MELCHIORRE GIOIA 22 MILANO | | Default Value | | Running | euro | 12.07.2019 | | ILOM-LOMBARDIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 20124 | Milano | Office building | melchiorre gioia 11 | 30 - Tender & Submission Phase | 12.07.2019 10:21 | | | | No | No | | | | | euro |
| 304839 | | | Costruzione edificio commerciale e OO UU | | Default Value | | Running | euro | 20.10.2017 | | IFRI-FRIULI VENEZIA GIULIA | Carlo Nusiner | | | | | Project | Halfen System Account | Italy | 33100 | UDINE | Technical facilities | Vie Cividale / Barcis | 10 - Information Phase | 11.01.2018 12:24 | 1164 | | | No | | | | | | euro |
| 304663 | | | Realizzazione impianto selezione e raccolta differenziata | | Default Value | | Running | euro | 15.12.2017 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62029 | TOLENTINO | Technical facilities | Localita' Piane Di Chienti | 10 - Information Phase | 09.01.2018 15:58 | 1163 | | | No | | | | | | euro |
| 304662 | | | Costruzione edificio temporaneo ad uso scolatico | | Default Value | | Running | euro | 07.12.2017 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62027 | SAN SEVERINO MARCHE | | Via L. D'Alessandro | 10 - Information Phase | 09.01.2018 15:58 | 1162 | | | No | | | | | | euro |
| 304661 | | | Costruzione (demoricostruzione) scuola Romolo Murri | | Default Value | | Running | euro | 01.12.2017 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 62020 | GUALDO | | Viale V. Veneto 16 | 10 - Information Phase | 09.01.2018 15:58 | 1161 | | | No | | | | | | euro |
| 304660 | | | Costruzione scuola per l'infanzia 4 sezioni 120 alunni | | Default Value | | Running | euro | 03.11.2017 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 60044 | FABRIANO | | Via Don Petruio Q.re Misericordia | 10 - Information Phase | 09.01.2018 15:58 | 1160 | | | No | | | | | | euro |
| 304659 | | | Costruzione nuovo polo scolastico terzo stralcio Riappalto Lavori | | Default Value | | Running | euro | 20.10.2017 | | IMAR-MARCHE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 60030 | MAIOLATI SPONTINI | | Localita' Moie | 10 - Information Phase | 09.01.2018 15:57 | 1159 | | | No | | | | | | euro |
| 304654 | | | Realizzazione centro cottura per la gestione refezione scolastica | | Default Value | | Running | euro | 02.11.2017 | | IMOL-MOLISE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 86039 | TERMOLI | Technical facilities | Via Dei Lecci | 10 - Information Phase | 09.01.2018 15:56 | 1154 | | | No | | | | | | euro |
| 304653 | | | Ricostruzione scuola primaria Mariele Ventre | | Default Value | | Running | euro | 07.12.2017 | | IMOL-MOLISE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67100 | L'AQUILA | | Via Antica Arischia Loc. Pettino | 10 - Information Phase | 09.01.2018 15:56 | 1153 | | | No | | | | | | euro |
| 304652 | | | Costruzione nuovo Comando Stazione Corpo Forestale Dello Stato | | Default Value | | Running | euro | 23.11.2017 | | IMOL-MOLISE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 67020 | FONTECCHIO | | Capoluogo | 10 - Information Phase | 09.01.2018 15:56 | 1152 | | | No | | | | | | euro |
| 304651 | | | Costruzione edifici commerciali no food prima fase OO UU | | Default Value | | Running | euro | 15.12.2017 | | IMOL-MOLISE | Amedeo Geraldi | | | | | Project | Halfen System Account | Italy | 65012 | CEPAGATTI | Technical facilities | Localita' Santa Filomena | 10 - Information Phase | 09.01.2018 15:56 | 1151 | | | No | | | | | | euro |
| 298006-004 | | | EDIFICIO BASE AEREA MILITARE SIGONELLA / CATANIA /GIUNTI | | Default Value | | Running | euro | 03.03.2020 | | ISIC-SICILIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 95032 | Catania | | X | 30 - Tender & Submission Phase | 03.03.2020 17:11 | | | | No | No | | | | | euro |
| 298006-003 | | | EDIFICIO BASE AEREA MILITARE SIGONELLA / CATANIA /HTA | | Default Value | | Running | euro | 17.09.2019 | | ISIC-SICILIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 95032 | Catania | | X | 10 - Information Phase | 17.09.2019 18:47 | | | | No | No | | | | | euro |
| 298006-002 | | | EDIFICIO BASE AEREA MILITARE SIGONELLA / CATANIA / HD | | Default Value | | Running | euro | 25.07.2019 | | ISIC-SICILIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 95032 | Catania | | X | 30 - Tender & Submission Phase | 25.07.2019 16:49 | | | | No | No | | | | 7.000,00 € | euro |
| 297256-002 | | | OSPEDALE S.CATALDO / TARANTO / GIUNTI | | Default Value | | Running | euro | 12.10.2018 | | IPUG-PUGLIA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 74100 | TARANTO | | * | 30 - Tender & Submission Phase | 12.10.2018 08:28 | | | | No | No | | | | | euro |
| 294816-002 | | | NOSEB scarl/OSPEDALE MONOPOLI/FASANO/HBT | | Default Value | | Running | euro | 29.11.2019 | | IPUG-PUGLIA | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 72010 | Fasano | Medical facility | -- | 10 - Information Phase | 29.11.2019 17:32 | | | | No | No | | | | | euro |
| 292632-001 | | | COSTRUZIONE RESIDENZA PER STUDENTI UNI ROMA TRE /giunti | | Default Value | | Running | euro | 10.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00146 | Roma | Residential houses | DELLA VASCA NAVALE | 30 - Tender & Submission Phase | 10.07.2019 17:00 | | | | No | No | | | | | euro |
| 291430-002 | | | Ampliamento Facolta' di Medicina e Psicologia Universita' Studi / GIUNTI | | Default Value | | Running | euro | 19.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00100 | ROMA | | Via Di Grottarossa 1035 | 30 - Tender & Submission Phase | 19.07.2019 08:46 | 583 | | | No | No | | | | | euro |
| 282500-002 | | | RESIDENZIALE SANTA PALOMBA / ROMA /RITENUTE PER MURATURE | | Default Value | | Running | euro | 31.07.2019 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00040 | Pomezia | | Via Nazionale | 30 - Tender & Submission Phase | 31.07.2019 10:37 | | | | No | No | | | | | euro |
| 275522-005 | | | REALIZZAZIONE STRUTTURE- UNI ROMA TRE / GIUNTI | | Default Value | | Running | euro | 23.07.2020 | | ILAZ-LAZIO | Amedeo Geraldi | | | | No | Opportunity | Halfen System Account | Italy | 00100 | ROMA | Educational facility | Via Ostiense 133 | 10 - Information Phase | 23.07.2020 15:55 | 1 | | | No | No | | | | | euro |
| 273051-003 | | | MANELLI / EX MANIFATTURA TABACCHI 2 (TECNOPOLO) / BOLOGNA / GROUT E CXL | | Default Value | | Running | euro | 24.09.2021 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | Infrastructural facility | VIA STALINGRADO | 40 - Realisation Phase | 24.09.2021 11:13 | | | | No | No | | | | | euro |
| 273051-002 | | | MANELLI / EX MANIFATTURA TABACCHI 2 (TECNOPOLO) / BOLOGNA / DETAN | | Default Value | | Running | euro | 06.07.2020 | | IEMI-EMILIA ROMAGNA | Andrea Piazzalunga | | | | No | Opportunity | Halfen System Account | Italy | 40100 | BOLOGNA | Infrastructural facility | VIA STALINGRADO | 40 - Realisation Phase | 06.07.2020 12:56 | | | | No | No | | | | | euro |
| 268531-002 | | | AEREOPORTO / ORLY / HL 41/41 FV CURVED | | Default Value | | Running | euro | 01.08.2019 | | IVEN-VENETO | Marco Testa | | | | No | Opportunity | Halfen System Account | France | 94390 | Orly aéroport | Infrastructural facility | -- | 10 - Information Phase | 01.08.2019 11:36 | | | | No | No | | | | | euro |
| 248744-001 | | | Costruzione nuovo supermercato Conad 4500 mq / HBT | | Default Value | | Running | euro | 24.01.2018 | | IEMI-EMILIA ROMAGNA | Diego Carminati | | | | | Opportunity | Halfen System Account | Italy | 47100 | FORLI' | Shopping center | Via Cava | 30 - Tender & Submission Phase | 24.01.2018 14:32 | | | | No | | | | | 1.000,00 € | euro |
| 243206-002 | | | ADEGUAMENTO PORTO GENOVA / HSD | | Default Value | | Running | euro | 16.07.2019 | | ILIG-LIGURIA | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 16121 | Genova | | X | 40 - Realisation Phase | 16.07.2019 10:21 | | | | No | No | | | | 7.619,00 € | euro |
| 238299-001 | | | HDB / Costruzione parcheggio interrato 4 piani 227 box 20 posti auto | | Default Value | | Running | euro | 21.07.2020 | | ILIG-LIGURIA | Stefano Ceriani | | | | No | Opportunity | Halfen System Account | Italy | 16032 | CAMOGLI | Infrastructural facility | Piazza Matteotti ex scalo ferroviario | 40 - Realisation Phase | 21.07.2020 16:07 | | | | No | No | | | | | euro |
| 238259-001 | | | Realizzaz nuovo incubatore di imprese e ricerca campo Biotecnologie / LOTTO 2 / GIUNTI | | Default Value | | Running | euro | 20.11.2019 | | IPIE-PIEMONTE | Diego Carminati | | | | No | Opportunity | Halfen System Account | Italy | 10100 | TORINO | Infrastructural facility | * | 20 - Planning Phase | 20.11.2019 15:22 | | | | No | No | | | | | euro |
| 238192-001 | | | Realizz piattaforma tecnologica europea centro multifunzionale / HBS | | Default Value | | Running | euro | 14.01.2019 | | ISAR-SARDEGNA | Carlo Nusiner | | | | | Opportunity | Halfen System Account | Italy | 07026 | OLBIA | Infrastructural facility | * | 40 - Realisation Phase | 14.01.2019 08:27 | | | | No | No | | | | | euro |
| 238110-001 | | | ISARCO / Costruz sottoattraversamento Fiume Isarco Galleria Base Brennero / FORTEZZA / DISTANZIATORI | | Default Value | | Running | euro | 14.10.2021 | | ITRE-TRENTINO ALTO ADIGE | Carlo Nusiner | | | | No | Opportunity | Halfen System Account | Italy | 39045 | FORTEZZA | Infrastructural facility | * | 30 - Tender & Submission Phase | 14.10.2021 14:56 | | | | No | No | | | | | euro |
| 237947-004 | | | Costruzione Nuovo Ospedale Ancona Sud / CANDELA COSTRUZIONI / FK5 | | Default Value | | Running | euro | 10.02.2021 | | IMAR-MARCHE | Anna Magri | | | | No | Opportunity | Halfen System Account | Italy | 60021 | CAMERANO | Infrastructural facility | Localita' Aspio | 10 - Information Phase | 10.02.2021 15:21 | | | | No | No | | | | | euro |